pre-design
analysis
titiwangsa : site 1+ 4
character appraisal
buildings, structures and spaces
restrictions, guidelines and requirements
micro
users + activities
precedents
character
appraisal
Settlement pattern
2
(HKL)Women and
chilrden’s Hospital
5
National
Library
9 National Heart
Institute
4
National
Blood Institute
6
Istana
Budaya
7
National Visual
Art Museum
10 Titiwangsa
Stadium
3
UKM
Medical
1 Pulapol KL
8 KPJ
(HKL)North, South Ward
Block, Radiotheraphy
1940
1962
1975
1977
Titiwangsa Lake
Park
1982
11
1999
2000
2002
2005
2009
2011
Historical development
From mining to an urban
park
5
National
Library4
National
Blood Centre
6
Istana
Budaya
7
National Visual
Art Museum
10 Titiwangsa
Stadium
Management
office
tinted glass and clean
modern lines with traditional
Malay design prominent in
the form of a light blue
origami-style metallic roof
sirih junjung inspired roof shape
(traditional arrangement or a
present made of betel leaves
used during Malay weddings).
Serambi, rummah ibu, rumah
dapur layout
building design is based on
the Malay headgear or
'tengkolok' which is a symbol
of intellectual pride and
respect in Malay culture.
Traditional malay
architecture
Applying the past to the present
modernized
traditional
The slope
Pitch roof + layering
The blue roof
Public buildings :
healthcare + culture
buildings,
structures
and spaces
Relationship
built-unbuilt
Provide intimacy and
sense of enclosure
which defines the
boundaries
Urban grain
Contrast between
fine and coarse
creates focal point
Formal-informal
Site at contiguous
area, acts as the
engaging point
The frame
Hard edges frames area of
potential users. Soft edges
promotes engagement in
free flowing space.
District
Urban park as the heart of
this district
residential
institutional
Path
| major path branches
out to a network that wraps
around
| multiple ingress points
Point of Interest
Visual Cues:
| National Landmark gives
impression to site
| Local Landmark creates
familiarity
SK Jln Kuantan 1
Asrama 1M
Stadium Titiwangsa
D’SAJI KL Titiwangsa
Istana Budaya Office
Kelab Golf Titiwangsa PDRM
Foci
| Sandwiched between 2
prominent nodes
| physically and visually
reachable from sites
school
food stall
floating restaurant
food stall
Site 1
Foci
Site 4
Restrictions,
guidelines
+ requirements
ZONE : PUBLIC OPEN SPACE
Class D6 Sports and Recreation Facilities
| Courts or sports and recreational spaces
| Race course
| Swimming Pool
| Polo Ground
| Clubhouse
| Paintball space
| Facilities for sports and recreational
Class + Activity
Height control
Source: DBKL
Height control
Source: DBKL
60m
40m
35m
20m
Height control
Site 1
Site 4
Future
developments
micro
Site condition :
sun orientation
Suitable placement of
program depending on
orientation
| morning based programme
| evening based programme
0700
Site condition :
sun orientation
Suitable placement of
program depending on
orientation
| morning based programme
| evening based programme
1000
Site condition :
sun orientation
Suitable placement of
program depending on
orientation
| morning based programme
| evening based programme
1200
Site condition :
sun orientation
Suitable placement of
program depending on
orientation
| morning based programme
| evening based programme
1400
Site condition :
sun orientation
Suitable placement of
program depending on
orientation
| morning based programme
| evening based programme
1700
Site condition :
sun orientation
Suitable placement of
program depending on
orientation
| morning based programme
| evening based programme
0700
Site condition :
sun orientation
Suitable placement of
program depending on
orientation
| morning based programme
| evening based programme
1000
Site condition :
sun orientation
Suitable placement of
program depending on
orientation
| morning based programme
| evening based programme
1200
Site condition :
sun orientation
Suitable placement of
program depending on
orientation
| morning based programme
| evening based programme
1400
Site condition :
sun orientation
Suitable placement of
program depending on
orientation
| morning based programme
| evening based programme
1700
Site condition :
lake view
Possible glare to occur at
certain times of the day
Site condition :
lake view
Possible glare to occur at
certain times of the day
Permeability +
transparencies
Ambiguous boundary
proposing a free moving
ground
Permeability +
transparencies
Defined boundary defines
movement
Permeability +
transparencies
Intersection creates pauses
Permeability +
transparencies
Directional linear flow
Visual analysis
Line of sight
Visual analysis
Line of sight
Visual analysis
Site 1
Visual analysis
Site 4
users
+activities
Activity spine +
nodes
Sites intersect with spine
which absorbs the vibrancy
of the park
Temporal quality
Fluctuates throughout the
day
0700 1100 1500 1900 2200
User Group
| Close proximity to
destination, directs
potential users to use that
path
| Potential users play a
role in programme
food stalls
food stalls
plaza
school
carpark
bike rental
construction
office
Gap + Enclosure
| Active + dormant
| Infill + improve street
quality
| Influx of human flow
SWOT
SITE 1
Strength : multiple
ingress points
Weakness : exposed
Threat : traffic at peak
hours
Opportunity : fluctuation
of crowd
SWOT
SITE 4
Strength : Single
entry point
Opportunity : Observation
platform
Threat :
pedestrian’s
safety questioned
Weakness :
absence of
node
precedent
fala park
/ PL
architekci
Wolsztyn,
Poland
2012
location
Old abandoned
industrial site
Wolsztyn lake
Wolsztyn park
context
programme
ground floor plan
children play area
squash courtsclimbing wall
bowling alley
cafe
programme
section
children	play	area	
squash	courts	climbing	wall	
cafe	
promoting life at the core which
punctures through levels
focal point
central dispersion
+ linearity in
movement
core
programme
first floor plan
gymnasium
lockers
extensive
character
programme
second floor plan
rooftop tennis courts
cityscape
church towers
dense roofs
Black box gym
/ HAD &
Epos Architects
Chengdu, China
2015
location
programme
ground floor planTraffic flow and internal-external space
transformations unfold around this courtyard
programme
first floor planMultiple and contrasting programmes
becomes center of vitality
Steel beams + columns
perforated steel plates
attraction power
holding power
[engagement] power
[ engagement ]
noun
meaningful contact and connection

ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA