Assignment 4: VoIP Part 4 (Risk Register)
Utilizing the Delphi technique, your team constructed the following risks register the VoIP project containing the risk, the likelihood of its occurrence on a scale of 1 (least likely) to 5 (most likely), and the potential negative impact on the project on the same scale. In addition, they recommended the appropriate response and identified its type for one of the risks identified.
#
Risk
Likelihood (1-5)
Impact
(1-5)
Response Type
Response
1
Project Delayed due to lack of resources
3
5
2
Project runs out of funds before completion
1
5
3
Users reject new system
2
2
4
Defective Hardware
1
5
5
New government regulations introduced during deployment increase the cost of running VoIP
2
3
6
Yearly renewal fee issued on the legacy system due to delay of over 30 days in deployment of the new system
1
4
Mitigation
Schedule check 30 days before project deadline to determine if action needs to be taken to avoid delay. Decision tree will be utilized.
Write a three to five (3-5) page paper in which you:
1. Explain risk management and its associated activities and defend the need for a risk management plan.
2. Describe the Delphi technique used to identify risks and infer on types of projects where this technique is most accurate.
3. Examine the four (4) types of risk response (i.e., avoidance, acceptance, transference, and mitigation) and determine the appropriate situation where each should be used.
4. Complete the table with the risk response type (i.e., avoidance, acceptance, transference, and mitigation) and a description of the response.
5. Create a decision tree with the software of your choice to address risk number 6. Assume that when you check the schedule on day 60 of the project, it becomes evident that two (2) additional engineers are needed to ensure on-time completion of the project. The engineers cost $25,000 each and a fee of $120,000 is issued by the legacy provider. The probability of completing the project on time is as follows: With the current personnel – 60%; With one (1) engineer – 80%; With both engineers – 98%.
6. Explain the methodology utilized to create a decision tree and recommend the appropriate action to take based on your decision tree from criterion 5.
7. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
· Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
· Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
· Include the decision tree created in your chosen software. The complete ...
Assignment 4 VoIP Part 4 (Risk Register)Utilizing the Delphi .docx
1. Assignment 4: VoIP Part 4 (Risk Register)
Utilizing the Delphi technique, your team constructed the
following risks register the VoIP project containing the risk, the
likelihood of its occurrence on a scale of 1 (least likely) to 5
(most likely), and the potential negative impact on the project
on the same scale. In addition, they recommended the
appropriate response and identified its type for one of the risks
identified.
#
Risk
Likelihood (1-5)
Impact
(1-5)
Response Type
Response
1
Project Delayed due to lack of resources
3
5
2
Project runs out of funds before completion
1
5
3
Users reject new system
2
2
2. 4
Defective Hardware
1
5
5
New government regulations introduced during deployment
increase the cost of running VoIP
2
3
6
Yearly renewal fee issued on the legacy system due to delay of
over 30 days in deployment of the new system
1
4
Mitigation
Schedule check 30 days before project deadline to determine if
action needs to be taken to avoid delay. Decision tree will be
utilized.
Write a three to five (3-5) page paper in which you:
1. Explain risk management and its associated activities and
defend the need for a risk management plan.
2. Describe the Delphi technique used to identify risks and infer
on types of projects where this technique is most accurate.
3. Examine the four (4) types of risk response (i.e., avoidance,
acceptance, transference, and mitigation) and determine the
appropriate situation where each should be used.
4. Complete the table with the risk response type (i.e.,
avoidance, acceptance, transference, and mitigation) and a
description of the response.
5. Create a decision tree with the software of your choice to
address risk number 6. Assume that when you check the
schedule on day 60 of the project, it becomes evident that two
3. (2) additional engineers are needed to ensure on-time
completion of the project. The engineers cost $25,000 each and
a fee of $120,000 is issued by the legacy provider. The
probability of completing the project on time is as follows:
With the current personnel – 60%; With one (1) engineer –
80%; With both engineers – 98%.
6. Explain the methodology utilized to create a decision tree and
recommend the appropriate action to take based on your
decision tree from criterion 5.
7. Use at least two (2) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
· Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and references
must follow APA or school-specific format. Check with your
professor for any additional instructions.
· Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
· Include the decision tree created in your chosen software. The
completed decision tree must be imported into the Word
document before the paper is submitted.
The specific course learning outcomes associated with this
assignment are:
· Examine the human resource factors that can impact project
management.
· Summarize how the PMBOK® process groups and knowledge
areas are involved throughout the project life cycle.
· Compare and contrast the sources and mitigating factors of
project risk.
· Use project management and graphic software to plan and
manage a project throughout the project life cycle.
· Use technology and information resources to research issues in
IT project management.
