John Q Public completed a Six Sigma project from January 2006 to March 2006 to reduce quality defects in the XXX process at Never Fail Inc. The process was producing over 20% defects, resulting in customer complaints, inconsistent delivery, and increased costs. The goal was to reduce defects to under 0.5% while achieving 99% on-time delivery. As black belt, John created project documents, led a team through analysis tools including process mapping, DOE, and capability studies to identify and optimize significant factors. This reduced defects and improved customer satisfaction. The project saved $250,000 annually in material and labor costs by reducing scrap and improving capacity for on-time delivery. Bruce Almighty, Operations Director at Never Fail Inc., verified