Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518
In the commence of the Community Service Initiate module, we were briefed by the
lecturers on the details, objectives and methods to achieve the completion of the assignment
before we start the discussions and planning stage of the assigned tasks. It is expressed that the
intention of the module is to provide us circumstances to showcase our theories of design practice
as well as gain understanding on how the techniques could benefits charity activities in real
community service works.
The overall project call for a group of maximum nine members. Then, we were given
choices to four beneficiaries with each of them targeting different socio-economic status and social
groups, which are the Charitable Homes, Community Centre, Street Community and lastly the
Environment Enhancing Project, which is a collaborative project with the JCI and OCBC bank.
Each of these categories of project has different suggested activities, tasks and schemes to
achieve environmental enhancing effects and benefits in the chosen community.
Through several discussions among the team members, we have chose to carry out the
Environment Enhancing project that was intended to target the Jinjang community in Kepong,
Kuala Lumpur. As stated above, this project is a collaborative community service with the JCI and
OCBC bank with the idea of materialise students’ proposal and ideas that will truly benefit the
community by either enhancing urban community experiences or improve and revitalise condition
of a space. The proposal of the project were to be architectural as relating to our course.
The reason behind the selection of this category is because of the slight possibility and
opportunity of witnessing the design and proposal to be materialised. Throughout the years of
studio designing coursework, ideas and designs were completed with drawings, digital 3D models
and renderings. But with this opportunity, the effort made might come true and this really excites us
as a design student. It is also because of the realistic targeted community with their very own
culture and history. The sense of community around the town made us question the method of we
will able to augment the identity of them. The large range of are group around the area also really
challenges us on how we can bring them together without awkwardness between two different age
group.
Jinjang is a town located in Kepong, Kuala Lumpur with mostly settlements of the Chinese
community. It was established as part of the British strategy during Malayan Emergency to forcibly
relocate all races thus isolating them from the communist influences. According to research, it is by
far the largest relocation communities, which cause the formation of 445 hectares residential area
today.
Page of1 7
Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518
The site we have chosen is placed in Jinjang Utara, Padang Jinjang Utara, a communal
park with spaces like, basketball court, jogging or cycling trail, children playground, football field,
Chinese food hawker centre and a well managed public toilet. (Figure 1.1) Jinjnag Utara is an
easily accessed housing area. Due to the age of the area, facilities around are at its least and the
roads are generally narrow as they were not designed for the vehicles. But the site we have
chosen were located close to the houses that acts like a central gathering spot of the community
as I believe was because it is a communal space developed since the early stage of this new
village. Therefore, this became one of our main reason to elect this specific space as the project
site as we interpret it as a vital community space that convivial the societies around through
observations and collection of every group members’ perceptions.
As stated in the brief, we were suggested to start off with conduction of site analysis (Figure
1.2) that consists of identification and evaluation of needs and issues in the community. We were
to determine the issue of a target population and discuss the possible solution of the issue.
Page of2 7
6/8/2017 Google Maps
https://www.google.com/maps/@3.2129035,101.6591082,783m/data=!3m1!1e3 1/1
Imagery ©2017 DigitalGlobe, Map data ©2017 Google 100 m
Figure 1.1 Map of Jinjang Utara.
Figure 1.2 Site analysis.
Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518
During the early stage of site visits and discussions, we have observed and concluded that
the issue to be tackled around the site chosen is the lack of bicycle rack, which caused the
unplanned placing of bicycles around the park, around a lamp post, under the gazebo or beneath
the trees. The bicycles are mainly owned by the teenagers who live in the Jinjnag residential
housing area and it is believed that their main transportation around is their bicycle as several
education institutions were located nearby as well as the condition of the narrowness of the roads.
The casual parking of these bicycles has caused obstruction is circulation and it seems to have
cause several surface damages to them.
Thus, through further meeting and discussions, we have decided to perform design
development on a norm bicycle rack. (Figure 1.5) As we thought that maybe we could include
