An enthusiastic and dedicated Technical Services Engineer/Project/Site Manager with extensive
experience in all areas of plant maintenance throughout the Petro-Chem. industry. A time served
Mechanical Fitter who has progressed into management to become a successful leader who is able to
develop and motivate others to achieve targets. I am a proactive individual with a logical and determined
approach with the ability to manage projects from conception through to a successful completion within
limited timescales and budgets. Widely travelled throughout Europe and the Middle East on both onshore
and offshore installations and enjoys performing effectively within a highly pressurised working
environment.
Objective
I am now looking to build on my extensive range of technical skills within the Petro-Chem. industry with a
suitably challenging role particularly in the Middle East, Asia and throughout Europe.
Career Summary
1986-date
PROJECT MANAGER (South Africa/Europe) – Koch Glitsch (Full time 2010 – Date)
 Responsible for the planning and execution of large contracts carried out in South Africa and
Europe with manpower in excess of 140 men and budgets exceeding £4.5m.
 Promoting and enforcing that all Safety guidelines are being met and strictly adhered to as per the
companies Safety Policy
 Leading a team of Superintendants, Supervisors, QA/QC and Site Agents and ensuring that each
individual is compliant in his role and realises his responsibilities and expectations.
 Working closely with the client and lead project executioners to control expenditure and maximize
performance with regards to meeting schedules and deadlines efficiently.
 Assessments of employees to guarantee suitability of employment within the organisation.
TECH ENGINEER- Koch-Glitsch (2002-2010)
 Successful completion of long and short term contracts in Dubai, Qatar, Bahrain, Saudi Arabia,
India, Malaysia, Brazil, Kazakhstan, and Lithuania and throughout the UK, Europe and
Scandinavia. Also offshore work in the Caspian Sea, North Sea and off Newfoundland Canada.
 Liaising with clients to ensure contracts are carried out effectively within their pre-determined
timescale.
 Advising and reviewing method statements and risk assessments to execute jobs efficiently and
safely. Daily Completion of Job safety Analysis to highlight and minimise any hazards.
 Reporting daily with clients’ management and engineers and submitting progress reports and
delivering detailed end of job reports with recommendations for future contracts.
 Resolving any technical queries which arise regarding all aspects of installation and modifications
to be carried out.
 Carrying out surveys and thorough inspections prior to installation to determine any shortfalls or
deviations from the drawings. Issuing new as built drawings as necessary.
 Responsible that all permitry is correct and being strictly adhered to. Checking isolations of all
vessels and columns prior to initial confined space entry.
Page 2 of 2
SITE MANAGER / SUPERINTENDANT- KIRSTALL (2005-2010)
 Responsible for the successful execution of numerous contracts throughout the UK and Europe
from pre-shutdown planning to final completion and sign off.
 Managing the safety and welfare of up to 100 employees per shift whilst adhering to all HASAW
guidelines and conforming to BS EN ISO 9001:2000 European standards.
 Liaising with clients to establish positive manufacturer and customer relations.
 Controlling and monitoring man-hours, budgets, shift patterns, extra work orders and devising
spreadsheets to contain all the relevant information.
 Carrying out tool box talks and motivating employees prior to all work, co-ordinating
accident investigations and issuing reports along with recommendations for safety
improvements.
 Assisting in work related training and breathing apparatus mask fitting tests.
 Issuing and overseeing the completion of QA documentation.
MECHANICAL FITTER / SUPERVISOR- KOCH-GLITSCH (1992-2002)
 Working as part of a team carrying out major revamps and installation of column and drum
internals on shutdown and emergency work throughout the UK, Europe and Scandinavia.
 All types of tray work and distributors including random packing, structured packing and
mist eliminators.
 Working to very fine tolerances using specialised tools and equipment including laser levels
and a variety of pneumatic tools.
 Carrying out isolation work to all vessels. Removal and reinstatement of pipe work and
valves with the use of craneage and lifting equipment.
MECHANICAL FITTER- CAMMELL LAIRD SHIPBUILDERS (1990-1992)
 Testing, fitting and flushing of the weapons hydraulics system.
 Commissioning of the reverse osmosis plant.
 Testing of the refrigeration units.
APPRENTICESHIP- MECHANICAL FITTER- ASSOCIATED OCTEL (1986-90)
 4 year apprenticeship gaining experience in the overhauling and replacement of mechanical
seals, gland packing, shafts and bearings.
 Overhauling rotary and reciprocating compressors.
 Refurbishing and replacement of plug, ball diaphragm and gate valves.
 Training in the use of Lathes, Milling machines, surface and pedestal grinders and all hand
tools.
KEY I.T SKILLS
 Word, Excel, PowerPoint, Microsoft Project, Outlook
SAFETY COURSES
VCA Safety Passport
CCNSG
Breathing Apparatus and H²S awareness
ECITB Supervisory Management Training & Development Scheme reg no. 4669293
Confined Space Awareness
Working at Heights
PERSONAL DETAILS
Date of Birth: 6
th
March 1970 Health: Excellent
Nationality: British
INTERESTS AND ACTIVITIES
Currently include: Golf, Football, Computer Studies and Reading.
REFERENCES ARE AVAILABLE ON REQUEST

Ian Entwistle CV

  • 1.
