© 2010 IBM Corporation
This document is for IBM and IBM Business Partners only. It is not for client distribution.
© 2008 IBM
Corporation
AIX:
The Future of UNIX
Name
Title
Seller
© 2010 IBM Corporation
2 This document is for IBM and IBM Business Partners onl
IBM Power Systems
As the world gets smarter, infrastructure demands will grow
Smart
traffic
systems
Smart water
management
Smart
energy
grids
Smart
healthcare
Smart
food
systems
Intelligent
oil field
technologies
Smart
regions
Smart
weather
Smart
countries
Smart
supply
chains
Smart
cities
Smart retail
© 2010 IBM Corporation
3 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Consolidating with AIX on Power Systems
enables clients to…
Server consolidation improves service to clients by
delivering flexible performance, dynamic provisioning
and enabling clients to avoid disruption
Server consolidation with shared resources enables high
system utilization, which lowers the cost of ownership by
reducing networking, energy, floor space, and software
costs.
REDUCE COST
IMPROVE SERVICE
MANAGE RISK
Server consolidation manages IT risk by improving
security, increasing business resiliency and
simplifying operations.
AIX, Power™ Systems and PowerVM™ are designed to deliver
effective consolidation in the most demanding data
centers
© 2010 IBM Corporation
4 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Winn-Dixie
Strengthening the infrastructure with an IBM consolidation solution
Business challenge:
Winn-Dixie, a Jacksonville, Florida-based grocery chain based with
more than 600 retail locations throughout the southeastern U.S.,
needed a cost-effective and easily managed solution to replace its
aging distributed IT infrastructure and quickly enable disaster
recovery.
Solution:
The solution consolidated more than 600 stand-alone servers at
individual grocery stores into a centralized data center at Winn
Dixie headquarters using IBM AIX® and IBM PowerVM™
virtualization technologies to support 16 stores on a single
IBM BladeCenter® JS22 blade server, mirrored to a nearby facility
as well as to a remote disaster recovery location.
Benefits:
 Redirected $5 million capital cost savings to store
remodelling
 Improved application performance by 5 to 10 times, enabling
better service
 Reduced disaster recovery time from days to hours
“We thought the IBM
solution gave us the most
flexibility not only for now,
but going forward. It
accommodated our existing
application portfolio while
providing a very rich
upgrade path in our
infrastructure.”
– Barry Kirk, director of
architecture, Winn-Dixie
Solution components:
 IBM BladeCenter® JS22
blades in IBM BladeCenter H
 IBM PowerVM™
 IBM AIX®
POP03046-USEN-00
© 2010 IBM Corporation
5 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Baylor College of Medicine improves performance and
sets the stage for an SAP upgrade with IBM servers
Business challenge:
When Baylor College of Medicine (Baylor) decided to build a new
hospital, it also planned to upgrade its existing data center in
order to ease space constraints and replace end-of-life Sun
servers. It needed a smooth migration that would provide
uninterrupted access to its SAP ERP system and other supporting
systems.
Solution:
Baylor engaged IBM Premier Business Partner Mark III and brought
in the IBM Migration Factory team to provide the transition of
workloads from 32 legacy Sun servers onto three IBM Power™
570
servers, running the IBM AIX®
operating system. IBM Migration
Factory performed the server consolidation and migration of
Baylor’s software applications from the old Sun hardware platform
to the new IBM platform.
Benefits:
 Achieves a 60 percent reduction in rack space footprint and
better than 40 percent savings in both cooling and power
 Improves overall performance by 30 percent
 Improves payroll processing time by 213 percent
“Nobody else had as
eloquent and simple a
design as IBM did. They also
offered very cost-effective
solutions.”
— Al Reineking,
executive director of IT operations
and technical services, Baylor
College of Medicine
Solution components:
 SAP ERP
 IBM Migration Factory
 IBM Power 570
© 2010 IBM Corporation
6 This document is for IBM and IBM Business Partners onl
IBM Power Systems
The Coca-Cola Bottling Company of Egypt
IBM enables growth with powerful, scalable solutions
Business Challenge:
The Coca-Cola Bottling Company of Egypt’s hardware
infrastructure hosted their enterprise resource planning
system, Oracle E-Business Suite. As they grew and added
modules, server performance failed to meet business needs.
