BUILDING CONSTRUCTION II
PROJECT 1 : SKELETAL CONSTRUCTION (TEMPORARY BUS SHELTER)
LEE HO JUN 1007P10652
FRANCIS YEOW 1101A12395
TEH CHIE YANG 0324947
LAI TZE XIUAN 0318056
TAY JING HENG 0325230
RIVARTHINI A/P CHELIYEN 0325880
TUTOR : MOHAMED RIZAL MOHAMED
CONTENTS
1.0 DESIGN DEVELOPMENT
2.0 FINAL DESIGN
3.0 CONSTRUCTION : -
- 3.1 STRUCTURAL COMPONENTS
- 3.2 MATERIALITY
- 3.3 JOINTS
4.0 LOAD & STRESS TEST
5.0 ACCESS
6.0 SITE CONTEXT
7.0 CONCLUSION
APPENDIX
REFERENCE
INTRODUCTION
The design of skeletal structure require all components to be
able to withstand forces that may be subjected to itself during its
useful lifetime. This includes dead and live loads. Alongside
mechanical forces, timber structures also require a certain level of
stiffness depending on its design and functional intention to prevent
bending of timber components over time that eventually leads to
structural failure.
Timber design construction is the proper evaluation of timber
or wood elements from bottom up. This means that the structure is
considered from the foundation up to its roof or highest point of the
structure. The careful selection of timber elements, joints and
connections and subsequently the evaluation of their performance as
structural systems is the focus of this project.
1.0 DESIGN DEVELOPMENT
Our group chose Triangular Prism and Cuboid
as concept form of our structure, as it’s
flexible in transformation in form.
Our design started off aiming on providing
maximal access and ventilation. However, in
order to fulfill such features, we had to
minimize the use of columns which is not
going to be structurally stable of loading of
force and resistance of external weather
effects.
Hence, in order to achieve both stability and
architectural features, we added a span of wall
across the structure, continuing all the way from
the roof, acting as the wall, providing more than
enough shelter for users.
Nonetheless, our design was heavily occupied
with unnecessary components, making the
structure being stressed of its excessive dead
load.
In the end, we could achieve the design
with satisfying stability by removing
unnecessary components, decreasing its
dead load. Columns were aligned
parallel, bracings reinforced and floor
framings were applied for better
transfer and capacity of load.
3.0 CONSTRUCTION
3.0 STRUCTURAL COMPONENTS
4mm thick aluminium composite with mineral wool core rod panel.
Dimension - (4000 X 2200 X 4)mm
Timber rafters, 10 pieces at 350mm c/c
Dimension : (2100 X 47 X 100)mm
Front primary timber column
Dimension : (200 X 200)mm
Timber beam (acts as purlins), 2 pieces
Dimension : (200 X 200 X 3600)mm
Rear primary timber column
Dimension : (200 X 200 X )mm
Roof bracing support
Dimension : ( )mm
Secondary timber column(to counter bending moment)
Dimension : (100 X 100 X )mm
Primary column bracing
Dimension : ( )mm
Timber floor beam
Dimension : ( )mm
Plywood floor decking
Strip dimension :
Dimension : ( )mm
Timber floor joist system with floor jack studs
Joist dimension :
Jack stud dimension : ( )mm
Polycarbonate infill wall (non-structural)
Dimension:
2.0 TECHNICAL DRAWINGS
FLOOR PLAN
RIGHT ELEVATIONLEFT ELEVATION
2.0 TECHNICAL DRAWINGS
FRONT ELEVATION REAR ELEVATION
3.1 MATERIALITY Aluminium Composite Roof
A type of flat panel that consists of two thin aluminium sheets
bonded to a non-aluminium core
Advantages: More susceptible to denting, being a softer metal,
lightweight and quick to install
Disadvantage: High in cost
Polycarbonate
A synthetic resin linked through carbonate groups
Advantages: Able to withstand massive force, high resistance
to heat and cold, ultraviolet blockage
Disadvantages: Not very resistant to scratching, marring, and
abrasive surfaces
Timber wood
Commonly used to form a part of a building.
Advantages: Stable, durable, decay resistance, easy to handle
Disadvantages: Vulnerable to pest attacks
Pinewood
Softwood that can be used as structure.
Advantages: Easy to work, strength to weight ratio relatively high
Disadvantages: Easy to crack
Plywood
Versatile building material made from thin layers of wood veneer
