AUTOMATIC FIRE
EXTINGUISHING SYSTEM
AT RECORD ROOM,
DHA KARACHI OFFICE
12/30/13

COPYRIGHT@2007 PARAGON

1
Project Goals
 Secure

the record room from fire.
 Optimum performance of proposed
system.
 Minimize project completion time.

12/30/13

COPYRIGHT@2007 PARAGON
2
Description
 Installation

of Automatic fire
Extinguishing system, cylinder based
to secure record room from fire.
 Proposed system is based on Fire
Alarm system instead of Automatic Gas
Extinguishers.
FOR MORE INFO...

See the documentation or product catalogues.

12/30/13

COPYRIGHT@2007 PARAGON
3
Competitive Analysis
 Pioneer

in introducing low cost
technologies in the field of Safety &
Security.
 Not completely depending on foreign
manufacturers.
 Maximum utilization of components
available in local market or
manufactured in country.
12/30/13

COPYRIGHT@2007 PARAGON
4
Technology
 Conventional

Fire Alarm system to be
used for Fire detection. Integration of
instrumentation with Fire Cylinders and
detection system to activate Gas
Extinguishing system.
 All installation and products are
compliance with NFPA, ISO, ASTM, ANSI
standards
12/30/13

COPYRIGHT@2007 PARAGON
5
Team/Resources
 Following

resources will be allocated to
this project
– People
Full Time Supervisor with the team of skilled
technicians.
Project coordinator to communicate between
customer and our management for all
technical and commercial issues.
– Technical Support & after sale services.

12/30/13

COPYRIGHT@2007 PARAGON
6
Procedures
 Normally

regular projects of this type are
based on automatic fire suppression
system or automatic BCF cylinders.
 Our proposed solution is a mix & match of
conventional fire alarm system and normal
BCF cylinders.
FOR MORE INFO...

See the documentation or product catalogues.

12/30/13

COPYRIGHT@2007 PARAGON
7
Procedures
 Fire

suppression system based on
FM 200 Gas, which is most
expensive fire extinguishing gas.
 We can achieve our goal with the low
cost BCF gas.
FOR MORE INFO...

See the documentation or product catalogues.

12/30/13

COPYRIGHT@2007 PARAGON
8
Procedures
 Re-filling

of BCF cylinders whenever
required will be economical and easy
to manage.
 Easy operation, low maintenance
cost, user friendly, no high tech
equipments,
FOR MORE INFO...

See the documentation or product catalogues.

12/30/13

COPYRIGHT@2007 PARAGON
9
Components / Products

12/30/13

COPYRIGHT@2007 PARAGON
10
Components / Products

12/30/13

COPYRIGHT@2007 PARAGON
11
Components / Products

12/30/13

COPYRIGHT@2007 PARAGON
12
Components / Products

12/30/13

COPYRIGHT@2007 PARAGON
13
Components / Products

12/30/13

COPYRIGHT@2007 PARAGON
14
Schedule
 Review

high-level schedule milestones here

Electrical wiring
Piping & Instrumentation
Final Installation

Day 01

Day 07

Day 20

FOR MORE INFO...

Detailed Work schedule will be submitted before
commencement of work.

12/30/13

COPYRIGHT@2007 PARAGON
15

Day 30
Expected Status
 High-level

overview of progress against

schedule
– On-track in wiring job.
– Behind in piping work due to less working
hours or work to be done in nights.
– Ahead in final Installation
 Expected

delays due to low geared inter
office processing as measured in pre and
post tendering activities.

12/30/13

COPYRIGHT@2007 PARAGON
16
Related Documents
 Design

Layout with schematic
drawings.
 Final As-Built Drawing.
 Catalogues / Leaflet of Components.
 Maintenance manuals and user
training.
12/30/13

COPYRIGHT@2007 PARAGON
17

Automatic fire extinguishing system

  • 1.
    AUTOMATIC FIRE EXTINGUISHING SYSTEM ATRECORD ROOM, DHA KARACHI OFFICE 12/30/13 COPYRIGHT@2007 PARAGON 1
  • 2.
    Project Goals  Secure therecord room from fire.  Optimum performance of proposed system.  Minimize project completion time. 12/30/13 COPYRIGHT@2007 PARAGON 2
  • 3.
    Description  Installation of Automaticfire Extinguishing system, cylinder based to secure record room from fire.  Proposed system is based on Fire Alarm system instead of Automatic Gas Extinguishers. FOR MORE INFO... See the documentation or product catalogues. 12/30/13 COPYRIGHT@2007 PARAGON 3
  • 4.
    Competitive Analysis  Pioneer inintroducing low cost technologies in the field of Safety & Security.  Not completely depending on foreign manufacturers.  Maximum utilization of components available in local market or manufactured in country. 12/30/13 COPYRIGHT@2007 PARAGON 4
  • 5.
    Technology  Conventional Fire Alarmsystem to be used for Fire detection. Integration of instrumentation with Fire Cylinders and detection system to activate Gas Extinguishing system.  All installation and products are compliance with NFPA, ISO, ASTM, ANSI standards 12/30/13 COPYRIGHT@2007 PARAGON 5
  • 6.
    Team/Resources  Following resources willbe allocated to this project – People Full Time Supervisor with the team of skilled technicians. Project coordinator to communicate between customer and our management for all technical and commercial issues. – Technical Support & after sale services. 12/30/13 COPYRIGHT@2007 PARAGON 6
  • 7.
    Procedures  Normally regular projectsof this type are based on automatic fire suppression system or automatic BCF cylinders.  Our proposed solution is a mix & match of conventional fire alarm system and normal BCF cylinders. FOR MORE INFO... See the documentation or product catalogues. 12/30/13 COPYRIGHT@2007 PARAGON 7
  • 8.
    Procedures  Fire suppression systembased on FM 200 Gas, which is most expensive fire extinguishing gas.  We can achieve our goal with the low cost BCF gas. FOR MORE INFO... See the documentation or product catalogues. 12/30/13 COPYRIGHT@2007 PARAGON 8
  • 9.
    Procedures  Re-filling of BCFcylinders whenever required will be economical and easy to manage.  Easy operation, low maintenance cost, user friendly, no high tech equipments, FOR MORE INFO... See the documentation or product catalogues. 12/30/13 COPYRIGHT@2007 PARAGON 9
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
    Schedule  Review high-level schedulemilestones here Electrical wiring Piping & Instrumentation Final Installation Day 01 Day 07 Day 20 FOR MORE INFO... Detailed Work schedule will be submitted before commencement of work. 12/30/13 COPYRIGHT@2007 PARAGON 15 Day 30
  • 16.
    Expected Status  High-level overviewof progress against schedule – On-track in wiring job. – Behind in piping work due to less working hours or work to be done in nights. – Ahead in final Installation  Expected delays due to low geared inter office processing as measured in pre and post tendering activities. 12/30/13 COPYRIGHT@2007 PARAGON 16
  • 17.
    Related Documents  Design Layoutwith schematic drawings.  Final As-Built Drawing.  Catalogues / Leaflet of Components.  Maintenance manuals and user training. 12/30/13 COPYRIGHT@2007 PARAGON 17