    Page 1 of2 CURRICULUM VITAE IAN JAMES ENTWISTLE 4 Bryony Way, Birkenhead, Merseyside, CH42 4LY Telephone: +447977013504 (mobile) Email: ian.entwistle@kochglitsch.com Professional Profile An enthusiastic and dedicated Technical Services Engineer/Project/Site Manager with extensive experience in all areas of plant maintenance throughout the Petro-Chem. industry. A time served Mechanical Fitter who has progressed into management to become a successful leader who is able to develop and motivate others to achieve targets. I am a proactive individual with a logical and determined approach with the ability to manage projects from conception through to a successful completion within limited timescales and budgets. Widely travelled throughout Europe and the Middle East on both onshore and offshore installations and enjoys performing effectively within a highly pressurised working environment. Objective I am now looking to build on my extensive range of technical skills within the Petro-Chem. industry with a suitably challenging role particularly in the Middle East, Asia and throughout Europe. Career Summary 1986-date PROJECT MANAGER (South Africa/Europe) – Koch Glitsch (Full time 2010 – Date)  Responsible for the planning and execution of large contracts carried out in South Africa and Europe with manpower in excess of 140 men and budgets exceeding £4.5m.  Promoting and enforcing that all Safety guidelines are being met and strictly adhered to as per the companies Safety Policy  Leading a team of Superintendants, Supervisors, QA/QC and Site Agents and ensuring that each individual is compliant in his role and realises his responsibilities and expectations.  Working closely with the client and lead project executioners to control expenditure and maximize performance with regards to meeting schedules and deadlines efficiently.  Assessments of employees to guarantee suitability of employment within the organisation. TECH ENGINEER- Koch-Glitsch (2002-2010)  Successful completion of long and short term contracts in Dubai, Qatar, Bahrain, Saudi Arabia, India, Malaysia, Brazil, Kazakhstan, and Lithuania and throughout the UK, Europe and Scandinavia. Also offshore work in the Caspian Sea, North Sea and off Newfoundland Canada.  Liaising with clients to ensure contracts are carried out effectively within their pre-determined timescale.  Advising and reviewing method statements and risk assessments to execute jobs efficiently and safely. Daily Completion of Job safety Analysis to highlight and minimise any hazards.  Reporting daily with clients’ management and engineers and submitting progress reports and delivering detailed end of job reports with recommendations for future contracts.  Resolving any technical queries which arise regarding all aspects of installation and modifications to be carried out.  Carrying out surveys and thorough inspections prior to installation to determine any shortfalls or deviations from the drawings. Issuing new as built drawings as necessary.  Responsible that all permitry is correct and being strictly adhered to. Checking isolations of all vessels and columns prior to initial confined space entry.
  • 2.
    Page 2 of2 SITE MANAGER / SUPERINTENDANT- KIRSTALL (2005-2010)  Responsible for the successful execution of numerous contracts throughout the UK and Europe from pre-shutdown planning to final completion and sign off.  Managing the safety and welfare of up to 100 employees per shift whilst adhering to all HASAW guidelines and conforming to BS EN ISO 9001:2000 European standards.  Liaising with clients to establish positive manufacturer and customer relations.  Controlling and monitoring man-hours, budgets, shift patterns, extra work orders and devising spreadsheets to contain all the relevant information.  Carrying out tool box talks and motivating employees prior to all work, co-ordinating accident investigations and issuing reports along with recommendations for safety improvements.  Assisting in work related training and breathing apparatus mask fitting tests.  Issuing and overseeing the completion of QA documentation. MECHANICAL FITTER / SUPERVISOR- KOCH-GLITSCH (1992-2002)  Working as part of a team carrying out major revamps and installation of column and drum internals on shutdown and emergency work throughout the UK, Europe and Scandinavia.  All types of tray work and distributors including random packing, structured packing and mist eliminators.  Working to very fine tolerances using specialised tools and equipment including laser levels and a variety of pneumatic tools.  Carrying out isolation work to all vessels. Removal and reinstatement of pipe work and valves with the use of craneage and lifting equipment. MECHANICAL FITTER- CAMMELL LAIRD SHIPBUILDERS (1990-1992)  Testing, fitting and flushing of the weapons hydraulics system.  Commissioning of the reverse osmosis plant.  Testing of the refrigeration units. APPRENTICESHIP- MECHANICAL FITTER- ASSOCIATED OCTEL (1986-90)  4 year apprenticeship gaining experience in the overhauling and replacement of mechanical seals, gland packing, shafts and bearings.  Overhauling rotary and reciprocating compressors.  Refurbishing and replacement of plug, ball diaphragm and gate valves.  Training in the use of Lathes, Milling machines, surface and pedestal grinders and all hand tools. KEY I.T SKILLS  Word, Excel, PowerPoint, Microsoft Project, Outlook SAFETY COURSES VCA Safety Passport CCNSG Breathing Apparatus and H²S awareness ECITB Supervisory Management Training & Development Scheme reg no. 4669293 Confined Space Awareness Working at Heights PERSONAL DETAILS Date of Birth: 6 th March 1970 Health: Excellent Nationality: British INTERESTS AND ACTIVITIES Currently include: Golf, Football, Computer Studies and Reading. REFERENCES ARE AVAILABLE ON REQUEST