glued together.
Advantages: Cheap, resistant to cracking, aesthetic
Disadvantages: Susceptible to water damage
3.1 MATERIALITY
GYPSUM POWDER
Advantages:
Lightweight, durable,
water resistant
Disadvantages:
Cannot be used in moist
situations, not suitable
as exterior finish
NAILS
Advantages:
Holds the building
elements together
Disadvantages:
Consumes time and effort
to hammer into the wood
manually
SCREWS
Advantages:
Much easier to control, highly
effective on all joints
Disadvantages:
Less aesthetic appearance
L BRACKET
Advantages:
Increases load bearing capacity
of an element
Disadvantages:
Adds weight to the structure,
bulky, degrades over time
3.3 JOINT DETAILS
ROOF
3.3 JOINT DETAILS
ROOF
3.3 JOINT DETAILS
COLUMN TO FLOOR
3.3 JOINT DETAILS
FLOOR DECKING
3.3 JOINT DETAILS
FLOOR FRAMING
3.3 JOINT DETAILS
FOUNDATION
4.0 LOAD AND STRESS DIAGRAMS
The red arrows represent the downward forces
acting on the building components whilst the
blue arrows represent the upwards reactionary
force. In the primary structure, the weight of
the roof both live and dead is entirely
supported by the primary and secondary timber
columns. The weight of the floor system is
supported by lateral joining methods to the
floor beam which in turn is laterally supported
by the primary columns.
CONSTRUCTION PROGRESS
Primary Structure and Secondary Structure
The axonometric view on the left is a 3D representation of our temporary
bus shelter ‘s main structural components. First and foremost, the
construction of the floor system was made, followed by the installation of
the 4 primary columns to the floor system. Next came the installation of the
roof beam to the columns and thereafter, the roof rafters.
The secondary structure includes the two smaller timber columns, made to
counter bending moments, the roof bracing, to provide little vertical
support and to prevent bending of the roof due to live loads, and the
column bracing, to grant stability and keep the distance between the front
and rear primary columns constant
Column Bracing Construction
The two diagonal members are joined by bolts and nuts. They provide
greater strength and stability than a rigid frame by resisting horizontal
forces .
Floor System Construction
Sawn timber were made to scale and installed as floor joists. The joining
involved cutting half lap joints into the floor beam and the joists and
subsequently, using steel L-hangers to hold the joists in place.
CONSTRUCTION PROGRESS
Roof System Construction
The installation of the rafters was done after the roof beam was
fixed in position. A combination of double birdsmouth joint on the
beam and a half lap joint on the rafter secured the rafter in the x and
y axis of motion. The final step was nailing the rafters in to secure
the z axis of motion.
Plywood Floor Decking Installation
The floor decks consists of strips of plywood. These strips are nailed at
each corner and at points that coincide with the floor joist beneath.
Applying of Roof Rafters
Roof rafter is the primary part of the roof system where it also acts as
media between roof and column/main structure, also a start of roof
system. We made a careful measurement of angles and lengths
between components as there will be other more components
following parts of roof coming along
CONSTRUCTION PROGRESS
Bench Installation
The wooden bench is a length of even wood supported vertically by two
wooden stumps that are nailed to the it and stabilised with L-hangers.
Wall System
The infill wall is made of polycarbonate material
and fixed onto the structure via nailing unto the
primary and secondary columns.
APPENDIX
APPENDIX
REFERENCES
1. D. K. Ching, F. 1991. Building Construction Illustrated(2nd ed.). Van Nostrand Reinhold
2. Dr. Wong Tuck Meng. 2011. Guidebook for Timber Flooring in Malaysia. Malaysian Timber Council
3. Scot Simpson. 2012. Complete Book of Framing(2nd ed.). RSMeans
4. American Institution of Timber Construction. 2005. Timber Construction Manual. Hoboken
5. Subir K. Sarkar. 2012. Construction Technology. Oxford University Press