4. · Write clearly and concisely about issues in IT project
management using proper writing mechanics and technical style
conventions
Grading for this assignment will be based on answer quality,
logic / organization of the paper, and language and writing
skills, using the following rubric.
Assignment 4: VoIP Part 4 (Risk Register)
Criteria
Unacceptable
Below 70% F
Fair
70-79% C
Proficient
80-89% B
Exemplary
90-100% A
1. Explain risk management and its associated activities and
defend the need for a risk management plan.
Weight: 10%
Did not submit or incompletely explained risk management and
its associated activities and did not submit or incompletely
defended the need for a risk management plan.
Partially explained risk management and its associated activities
and partially defended the need for a risk management plan.
Satisfactorily explained risk management and its associated
activities and satisfactorily defended the need for a risk
management plan.
Thoroughly explained risk management and its associated
activities and thoroughly defended the need for a risk
management plan.
2. Describe the Delphi technique used to identify risks and infer
on types of projects where this technique is most accurate.
5. Weight: 10%
Did not submit or incompletely described the Delphi technique
used to identify risks and did not submit or incompletely
inferred on types of projects where this technique is most
accurate.
Partially described the Delphi technique used to identify risks
and partially inferred on types of projects where this technique
is most accurate.
Satisfactorily described the Delphi technique used to identify
risks and satisfactorily inferred on types of projects where this
technique is most accurate.
Thoroughly described the Delphi technique used to identify
risks and thoroughly inferred on types of projects where this
technique is most accurate.
3. Examine the four (4) types of risk response (i.e., avoidance,
acceptance, transference, and mitigation) and determine the
appropriate situation where each should be used.
Weight: 10%
Did not submit or incompletely examined the four (4) types of
risk response and did not submit or incompletely determined the
appropriate situation where each should be used.
Partially examined the four (4) types of risk response and
partially determined the appropriate situation where each should
be used.
Satisfactorily examined the four (4) types of risk response and
satisfactorily determined the appropriate situation where each
should be used.
Thoroughly examined the four (4) types of risk response and
thoroughly determined the appropriate situation where each
should be used.
4. Complete the table with the risk response type (i.e.,
avoidance, acceptance, transference, and mitigation) and a
description of the response.
Weight: 15%
Did not submit or incompletely completed the table with the
risk response type and a description of the response.
6. Partially completed the table with the risk response type and a
description of the response.
Satisfactorily completed the table with the risk response type
and a description of the response.
Thoroughly completed the table with the risk response type and
a description of the response.
5. Create a decision tree with the software of your choice to
address risk number 6 of the provided information.
Weight: 20%
Did not submit or incompletely created a decision tree with the
software of your choice to address risk number 6 of the
provided information.
Partially created a decision tree with the software of your
choice to address risk number 6 of the provided information.
Satisfactorily created a decision tree with the software of your
choice to address risk number 6 of the provided information.
Thoroughly created a decision tree with the software of your
choice to address risk number 6 of the provided information.
6. Explain the methodology utilized to create a decision tree and
recommend the appropriate action to take based on your
decision tree from criterion 5.
Weight: 20%
Did not submit or incompletely explained the methodology
utilized to create a decision tree and did not submit or
incompletely recommended the appropriate action to take based
on your decision tree from criterion 5.
Partially explained the methodology utilized to create a decision
tree and partially recommended the appropriate action to take
based on your decision tree from criterion 5.
Satisfactorily explained the methodology utilized to create a
decision tree and satisfactorily recommended the appropriate
action to take based on your decision tree from criterion 5.
Thoroughly explained the methodology utilized to create a
decision tree and thoroughly recommended the appropriate
action to take based on your decision tree from criterion 5.
7. 2 references
7. Weight: 5%
No references provided
Does not meet the required number of references; some or all
references poor quality choices.
Meets number of required references; all references high quality
choices.
Exceeds number of required references; all references high
quality choices.
8. Clarity, writing mechanics, and formatting requirements
Weight: 10%
More than 6 errors present
5-6 errors present
3-4 errors present
0-2 errors present
Assignment 3: VoIP Part 3 (Quality)
Suppose the VoIP project sponsor wants you to present the
project to the board of directors. Particularly, the sponsor would
like you to discuss the quality of the project. It is worth noting
that during the deployment of the VoIP system the quality
control team tracked forty (40) of the deployments. The
following problems were documented:
· Five (5) of the deployments experienced delays due to the
unique configuration of the office space which required
modification to install the proper wiring.
· Twelve (12) of the users called the help desk to get additional
training on the new system.
· Two (2) of the new devices were defective.