certain feature and facility for conveniency of the users. After brainstorming and research, decision
was made to integrate the idea of seatings and communal table with a bicycle rack. It would be a
furniture where one side will be bicycle rack and on the other side it would be normal seating with a
table at the centre, separating both function. The purpose is to allow user to have a choice on
deciding whether to carry out their activity on the bicycle as the table is provided at the mechanism
height, or one could park the bicycle at the rack and have a seat on the other side.
Page of3 7
Figure 1.4 Diagrams of bicycle rack proposal.
Figure 1.3 Photos of casual bicycle placement.
Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518
As the proposal was submitted, our tutor, Ms. Ann See Peng, commented that it is less
appropriate for an architectural enhancement and the target issue was not solidified. It is
suggested that maybe we could identify issue around the site like the lack of bicycle trails on the
narrow road and probably we could map out a creative trails from the schools to the park as this
could be the community resting point after the day. As for the designated bicycle rack, it could act
as ‘stations’ around the trail for resting purposes or as a pinpoint structure.
Based on the comments given, we realised probability of the negative judgement is
because of the lack of consideration and understanding of real needs of the park user and the
context of the site. Hence, we went back to the site to conduct the second site analysis where we
decided to interview the park users and residents around, especially the teenagers who seems to
play basketball in the evening on daily basis and the adults that sits around the playground area
with the intention of people watching or guarding over their children. Through several effort by the
team members as the residents were self-conscious around us, the result was unexpected as their
desire for further improvement of the park was as simple as proper seats for more people in the
neighbourhood to come around, to gather or linger in the park.
I became aware of the simple necessity of a community. I realised the purpose of this
project is not to build and design something lavish and complicated but as simple as to bring more
Page of4 7
Figure 1.5 Renderings of bicycle rack proposal.
Figure 1.6 Photos of user sitting on informal seating spots.
Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518
people together in a neighbourhood. To create a space that enable the gathering of family, siblings
and friends. It could be a space that enable usage of different age group at close proximity.
The team came up with an agreement on designing a playscape. A designed seatings in
hammock form, consisting of three levels, allowing different usage for different age group at variety
of time. The structure will be locate alongside with the jogging trail, beneath the trees where the
shades could be enjoy by the user. It will be complemented with stacks of pallets on both side of
the structure, which will act as normal seatings with low tables for older adults with back problems,
as well as steps leading upwards to the hammock like playscape. The proposal of bicycle rack will
be a complimentary feature of the playscape in the park.
To verify the affirmation of the user towards the playscape, we have made a physical model
out of grey board, steel hollow tube, white synthetic net and cotton thread. Later, we brought the
completed model to the site and had another section of interview with the user. We inquired them
based on their thoughts and idea of the playscape, its location, function, size as well as aesthetic
and conveniency. As the result, the residents visited the park on that day were satisfy and happy
with the outcome and they were excited to see how it would be use by the community and how it
will affect the society for a better and convivial environment.
Page of5 7
Figure 1.7 Rendering of the playscape.
Figure 1.8 Diagrams for the application of
playscape.
Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518
Page of6 7
Figure 1.9 Final proposal board.
Figure 1.9 Playscape physical model.
Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518
Link to full video: https://www.youtube.com/watch?v=VeMSHGRfj74&feature=youtu.be
Throughout the process of the project, I have realise the importance of contribution to
society by using skills and techniques gained during the previous learning stages. It is also about
the satisfaction of being able to help the community and enhance the urban environment base on a
student’s passion and dedication towards architecture and creation. I have also gain knowledge on
holistic awareness of the contextual issue and methods of critical analysis on issue observes, thus
determine solutions and designs to solve them with efficiency. It is definitely a great opportunity
and platform for us to apply management skills and project planning techniques as well as
responsive design production ability. I have also definitely able to work better in team work
production after this extent of work progress where we have corporate well and enjoy every debate
and discussion to produce satisfying work.
Page of7 7
Figure 2.0 Final proposal video.

