Distinction of executing prestigious projects of large magnitude within strict time schedule, cost & quality, targeting
challenging assignments in Project & Constructions Management / HR Consultancy / Outsourcing / Design & Detail
Engineering with a growth-oriented organisation of repute in Oil & Gas / Refinery / Petrochemicals / Energy / Power /
Utilities / Fertilizers / Pulp & Paper / Steel industry
P R O F I L E S N A P S H O T
ď‚· BE (Mechanical Engineering) with over 44 years and 7 months of rich experience in
Business Development, Project Management, Site Execution, Construction
Management, Quality Assurance & Control and Welding & Fabrication
ď‚· Hands-on experience in handling project & construction management activities
entailing resource management, tender evaluation and contract management for
large size projects in various domains such as Oil & Gas, Refinery, Petrochemicals,
Fertiliser, Thermal & Hydro Power, Energy, Pulp & Paper, Steel and Cement
ď‚· The wealth of expertise entails in Safety Management, Procurement & Logistics
Management, Contract Management, Manpower Management, Budgeting & Cost
Control, Health Safety Environment, Quality Management, Disaster Management,
Environmental Management and overall management of the organization
ď‚· Abilities in planning, executing & spearheading various estimation, engineering &
technical activities
ď‚· A Technocrat with deep sense of commitment & will towards the responsibility of the
social welfare, upliftment of poor & needy, sustainability of the global environment &
animal world
ď‚· Demonstrated acumen in managing maintenanceof various equipment for reducing
downtime as well as enhancing operational effectiveness of utilities
ď‚· Skills in problem solving coupled with confident decision making for enabling effective
solutions leading to high customer satisfaction and low operational costs
O R G A N I Z A T I O N A L E X P E R I E N C E
Since May’90 ENCON (Engineering & Construction), Guwahati, Assam as CEO
Nov’81 – Jan’90 Davy Ashmore IndiaLtd. (A member of Davy Corporation U.K.), Assam, West Bengal, Bangalore
as Site Manager (Resident Manager, over all In-charge of the Projects/ Sites)
Nov’78 – Nov’81 Hindustan Paper Corporation Ltd., Calcutta, as Project Engineer – Inspection & Expediting,
Tendering & Contract Management
Feb’76 – Nov’78 Indian Oil Corporation Ltd. (Refinery & Pipeline Division) as Inspection Engineer – QA/QC,
Process & Construction Safety, Corrosion Control, RoutineInspection ofPlant & Equipment and
Piping including Offsite & Failure Analysis
Jun’72 – Jan’76 Ashok Paper Mills Ltd., Assam & Bihar Unit as Project & Construction Engineer
Key Result Areas:
ď‚· Developing project baselines; monitoring & controlling projects with respect to cost, resource deployment, time over-
runs and quality compliance to ensure satisfactory execution of projects
ď‚· Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and
effective resource utilization to maximize output
ď‚· Overseeing the preparation of monthly progress reports entailing
progress & details for engineering, procurement, construction and
commissioning activities
ď‚· Analyzing various processes and recommending modifications &
equipment calibrations to enhance operational efficiency
ď‚· Networking with architects, consultants, clients & contractors to
ascertain technical specifications and construction related
essentials, based on the prevalent rules
ď‚· Maintaining excellent relations with Statutory Authorities /
Government Agencies for availing mandatory sanctions / license;
coordinating with consultant engineer, departments & supervisors
for daily work progress
ď‚· Ensuring that theprojects areexecuted as per planned construction
standards and customer requirements are met within the given
delivery schedule
ď‚· Maintaining daily & weekly progressive & quality control reports and recording them properly as a part of Document
control in various quality & inspections procedures
ď‚· Coordinating with external agencies for techno-commercial negotiations, preparation of tender / contract documents,
cost estimates, including billing, variation / deviation proposals, claims, etc.