Prepare a fifteen to twenty (15-20) slide digital presentation
with the software of your choice (e.g., PowerPoint, Google
slides, Prezi, etc.) in which you:
1. Explain quality and its importance to project success.
2. Explain quality management planning.
3. Contrast quality assurance and quality control.
8. 4. Describe the different quality activities involved in this
project and each of their outcomes.
5. Describe Pareto diagrams and their use in project
management.
6. Present the data in the provided scenario using a Pareto
diagram (Use the software of your choosing to prepare the
diagram).
7. Use appropriate key points and / or graphics to professionally
convey the information.
8. Include presenter notes to explain each slide.
9. Use at least two (2) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
· Include the title of the assignment, the student’s name, the
professor’s name, the course title, and the date in the
presentation.
· Include the references used in the assignment in the
presentation.
· Import charts, graphs, and / or the Pareto diagram into the
presentation. The completed works must be imported into the
presentation.
The specific course learning outcomes associated with this
assignment are:
· Explain and defend the various quality factors in project
quality.
· Use technology and information resources to research issues in
IT project management.
· Write clearly and concisely about issues in IT project
management using proper writing mechanics and technical style
conventions.
Grading for this assignment will be based on answer quality,
logic / organization of the paper, and language and writing
skills, using the following rubric.
9. Assignment 3: VoIP Part 3 (Quality)
Criteria
Unacceptable
Below 70% F
Fair
70-79% C
Proficient
80-89% B
Exemplary
90-100% A
1. Explain quality and its importance to project success.
Weight: 10%
Did not submit or incompletely explained quality and its
importance to project success.
Partially explained quality and its importance to project
success.
Satisfactorily explained quality and its importance to project
success.
Thoroughly explained quality and its importance to project
success.
2. Explain quality management planning.
Weight: 10%
Did not submit or incompletely explained quality management
planning.
Partially explained quality management planning.
Satisfactorily explained quality management planning.
Thoroughly explained quality management planning.
3. Contrast quality assurance and quality control.
Weight: 10%
Did not submit or incompletely contrasted quality assurance and
quality control.
Partially contrasted quality assurance and quality control.
Satisfactorily contrasted quality assurance and quality control.
Thoroughly contrasted quality assurance and quality control.
4. Describe the different quality activities involved in this
10. project and each of their outcomes.
Weight: 15%
Did not submit or incompletely described the different quality
activities involved in this project and each of their outcomes.
Partially described the different quality activities involved in
this project and each of their outcomes.
Satisfactorily described the different quality activities involved
in this project and each of their outcomes.
Thoroughly described the different quality activities involved in
this project and each of their outcomes.
5. Describe Pareto diagrams and their use in project
management.
Weight: 10%
Did not submit or incompletely described Pareto diagrams and
their use in project management.
Partially described Pareto diagrams and their use in project
management.
Satisfactorily described Pareto diagrams and their use in project
management.
Thoroughly described Pareto diagrams and their use in project
management.
6. Present the data in the provided scenario using a Pareto
diagram (Use the software of your choosing to prepare the
diagram).
Weight: 20%
Did not submit or incompletely presented the data in the
provided scenario using a Pareto diagram.
Partially presented the data in the provided scenario using a
Pareto diagram.
Satisfactorily presented the data in the provided scenario using
a Pareto diagram.
Thoroughly presented the data in the provided scenario using a
Pareto diagram.
7. Use appropriate key points and / or graphics to professionally
convey the information.
Weight: 10%
11. Did not submit or incompletely used appropriate key points and
/ or graphics to professionally convey the information.
Partially used appropriate key points and / or graphics to
professionally convey the information.
Satisfactorily used appropriate key points and / or graphics to
professionally convey the information.
Thoroughly used appropriate key points and / or graphics to
professionally convey the information.
8. Include presenter notes to explain each slide.
Weight: 10%
Did not submit or incompletely included presenter notes to
explain each slide.
Partially included presenter notes to explain each slide.
Satisfactorily included presenter notes to explain each slide.
Thoroughly included presenter notes to explain each slide.
9. 2 references
Weight: 5%
No references provided
Does not meet the required number of references; some or all
references poor quality choices.
Meets number of required references; all references high quality
choices.
Exceeds number of required references; all references high
quality choices.
Assignment 2: VoIP Part 2 (Gantt and PERT Charts)
Update the Microsoft Project file you created in Assignment 1:
VoIP Part 2 (Work Breakdown Structure) with the following
changes:
· Set property values to denote progress in at least fifteen (15)
of the line items.
· Set properties so that at least one (1) of the main tasks is
behind schedule.
12. · Create a Gantt chart for your project.
· Take a screenshot of the Gantt chart which can later be
inserted into your written paper.
· Create a PERT diagram that identifies the critical path.
· Take a screenshot of the PERT chart which can later be
inserted into your written paper.