More Related Content

Similar to DEGREEM SEM 5 CSI REFLECTIVE JOURNAL

Esd project mcmc marcht 2016
Esd project mcmc marcht 2016Esd project mcmc marcht 2016
Esd project mcmc marcht 2016
Lau Hui Ming Belinda
 
Community Service Initiative Journal
Community Service Initiative JournalCommunity Service Initiative Journal
Community Service Initiative Journal
Joe Onn Lim
 
St. James Town Initiative: Neighbourhood and Health
St. James Town Initiative: Neighbourhood and HealthSt. James Town Initiative: Neighbourhood and Health
St. James Town Initiative: Neighbourhood and Health
Wellesley Institute
 
Happy city workshop
Happy city workshopHappy city workshop
Happy city workshop
Blaise Nkubiyaho
 
MapTheSquare
MapTheSquareMapTheSquare
MapTheSquare
Yes Segura
 
portfolionew1613
portfolionew1613portfolionew1613
portfolionew1613
Cesar Yoc
 
http://taxitaiongtho.com/chuyen-nha-lien-tinh-thue-xe-tai-lien-tinh/
http://taxitaiongtho.com/chuyen-nha-lien-tinh-thue-xe-tai-lien-tinh/http://taxitaiongtho.com/chuyen-nha-lien-tinh-thue-xe-tai-lien-tinh/
http://taxitaiongtho.com/chuyen-nha-lien-tinh-thue-xe-tai-lien-tinh/
le bao
 
Ux2
Ux2Ux2
Online Mapping Support - Age Advantage Association
Online Mapping Support - Age Advantage AssociationOnline Mapping Support - Age Advantage Association
Online Mapping Support - Age Advantage Association
COGS Presentations
 
Esd project mcmc august 2014 (1)
Esd project mcmc august 2014 (1)Esd project mcmc august 2014 (1)
Esd project mcmc august 2014 (1)
Anthony Chew
 
Esd project mcmc august 2014
Esd project mcmc august 2014Esd project mcmc august 2014
Esd project mcmc august 2014
Preston Liew
 
Proposal
ProposalProposal
Proposal
Yvonne Chin
 
Landscape Architecture Portfolio - Kate O'Hara
Landscape Architecture Portfolio - Kate O'HaraLandscape Architecture Portfolio - Kate O'Hara
Landscape Architecture Portfolio - Kate O'Hara
Kate O'Hara
 
Let's Chalk Supplementary
Let's Chalk SupplementaryLet's Chalk Supplementary
Let's Chalk Supplementary
slouraine
 
Lets chalk-supplementary-chi
Lets chalk-supplementary-chiLets chalk-supplementary-chi
Lets chalk-supplementary-chi
Angelica Rosenzweig
 
Green Map 2014
Green Map 2014Green Map 2014
Green Map 2014
Wendy Brawer
 
Kuala Lumpur Neighbourhood Case Study Taman Tun Dr. Ismail
Kuala Lumpur Neighbourhood Case Study Taman Tun Dr. IsmailKuala Lumpur Neighbourhood Case Study Taman Tun Dr. Ismail
Kuala Lumpur Neighbourhood Case Study Taman Tun Dr. Ismail
Hazreena Hussein
 
Community solutions lab
Community solutions labCommunity solutions lab
Community solutions lab
Gabe Sawhney
 
Service Design tools and techniques
Service Design tools and techniquesService Design tools and techniques
Service Design tools and techniques
Kathryn Woolf
 
Hunts Point Studio FINAL Report, pages
Hunts Point Studio FINAL Report, pagesHunts Point Studio FINAL Report, pages
Hunts Point Studio FINAL Report, pages
Sarah Gelder, AICP, CPRP
 

Similar to DEGREEM SEM 5 CSI REFLECTIVE JOURNAL (20)

Esd project mcmc marcht 2016
Esd project mcmc marcht 2016Esd project mcmc marcht 2016
Esd project mcmc marcht 2016
 
Community Service Initiative Journal
Community Service Initiative JournalCommunity Service Initiative Journal
Community Service Initiative Journal
 
St. James Town Initiative: Neighbourhood and Health
St. James Town Initiative: Neighbourhood and HealthSt. James Town Initiative: Neighbourhood and Health
St. James Town Initiative: Neighbourhood and Health
 
