AO1- Production Schedule- 'Echoes'
Day one- 21st November 2015
Scene: Echoes monologue to end of second Chorus (woods and water stream)
Crew required at location: Camera operator, director, actors, editor, costume
Call Time: All cast should be ready latest 9:45 am
Actors required: Danny, Jammi,
Set up start time: 9:00 am, set up
Set up finish time: 9:30 am
Contingency Plan:
An issue for the first day of filming would be if the actors were unable to turn up for
filming, dew to things such as illness. Filming would then get delayed if they were ill,
we will make sure that there are a few days leeway before filming so we can cope
with these issues. Another issue is the fact that we only have one chance for our final
cut, therefore Friday the 28th will be the day if there are any touchups.
Shots:
1. Establishing shot (the woods) 9:30am
2. Jump shot (other parts of the woods)
3. Jump shot (water stream view)
4. Arc shot (the sky, might be some birds) 9:40am
Monologue
5. Wide shot (walking towards the camera) 9:50am
6. Tracking shot (rustling of the leafs as he’s steps on them) 10:00am
7. Mid shot (lip syncing, walking backwards with the camera) 10:10am
8. Tracking shot (shows the path way he’s walking on) 10:20am
9. Wide shot (crouching touching a plant) 10:30am
10. Wide shot (stands up and walks towards the camera) 10:40am
11. Mid Shot (lip syncing) 10:50am
12. Close up (lip syncing) 11:00am
13. Pan shot (walking as he strokes a tree) 11:10am
14. Wide shot (walking away from camera and cuts to next shot) 11:20am
15. Arc shot (arc shot of him walking and sing through the trees) 11:30am
16. Wide shot (of the flowing stream) 11:40am
17. Mid shot (lip syncing again) 11:50am
18. Pan shot (lip syncing, with emotional actions.) 12:00pm
Day Two- 28th November 2015
Scene: River stream and bridge scene (4th chorus)
Crew required at location: Camera operator, director, actors, editor, costume
Call Time: All cast should be ready latest 1:25 pm
Actors required: Danny, Jammi,
Set up start time: 10:00 am
Set up finish time: 1:10 am
Shots:
19. Jump shot 10:10 am
20. Tracking shot (walking through the woods slowly) 10:20 am
21. Mid shot (a jogger bumps into him) 10:30am
22. Two shot (the jogger takes no notice of him) 10:40am
23. Close up (Excuse me) 10:50am
24. Two shot (stranger blanks him) 11:00 am
25. Arc shot (he is tapping the man to get his attention) 11:00 am
CUT SCENE
26. Jump shot 11:10 am
27. Wide shot 11:20 am
28. Mid shot 11:30 am
29. Close up 11:40 am
30. Close up 11:50 am
31. Arc shot 12:00 pm
32. Crane shot 12:10 pm
33. Wide shot 12:20 pm
34. Wide shot 12:30 pm
35. Mid shot 12:40 pm
36. Mid shot 12:50 pm
37. Zoom Shot (walking around) 1:00 pm
38. Close up 1:10 pm
39. Wide shot (moving around lip syncing) 1:20 am
40. Close up (lip syncing) 1:30 pm
41. Pan shot (of a tree) 1:40 pm
42. Mid shot (hands in the air while lip syncing) 1:50 pm
43. Arc shot (Close up on his face while lip syncing with arc shock circling
him 180) 2:00 pm
44. Arc shot (still lip syncing) 2:10 pm
45. Close up (lip syncing) 2:20 pm
46. Jump shot 2:30 pm
47. Mid shot (In the woods walking into the sunset while lip syncing) 2:40 pm
48. Wide shot (he is standing in the middle of the woods with tree
surrounding him) 2:50 pm
49. Pan shot (spins around looking at the heavens) 3:00 pm
50. Tracking shot (he runs and jumps into a puddle) 3:10 pm
51. Two shot (someone looks at him in disarray) 3:20 pm
52. Close up (close up of confused stranger) 3:30 pm
53. Two shot (the stranger takes no notice of the singer, he is invisible to
him) 3 40 pm
54. Wide Shot (he is cleaning himself while walking through the woods) 3:50
pm
Contingency Plan
The problems that could be addressed is if it rains, filming must be stopped due to the
equipment going to be issued. This will be when we are going to film the bridge
scene, if this issue does happen then we will change filming day therefore we should
allow a few days leeway so that we should be able to keep similar schedule order.
