The shooting schedule outlines 10 days of filming for a music video. Day 1 involves rehearsing the intro and establishing characters. Day 2 shoots the intro with multiple takes. Days 3-4 shoot flashbacks from verses 1-2 with rehearsal. Day 5 rehearses a studio performance. Days 6-8 shoot the chorus, final verse, and outro with multiple takes each. Days 9-10 film bridging components and the outro with rehearsal and multiple takes.
2. Day 1
• We rehearse the intro to our song, we get all
the actors use to their characters, and figure
out how to use our surroundings to have the
most effect on the audience. Figure out the
different camera shots we could possibly use.
3. Day 2
• Shoot the intro with all cast involved. Shoot
more then once so we are able to choose from
varies clips due to inconsistent quality.
4. Day 3
• Begin to rehearse the flash backs for verses 1
and 2, for this scene we have to figure out a
way to show it is not present time but the
past, once again we get the suitable
characters use to there stage directions and
costumes they need to wear
5. Day 4
• Shoot the flash backs with all cast involved.
Shoot more then once so we are able to
choose from varies clips due to inconsistent
quality.
6. Day 5
• Move to a studio to rehearse the performance
aspect of our piece, get the actors use to there
instruments and use to being in front of
lighting. Figure out different shots we can use
to help in defining the band.
7. Day 6
• Shoot the chorus with all cast involved. Shoot
more then once so we are able to choose from
varies clips due to inconsistent quality.
8. Day 7
• Rehearse the final verse as it is now in present
time, figure out the different angles to shoot
from and figure out the costumes to wear.
9. Day 8
• Shoot the final verse with all cast involved.
Shoot more then once so we are able to
choose from varies clips due to inconsistent
quality.
10. Day 9
• Work on the bridge components of our song
and the outro as they link, figure out the
timings between each visual of the band
members and there attitudes and facial
expressions during this bit.
11. Day 10
• Shoot the bridging components with all cast
involved. Shoot more then once so we are
able to choose from varies clips due to
inconsistent quality.