Happy city workshop
Happy city workshopHappy city workshop
Happy city workshop
 
MapTheSquare
MapTheSquareMapTheSquare
MapTheSquare
 
portfolionew1613
portfolionew1613portfolionew1613
portfolionew1613
 
http://taxitaiongtho.com/chuyen-nha-lien-tinh-thue-xe-tai-lien-tinh/
http://taxitaiongtho.com/chuyen-nha-lien-tinh-thue-xe-tai-lien-tinh/http://taxitaiongtho.com/chuyen-nha-lien-tinh-thue-xe-tai-lien-tinh/
http://taxitaiongtho.com/chuyen-nha-lien-tinh-thue-xe-tai-lien-tinh/
 
Ux2
Ux2Ux2
Ux2
 
Online Mapping Support - Age Advantage Association
Online Mapping Support - Age Advantage AssociationOnline Mapping Support - Age Advantage Association
Online Mapping Support - Age Advantage Association
 
Esd project mcmc august 2014 (1)
Esd project mcmc august 2014 (1)Esd project mcmc august 2014 (1)
Esd project mcmc august 2014 (1)
 
Esd project mcmc august 2014
Esd project mcmc august 2014Esd project mcmc august 2014
Esd project mcmc august 2014
 
Proposal
ProposalProposal
Proposal
 
Landscape Architecture Portfolio - Kate O'Hara
Landscape Architecture Portfolio - Kate O'HaraLandscape Architecture Portfolio - Kate O'Hara
Landscape Architecture Portfolio - Kate O'Hara
 
Let's Chalk Supplementary
Let's Chalk SupplementaryLet's Chalk Supplementary
Let's Chalk Supplementary
 
Lets chalk-supplementary-chi
Lets chalk-supplementary-chiLets chalk-supplementary-chi
Lets chalk-supplementary-chi
 
Green Map 2014
Green Map 2014Green Map 2014
Green Map 2014
 
Kuala Lumpur Neighbourhood Case Study Taman Tun Dr. Ismail
Kuala Lumpur Neighbourhood Case Study Taman Tun Dr. IsmailKuala Lumpur Neighbourhood Case Study Taman Tun Dr. Ismail
Kuala Lumpur Neighbourhood Case Study Taman Tun Dr. Ismail
 
Community solutions lab
Community solutions labCommunity solutions lab
Community solutions lab
 
Service Design tools and techniques
Service Design tools and techniquesService Design tools and techniques
Service Design tools and techniques
 
Hunts Point Studio FINAL Report, pages
Hunts Point Studio FINAL Report, pagesHunts Point Studio FINAL Report, pages
Hunts Point Studio FINAL Report, pages
 

More from jolynnTJL

BSC (H) IN ARCHITECTURE DEGREE SEM 6 PROJECT MANAGEMENT FINAL REPORT
BSC (H) IN ARCHITECTURE DEGREE SEM 6 PROJECT MANAGEMENT FINAL REPORT BSC (H) IN ARCHITECTURE DEGREE SEM 6 PROJECT MANAGEMENT FINAL REPORT
BSC (H) IN ARCHITECTURE DEGREE SEM 6 PROJECT MANAGEMENT FINAL REPORT
jolynnTJL
 
ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA
ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA
ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA
jolynnTJL
 
DEGREE SEM 5 THEORIES OF ARCHI. & URBANISM COMPARATIVE ESSAY
DEGREE SEM 5 THEORIES OF ARCHI. & URBANISM COMPARATIVE ESSAYDEGREE SEM 5 THEORIES OF ARCHI. & URBANISM COMPARATIVE ESSAY
DEGREE SEM 5 THEORIES OF ARCHI. & URBANISM COMPARATIVE ESSAY
jolynnTJL
 
DEGREE SEM 5 BUILDING TECHNOLOGY PROJECT 02 IBS REPORT
DEGREE SEM 5 BUILDING TECHNOLOGY PROJECT 02 IBS REPORT DEGREE SEM 5 BUILDING TECHNOLOGY PROJECT 02 IBS REPORT
DEGREE SEM 5 BUILDING TECHNOLOGY PROJECT 02 IBS REPORT
jolynnTJL
 
DEGREE SEM 5 BUILDING SCIENCE PROJECT 2 INTEGRATION PROJECT
DEGREE SEM 5 BUILDING SCIENCE PROJECT 2 INTEGRATION PROJECT DEGREE SEM 5 BUILDING SCIENCE PROJECT 2 INTEGRATION PROJECT
DEGREE SEM 5 BUILDING SCIENCE PROJECT 2 INTEGRATION PROJECT
jolynnTJL
 
