Line balancing aims at grouping the facilities or workers in an efficient pattern in order to obtain an optimum or most efficient balance of the capacities and flows of the production or assembly processes.
This presentation is on the based on case study done by using line balancing technique which a prime concern for an industrial engineer. This shows an efficient line balancing for a better production line performed at Runner Automobiles Ltd, Bangladesh.
Planned Maintenance is a proactive approach to maintenance that focuses on minimizing the downtime and costs associated with machine breakdowns. As one of the key pillars of the TPM Excellence framework, the goal of Planned Maintenance is to have trouble-free equipment that produce defect-free products.
Planned Maintenance achieves and sustains availability of machines at an optimum maintenance cost, reduces spares inventory, and improves reliability and maintainability of machines.
In this presentation developed by our JIPM-certified TPM Instructor, you will learn how to plan and organize the Plan Maintenance activities to strengthen the capabilities of your Maintenance department. It clarifies the roles of the Operations and Maintenance departments in supporting the TPM initiative and provides step-by-step guidance on the implementation of the Planned Maintenance pillar.
LEARNING OBJECTIVES
1. Understand what is Planned Maintenance and why it is important in TPM implementation
2. Acquire knowledge on how to plan and organize Planned Maintenance activities
3. Describe the seven implementation steps of Planned Maintenance
4. Gain knowledge on the JIPM TPM Excellence Criteria for Planned Maintenance
CONTENTS
1. Introduction to Planned Maintenance
2. What is Planned Maintenance?
3. Planning & Organizing for Planned Maintenance
4. The 7 Steps of Planned Maintenance
5. JIPM TPM Excellence Criteria for Planned Maintenance
To download this complete presentation, goto:
https://www.oeconsulting.com.sg/training-presentations
When working for Petrobras at PRSI (Pasadena Refining System Inc.) I had this opportunity to share my experience as a Maintenance Manager in Brazil with PRSI operators and maintenance crew.
This presentation is on the based on case study done by using line balancing technique which a prime concern for an industrial engineer. This shows an efficient line balancing for a better production line performed at Runner Automobiles Ltd, Bangladesh.
Planned Maintenance is a proactive approach to maintenance that focuses on minimizing the downtime and costs associated with machine breakdowns. As one of the key pillars of the TPM Excellence framework, the goal of Planned Maintenance is to have trouble-free equipment that produce defect-free products.
Planned Maintenance achieves and sustains availability of machines at an optimum maintenance cost, reduces spares inventory, and improves reliability and maintainability of machines.
In this presentation developed by our JIPM-certified TPM Instructor, you will learn how to plan and organize the Plan Maintenance activities to strengthen the capabilities of your Maintenance department. It clarifies the roles of the Operations and Maintenance departments in supporting the TPM initiative and provides step-by-step guidance on the implementation of the Planned Maintenance pillar.
LEARNING OBJECTIVES
1. Understand what is Planned Maintenance and why it is important in TPM implementation
2. Acquire knowledge on how to plan and organize Planned Maintenance activities
3. Describe the seven implementation steps of Planned Maintenance
4. Gain knowledge on the JIPM TPM Excellence Criteria for Planned Maintenance
CONTENTS
1. Introduction to Planned Maintenance
2. What is Planned Maintenance?
3. Planning & Organizing for Planned Maintenance
4. The 7 Steps of Planned Maintenance
5. JIPM TPM Excellence Criteria for Planned Maintenance
To download this complete presentation, goto:
https://www.oeconsulting.com.sg/training-presentations
When working for Petrobras at PRSI (Pasadena Refining System Inc.) I had this opportunity to share my experience as a Maintenance Manager in Brazil with PRSI operators and maintenance crew.
The International Journal of Engineering & Science is aimed at providing a platform for researchers, engineers, scientists, or educators to publish their original research results, to exchange new ideas, to disseminate information in innovative designs, engineering experiences and technological skills. It is also the Journal's objective to promote engineering and technology education. All papers submitted to the Journal will be blind peer-reviewed. Only original articles will be published.
How To Fix The Key Not Detected Issue In Mercedes CarsIntegrity Motorcar
Experiencing a "Key Not Detected" problem in your Mercedes? Don’t take it for granted. Go through this presentation to find out the exact nature of the issue you are dealing with. Have your vehicle checked by a certified professional if necessary.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
Your VW's camshaft position sensor is crucial for engine performance. Signs of failure include engine misfires, difficulty starting, stalling at low speeds, reduced fuel efficiency, and the check engine light. Prompt inspection and replacement can prevent further damage and keep your VW running smoothly.
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...Import Motorworks
Learn how to respond when the red temperature light flashes in your VW with this presentation. From checking coolant levels to seeking professional help, follow these steps promptly to prevent engine damage and ensure safety on the road.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingLancer Service
Discover why your Porsche 911 headlights might flicker out unexpectedly. From aging bulbs to electrical gremlins and moisture mishaps, we're delving into the reasons behind the blackout. Stay tuned to illuminate the road ahead and ensure your lights shine bright for safer journeys.
Learn why monitoring your Mercedes' Exhaust Back Pressure (EBP) sensor is crucial. Understand its role in engine performance and emission reduction. Discover five warning signs of EBP sensor failure, from loss of power to increased emissions. Take action promptly to avoid costly repairs and maintain your Mercedes' reliability and efficiency.