They needed to implement a high performance, scalable
infrastructure, including a centralized storage system.
Solution:
The company implemented two IBM Power™ 570 servers —
one each for the main site and the remote site — both running
IBM AIX®
. They implemented IBM PowerVM™ Dynamic
Logical Partitioning and Micro-Partitioning to minimize server
administration and to minimize the number of processors
needed. They also implemented IBM System
Storage™ DS4800.
Benefits:
 Improves performance while reducing the number of
processors from 16 to 7
 Reduces risk and reduces the number of servers needed
for disaster recovery
 Increases server utilization by 35 percent and supports 71
percent more users
“Our new IBM
infrastructure provides us
with improved performance,
availability
and scalability to manage
our growth.”
— The Coca-Cola Bottling
Company of Egypt
Solution Components:
 IBM Power 570
 IBM AIX
 IBM PowerVM Dynamic
Logical Partitioning and Micro
Partitioning
 IBM System Storage DS4800
MUP03005-USEN-00
© 2010 IBM Corporation
7 This document is for IBM and IBM Business Partners onl
IBM Power Systems
University of Pittsburgh Medical Center (UPMC)
Rewriting the rules on IT investment to facilitate tomorrow’s healthcare innovations
Business Challenge
UPMC, Pennsylvania’s largest integrated healthcare delivery
network, sought to lower the cost and complexity of IT infrastructure
to enable the continued investment in next-generation clinical
systems and to lay the foundation for the best possible patient care.
Solution
Now in the middle of a landmark, 8-year strategic partnership with
IBM, UPMC is transforming its systems through consolidation,
standardization and virtualization. Relying on IBM products and
services, the mid-stream effort has already resulted in the reduction of
hundreds of servers across the UPMC network and achieved more
than a quantum improvement in resource efficiency. It has
fundamentally changed the
link between processing and resource needs — enabling it to meet an
ambitious clinical agenda with a far lower rate of IT investment growth.
Benefits
 $30 million in capital and operating cost reductions
150 percent increase in processing capacity with no increase
in IT support costs
 40 percent reduction in IT infrastructure floor space requirements,
freeing up space for revenue generating services
 67 percent reduction in number of physical servers
“ Considering that IBM and UPMC
are only midway through this trans-
formation project, the results have been
impressive. We have already proven that
standardization, along with aggressive
implementation of virtualization, yields
unprecedented productivity and
efficiency.”
– Paul Sikora, VP of IT Transformation, UPMC
Solution Components
 IBM BladeCenter®
 IBM Component Infrastructure Roadmap
 IBM Global Technology Services
 IBM Healthcare and Life Sciences
 IBM Research
 IBM STG Services
 IBM SWG Services
 IBM System p™, System x™, System z™
 IBM Tivoli® product suite
 IBM TotalStorage® Enterprise Storage
 IBM WebSphere Business Integration
 IBM WebSphere® Application Server
© 2008 IBM Corporation
© 2010 IBM Corporation
8 This document is for IBM and IBM Business Partners onl
IBM Power Systems
IBM Power Systems Success Stories
Power technologies provide real business value
Annual savings of over $500,000 + accelerated new
services deployment from 1 month to 2 days
Reduced application downtime + increased
flexibility to dynamically scale and
change workload capacity
Fewer processor cores than previous
Sun servers reduced software and
management costs + PowerVM simplified
the effort to deploy or scale new services
Consolidated and virtualized 76 servers to 6 –
reducing complexity and total cost of ownership
of global IT infrastructure
© 2010 IBM Corporation
9 This document is for IBM and IBM Business Partners onl
IBM Power Systems
IBM’S 10-year march to UNIX leadership
15%
20%
25%
30%
35%
40%
45%
Q
100
Q
300
Q
101
Q
301
Q
102
Q
302
Q
103
Q
303
Q
104
Q
304
Q
105
Q
305
Q
106
Q
306
Q
107
Q
307
Q
108
Q
308
Q
109
Q
309
Q
110
HP Sun IBM
UNIX Server Rolling Four Quarter Average Revenue Share
POWER4
Dynamic LPARsDynamic LPARs
POWER6
Live PartitionLive Partition
MobilityMobility
POWER5
Micro-PartitioningMicro-Partitioning
POWER7
Workload OptimizedWorkload Optimized
LeadershipLeadership
dot.com
bubble
burst
global
economic
recession
…the largest shift of customer spending in UNIX history
© 2010 IBM Corporation
10 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Why AIX is the Premier UNIX® Platform Today
Strong, stable, non-disruptive roadmap
Improved Efficiency through Virtualization
Outstanding Performance
Innovation through integrated Development
© 2010 IBM Corporation
12 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Network Centric
Computing
AIX V2 & V3
Establishment in
the market:
- RISC Support
- UNIX credibility
- Open Sys. Stds..