More Related Content

What's hot

Bulk active
Bulk activeBulk active
Bulk active
DanishPathan7
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
Grace Henry
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
Rithika Ravishankar
 
kkr 2
kkr 2kkr 2
High Rise Building- Taipei 101, Taiwan
High Rise Building- Taipei 101, TaiwanHigh Rise Building- Taipei 101, Taiwan
High Rise Building- Taipei 101, Taiwan
PRANJAL MORE
 
Post lintel structre
Post lintel structrePost lintel structre
B tech individual report
B tech individual reportB tech individual report
B tech individual report
ong93
 
High Rise Building Structure Systems Types
High Rise Building Structure Systems TypesHigh Rise Building Structure Systems Types
High Rise Building Structure Systems Types
Mazin Elbashkatib
 
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORTBUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
Darshiini Vig
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 Report
Wilden How
 
Indian Standard
Indian StandardIndian Standard
Indian Standard
aman kumar
 
plastic modular formwork
plastic modular formworkplastic modular formwork
plastic modular formwork
zhen fang
 
Scaffolding 101
Scaffolding 101Scaffolding 101
Scaffolding 101
Mitten Siding
 
L9 envelope pt.1
L9 envelope pt.1L9 envelope pt.1
L9 envelope pt.1
chuhonsan
 
Construction Techniques Of framed Industrial Building by Shabaz Khan
Construction Techniques Of framed Industrial Building by Shabaz KhanConstruction Techniques Of framed Industrial Building by Shabaz Khan
Construction Techniques Of framed Industrial Building by Shabaz Khan
Shabaz Khan
 
Tensile structures for architects
Tensile structures for architectsTensile structures for architects
Tensile structures for architects
Deepak KUMAR
 
Vellodrome Stadium ,London : Long span Structure
Vellodrome Stadium ,London : Long span StructureVellodrome Stadium ,London : Long span Structure
Vellodrome Stadium ,London : Long span Structure
DanishPathan7
 
Composite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and ArchitectureComposite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and Architecture
Mimi Alguidano
 
Building Construction II - Project 1
Building Construction II - Project 1Building Construction II - Project 1
Building Construction II - Project 1
Bolin Loong
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)
ong93
 

What's hot (20)

Bulk active
Bulk activeBulk active
Bulk active
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
kkr 2
kkr 2kkr 2
kkr 2
 
High Rise Building- Taipei 101, Taiwan
High Rise Building- Taipei 101, TaiwanHigh Rise Building- Taipei 101, Taiwan
High Rise Building- Taipei 101, Taiwan
 
Post lintel structre
Post lintel structrePost lintel structre
Post lintel structre
 
B tech individual report
B tech individual reportB tech individual report
B tech individual report
 
High Rise Building Structure Systems Types
High Rise Building Structure Systems TypesHigh Rise Building Structure Systems Types
High Rise Building Structure Systems Types
 
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORTBUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
BUILDING CONSTRUCTION 2 ; PROJECT 1 REPORT
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 Report
 
Indian Standard
Indian StandardIndian Standard
Indian Standard
 
plastic modular formwork
plastic modular formworkplastic modular formwork
plastic modular formwork
 
Scaffolding 101
Scaffolding 101Scaffolding 101
Scaffolding 101
 
L9 envelope pt.1
L9 envelope pt.1L9 envelope pt.1
L9 envelope pt.1
 
Construction Techniques Of framed Industrial Building by Shabaz Khan
Construction Techniques Of framed Industrial Building by Shabaz KhanConstruction Techniques Of framed Industrial Building by Shabaz Khan
Construction Techniques Of framed Industrial Building by Shabaz Khan
 
Tensile structures for architects
Tensile structures for architectsTensile structures for architects
Tensile structures for architects
 
Vellodrome Stadium ,London : Long span Structure
Vellodrome Stadium ,London : Long span StructureVellodrome Stadium ,London : Long span Structure
Vellodrome Stadium ,London : Long span Structure
 
Composite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and ArchitectureComposite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and Architecture
 
Building Construction II - Project 1
Building Construction II - Project 1Building Construction II - Project 1
Building Construction II - Project 1
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)
 

Similar to B con 2

MDC.pptx
MDC.pptxMDC.pptx
MDC.pptx
ssuserc0bf9b
 
Bcon final.compressed
Bcon final.compressedBcon final.compressed
Bcon final.compressed
Alexis Wei
 
BUILDING TECH 5_04.pptx
BUILDING TECH 5_04.pptxBUILDING TECH 5_04.pptx
BUILDING TECH 5_04.pptx
LawrenceMartinez7
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
HARITHASIVAGURU
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
Jy Chong
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
Ong Shi Hui
 
Prefabricated wall panel
Prefabricated wall panelPrefabricated wall panel
Prefabricated wall panel
SAHIL KUMAR
 
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
mustafa hussain
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building construction
hlksd
 
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
mustafa hussain
 
building construction and material
building construction and materialbuilding construction and material
building construction and material
suzain ali
 
Tokyo Sky Tree
Tokyo Sky TreeTokyo Sky Tree
Tokyo Sky Tree
Sai akhil jayavarapu
 
Bcon
BconBcon
Bcon
YowHue
 
Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1
Ow Cong
 
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
IRJET Journal
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
Ian Toisa
 
Building Construction II - Skeletal Construction
Building Construction II - Skeletal ConstructionBuilding Construction II - Skeletal Construction
Building Construction II - Skeletal Construction
chiwunloi
 