Note: If you need a tutorial on taking a screen shot, visit one of
the following locations: (PC users: http://www.take-a-
screenshot.org/) (MAC users: http://binged.it/1xriOcN).
Write a two to three (2-3) page paper in which you:
1. Compare and contrast the information that one receives from
a Gantt chart, versus that of a PERT diagram.
2. Examine the advantages of using a Gantt chart over a PERT
chart and vice versa. Determine when it is appropriate to use
one over the other. Justify your response.
3. Assess the importance of the critical path in project
management.
4. Insert the screenshots of the Gantt and PERT charts you
created based on the provided criteria. Elaborate on the status of
the VoIP deployment project based on the updated information.
Note: The graphical representations do not count toward the
overall page requirement.
5. Use at least two (2) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
· Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and references
must follow APA or school-specific format. Check with your
professor for any additional instructions.
· Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
· Import completed diagrams, charts, or screenshots into the
13. Word document before the paper is submitted.
The specific course learning outcomes associated with this
assignment are:
· Distinguish among various time management techniques such
as CPM, Gantt charts, and the PERT method.
· Use project management and graphic software to plan and
manage a project throughout the project life cycle.
· Use technology and information resources to research issues in
IT project management.
· Write clearly and concisely about issues in IT project
management using proper writing mechanics and technical style
conventions.
Grading for this assignment will be based on answer quality,
logic / organization of the paper, and language and writing
skills, using the following rubric.
Assignment 2: VoIP Part 2 (Gantt and PERT Charts)
Criteria
Unacceptable
Below 70% F
Fair
70-79% C
Proficient
80-89% B
Exemplary
90-100% A
1. Compare and contrast the information that one receives from
a Gantt chart, versus that of a PERT diagram.
Weight: 20%
Did not submit or incompletely compared and contrasted the
information that one receives from a Gantt chart, versus that of
a PERT diagram.
Partially compared and contrasted the information that one
receives from a Gantt chart, versus that of a PERT diagram.
Satisfactorily compared and contrasted the information that one
14. receives from a Gantt chart, versus that of a PERT diagram.
Thoroughly compared and contrasted the information that one
receives from a Gantt chart, versus that of a PERT diagram.
2. Examine the advantages of using a Gantt chart over a PERT
chart and vice versa. Determine when it is appropriate to use
one over the other. Justify your response.
Weight: 20%
Did not submit or incompletely examined the advantages of
using a Gantt chart over a PERT chart and vice versa. Did not
submit or incompletely determined when it is appropriate to use
one over the other. Did not submit or incompletely justified
your response.
Partially examined the advantages of using a Gantt chart over a
PERT chart and vice versa. Partially determined when it is
appropriate to use one over the other. Partially justified your
response.
Satisfactorily examined the advantages of using a Gantt chart
over a PERT chart and vice versa. Satisfactorily determined
when it is appropriate to use one over the other. Satisfactorily
justified your response.
Thoroughly examined the advantages of using a Gantt chart
over a PERT chart and vice versa. Thoroughly determined when
it is appropriate to use one over the other. Thoroughly justified
your response.
3. Assess the importance of the critical path in project
management.
Weight: 20%
Did not submit or incompletely assessed the importance of the
critical path in project management.
Partially assessed the importance of the critical path in project
management.
Satisfactorily assessed the importance of the critical path in
project management.
Thoroughly assessed the importance of the critical path in
project management.
4. Insert the screenshots of the Gantt and PERT charts you
15. created based on the provided criteria. Elaborate on the status of
the VoIP deployment project based on the updated information.
Weight: 25%
Did not submit or incompletely inserted the screenshots of the
Gantt and PERT charts you created based on the provided
criteria. Did not submit or incompletely elaborated on the status
of the VoIP deployment project based on the updated
information.
Partially inserted the screenshots of the Gantt and PERT charts
you created based on the provided criteria. Partially elaborated
on the status of the VoIP deployment project based on the
updated information.
Satisfactorily inserted the screenshots of the Gantt and PERT
charts you created based on the provided criteria. Satisfactorily
elaborated on the status of the VoIP deployment project based
on the updated information.
Thoroughly inserted the screenshots of the Gantt and PERT
charts you created based on the provided criteria. Thoroughly
elaborated on the status of the VoIP deployment project based
on the updated information.
5. 2 references
Weight: 5%
No references provided
Does not meet the required number of references; some or all
references poor quality choices.
Meets number of required references; all references high quality
choices.
Exceeds number of required references; all references high
quality choices.
6. Clarity, writing mechanics, and formatting requirements
Weight: 10%
More than 6 errors present
5-6 errors present
3-4 errors present
0-2 errors present