- Dynamic Kernel
- JFS and LVM
- SMIT
AIX V3.2.5
Maturity:
- Stability
- Quality
AIX V4.1/4.2
SMP Scalability:
- POWERPC spt.
- 4-8 way SMP
- Kernel Threads
- Client/Server pkg
- NFS V3
- CDE
- UNIX95 branded
- NIM
- > 2GB filesystems
-HACMP Clustering
- POSIX 1003.1,
1003.2, XPG4
- Runtime Linking
- Java 1.1.2
AIX V4.3
Higher levels of
scalability:
- 24-way SMP
- 64-bit HW support
- 96 GB memory
- UNIX98 branded
- TCP/IP V6
- IPsec
- Web Sys. Mgr.
- LDAP Dir. Server.
- Workload Mgr
- Java JDT/JIT
- Direct I/O
- Alt. Disk Install
- Exp/Bonus CDs
Distributed
Client-Server
1986-19921986-1992 1994-19961994-1996 1997-19991997-1999
Flexible Resource
Management:
- POWER4+ spt.
- Dynamic LPAR
- Dynamic CUoD
- New 64bit kernel
- 512GB mem
- JFS2
- 16 TB filesystems
- UNIX03 branded
- Concurrent I/O
- MultiPath I/O
- Flex LDAP Client
- XSSO PAM spt
e-Business
Computing
Open Systems
Workstations
AIX Evolution – Over Twenty years of Progress
AIX/6000
Uni-processor 4-8 way SMP 24-way SMP 32-way SMP
AIX 7
Future of UNIX:
-256 core/1024 tread
scalability
-POWER7
Exploitation
-Domain based
RBAC
- AIX Profile
Manager
-WPAR
enhancements
-AIX 5.2 in a WPAR
-PowerVM
virtualized storage
-LVM SSD support
-Terabyte segment
20102010
On Demand
Business
2001-20022001-2002
64/256-way SMT
AIX 5L V5.3
Advanced
Virtualization:
- POWER5 support
- 64-way SMP
- SMT
- MicroPartitions™
- Virt I/O Server
- Partition Load Mgr
- NFS Version 4
- Adv. Accounting
- Scaleable VG
- JFS2 Shrink
- SUMA
- SW RAS features
- POSIX Realtime
2004-20052004-2005
AIX 5L V5.1/5.2
Smarter
Planet
20072007
AIX 6
Enterprise RAS:
-POWER6 support
-Workload Partitions
-Application Mobility
-Continuous Avail.
-Storage Keys
-Dynamic tracing
-Software FFDC
-Recovery Rtns
-Concurrent MX
-Trusted AIX
-RBAC
-Encrypting JFS2
-AIX Security Expert
-Director Console
New Enterprise
Data Center
1024-way SMT4
© 2010 IBM Corporation
13 This document is for IBM and IBM Business Partners onl
IBM Power Systems
PowerVM Virtualization Architecture
Networks and network storage
On demand
resources
Power
Hypervisor
Service
processor
Processors
Memory
Linux
partitions
Virtual Network
AIX
Dedicated
partitions
Expansion slots
Virtual processors Virtual adapters
Local devices & storage
Workload management and provisioning
WPAR
WPAR
WPAR
Virtual
I/O
server
Virtual
network
&
storage
SLICLinux
kernels
AIX
Shared partitions
AIX
kernels
Virtual
I/O
server
Virtual
network
&
storage
IBM i
© 2010 IBM Corporation
14 This document is for IBM and IBM Business Partners onl
IBM Power Systems
What is new for August 2010
 AIX 7
– The Future of UNIX
 AIX 5.2 Workload Partitions for AIX 7
– A new way to consolidate older workloads on POWER7
© 2010 IBM Corporation
15 This document is for IBM and IBM Business Partners onl
IBM Power Systems
 Workload-Optimizing Systems
– Vertical scalability for massive workloads with up to 256 cores/1024 threads
in a single AIX partition
 Virtualization without limits
– Run AIX 5.2 in a WPAR to simplify consolidation of legacy environments on POWER7
 Resiliency without downtime
– Built in clustering to simplify configuration and management of scale-out
workloads and high availability solutions
 Management with Automation
– Profile based configuration management eases the management
of pools of AIX systems
AIX 7 -- The Future of UNIX
*All statements regarding IBM's future direction and intent are subject
to change or withdrawal without notice, and represent goals and objectives
only.
