1. 1
AR. BARKHA KASHILANI
1 ST SEM,
M.ARCH(LANDSCAPE)
SESSION - 2022-2023
P.I.A.D.S, NAGPUR
SHEET NO
SIGN
ASSIGNMENT TOPIC :
JOURNAL REVIEW
SEMINAR
2. city and culture |
2
AR. BARKHA KASHILANI
3 rd SEM,
M.ARCH(LANDSCAPE)
SESSION – 2023-2024
P.I.A.D.S, NAGPUR
SHEET NO
SIGN
TOPIC:
STREETSCAPES IN PUNE
SEMINAR
PLACEMAKING
EXPERIENCE
• A sustainable project that
promotes cycling, walking and
use of public transport.
• The design equitably divides
the street space into various
linear zones, creating diverse
yet intergrated multi utility
zones which are contextual to
the abutting land use.
• JM Road project is the recipient
of IIA Award for Excellence in
Architecture 2018 in Landscape
Category.
• HUDCO Award 2018
• WRI Connect Karo Award 2018
(Universal Accessibility)
PROJECT FACTS
Client
Pune Municipal Corporation
Location
Pune, Maharashtra
Length
1.87Km and ROW 36 m
Services Provided
Streetscape Design
Sustainable Mobility
Place Making
Category
Streetscape
Public Realm
Fig 1 – JM road
3. 3
AR. BARKHA KASHILANI
3 rd SEM,
M.ARCH(LANDSCAPE)
SESSION – 2023-2024
P.I.A.D.S, NAGPUR
SHEET NO
SIGN
STREETSCAPES IN PUNE
SEMINAR
JM ROAD LENGTH – 1.87 KM ROW - 36 MT
ONE WAY TRAFFIC MOVEMENT 2 MV LANE + BUS LANE + SERVIE LANE
CELEBRATES THE SPIRIT
OFFERING FANTASTIC POTENTIAL TO BEING REDEVELOPED AS
DESTINATION SPACES ON THE LINES OF THE ORCHARD ROAD IN
SINGAPORE
THE
VISION
4. 4
AR. BARKHA KASHILANI
3 rd SEM,
M.ARCH(LANDSCAPE)
SESSION – 2023-2024
P.I.A.D.S, NAGPUR
SHEET NO
SIGN
STREETSCAPES IN PUNE
SEMINAR
• Prime arterial road – majorly commercial – with many
high end shops.
• Along with Sambhaji Park, a large public garden that
abuts the road, it has many schools and colleges
located in its close proximity.
• This imparts a yound and vibrant character to it.
• Known for majestic Rain trees ( Samnea Saman).
• Covers the entire stretch providing shade throughout
the year.
CHARACTERISTIC OF ROAD:
Walkway Parking Carriageway Parking Walkway Park
Commercial
building
line
Row varies 23 mts to 32 mts
EXISTING SECTION
Fig 2 – Existing section of JM road
Fig 3– Uses of street
Fig 4 – Existing condition of JM road
5. Pedestrian
crossing
Green
buffter
along
the
road
Segregated
cycle
track
with
Green
buffter
along
the
road
5
AR. BARKHA KASHILANI
3 rd SEM,
M.ARCH(LANDSCAPE)
SESSION – 2023-2024
P.I.A.D.S, NAGPUR
SHEET NO
SIGN
STREETSCAPES IN PUNE
SEMINAR
PROPOSAL:
JM ROAD LENGTH – 1.87 KM
ROW - 36 MT
• Equitably divided the linear street
space distinct zones, creating
various types of multi utility zones
which are contextual to the
abutting land use.
• Wide continuous walking street on
both side of the road with cycle a
cycle track on one side defines the
new friendly character of the road.
• New design elements for
pedestrian safety and security
includes:
Sidewalks
Safe junctions
Barrier free environment
Segregated cycle tracks
Plaza in front of park entries
Vending spaces
Active gathering spaces
Multimodal plaza
Vibrant public space THE VISION Fig 6 – Proposed conceptual
6. 6
AR. BARKHA KASHILANI
3 rd SEM,
M.ARCH(LANDSCAPE)
SESSION – 2023-2024
P.I.A.D.S, NAGPUR
SHEET NO
SIGN
STREETSCAPES IN PUNE
SEMINAR
PROPOSAL:
Walkway
Cycle
track
2.5
mts
Muz
/
parking
Bus lane
Vendor
Walkway
Park
Commercial
building
edge
Park
edge
Motorised
vehicles lane
Cycle
track
2.5
mts
PROPOSED
SECTION Fig 9 – Proposed section
• The main challenges for the development included
maintaining Right of Way (ROW) by procurement of space
for commercial establishment.
• So as to follow a seamless movement form path to the
shops in regard of revised ROW from 30 mts to 36 mts
and conversion of perpendicular parking to parallel
parking hence optimizing ROW section for incorporating
other functions.
Fig 7 – JM road before Fig 8 – JM road after
Before After
7. 7
AR. BARKHA KASHILANI
3 rd SEM,
M.ARCH(LANDSCAPE)
SESSION – 2023-2024
P.I.A.D.S, NAGPUR
SHEET NO
SIGN
STREETSCAPES IN PUNE
SEMINAR
Fig 10– Snippets from the newly built road
• A new multiutility zone near Sambhaji nagar
garden is an active space that integrates
existing trees with seating areas, play zone
for kids and planting.
• The design is inspired by the elements of park
itself finding expressions in new stepped
seaters and pergolas.
• These elements are used all along the road to
creat a unified design language.
• All three junctions on the road are detailed in
such a way so that apart for the vehicles,
there were easy ingress – egress points for
the pedestrians as well as the cyclists.
• New pedestrian plazas have been designed
by reclaiming large areas near Bata Chowk
and Bharve Chowk.
FEATURES:
8. 8
AR. BARKHA KASHILANI
3 rd SEM,
M.ARCH(LANDSCAPE)
SESSION – 2023-2024
P.I.A.D.S, NAGPUR
SHEET NO
SIGN
STREETSCAPES IN PUNE
SEMINAR
• The new design of the street while encouraging cycling, walking and use of
public transport envisions the side streets as vibrant public spaces in the life of
the city.
• Removal or relocation of many of the existing incompatible functions and
elements for the idea of creating a safe public space along the vehicular road
like shifting of feeder pillars into multi utility zones and light poles while addition
of others to complete NMT network are integral part of the proposal.
Fig 11– Snippets from the newly built road
FEATURES:
Before
After
9. 9
AR. BARKHA KASHILANI
3 rd SEM,
M.ARCH(LANDSCAPE)
SESSION – 2023-2024
P.I.A.D.S, NAGPUR
SHEET NO
SIGN
STREETSCAPES IN PUNE
SEMINAR
Before
After
PLACEMAKING OUTCOME
• Ensuring equitable distribution of
space for improving universal
accessibility for all, carbing out
pedestrian space, and maintaining
continuity and ease of movement
has made J.M road a popular and
vibrant public space.
• After the on ground roll of the
project, there has been a
perceptible increase in the number
people of all age groups and all
strata of income groups using this
public space of the city as a “hang
out” space rather than an only
“walk through” one.
• More cyclists have started using
the cycle trace and the demand for
cycle stands have increased.
Fig 12– Snippets from the newly built road