ď‚· Performing inspection of welds, NDT, weld repair of piping, pressure vessels, heat exchangers, boilers, pressure & non
pressure tanks, heaters, reactors, equipment in fabrication & welding line
ď‚· Conducting regular inspection and testing trial of static & rotary equipment to ensure the performance capacity of
various machines & equipment for ensuring smooth operations / functions
 Preparing cost proposals, contracts & documentation by following company’s procedures; responding to tenders &
requests in a timely manner
Accomplishments:
At ENCON (Engineering & Construction), Guwahati, Assam:
ď‚· Served as a consultant to study & analyze problem and submitted the same with various immediate measures to take
by the then management during Feb’90 – Apr’90
ď‚· Steered efforts in increasing in the asset more than 20% after squaring up all liabilities in 1992
ď‚· Essayed a stellar role in increasing the order and growth up to 45%, with 12% profit in 1994
ď‚· Successfully handled various projects and increased the growth up to 70% with major workforce, technical &
administrative personnel good tools & plant assets in 2005
ď‚· Played a vitalrole in introducing more domains in HR Consultancy, Outsourcing of Technical & Administrative Personnel,
Academics & Training in EHS, Disaster Management & Quality Management; thereby resulting in increasing growth by
another 8% in 2014
ď‚· Completed the difficult Geo-Technical Survey to ascertain the geological behaviour of rocks at the dam axis of both the
bank of river Subansiri at the Hydro Power Project of NHPC (a CPSU, Govt. of India)
At Hindustan Paper Corporation Ltd.:
ď‚· Played a key role in improving raw material quality by taking initiatives such as marginally changing the chemical
composition in power plant & boilers materials.
ď‚· Supervised inspection of raw material which improved product quality by 15% against 10% previously
ď‚· Steered the implementation of quality initiatives such as creating more quality awareness & steady operation
monitoring that instilled basic quality philosophies of doing things right the first time, thereby resulting in reduction of
9% in company rework cost in the boilers including the captive power plants in three different Paper projects of HPCL
At Indian Oil Corporation Ltd.:
ď‚· Bagged the Safety, Safe & Critical Structural Design and Best Completion Schedule award / appreciation from the
management of Numaligarh Refinery (BPCL) & Digboi Refinery (IOCL)
ď‚· Implemented several measures to identify deformities, malfunctions & other abnormalities such as severe corrosion,
erosion, fretting, bending, crack, collapse of storagetanks, structures, offsite piping & failure of water wall tube of boiler
(Haldia Refinery)
ď‚· Distinction of completing quality projects within time by taking extra augmentation & incentive initiatives
ď‚· Reduced the rejection rate by 6% and incidence of defects by 12% through measures such as strict
inspection/monitoring of operation parameters (Numaligarh Refinery Projects & Chandrapur Thermal Power Station)
At Ashok Paper Mills Ltd.:
ď‚· Steered the implementation of quality initiatives such as creating more quality awareness & steady operations by
monitoring & integrating the concept & quality philosophies of doing job with the right earnestness, thereby resulting
in considerable cost saving by improvement of quality at the same time reducing the rejection
A C A D E M I C D E T A I L S
1970 B.E. (Mechanical Engineering), securing first class with 74.5% marks, from Jorhat Engineering
College (Govt.), Jorhat, Assam under Dibrugarh University
P R O F E S S I O N A L E N H A N C E M E N T S
ď‚· Post Graduate Vocational Courses on Petroleum Technology from IIPT, Dehradun in 1976 (during employment in IOCL)
 Post Graduate Diploma on Paper Technology from IPT, Saharanpur from Oct’70 – Jun’72
ď‚· NDT, Ultrasonic Testing, Industrial Safety & Radiation (Isotope) Technology from Bhaba Atomic Research Centre,
Bombay in 1977 (during employment in IOCL)
 Certificate of Competency as 'Competent Person’ for Safety in the Industries (statutory assignment, appointed by the
Govt.)for Inspection & Testing of Plant & Equipment in Various Types of Industries’ from the office of the Chief Inspector
of Factories, Assam, India
ď‚· Design & Testing of Pressure Vessels, Failure Analysis, Project & Construction Management from Institute of BHPV,
Vizag
ď‚· Executive Development Programme on Pressure Vessels Fabrication & Testing (during employment in IOCL)
M E M B E R S H I P
ď‚· American Welding Society (AWS) (Member No. 2013644)
P E R S O N A L D E T A I L S
Date of Birth: 1stJuly 1947
Permanent Address: S.B. Housing (Shantigram Housing Complex), Flat No. 7/121, Jawahar Nagar, Tripura Road,
Guwahati – 781022, Assam, India
Languages Known: Hindi, English, Bengali, French (Basic) and Assamese

CV_1

  • 1.