Some features require the purchase of additional software components.
© 2010 IBM Corporation
16 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Binary Compatibility Guarantee
© 2010 IBM Corporation
17 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Moving up to AIX 7
AIX 7 runs on your existing hardware
– Fully exploits POWER7 processor-based systems
– Also exploits systems based on POWER4™, POWER5™, POWER6 processors
AIX 7 runs your existing applications
– Current applications will continue to run – no need to recompile applications *
– Even supports 32 bit applications created on AIX versions prior to AIX V5
– Binary compatibility guarantee
Upgrade process
– Prior upgrade tools will support upgrade to AIX 7
– Clients can upgrade directly to AIX 7 from AIX 6 and AIX V5
– Free upgrade for customers with Software Maintenance Agreements (SWMA)
–Upgrades are no charge within the same edition:
AIX 5.3 to AIX 7 Standard edition
AIX 6 Express Edition to AIX 7 Express Edition, etc,
*See general conditions at ibm.com/systems/power/software/aix/compatibility
© 2010 IBM Corporation
18 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Scalability Evolution
AIX/6000
UniprocessorUniprocessor
2424
ThreadsThreads
4-84-8
ThreadsThreads
256256
ThreadsThreads
32-12832-128
ThreadsThreads
10241024
ThreadsThreads
© 2010 IBM Corporation
19 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX 7* Hardware Enablement and Support
 Terabyte Segment support
– Designed to improve performance for workloads that use large amounts of memory
 AIX kernel memory pinning
– AIX 7 memory pinned by default to enhance performance
 Hardware acceleration for Encrypting Filesystems, IPSec and Trusted
Execution
– Reduce processor workload for encryption
 LVM Solid State Disk Support
– SSD only Volume Groups, enhancements to filemon to identify SSD candiates
 Shared Memory interface to Barrier Synchronous Register
– Reduce need for kernel extensions for BSR access
* These features are also available in AIX 6 Technology Level 6
© 2010 IBM Corporation
20 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Workload Partitions (WPAR)
 WPARs are designed to save
administrator work by reducing
the number of AIX instances to
patch
 WPARs have much lower
memory resource requirements:
68 MB vs 1GB for an LPAR
 WPAR takes seconds to create
and LPARs minutes
 Application mobility much
simpler to organize than LPM
 Lots of WPARs on one AIX is
simpler to monitor and control
than monitoring across many
LPARs.
 Rapid cloning is easy and lets
you use "disposable images" -
simple to create, experiment and
throw away
Virtualized AIX operating
system environments within a
single AIX image
Each WPAR shares the single
AIX operating system
AIX 7 added the capability to
run AIX 5.2 in a WPAR*
Applications and users inside a
WPAR cannot affect resources
outside the WPAR*
Each WPAR can have a
regulated share of processor,
memory and other resources
Two types of WPAR
- System WPARs have separate
security and appear like a
completely separate OS
- Application WPARs are
manageability wrappers around a
single application
Top reasons to use WPARsWhat is it?
