CURRICULUM VITAE
SYED SAMAD
samadsyed167@gmail.com
Contact NO:+919581138504
CAREER OBJECTIVE
To work in a firm with a professional work driven environment where I can utilize and apply my
knowledge, skills which would enable me as a fresh graduate to grow while fulfilling organizational
goals.
EDUCATIONAL BACKGROUND
Qualification Board/University Year of Passing Percentage
B.Tech
(Mechanical)
Arkay college, JNTUH university 2016 62.61 %
Intermediate Board of Intermediate Education 2012 70.9 %
SSC Board Of Secondary Education 2010 67.83 %
TECHNICAL SKILLS
 Capable of Designing & Drafting MEP Systems for Construction Industry.
 Expert in Electrical Maintenance and Safety.
 Expert in Industrial Motor Control.
 Able to Design HVAC System, Electrical System & Plumbing Service for any given project.
 Capable of working on International (Gulf) Projects.
 Expert in AutoCAD drafting & Shop Drawing for MEP Systems.
 Ability to handle Site Erection/Inspection of MEP Systems
 Expertise in all editions of windows & MS Office.
PROFESSIONAL EXPERIENCE
EMPLOYER: SEA CONSTRUCTIONS – NIZAMABAD
Mechanical Engineer (MEP Works)
-Working as a MEP ENGINER From 20-01-16 to 10-02-2017
JOB RESPONSIBILTIES
• Coordinating with Client, Project Manager, Main Contractor, and other specialist sub-
contractors.
• The main role as electrical engineer in construction projects is to supervise the electricians in
handling all the electrical works considering the safety and quality requirements.
• The construction side also read and studies electrical plans (usually done by electrical design
engineer) and implements it in the site, and sometime does necessary actions whether to
correct or to improve the design.
• Estimating load schedule at LV-Panel, MDB, SMDB & Final DB level, voltage-drop
calculation, cables selection & sizing, DG selection & sizing and Transformer Selection and
sizing. Earthing and Lighting protection system design.
• Looking after designing & Installation of Fire Alarm System.
• Overseeing activities related to Installation of other low current services like Access Control,
CCTV and Security System, SMATV System, IP-PBX System.
• Planning, scheduling and determining manpower for the project, leading project electrical
team from conceptual stage to detail design stage, providing support and guidance to design
engineers, CAD operators and coordination with team members of other disciplines.
• Attending kick-off, weekly progress and coordination meetings at site.
• Electrical installation of Residential & commercial Buildings.
• Inspection on electrical conduting & wiring work with respect to electrical load.
• Preparing the load schedules, lightning load calculations & single line diagram.
• Assisting in getting the approvals for the materials to be used.
• Inspecting the site work as per the approved drawings.
• Maximum demand estimation and deciding voltage level.
• Selection of transformer/Dg capacity and number with necessary metering and protection.
• Preparation of detail main single line schematic.
• Short circuit & voltage drop calculation at each level of distribution.
• Selection of HT/LT switches gear based on breaking, making &short time capacity.
• Selection of HT/LT cables based on thermal, short circuit & voltage drop based ampacity.
• Preparation of GA/sectional drawings, HT & LT switch board and busbar sizing.
• Design of Earthing & Lighting protection system.
• Design of fire-safety in substation, cable trenches & other parts of electrical system.
• Preparation of power & control cable schedule.
Hands On:
 HVAC Work
:
• Heat load calculation after building survey using CARRIER and ASHRAE standards by
manuals and by latest HVAC ASHRAE E20 Form
• Calculation of blower CFM, air distribution duct design following SMACNA and DW144
duct design codes, selection of diffusers, grilles G.I sheet etc. (Mc Quay Software)
• To prepare the selection of machines like FCU’s, AHU’s, Chillers, Pumps etc, on the basis of
Heat Load calculations from respective models like Blue Star, Voltas, and Carrier etc.
• Preparing the Air Distribution System for the complete design.
• Calculating the Duct Sizing according to the CFM by using Mc Quay Software
• Calculating the Pipe Sizing for the chilled water system according to the GPM.
• Preparing the BOQ for the complete project.
• Preparing the Equipment and Technical Schedule depending upon the project.
• Preparing Material Take-off (MTO) from tender drawings as per Specifications and
International Standards.