    SUSHIL KUMAR BOROOAH :07896055509 : encon.ec@gmail.com / encon_ec@yahoo.com : House No. 30, Ananda Nagar Path, Near Axis Bank, Six Mile – 781022, Guwahati, Assam, India ~ TOP MANAGEMENT PROFESSIONAL ~ Distinction of executing prestigious projects of large magnitude within strict time schedule, cost & quality, targeting challenging assignments in Project & Constructions Management / HR Consultancy / Outsourcing / Design & Detail Engineering with a growth-oriented organisation of repute in Oil & Gas / Refinery / Petrochemicals / Energy / Power / Utilities / Fertilizers / Pulp & Paper / Steel industry P R O F I L E S N A P S H O T  BE (Mechanical Engineering) with over 44 years and 7 months of rich experience in Business Development, Project Management, Site Execution, Construction Management, Quality Assurance & Control and Welding & Fabrication  Hands-on experience in handling project & construction management activities entailing resource management, tender evaluation and contract management for large size projects in various domains such as Oil & Gas, Refinery, Petrochemicals, Fertiliser, Thermal & Hydro Power, Energy, Pulp & Paper, Steel and Cement  The wealth of expertise entails in Safety Management, Procurement & Logistics Management, Contract Management, Manpower Management, Budgeting & Cost Control, Health Safety Environment, Quality Management, Disaster Management, Environmental Management and overall management of the organization  Abilities in planning, executing & spearheading various estimation, engineering & technical activities  A Technocrat with deep sense of commitment & will towards the responsibility of the social welfare, upliftment of poor & needy, sustainability of the global environment & animal world  Demonstrated acumen in managing maintenanceof various equipment for reducing downtime as well as enhancing operational effectiveness of utilities  Skills in problem solving coupled with confident decision making for enabling effective solutions leading to high customer satisfaction and low operational costs O R G A N I Z A T I O N A L E X P E R I E N C E Since May’90 ENCON (Engineering & Construction), Guwahati, Assam as CEO Nov’81 – Jan’90 Davy Ashmore IndiaLtd. (A member of Davy Corporation U.K.), Assam, West Bengal, Bangalore as Site Manager (Resident Manager, over all In-charge of the Projects/ Sites) Nov’78 – Nov’81 Hindustan Paper Corporation Ltd., Calcutta, as Project Engineer – Inspection & Expediting, Tendering & Contract Management Feb’76 – Nov’78 Indian Oil Corporation Ltd. (Refinery & Pipeline Division) as Inspection Engineer – QA/QC, Process & Construction Safety, Corrosion Control, RoutineInspection ofPlant & Equipment and Piping including Offsite & Failure Analysis
  • 2.
    Jun’72 – Jan’76Ashok Paper Mills Ltd., Assam & Bihar Unit as Project & Construction Engineer Key Result Areas:  Developing project baselines; monitoring & controlling projects with respect to cost, resource deployment, time over- runs and quality compliance to ensure satisfactory execution of projects  Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize output  Overseeing the preparation of monthly progress reports entailing progress & details for engineering, procurement, construction and commissioning activities  Analyzing various processes and recommending modifications & equipment calibrations to enhance operational efficiency  Networking with architects, consultants, clients & contractors to ascertain technical specifications and construction related essentials, based on the prevalent rules  Maintaining excellent relations with Statutory Authorities / Government Agencies for availing mandatory sanctions / license; coordinating with consultant engineer, departments & supervisors for daily work progress  Ensuring that theprojects areexecuted as per planned construction standards and customer requirements are met within the given delivery schedule  Maintaining daily & weekly progressive & quality control reports and recording them properly as a part of Document control in various quality & inspections procedures  Coordinating with external agencies for techno-commercial negotiations, preparation of tender / contract documents, cost estimates, including billing, variation / deviation proposals, claims, etc.  