* Requires purchase of the AIX 5.2 WPARs for AIX 7
product
NetworksDisk or NFS storage NetworksDisk or NFS storage
© 2010 IBM Corporation
21 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Workload Partitions can be used in LPARs
LPAR
Asia
LPAR LPAR
EMEA
LPAR
Americas
VIO
Server
Dedicated
Processor
LPAR
Finance
Dedicated
Processor
LPAR
Planning
WPAR #1
Business
Intelligence
WPAR #1
MFG
WPAR #2
Planning
WPAR #1
eMail
WPAR #3
Billing
WPAR #2
Test
Micro-partition Processor Pool
POWER Hypervisor™POWER Hypervisor™
© 2010 IBM Corporation
22 This document is for IBM and IBM Business Partners onl
IBM Power Systems
WPAR Shared Applications Enables Administrative
Efficiency
Workload
Partition
App Server
#1
Workload
Partition
Billing
Workload
Partition
BI
Global filesystems
/
/etc
/usr application code
/opt application code (or here)
/var
/tmp
/appserver application code (or here)
System WPAR filesystems
/ r/w - unique per WPAR
/etc r/w - unique per WPAR
/usr r/o from global (typically)
/opt r/o from global (typically)
/var r/w - unique per WPAR
/tmp r/w - unique per WPAR
Global FS
/
/etc
/usr
/opt
/var
/tmp
/appsvr
WPAR FS
App Server 1
Workload
Partition
App Server
#2 Workload
Partition
Web
Server
Application installed in Global instance and used by multiple WPARs
WPAR FS
App Server 1
/
/etc
/var
/tmp
/config
/
/etc
/var
/tmp
/config
NFS
AIX
global Instance
© 2010 IBM Corporation
23 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX 7 WPAR Enhancements
 Export of Fibre channel adapters to WPARs
– NPIV-like, but can work on any Fibre Channel adapter
– Adds support for Fibre Channel tape
 Kernel Extensions for WPARs
– Trusted kernel extensions may be loaded by the WPAR administrator
– Extensions can be only for one WPAR or for entire system
 Support for VIOS disks in WPARs
– VSCSI disks can be exported to a WPAR
– This feature also available in AIX 6 Technology Level 6
 Run AIX 5.2 inside of a Workload Partition
– Consolidate older environments on POWER7 processor-based systems
– Requires AIX 5.2 WPARs for AIX 7 – available separately from AIX 7
© 2010 IBM Corporation
24 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Introducing:
AIX 5.2 Workload Partitions for AIX 7
 A new licensed program product offering that allows customers to
simplify migrating their old, AIX 5.2 workloads to POWER7
– Runs on top of AIX 7 and POWER7 processor-based server
 Customer value
– Simplify consolidation of old workloads on new hardware
– Reclaim floor space and eliminate hardware support for obsolete servers
– Protects customer investment in application stacks
– Offering includes phone and fix support for AIX 5.2
– Enables advanced capabilities such as SMT4, Live Application Mobility and Live
Partition Mobility
– Provides a way for AIX 5.2 clients to move up to POWER7
© 2010 IBM Corporation
25 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX 5.2 WPARs for AIX 7
 Client simply backs up existing legacy AIX 5.2
environment and restores into an AIX 7 WPAR
 Client applications continue to run in AIX 5.2
environment with AIX 5.2 libraries
 The SWMA for this offering will also provide how-
to and limited defect support for the AIX 5.2
operating system
 POWER7 exploitation: SMT4, VIOS,
MicroPartitioning and Mobility
 Managed via IBM Systems Director Workload
Partitions Manager or command line
AIX 5.2 WPARs for AIX 7 will be a separately charged product built on AIX 7AIX 5.2 WPARs for AIX 7 will be a separately charged product built on AIX 7
*All statements regarding IBM's future direction and intent are subject
to change or withdrawal without notice, and represent goals and objectives
only.
Some features require the purchase of additional software components.