Possible the following Sunday 29th November.
Day Three- 29th November 2015
Scene: Running through the woods singing scene
Crew required at location: Camera operator, director, actors, editor, costume
Call Time: All cast should be ready latest 1:20 pm
Actors required: Danny, Jammi,
Set up start time: 1:25 pm
Set up finish time: 1:35 pm
Shots:
55. Wide Shot (he is cleaning himself while walking through the woods) 1:40
pm
56. Jump shot
57. Arc shot (he is running through the woods) 1:50 pm
58. Mid shot (he is now moving at a much more faster pace to match the songs
pace) 2:00 pm
59. Jump shot
60. Close up (he is spinning around while lip syncing) 2:10 pm
61. Wide shot (he is back at the water stream) 2:20 pm
62. Arc shot (circles him as he looks at his reflection in the water) 2:30 pm
63. Mid Shot (of him standing up as he hits the water) 2:40 pm
64. Over the shoulder shot (he’s moving side to side seems like he’s happy) 2:50
pm
65. Arc shot (he is lip syncing) 3:00 pm
66. Tracking shot (as he runs casually through the woods) 3:10 pm
67. Close up (he is running while singing) 3:20 pm
68. Jump shot
69. Pan shot (he is feeling the music) 3:30 pm
70. Wide shot (he sings while walking through a flock of bushes/trees) 3:40 pm
71. Trombone shot (he finally starts to feel more calm as the song starts to tone
down)3:50 pm
72. Mid shot (Mid shot as he walks past the camera and draws the video to an
end) 4:00 pm
73. Jump shot
74. Reverse Pan shot 4:05 pm
75. Low shot (looking at the floor where there is echoes written in pebbles) 4:10
pm
76. Zoom shot (into a pebble) 4:15 pm
77. End (cut to black) 4:20pm
Contingency Plan:
On this day like the last we are at risk of there being potential rainfall. But we will
take precautions in that we will postpone filming for a couple of days and make time
to edit what we have so far, while we still wait to edit the rest of the video.
Ao1 production schedule (1)

Ao1 production schedule (1)

  • 1.
    AO1- Production Schedule-'Echoes' Day one- 21st November 2015 Scene: Echoes monologue to end of second Chorus (woods and water stream) Crew required at location: Camera operator, director, actors, editor, costume Call Time: All cast should be ready latest 9:45 am Actors required: Danny, Jammi, Set up start time: 9:00 am, set up Set up finish time: 9:30 am Contingency Plan: An issue for the first day of filming would be if the actors were unable to turn up for filming, dew to things such as illness. Filming would then get delayed if they were ill, we will make sure that there are a few days leeway before filming so we can cope with these issues. Another issue is the fact that we only have one chance for our final cut, therefore Friday the 28th will be the day if there are any touchups. Shots: 1. Establishing shot (the woods) 9:30am 2. Jump shot (other parts of the woods) 3. Jump shot (water stream view) 4. Arc shot (the sky, might be some birds) 9:40am Monologue 5. Wide shot (walking towards the camera) 9:50am 6. Tracking shot (rustling of the leafs as he’s steps on them) 10:00am 7. Mid shot (lip syncing, walking backwards with the camera) 10:10am 8. Tracking shot (shows the path way he’s walking on) 10:20am 9. Wide shot (crouching touching a plant) 10:30am 10. Wide shot (stands up and walks towards the camera) 10:40am 11. Mid Shot (lip syncing) 10:50am 12. Close up (lip syncing) 11:00am 13. Pan shot (walking as he strokes a tree) 11:10am 14. Wide shot (walking away from camera and cuts to next shot) 11:20am 15. Arc shot (arc shot of him walking and sing through the trees) 11:30am 16. Wide shot (of the flowing stream) 11:40am 17. Mid shot (lip syncing again) 11:50am 18. Pan shot (lip syncing, with emotional actions.) 12:00pm Day Two- 28th November 2015 Scene: River stream and bridge scene (4th chorus) Crew required at location: Camera operator, director, actors, editor, costume Call Time: All cast should be ready latest 1:25 pm Actors required: Danny, Jammi, Set up start time: 10:00 am Set up finish time: 1:10 am Shots: 19. Jump shot 10:10 am
  • 2.