• Incorporating the standards in the Shop Drawings and Sections
• Preparing the Schematic drawing for the project HVAC System Ducting and Chilled Water
piping.
• Preparing the Pump Head Calculation for the selection of Pump Head.
• Preparing the Static Pressure Calculation fort the selection of AHU Fan capacity.
• Preparing the Shop drawings for Ducting and Chilled water system
• Preparing the Sections for the complicated areas and for the plant rooms.
 Plumbing – Design & Drafting (Water Supply, Drainage & Fire Fighting)
Designing Work Ability – Plumbing:
• Preparing Single Line Design Drawing for the Plumbing Systems.
• Designing of Water Supply & Sanitary Drainage System for a Building.
• Applying the Codes & Standards of Plumbing as per IPC.
• Preparing Double Line Shop Drawing for Water Supply & Sanitary Drainage System
• Preparing the BOQ for the complete project.
• Preparing the Equipment and Technical Schedule depending upon the project.
• Preparing Material Take-off (MTO) from tender drawings as per Specifications and
International Standards.
• Incorporating the standards in the Shop Drawings and Sections
• Preparing the Schematic drawing for the project Plumbing System Water Supply & Sanitary
Drainage piping.
• Preparing the Shop drawings for Water Supply & Sanitary Drainage system
• Preparing the Sections for the complicated areas.
PERSONAL SKILLS
 Ability to rapidly build relationship and set up trust.
 Confident and Determined.
 Ability to cope up with different situations.
 Ability to handle pressure.
 Positive attitude.
 Dedicated towards my job
PERSONAL DETAILS
 Name : Syed Samad
 Father’s Name : Syed Hameed
 Date of Birth : 15/05/1995
 Marital Status : Single
 Nationality/Religion : Indian / Muslim
 Interest & Hobbies. : Watching Cricket
 Languages Known : Hindi, Urdu, English, Telugu
 Permanent Address : Nizamabad,Telangana,India
PASSPORT DETAILS
 Passport No : P3053173
 Passport Issue : 20/06/2016
 Passport Expiry : 19/06/2026
DECLARATION
I hereby declare that the above-mentioned information is correct up to my Knowledge
and I bear the responsibility for the correctness of the above-mentioned particulars.
( SYED SAMAD)

Sam mep

  • 1.
    CURRICULUM VITAE SYED SAMAD samadsyed167@gmail.com ContactNO:+919581138504 CAREER OBJECTIVE To work in a firm with a professional work driven environment where I can utilize and apply my knowledge, skills which would enable me as a fresh graduate to grow while fulfilling organizational goals. EDUCATIONAL BACKGROUND Qualification Board/University Year of Passing Percentage B.Tech (Mechanical) Arkay college, JNTUH university 2016 62.61 % Intermediate Board of Intermediate Education 2012 70.9 % SSC Board Of Secondary Education 2010 67.83 % TECHNICAL SKILLS  Capable of Designing & Drafting MEP Systems for Construction Industry.  Expert in Electrical Maintenance and Safety.  Expert in Industrial Motor Control.  Able to Design HVAC System, Electrical System & Plumbing Service for any given project.  Capable of working on International (Gulf) Projects.  Expert in AutoCAD drafting & Shop Drawing for MEP Systems.  Ability to handle Site Erection/Inspection of MEP Systems  Expertise in all editions of windows & MS Office. PROFESSIONAL EXPERIENCE EMPLOYER: SEA CONSTRUCTIONS – NIZAMABAD Mechanical Engineer (MEP Works)
  • 2.