PO W ER7
AIX 5.2 Versioned
Environm ent
5.2 syscall compatibility layer
AIX 7 Native Environm ent
AIX 7 native syscalls
W PAR
A
/
/var
/tm p
/hom e
W PAR
B
/
/var
/tm p
/hom e
W PAR
D
/
/var
/tm p
/hom e
W PAR
C
/
/var
/tm p
/hom e
AIX 7 Kernel
/usr
/opt
/usr
/opt /usr
/opt
m ksysb
backup
from
AIX 5.2
legacy
system
© 2010 IBM Corporation
26 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX 5.2 WPARs for AIX 7
 This offering requires AIX 7 and POWER7 so the client has to purchase those items separately
 Client provides their own backup of an AIX 5.2 environment
– IBM does not supply AIX 5.2 media or backup image
 Most applications should run in this environment. Notable exceptions:
– Applications that require the AIX 5.2 kernel or 32 bit kernel exceptions
– Applications that require hardware that is not supported by AIX 7 (e.g. Token ring)
– Applications that are locked to a machine serial number
– PowerHA SystemMirror and HACMP are not supported inside the WPAR
 Because the performance commands and libraries are used from AIX 7, applications that are
sensitive to output from these commands may not work
 The SWMA for this offering provides limited support for the AIX 5.2 operating system including
phone support and limited new fix support
– Fix support is limited to security and critical issues and may not always be possible
Seller
© 2010 IBM Corporation
27 This document is for IBM and IBM Business Partners onl
IBM Power Systems
When to use Workload Partitions
Requirement MicroPartitions Workload Partitions
Hardware enforced Isolation
Minimal number of AIX images
Server Consolidation
Greatest Flexibility
Cross system workload management
Move workload between systems
Most efficient use of hardware resources
Run AIX V5.2 on POWER7
© 2010 IBM Corporation
28 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Live Application Mobility
Can make it easier to consolidate
workloads from underutilized
servers
Can provide increased flexibility
to manage workloads by easily
moving the workload to another
system
Facilitates increased reliability by
allowing workloads to be moved
away during planned outages
Automated, policy based
relocation can reduce
administrative workload
Provides a way to manage
availability and workload of your IT
infrastructure without significantly
impacting end users
The capability to relocate a
running Workload Partition from
one system to another without
restarting the application
The application running inside
the WPAR resumes running
after the relocation is complete
Works with systems based on
POWER7, POWER6,
POWER5 and POWER4
processors
Requires the IBM PowerVM
Workload Partitions Manager for
AIX product, a Systems Director
advanced manager
Manual or automatic, policy
based relocation
How it can help?What is it?
Workload
Partition
QA
AIX # 2
Workload
Partition
Data Mining
Workload
Partition
App Server
Workload
Partition
Web
AIX # 1
Workload
Partition
Dev
Workload
Partition
e-mail
PowerVM™
Workload
Partitions
Manager
for AIX
Policy
Workload
Partition
Billing
Shared Storage (SAN or NFS)
© 2010 IBM Corporation
29 This document is for IBM and IBM Business Partners onl
IBM Power Systems
PowerVM Live Partition Mobility
Can make it easier to consolidate
workloads from underutilized
servers by facilitating the transfer
of workloads with almost no end
user impact
Can provide increased flexibility
to manage workloads by easily
moving the workload to another
system
Facilitates increased reliability by
allowing workloads to be moved
away during planned outages
PowerVM Live Partition Mobility
can provide for a much more
flexible and responsive IT
infrastructure by reducing the cost
and risk of rebalancing workloads
A PowerVM Enterprise Edition
feature that allows an entire
Logical Partition (LPAR) to be
relocated from one system to
another with almost no impact
to the end user
The end user effect is a single
delay of two seconds when the
relocation is completed
Supported by AIX 7, AIX 6, AIX
V5.3 and Linux®
PowerVM Live Partition
Mobility requires that all I/O be
virtualized through the Virtual
I/O server at the time of the
relocation
How it can help?What is it?
Movement to a
different server
with no loss of
service
Virtualized SAN and Network InfrastructureVirtualized SAN and Network Infrastructure
Live Partition Mobility requires the purchase of
the optional PowerVM Enterprise Edition.