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
IRJET Journal
 
composite structure.pptx
composite structure.pptxcomposite structure.pptx
composite structure.pptx
MichaelAlexander991289
 
Industrial construction
Industrial constructionIndustrial construction
Industrial construction
Charlie Gupta
 

Similar to B con 2 (20)

MDC.pptx
MDC.pptxMDC.pptx
MDC.pptx
 
Bcon final.compressed
Bcon final.compressedBcon final.compressed
Bcon final.compressed
 
BUILDING TECH 5_04.pptx
BUILDING TECH 5_04.pptxBUILDING TECH 5_04.pptx
BUILDING TECH 5_04.pptx
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
 
Prefabricated wall panel
Prefabricated wall panelPrefabricated wall panel
Prefabricated wall panel
 
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building construction
 
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
 
building construction and material
building construction and materialbuilding construction and material
building construction and material
 
Tokyo Sky Tree
Tokyo Sky TreeTokyo Sky Tree
Tokyo Sky Tree
 
Bcon
BconBcon
Bcon
 
Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1
 
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
Analysis of Multi-Storey Steel Structure with Different Infills and Steel Bra...
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
 
Building Construction II - Skeletal Construction
Building Construction II - Skeletal ConstructionBuilding Construction II - Skeletal Construction
Building Construction II - Skeletal Construction
 
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
 
composite structure.pptx
composite structure.pptxcomposite structure.pptx
composite structure.pptx
 
Industrial construction
Industrial constructionIndustrial construction
Industrial construction
 

Recently uploaded

Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
NgcHiNguyn25
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
taiba qazi
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 

Recently uploaded (20)

Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 

B con 2

  • 1. BUILDING CONSTRUCTION II PROJECT 1 : SKELETAL CONSTRUCTION (TEMPORARY BUS SHELTER) LEE HO JUN 1007P10652 FRANCIS YEOW 1101A12395 TEH CHIE YANG 0324947 LAI TZE XIUAN 0318056 TAY JING HENG 0325230 RIVARTHINI A/P CHELIYEN 0325880 TUTOR : MOHAMED RIZAL MOHAMED
  • 2. CONTENTS 1.0 DESIGN DEVELOPMENT 2.0 FINAL DESIGN 3.0 CONSTRUCTION : - - 3.1 STRUCTURAL COMPONENTS - 3.2 MATERIALITY - 3.3 JOINTS 4.0 LOAD & STRESS TEST 5.0 ACCESS 6.0 SITE CONTEXT 7.0 CONCLUSION APPENDIX REFERENCE
  • 3. INTRODUCTION The design of skeletal structure require all components to be able to withstand forces that may be subjected to itself during its useful lifetime. This includes dead and live loads. Alongside mechanical forces, timber structures also require a certain level of stiffness depending on its design and functional intention to prevent bending of timber components over time that eventually leads to structural failure. Timber design construction is the proper evaluation of timber or wood elements from bottom up. This means that the structure is considered from the foundation up to its roof or highest point of the structure. The careful selection of timber elements, joints and connections and subsequently the evaluation of their performance as structural systems is the focus of this project.
  • 4. 1.0 DESIGN DEVELOPMENT Our group chose Triangular Prism and Cuboid as concept form of our structure, as it’s flexible in transformation in form. Our design started off aiming on providing maximal access and ventilation. However, in order to fulfill such features, we had to minimize the use of columns which is not going to be structurally stable of loading of force and resistance of external weather effects. Hence, in order to achieve both stability and architectural features, we added a span of wall across the structure, continuing all the way from the roof, acting as the wall, providing more than enough shelter for users. Nonetheless, our design was heavily occupied with unnecessary components, making the structure being stressed of its excessive dead load. In the end, we could achieve the design with satisfying stability by removing unnecessary components, decreasing its dead load. Columns were aligned parallel, bracings reinforced and floor framings were applied for better transfer and capacity of load.
  • 6. 3.0 STRUCTURAL COMPONENTS 4mm thick aluminium composite with mineral wool core rod panel. Dimension - (4000 X 2200 X 4)mm Timber rafters, 10 pieces at 350mm c/c Dimension : (2100 X 47 X 100)mm Front primary timber column Dimension : (200 X 200)mm Timber beam (acts as purlins), 2 pieces Dimension : (200 X 200 X 3600)mm Rear primary timber column Dimension : (200 X 200 X )mm Roof bracing support Dimension : ( )mm Secondary timber column(to counter bending moment) Dimension : (100 X 100 X )mm Primary column bracing Dimension : ( )mm Timber floor beam Dimension : ( )mm Plywood floor decking Strip dimension : Dimension : ( )mm Timber floor joist system with floor jack studs Joist dimension : Jack stud dimension : ( )mm Polycarbonate infill wall (non-structural) Dimension:
  • 7. 2.0 TECHNICAL DRAWINGS FLOOR PLAN RIGHT ELEVATIONLEFT ELEVATION
  • 8. 2.0 TECHNICAL DRAWINGS FRONT ELEVATION REAR ELEVATION
  • 9. 3.1 MATERIALITY Aluminium Composite Roof A type of flat panel that consists of two thin aluminium sheets bonded to a non-aluminium core Advantages: More susceptible to denting, being a softer metal, lightweight and quick to install Disadvantage: High in cost Polycarbonate A synthetic resin linked through carbonate groups Advantages: Able to withstand massive force, high resistance to heat and cold, ultraviolet blockage Disadvantages: Not very resistant to scratching, marring, and abrasive surfaces
  • 10. Timber wood Commonly used to form a part of a building. Advantages: Stable, durable, decay resistance, easy to handle Disadvantages: Vulnerable to pest attacks Pinewood Softwood that can be used as structure. Advantages: Easy to work, strength to weight ratio relatively high Disadvantages: Easy to crack Plywood Versatile building material made from thin layers of wood veneer glued together. Advantages: Cheap, resistant to cracking, aesthetic Disadvantages: Susceptible to water damage 3.1 MATERIALITY
  • 11. GYPSUM POWDER Advantages: Lightweight, durable, water resistant Disadvantages: Cannot be used in moist situations, not suitable as exterior finish NAILS Advantages: Holds the building elements together Disadvantages: Consumes time and effort to hammer into the wood manually SCREWS Advantages: Much easier to control, highly effective on all joints Disadvantages: Less aesthetic appearance L BRACKET Advantages: Increases load bearing capacity of an element Disadvantages: Adds weight to the structure, bulky, degrades over time
  • 18. 4.0 LOAD AND STRESS DIAGRAMS The red arrows represent the downward forces acting on the building components whilst the blue arrows represent the upwards reactionary force. In the primary structure, the weight of the roof both live and dead is entirely supported by the primary and secondary timber columns. The weight of the floor system is supported by lateral joining methods to the floor beam which in turn is laterally supported by the primary columns.
  • 19. CONSTRUCTION PROGRESS Primary Structure and Secondary Structure The axonometric view on the left is a 3D representation of our temporary bus shelter ‘s main structural components. First and foremost, the construction of the floor system was made, followed by the installation of the 4 primary columns to the floor system. Next came the installation of the roof beam to the columns and thereafter, the roof rafters. The secondary structure includes the two smaller timber columns, made to counter bending moments, the roof bracing, to provide little vertical support and to prevent bending of the roof due to live loads, and the column bracing, to grant stability and keep the distance between the front and rear primary columns constant Column Bracing Construction The two diagonal members are joined by bolts and nuts. They provide greater strength and stability than a rigid frame by resisting horizontal forces . Floor System Construction Sawn timber were made to scale and installed as floor joists. The joining involved cutting half lap joints into the floor beam and the joists and subsequently, using steel L-hangers to hold the joists in place.
  • 20. CONSTRUCTION PROGRESS Roof System Construction The installation of the rafters was done after the roof beam was fixed in position. A combination of double birdsmouth joint on the beam and a half lap joint on the rafter secured the rafter in the x and y axis of motion. The final step was nailing the rafters in to secure the z axis of motion. Plywood Floor Decking Installation The floor decks consists of strips of plywood. These strips are nailed at each corner and at points that coincide with the floor joist beneath. Applying of Roof Rafters Roof rafter is the primary part of the roof system where it also acts as media between roof and column/main structure, also a start of roof system. We made a careful measurement of angles and lengths between components as there will be other more components following parts of roof coming along
  • 21. CONSTRUCTION PROGRESS Bench Installation The wooden bench is a length of even wood supported vertically by two wooden stumps that are nailed to the it and stabilised with L-hangers. Wall System The infill wall is made of polycarbonate material and fixed onto the structure via nailing unto the primary and secondary columns.
  • 24. REFERENCES 1. D. K. Ching, F. 1991. Building Construction Illustrated(2nd ed.). Van Nostrand Reinhold 2. Dr. Wong Tuck Meng. 2011. Guidebook for Timber Flooring in Malaysia. Malaysian Timber Council 3. Scot Simpson. 2012. Complete Book of Framing(2nd ed.). RSMeans 4. American Institution of Timber Construction. 2005. Timber Construction Manual. Hoboken 5. Subir K. Sarkar. 2012. Construction Technology. Oxford University Press