    -Working as aMEP ENGINER From 20-01-16 to 10-02-2017 JOB RESPONSIBILTIES • Coordinating with Client, Project Manager, Main Contractor, and other specialist sub- contractors. • The main role as electrical engineer in construction projects is to supervise the electricians in handling all the electrical works considering the safety and quality requirements. • The construction side also read and studies electrical plans (usually done by electrical design engineer) and implements it in the site, and sometime does necessary actions whether to correct or to improve the design. • Estimating load schedule at LV-Panel, MDB, SMDB & Final DB level, voltage-drop calculation, cables selection & sizing, DG selection & sizing and Transformer Selection and sizing. Earthing and Lighting protection system design. • Looking after designing & Installation of Fire Alarm System. • Overseeing activities related to Installation of other low current services like Access Control, CCTV and Security System, SMATV System, IP-PBX System. • Planning, scheduling and determining manpower for the project, leading project electrical team from conceptual stage to detail design stage, providing support and guidance to design engineers, CAD operators and coordination with team members of other disciplines. • Attending kick-off, weekly progress and coordination meetings at site. • Electrical installation of Residential & commercial Buildings. • Inspection on electrical conduting & wiring work with respect to electrical load. • Preparing the load schedules, lightning load calculations & single line diagram. • Assisting in getting the approvals for the materials to be used. • Inspecting the site work as per the approved drawings. • Maximum demand estimation and deciding voltage level. • Selection of transformer/Dg capacity and number with necessary metering and protection. • Preparation of detail main single line schematic. • Short circuit & voltage drop calculation at each level of distribution. • Selection of HT/LT switches gear based on breaking, making &short time capacity. • Selection of HT/LT cables based on thermal, short circuit & voltage drop based ampacity. • Preparation of GA/sectional drawings, HT & LT switch board and busbar sizing. • Design of Earthing & Lighting protection system. • Design of fire-safety in substation, cable trenches & other parts of electrical system. • Preparation of power & control cable schedule. Hands On:  HVAC Work : • Heat load calculation after building survey using CARRIER and ASHRAE standards by manuals and by latest HVAC ASHRAE E20 Form • Calculation of blower CFM, air distribution duct design following SMACNA and DW144
  • 3.
    duct design codes,selection of diffusers, grilles G.I sheet etc. (Mc Quay Software) • To prepare the selection of machines like FCU’s, AHU’s, Chillers, Pumps etc, on the basis of Heat Load calculations from respective models like Blue Star, Voltas, and Carrier etc. • Preparing the Air Distribution System for the complete design. • Calculating the Duct Sizing according to the CFM by using Mc Quay Software • Calculating the Pipe Sizing for the chilled water system according to the GPM. • Preparing the BOQ for the complete project. • Preparing the Equipment and Technical Schedule depending upon the project. • Preparing Material Take-off (MTO) from tender drawings as per Specifications and International Standards. • Incorporating the standards in the Shop Drawings and Sections • Preparing the Schematic drawing for the project HVAC System Ducting and Chilled Water piping. • Preparing the Pump Head Calculation for the selection of Pump Head. • Preparing the Static Pressure Calculation fort the selection of AHU Fan capacity. • Preparing the Shop drawings for Ducting and Chilled water system • Preparing the Sections for the complicated areas and for the plant rooms.  Plumbing – Design & Drafting (Water Supply, Drainage & Fire Fighting) Designing Work Ability – Plumbing: • Preparing Single Line Design Drawing for the Plumbing Systems. • Designing of Water Supply & Sanitary Drainage System for a Building. • Applying the Codes & Standards of Plumbing as per IPC. • Preparing Double Line Shop Drawing for Water Supply & Sanitary Drainage System • Preparing the BOQ for the complete project. • Preparing the Equipment and Technical Schedule depending upon the project. • Preparing Material Take-off (MTO) from tender drawings as per Specifications and International Standards. • Incorporating the standards in the Shop Drawings and Sections • Preparing the Schematic drawing for the project Plumbing System Water Supply & Sanitary Drainage piping. • Preparing the Shop drawings for Water Supply & Sanitary Drainage system • Preparing the Sections for the complicated areas. PERSONAL SKILLS  Ability to rapidly build relationship and set up trust.  Confident and Determined.  Ability to cope up with different situations.  Ability to handle pressure.  Positive attitude.  Dedicated towards my job
  • 4.
    PERSONAL DETAILS  Name: Syed Samad  Father’s Name : Syed Hameed  Date of Birth : 15/05/1995  Marital Status : Single  Nationality/Religion : Indian / Muslim  Interest & Hobbies. : Watching Cricket  Languages Known : Hindi, Urdu, English, Telugu  Permanent Address : Nizamabad,Telangana,India PASSPORT DETAILS  Passport No : P3053173  Passport Issue : 20/06/2016  Passport Expiry : 19/06/2026 DECLARATION I hereby declare that the above-mentioned information is correct up to my Knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. ( SYED SAMAD)