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDYDEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
jolynnTJL
 
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 2 JLN H.S. LEE, KUALA LUMPUR
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 2 JLN H.S. LEE, KUALA LUMPURDEGREE SEM 5 TALES OF 3 CITIES PROJECT 2 JLN H.S. LEE, KUALA LUMPUR
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 2 JLN H.S. LEE, KUALA LUMPUR
jolynnTJL
 
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1B URBAN JOURNAL
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1B URBAN JOURNALDEGREE SEM 5 TALES OF 3 CITIES PROJECT 1B URBAN JOURNAL
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1B URBAN JOURNAL
jolynnTJL
 
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1A GEORGETOWN
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1A GEORGETOWN DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1A GEORGETOWN
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1A GEORGETOWN
jolynnTJL
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINALBSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
jolynnTJL
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
jolynnTJL
 
BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT
jolynnTJL
 
BUIDLING STRUCUTRE BEAM & COLUMN CALCULATION
BUIDLING STRUCUTRE BEAM & COLUMN CALCULATION BUIDLING STRUCUTRE BEAM & COLUMN CALCULATION
BUIDLING STRUCUTRE BEAM & COLUMN CALCULATION
jolynnTJL
 
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER KHX
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER KHXBSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER KHX
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER KHX
jolynnTJL
 
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER
jolynnTJL
 
BSC (H) ARCHITECTURE DEGREE SEM 4 BUIDLING SERVICES REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4 BUIDLING SERVICES REPORT FINAL BSC (H) ARCHITECTURE DEGREE SEM 4 BUIDLING SERVICES REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4 BUIDLING SERVICES REPORT FINAL
jolynnTJL
 
Menara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportMenara Dayabumi Analysis Report
Menara Dayabumi Analysis Report
jolynnTJL
 
Final site a analysis
Final site a analysisFinal site a analysis
Final site a analysis
jolynnTJL
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final Report
jolynnTJL
 
PSY Presentation1 Comic
PSY Presentation1 Comic PSY Presentation1 Comic
PSY Presentation1 Comic
jolynnTJL
 

More from jolynnTJL (20)

BSC (H) IN ARCHITECTURE DEGREE SEM 6 PROJECT MANAGEMENT FINAL REPORT
BSC (H) IN ARCHITECTURE DEGREE SEM 6 PROJECT MANAGEMENT FINAL REPORT BSC (H) IN ARCHITECTURE DEGREE SEM 6 PROJECT MANAGEMENT FINAL REPORT
BSC (H) IN ARCHITECTURE DEGREE SEM 6 PROJECT MANAGEMENT FINAL REPORT
 
ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA
ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA
ARCHITECTURAL DESIGN PROJECT PRE DESIGN ANALYSIS TITIWANGSA
 
DEGREE SEM 5 THEORIES OF ARCHI. & URBANISM COMPARATIVE ESSAY
DEGREE SEM 5 THEORIES OF ARCHI. & URBANISM COMPARATIVE ESSAYDEGREE SEM 5 THEORIES OF ARCHI. & URBANISM COMPARATIVE ESSAY
DEGREE SEM 5 THEORIES OF ARCHI. & URBANISM COMPARATIVE ESSAY
 
DEGREE SEM 5 BUILDING TECHNOLOGY PROJECT 02 IBS REPORT
DEGREE SEM 5 BUILDING TECHNOLOGY PROJECT 02 IBS REPORT DEGREE SEM 5 BUILDING TECHNOLOGY PROJECT 02 IBS REPORT
DEGREE SEM 5 BUILDING TECHNOLOGY PROJECT 02 IBS REPORT
 
DEGREE SEM 5 BUILDING SCIENCE PROJECT 2 INTEGRATION PROJECT
DEGREE SEM 5 BUILDING SCIENCE PROJECT 2 INTEGRATION PROJECT DEGREE SEM 5 BUILDING SCIENCE PROJECT 2 INTEGRATION PROJECT
DEGREE SEM 5 BUILDING SCIENCE PROJECT 2 INTEGRATION PROJECT
 