Performing inspection of welds, NDT, weld repair of piping, pressure vessels, heat exchangers, boilers, pressure & non pressure tanks, heaters, reactors, equipment in fabrication & welding line  Conducting regular inspection and testing trial of static & rotary equipment to ensure the performance capacity of various machines & equipment for ensuring smooth operations / functions  Preparing cost proposals, contracts & documentation by following company’s procedures; responding to tenders & requests in a timely manner Accomplishments: At ENCON (Engineering & Construction), Guwahati, Assam:  Served as a consultant to study & analyze problem and submitted the same with various immediate measures to take by the then management during Feb’90 – Apr’90  Steered efforts in increasing in the asset more than 20% after squaring up all liabilities in 1992  Essayed a stellar role in increasing the order and growth up to 45%, with 12% profit in 1994  Successfully handled various projects and increased the growth up to 70% with major workforce, technical & administrative personnel good tools & plant assets in 2005  Played a vitalrole in introducing more domains in HR Consultancy, Outsourcing of Technical & Administrative Personnel, Academics & Training in EHS, Disaster Management & Quality Management; thereby resulting in increasing growth by another 8% in 2014  Completed the difficult Geo-Technical Survey to ascertain the geological behaviour of rocks at the dam axis of both the bank of river Subansiri at the Hydro Power Project of NHPC (a CPSU, Govt. of India) At Hindustan Paper Corporation Ltd.:  Played a key role in improving raw material quality by taking initiatives such as marginally changing the chemical composition in power plant & boilers materials.  Supervised inspection of raw material which improved product quality by 15% against 10% previously  Steered the implementation of quality initiatives such as creating more quality awareness & steady operation monitoring that instilled basic quality philosophies of doing things right the first time, thereby resulting in reduction of 9% in company rework cost in the boilers including the captive power plants in three different Paper projects of HPCL At Indian Oil Corporation Ltd.:  Bagged the Safety, Safe & Critical Structural Design and Best Completion Schedule award / appreciation from the management of Numaligarh Refinery (BPCL) & Digboi Refinery (IOCL)
  • 3.
     Implemented severalmeasures to identify deformities, malfunctions & other abnormalities such as severe corrosion, erosion, fretting, bending, crack, collapse of storagetanks, structures, offsite piping & failure of water wall tube of boiler (Haldia Refinery)  Distinction of completing quality projects within time by taking extra augmentation & incentive initiatives  Reduced the rejection rate by 6% and incidence of defects by 12% through measures such as strict inspection/monitoring of operation parameters (Numaligarh Refinery Projects & Chandrapur Thermal Power Station) At Ashok Paper Mills Ltd.:  Steered the implementation of quality initiatives such as creating more quality awareness & steady operations by monitoring & integrating the concept & quality philosophies of doing job with the right earnestness, thereby resulting in considerable cost saving by improvement of quality at the same time reducing the rejection A C A D E M I C D E T A I L S 1970 B.E. (Mechanical Engineering), securing first class with 74.5% marks, from Jorhat Engineering College (Govt.), Jorhat, Assam under Dibrugarh University P R O F E S S I O N A L E N H A N C E M E N T S  Post Graduate Vocational Courses on Petroleum Technology from IIPT, Dehradun in 1976 (during employment in IOCL)  Post Graduate Diploma on Paper Technology from IPT, Saharanpur from Oct’70 – Jun’72  NDT, Ultrasonic Testing, Industrial Safety & Radiation (Isotope) Technology from Bhaba Atomic Research Centre, Bombay in 1977 (during employment in IOCL)  Certificate of Competency as 'Competent Person’ for Safety in the Industries (statutory assignment, appointed by the Govt.)for Inspection & Testing of Plant & Equipment in Various Types of Industries’ from the office of the Chief Inspector of Factories, Assam, India  Design & Testing of Pressure Vessels, Failure Analysis, Project & Construction Management from Institute of BHPV, Vizag  Executive Development Programme on Pressure Vessels Fabrication & Testing (during employment in IOCL) M E M B E R S H I P  American Welding Society (AWS) (Member No. 2013644) P E R S O N A L D E T A I L S Date of Birth: 1stJuly 1947 Permanent Address: S.B. Housing (Shantigram Housing Complex), Flat No. 7/121, Jawahar Nagar, Tripura Road, Guwahati – 781022, Assam, India Languages Known: Hindi, English, Bengali, French (Basic) and Assamese