2. COMPANY PROFILE
Office / Factory Address: Eicher Engines -
A unit of TAFE Motors and Tractor
Ltd, Itarana Road, Alwar – 301001,
Rajasthan
Product: Automotive Engines
Stationary Engines
Agro / Industrial Engines
Year of Establishment: 1959
3. TMTL Engines Division is a unit of TAFE Motors and Tractors
Limited(TMTL) with Alwar, Rajasthan, India, as its manufacturing
base. TMTL is a wholly owned subsidiary of Tractors and Farm
Equipment Limited (TAFE), part of Chennai based
Amalgamations Group, which is one of India’s largest light
engineering conglomerates.
The TMTL Engines’ Alwar plant at Rajasthan, India, produces a
wide range of air and water cooled engines in the brand name
of EICHER ENGINES (upto 45 kVA) and TMTL ENGINES (62.5 kVA
and above), which carter to a wide range of automotive and
stationary applications and has an existing customer base of
over 700,000 spread across various segments
4. INTRODUCTION TO LINE
BALANCING
The main objective when it comes to the balancing of an assembly
line is the distribution of tasks among the stations to equalize the
workload between stations along the line.
Line balancing aims at grouping the facilities or workers in an
efficient pattern in order to obtain an optimum or most efficient
balance of the capacities and flows of the production or assembly
processes.
Task allocation of each worker was achieved by assembly line
balancing to increase an assembly efficiency and productivity.
5. OBJECTIVE OF LINE BALANCING
Line balancing technique is used to:
To manage the workloads among assemblers.
To identify the location of bottleneck
To reduce production cost.
To improve productivity and efficiency of existing layout.
To decrease man power required in the assembly line.
6. ASSEMBLY LINES
Assembly lines include single-model assembly lines, mixed-model
assembly lines and multi model assembly lines. There are different
layouts of the different assembly lines and different assembly lines
may be operated differently.
Single model assembly line
Multi model assembly line
Mixed model assembly line
7. TERMS IN LINE BALANCING
Cycle time
Takt Time
Tolerance time
Takt overdue
Idle time
Productivity
8. ENGINES
Single cylinder assembly works for three types of engines used for different purposes.
AUTO ENGINE – For tractor use
ESG ENGINE – For genset use
NC ENGINE – For agriculture use.
9. METHODOLOGY
Introduction Current State Analysis Future State Mapping Verification and validation
of the system.
Project initiation
Problem definition
Area of focus
Observation at line
Observation at
stations
Evaluation of current
line balance
Theoretical study
Interview
Data mining
Time study
Determination and
elimination of wastes
Line balancing
Operator planning
Layout planning
Theoretical study
Interview
Evaluation of proposed
system
Recommendation for
future
Project conclusion
10. AUTO ENGINE – ACTIVITY LIST
Processes Time
Put crank shaft in engine 43
Fit crank shaft in engine 92
Calibrate crank shaft & fill engine card 51
Fit crank gear 55
Fit idler and oil pump gear 48
Fit governor flange 12
Total Time (Seconds) 301
11. ESG ENGINE – ACTIVITY LIST
Processes Time
Put crank shaft in engine 43
Fit crank shaft in engine 92
Calibrate crank shaft & fill engine card 42
Fit crank gear 53
Fit PD gear 49
Fit oil ring & governor flange 30
Total Time (Seconds) 309
12. NC ENGINE – ACTIVITY LIST
Processes Time
Put crank shaft in engine 43
Fit crank shaft in engine 92
Calibrate crank shaft & fill engine card 42
Fit crank gear 55
Fit idler and oil pump gear 55
Fit governor flange 12
Total Time (Seconds) 299
13. YAMAZUMI CHART
The Yamazumi board provides a mechanism to quickly rebalance a
process when takt changes, and allows a visual indication of which
operations are overloaded (beyond takt), and which are underutilized.
Yamazumi charts for all three engines were plotted to check the
current state of the assembly line. In all the three graphs, there is a
black horizontal line showing the takt time is drawn. Processes having
cycle time above this line are undesirable and have a need to bring
under the tank time line.
Takt time > Cycle time
20. LINE EFFICIENCY
Line Efficiency = i=1
N
STi
m x C
x 100
Line efficiency of AUTO Engine is increased by 10.31%
Line efficiency of ESG Engine is increased by 9.95%
Line efficiency of NC Engine is increased by 9.75%
21. SMOOTHNESS INDEX
Smoothness Index = i=1
N
( 𝐶 − 𝑆𝑇𝑖)2
Smoothness index of AUTO Engine is improved by 53.08%
Smoothness index of ESG Engine is improved by 58.49%
Smoothness index of NC Engine is improved by 57.11%
22. MAN-POWER
AUTO ENGINE
There is requirement of 20 operators only as activities of ‘Spil Cut’ and
‘Control housing’ stage was transferred to other operators.
Productivity Increase = 10%
ESG ENGINE
There is requirement of 18 operators only as activities of ‘Spil Cut’ and
‘Control housing’ stage was transferred to other operators.
Productivity Increase = 14.29%
NC ENGINE
There is requirement of 19 operators only as activities of ‘Spil Cut’ and
‘Control housing’ stage was transferred to other operators.
Productivity Increase = 10.53%
23. CONTRIBUTION TO PROJECT
Studying the balancing and its related sequencing and scheduling
problems as an integrated problem
Have sole responsibility to accurately collect data from time study of
assembly line and proceed as well as to implement line balancing,
based on that data.
Increasing the line efficiency by providing unique intellects, such as:
moving the task of hammering dowel pin on L.O.P from assembly line
to washing to reduce operator fatigue and saving time.
24. LEARNING
The main objective is to look for the most efficient and economical
system. In method improvement only those operations are considered
which offer maximum potential for savings. New activities are
prepared for the selected operations, so as to examine them critically
and see how the assembly time could be reduced.