© 2010 IBM Corporation
30 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Live Application Mobility
Live Mobility on Power Systems
Movement of the
OS and
applications to a
different server
with no loss of
service
Virtualized SAN and Network InfrastructureVirtualized SAN and Network Infrastructure
PowerVM Live Partition Mobility
• Move an entire Logical Partition from one system to another
while it is running with almost no impact to end users
• Moves the entire LPAR including the operating system
• Requires systems based on the POWER6 or POWER7
processors, PowerVM Enterprise Edition, and all I/O must be
through the Virtual I/O Server
• Works with partitions running AIX 7, AIX 6, AIX V5.3 and Linux
Live Partition Mobility
AIX Live Application Mobility
• Move a Workload Partition from one AIX system to another
AIX system while running with almost no impact to end users
• Moves only the WPAR, the AIX operating system is not
moved
• Requires the PowerVM Workload Partitions Manager, and all
WPAR filesystems must be on shared storage
• Works on systems based on POWER4 processors and later
Potential Benefits
Improved application availability
Energy saving
Better workload management
Workload
Partition
QA
AIX # 2
Workload
Partition
Data Mining
Workload
Partition
App Server
Workload
Partition
Web
AIX # 1
Workload
Partition
Dev
Workload
Partition
e-mail
PowerVM™
Workload
Partitions
Manager
for AIX
Policy
Workload
Partition
Billing
Shared Storage (SAN or NFS)
© 2010 IBM Corporation
31 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Role Based Access Control (RBAC) with Domains
Can reduce the cost and complexity of security
administration by allowing secure delegation of
administrative tasks to non-privileged users
Enables a more secure IT infrastructure by
reducing the need for so many privileged
administrators
Assigning roles to programs can reduce the
need for security exposures such as the use of
setuid for programs
Allows for new ways to delegate administration
duties between system administrators and non-
administrative users
A capability of AIX that allows
privileged administration tasks
to be delegated to non-
privileged users
Access to system resources
are associated with roles that
are assigned to non-privileged
users
Many roles are predefined
which can reduce the effort of
implementing RBAC
Roles can also be associated
with programs
Domain access can further
limit administrators to only work
with resources for a particular
organization (AIX 7/AIX 6 TL6)
How it can help?What is it?
UsersUsers Roles
PRINT
AIX
Resources
AIX
Resources
BACKUP
Company A
DBA
Company A
BACKUP
Company Z
Company Z
Data
DBA
Company Z
Company A
Data
Domain support
Provides more granularity
for multi-tenant IT shops
© 2010 IBM Corporation
32 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Encrypting Filesystem
Enables improved security by
reducing unauthorized access to
data, even by privileged users
Secure backups reduces the
exposure of data compromised
when backup media is taken
outside of secure facilities
Automatic management of
protection keys can reduce the
administrative effort of using
encrypted data
Provides the capability for
additional security for applications
that may have security design
exposures
Automatically encrypt data in a
JFS2 filesystem
Data can be protected from
access by privileged users
Backup in encrypted or clear
formats
Automated key management -
integrated into AIX security
authentication
Each file encrypted with a
unique key
Hardware offload to
Cryptographic adapter
No keys stored in clear in kernel
memory
A variety of AES, and RSA
cryptography keys supported
How it can help?What is it?
Always encrypted on disk
Data in clear in memory.
VMM
J2
Filesystem
CLiC
Crypto Lib
User and Group
Key Stores
Crypto Kernext
Kernel ucred open
key store
Login Authentication Module
Key Store
Mgt Cmds
BOS Cmds
Backup/Restore
Cp, mv, crfs, etc
© 2010 IBM Corporation
33 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Security Expert
Can reduce the cost and
complexity of security
administration by allowing
federated management of security
profiles across multiple servers
Enables a more secure IT
infrastructure by reducing the
effort of maintaining system
security
“Check” functionality can provide
additional security by validating
that the security profile for each
system matches the actual
security settings
Allows for new ways to efficiently
manage security across multiple
AIX systems
A centralized security
management tool that can
control over 300 security
settings from a single console
Administrators can start from a
“Low”, “Medium”, “High” or
“Sarbanes-Oxley” security
template and customize settings
to met business requirements
Security settings can be
exported and imported as a
security profile to multiple
systems
Security profiles can be stored
in an LDAP directory for ease of
distribution
AIX Security Expert was first
included in AIX V5.3 TL5
How it can help?What is it?