    20. Tracking shot(walking through the woods slowly) 10:20 am 21. Mid shot (a jogger bumps into him) 10:30am 22. Two shot (the jogger takes no notice of him) 10:40am 23. Close up (Excuse me) 10:50am 24. Two shot (stranger blanks him) 11:00 am 25. Arc shot (he is tapping the man to get his attention) 11:00 am CUT SCENE 26. Jump shot 11:10 am 27. Wide shot 11:20 am 28. Mid shot 11:30 am 29. Close up 11:40 am 30. Close up 11:50 am 31. Arc shot 12:00 pm 32. Crane shot 12:10 pm 33. Wide shot 12:20 pm 34. Wide shot 12:30 pm 35. Mid shot 12:40 pm 36. Mid shot 12:50 pm 37. Zoom Shot (walking around) 1:00 pm 38. Close up 1:10 pm 39. Wide shot (moving around lip syncing) 1:20 am 40. Close up (lip syncing) 1:30 pm 41. Pan shot (of a tree) 1:40 pm 42. Mid shot (hands in the air while lip syncing) 1:50 pm 43. Arc shot (Close up on his face while lip syncing with arc shock circling him 180) 2:00 pm 44. Arc shot (still lip syncing) 2:10 pm 45. Close up (lip syncing) 2:20 pm 46. Jump shot 2:30 pm 47. Mid shot (In the woods walking into the sunset while lip syncing) 2:40 pm 48. Wide shot (he is standing in the middle of the woods with tree surrounding him) 2:50 pm 49. Pan shot (spins around looking at the heavens) 3:00 pm 50. Tracking shot (he runs and jumps into a puddle) 3:10 pm 51. Two shot (someone looks at him in disarray) 3:20 pm 52. Close up (close up of confused stranger) 3:30 pm 53. Two shot (the stranger takes no notice of the singer, he is invisible to him) 3 40 pm 54. Wide Shot (he is cleaning himself while walking through the woods) 3:50 pm Contingency Plan The problems that could be addressed is if it rains, filming must be stopped due to the equipment going to be issued. This will be when we are going to film the bridge scene, if this issue does happen then we will change filming day therefore we should allow a few days leeway so that we should be able to keep similar schedule order. Possible the following Sunday 29th November.
  • 3.
    Day Three- 29thNovember 2015 Scene: Running through the woods singing scene Crew required at location: Camera operator, director, actors, editor, costume Call Time: All cast should be ready latest 1:20 pm Actors required: Danny, Jammi, Set up start time: 1:25 pm Set up finish time: 1:35 pm Shots: 55. Wide Shot (he is cleaning himself while walking through the woods) 1:40 pm 56. Jump shot 57. Arc shot (he is running through the woods) 1:50 pm 58. Mid shot (he is now moving at a much more faster pace to match the songs pace) 2:00 pm 59. Jump shot 60. Close up (he is spinning around while lip syncing) 2:10 pm 61. Wide shot (he is back at the water stream) 2:20 pm 62. Arc shot (circles him as he looks at his reflection in the water) 2:30 pm 63. Mid Shot (of him standing up as he hits the water) 2:40 pm 64. Over the shoulder shot (he’s moving side to side seems like he’s happy) 2:50 pm 65. Arc shot (he is lip syncing) 3:00 pm 66. Tracking shot (as he runs casually through the woods) 3:10 pm 67. Close up (he is running while singing) 3:20 pm 68. Jump shot 69. Pan shot (he is feeling the music) 3:30 pm 70. Wide shot (he sings while walking through a flock of bushes/trees) 3:40 pm 71. Trombone shot (he finally starts to feel more calm as the song starts to tone down)3:50 pm 72. Mid shot (Mid shot as he walks past the camera and draws the video to an end) 4:00 pm 73. Jump shot 74. Reverse Pan shot 4:05 pm 75. Low shot (looking at the floor where there is echoes written in pebbles) 4:10 pm 76. Zoom shot (into a pebble) 4:15 pm 77. End (cut to black) 4:20pm Contingency Plan: On this day like the last we are at risk of there being potential rainfall. But we will take precautions in that we will postpone filming for a couple of days and make time to edit what we have so far, while we still wait to edit the rest of the video.