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDYDEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
DEGREE SEM 5 BUILDING SCIENCE PROJECT 01 ACOUSTIC CASE STUDY
 
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 2 JLN H.S. LEE, KUALA LUMPUR
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 2 JLN H.S. LEE, KUALA LUMPURDEGREE SEM 5 TALES OF 3 CITIES PROJECT 2 JLN H.S. LEE, KUALA LUMPUR
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 2 JLN H.S. LEE, KUALA LUMPUR
 
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1B URBAN JOURNAL
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1B URBAN JOURNALDEGREE SEM 5 TALES OF 3 CITIES PROJECT 1B URBAN JOURNAL
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1B URBAN JOURNAL
 
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1A GEORGETOWN
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1A GEORGETOWN DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1A GEORGETOWN
DEGREE SEM 5 TALES OF 3 CITIES PROJECT 1A GEORGETOWN
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINALBSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
 
BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT BUILDING STRUCTURE FINAL REPORT
BUILDING STRUCTURE FINAL REPORT
 
BUIDLING STRUCUTRE BEAM & COLUMN CALCULATION
BUIDLING STRUCUTRE BEAM & COLUMN CALCULATION BUIDLING STRUCUTRE BEAM & COLUMN CALCULATION
BUIDLING STRUCUTRE BEAM & COLUMN CALCULATION
 
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER KHX
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER KHXBSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER KHX
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER KHX
 
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER
BSC (H) ARCHITECTURE DEGREE SEM 4 ASIAN ARCHITECTURE CASE STUDY PAPER
 
BSC (H) ARCHITECTURE DEGREE SEM 4 BUIDLING SERVICES REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4 BUIDLING SERVICES REPORT FINAL BSC (H) ARCHITECTURE DEGREE SEM 4 BUIDLING SERVICES REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4 BUIDLING SERVICES REPORT FINAL
 
Menara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportMenara Dayabumi Analysis Report
Menara Dayabumi Analysis Report
 
Final site a analysis
Final site a analysisFinal site a analysis
Final site a analysis
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final Report
 
PSY Presentation1 Comic
PSY Presentation1 Comic PSY Presentation1 Comic
PSY Presentation1 Comic
 

Recently uploaded

CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
blueshagoo1
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
Krassimira Luka
 
How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17
Celine George
 
Bonku-Babus-Friend by Sathyajith Ray (9)
Bonku-Babus-Friend by Sathyajith Ray  (9)Bonku-Babus-Friend by Sathyajith Ray  (9)
Bonku-Babus-Friend by Sathyajith Ray (9)
nitinpv4ai
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
RamseyBerglund
 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Henry Hollis
 
Nutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour TrainingNutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour Training
melliereed
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
deepaannamalai16
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
MysoreMuleSoftMeetup
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Juneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School DistrictJuneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School District
David Douglas School District
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
MJDuyan
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
Nguyen Thanh Tu Collection
 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
nitinpv4ai
 
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
indexPub
 
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
EduSkills OECD
 
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
ImMuslim
 
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdfREASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
giancarloi8888
 
The basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptxThe basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptx
heathfieldcps1
 

Recently uploaded (20)

CIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdfCIS 4200-02 Group 1 Final Project Report (1).pdf
CIS 4200-02 Group 1 Final Project Report (1).pdf
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
 
How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17How Barcodes Can Be Leveraged Within Odoo 17
How Barcodes Can Be Leveraged Within Odoo 17
 
Bonku-Babus-Friend by Sathyajith Ray (9)
Bonku-Babus-Friend by Sathyajith Ray  (9)Bonku-Babus-Friend by Sathyajith Ray  (9)
Bonku-Babus-Friend by Sathyajith Ray (9)
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
 
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.pptLevel 3 NCEA - NZ: A  Nation In the Making 1872 - 1900 SML.ppt
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.ppt
 
Nutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour TrainingNutrition Inc FY 2024, 4 - Hour Training
Nutrition Inc FY 2024, 4 - Hour Training
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Juneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School DistrictJuneteenth Freedom Day 2024 David Douglas School District
Juneteenth Freedom Day 2024 David Douglas School District
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
 
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
THE SACRIFICE HOW PRO-PALESTINE PROTESTS STUDENTS ARE SACRIFICING TO CHANGE T...
 
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
Andreas Schleicher presents PISA 2022 Volume III - Creative Thinking - 18 Jun...
 
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
 
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdfREASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
REASIGNACION 2024 UGEL CHUPACA 2024 UGEL CHUPACA.pdf
 
The basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptxThe basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptx
 

DEGREEM SEM 5 CSI REFLECTIVE JOURNAL

  • 1. Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518 In the commence of the Community Service Initiate module, we were briefed by the lecturers on the details, objectives and methods to achieve the completion of the assignment before we start the discussions and planning stage of the assigned tasks. It is expressed that the intention of the module is to provide us circumstances to showcase our theories of design practice as well as gain understanding on how the techniques could benefits charity activities in real community service works. The overall project call for a group of maximum nine members. Then, we were given choices to four beneficiaries with each of them targeting different socio-economic status and social groups, which are the Charitable Homes, Community Centre, Street Community and lastly the Environment Enhancing Project, which is a collaborative project with the JCI and OCBC bank. Each of these categories of project has different suggested activities, tasks and schemes to achieve environmental enhancing effects and benefits in the chosen community. Through several discussions among the team members, we have chose to carry out the Environment Enhancing project that was intended to target the Jinjang community in Kepong, Kuala Lumpur. As stated above, this project is a collaborative community service with the JCI and OCBC bank with the idea of materialise students’ proposal and ideas that will truly benefit the community by either enhancing urban community experiences or improve and revitalise condition of a space. The proposal of the project were to be architectural as relating to our course. The reason behind the selection of this category is because of the slight possibility and opportunity of witnessing the design and proposal to be materialised. Throughout the years of studio designing coursework, ideas and designs were completed with drawings, digital 3D models and renderings. But with this opportunity, the effort made might come true and this really excites us as a design student. It is also because of the realistic targeted community with their very own culture and history. The sense of community around the town made us question the method of we will able to augment the identity of them. The large range of are group around the area also really challenges us on how we can bring them together without awkwardness between two different age group. Jinjang is a town located in Kepong, Kuala Lumpur with mostly settlements of the Chinese community. It was established as part of the British strategy during Malayan Emergency to forcibly relocate all races thus isolating them from the communist influences. According to research, it is by far the largest relocation communities, which cause the formation of 445 hectares residential area today. Page of1 7
  • 2. Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518 The site we have chosen is placed in Jinjang Utara, Padang Jinjang Utara, a communal park with spaces like, basketball court, jogging or cycling trail, children playground, football field, Chinese food hawker centre and a well managed public toilet. (Figure 1.1) Jinjnag Utara is an easily accessed housing area. Due to the age of the area, facilities around are at its least and the roads are generally narrow as they were not designed for the vehicles. But the site we have chosen were located close to the houses that acts like a central gathering spot of the community as I believe was because it is a communal space developed since the early stage of this new village. Therefore, this became one of our main reason to elect this specific space as the project site as we interpret it as a vital community space that convivial the societies around through observations and collection of every group members’ perceptions. As stated in the brief, we were suggested to start off with conduction of site analysis (Figure 1.2) that consists of identification and evaluation of needs and issues in the community. We were to determine the issue of a target population and discuss the possible solution of the issue. Page of2 7 6/8/2017 Google Maps https://www.google.com/maps/@3.2129035,101.6591082,783m/data=!3m1!1e3 1/1 Imagery ©2017 DigitalGlobe, Map data ©2017 Google 100 m Figure 1.1 Map of Jinjang Utara. Figure 1.2 Site analysis.
  • 3. Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518 During the early stage of site visits and discussions, we have observed and concluded that the issue to be tackled around the site chosen is the lack of bicycle rack, which caused the unplanned placing of bicycles around the park, around a lamp post, under the gazebo or beneath the trees. The bicycles are mainly owned by the teenagers who live in the Jinjnag residential housing area and it is believed that their main transportation around is their bicycle as several education institutions were located nearby as well as the condition of the narrowness of the roads. The casual parking of these bicycles has caused obstruction is circulation and it seems to have cause several surface damages to them. Thus, through further meeting and discussions, we have decided to perform design development on a norm bicycle rack. (Figure 1.5) As we thought that maybe we could include certain feature and facility for conveniency of the users. After brainstorming and research, decision was made to integrate the idea of seatings and communal table with a bicycle rack. It would be a furniture where one side will be bicycle rack and on the other side it would be normal seating with a table at the centre, separating both function. The purpose is to allow user to have a choice on deciding whether to carry out their activity on the bicycle as the table is provided at the mechanism height, or one could park the bicycle at the rack and have a seat on the other side. Page of3 7 Figure 1.4 Diagrams of bicycle rack proposal. Figure 1.3 Photos of casual bicycle placement.
  • 4. Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518 As the proposal was submitted, our tutor, Ms. Ann See Peng, commented that it is less appropriate for an architectural enhancement and the target issue was not solidified. It is suggested that maybe we could identify issue around the site like the lack of bicycle trails on the narrow road and probably we could map out a creative trails from the schools to the park as this could be the community resting point after the day. As for the designated bicycle rack, it could act as ‘stations’ around the trail for resting purposes or as a pinpoint structure. Based on the comments given, we realised probability of the negative judgement is because of the lack of consideration and understanding of real needs of the park user and the context of the site. Hence, we went back to the site to conduct the second site analysis where we decided to interview the park users and residents around, especially the teenagers who seems to play basketball in the evening on daily basis and the adults that sits around the playground area with the intention of people watching or guarding over their children. Through several effort by the team members as the residents were self-conscious around us, the result was unexpected as their desire for further improvement of the park was as simple as proper seats for more people in the neighbourhood to come around, to gather or linger in the park. I became aware of the simple necessity of a community. I realised the purpose of this project is not to build and design something lavish and complicated but as simple as to bring more Page of4 7 Figure 1.5 Renderings of bicycle rack proposal. Figure 1.6 Photos of user sitting on informal seating spots.
  • 5. Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518 people together in a neighbourhood. To create a space that enable the gathering of family, siblings and friends. It could be a space that enable usage of different age group at close proximity. The team came up with an agreement on designing a playscape. A designed seatings in hammock form, consisting of three levels, allowing different usage for different age group at variety of time. The structure will be locate alongside with the jogging trail, beneath the trees where the shades could be enjoy by the user. It will be complemented with stacks of pallets on both side of the structure, which will act as normal seatings with low tables for older adults with back problems, as well as steps leading upwards to the hammock like playscape. The proposal of bicycle rack will be a complimentary feature of the playscape in the park. To verify the affirmation of the user towards the playscape, we have made a physical model out of grey board, steel hollow tube, white synthetic net and cotton thread. Later, we brought the completed model to the site and had another section of interview with the user. We inquired them based on their thoughts and idea of the playscape, its location, function, size as well as aesthetic and conveniency. As the result, the residents visited the park on that day were satisfy and happy with the outcome and they were excited to see how it would be use by the community and how it will affect the society for a better and convivial environment. Page of5 7 Figure 1.7 Rendering of the playscape. Figure 1.8 Diagrams for the application of playscape.
  • 6. Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518 Page of6 7 Figure 1.9 Final proposal board. Figure 1.9 Playscape physical model.
  • 7. Community Service Initiative (UCM60102U) Tan Jo Lynn 0318518 Link to full video: https://www.youtube.com/watch?v=VeMSHGRfj74&feature=youtu.be Throughout the process of the project, I have realise the importance of contribution to society by using skills and techniques gained during the previous learning stages. It is also about the satisfaction of being able to help the community and enhance the urban environment base on a student’s passion and dedication towards architecture and creation. I have also gain knowledge on holistic awareness of the contextual issue and methods of critical analysis on issue observes, thus determine solutions and designs to solve them with efficiency. It is definitely a great opportunity and platform for us to apply management skills and project planning techniques as well as responsive design production ability. I have also definitely able to work better in team work production after this extent of work progress where we have corporate well and enjoy every debate and discussion to produce satisfying work. Page of7 7 Figure 2.0 Final proposal video.