© 2010 IBM Corporation
34 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX & Power Systems Security Certifications
AIX 5200-06
CAPP/EAL4+
Application: 01/11/05
Final report: 10/26/05
Certificate: 12/14/05
AIX 5L 5200-05 and
Pitbull LSPP/EAL4+
Application :01/11/05
Certificate issued: 05/16/06
AIX 5300-05
LSPP/EAL4+
Pitbull product Supports P5,
P4
Certificate issued: 12/19/06Pitbull MLS Ported to
AIX 5300-03
Pitbull product available
to customers Dec 31,
05
AIX 5300-04 CAPP/EAL4+
Supports P5, P4
Certificate issued: 12/19/06
AIX 7100-00)
CAPP/RBACPP/LSPP/EAL
4+
Supports P7, P6, P5, P4
Legend
AIX V5.2
AIX V5.3
AIX 6
AIX 7 (Planned)
VIOS
POWER6
Certification History
AIX 4.2 C2: Apr 24, 1997
AIX 4.3 C2: May 6, 19987
AIX 5.2 CAPP/EAL4+ : Nov 4, 2002
POWER4 HW CAPP/EAL4+ : Apr 2003
AIX 5.2 ML1 CAPP/EAL4+ : Sept 8, 2003
AIX 5.2 ML6 CAPP/EAL4+ : Dec 14, 2005
AIX 5.2 ML5 and Pitbull LSPP: May 16, 2006
AIX 5.3 TL5 and Pitbull LSPP: May 16, 2006
AIX 5.2 TL4 & VIOS CAPP/EAL4+: Dec 16, 2006
POWER6: Dec, 2007
AIX 6: May 26, 2008
AIX 7: Planned 2010 *All statements regarding IBM's future direction and intent are subject
to change or withdrawal without notice, and represent goals and objectives only
VIOS EAL4+
Included with AIX 53.00-04
CAPP/EAL4+
POWER6 Hardware
EAL4+
Dynamic LPAR with
MicroPartitioning
AIX 6100-00)
CAPP/RBACPP/LSPP/EAL
4+
MLS capabilities integrated
into standard AIX product
One certification for 3
Protection Profiles
Supports P6, P5, P4
2006 2007 20102005
© 2010 IBM Corporation
35 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Cluster Aware AIX
 Easily create clusters of AIX instances for scale-out computing or high
availability
 Designed to:
– Significantly simplify cluster configuration, construction, and maintenance
– Designed to improve availability by reducing the time to discover failures
– Capabilities such as common device naming help simplify administration
– Built in event management and monitoring
 A foundation for future AIX capabilities and the next generation of PowerHA
SystemMirror and PowerVM
Designed to simplify construction and management of clusters of AIX
systems for scale-out computing and high availability
© 2010 IBM Corporation
36 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Cluster Aware AIX Exploiters
Legacy AIX
PowerHA
System Mirror
TSA HMC
IBM
Storage
HPC
DB2
IBM
Director
Monitoring
API
Cluster
Monitoring
Group Services
Cluster Admin
UI
Cluster CFG
Repository
Resource Mgr Services
Bundled Resource Managers
Cluster
Messaging
Messaging
API
Legacy RSCT
RSCT Consumers
VIOS
Monitoring
API
Cluster
Monitoring
Group Services
Cluster Admin
UI
Cluster CFG
Repository
Resource Mgr Services
Bundled Resource Managers
Cluster
Messaging
Messaging
API
RSCT With Cluster Aware AIX
Cluster Aware AIX
Cluster
Repository
Cluster
Messaging
Cluster
Monitoring
Cluster
Events
CAA APIs and UIs
Redesigned Layers Integrated to CAA Capabilities
 RSCT and Cluster Aware AIX together provide the foundation of strategic Power Systems SW
 RSCT-CAA integration enables compatibility with a diverse set of dependent IBM products
 RSCT integration with CAA extends simplified cluster management along with optimized and robust cluster monitoring,
failure detection, and recovery to RSCT exploiters on Power / AIX
© 2010 IBM Corporation
37 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Non-intrusive Reliability Features
 Designed to increase availability
by reducing problem
determination time and effort
Can reduce the impact of
problems by minimizing the
intrusiveness of problem
determination compared to
traditional methods
 These new service features
provide an infrastructure that can
fundamentally change the OS
problem determination process for
the better
A number of new reliability,
availability and serviceability
features that are designed to
improve system and application
reliability
 New features include:
 Live Dump
 Firmware Assisted Dump
 Enhanced First Failure
Data Capture (FFDC) for
AIX
Enhanced features:
 Lightweight malloc debug
 Lightweight memory trace
 Consistency checkers
 Component trace
How it can help?What is it?
© 2010 IBM Corporation
38 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Storage Keys
Can provide for higher AIX
availability by reducing the
number of unplanned outages due
to intermittent memory overlay
Enables complex applications
that use large amounts of memory
to protect core functions from
memory overlay
This new capability can reduce
the likelihood of an entire class of
intermittent application and AIX
problems
Exploitation of a POWER7 and
POWER6 processors hardware
feature to provide additional
isolation of kernel and
application data
Storage keys can prevent
invalid changes to memory
cause by programming errors
Application use of storage keys
is enabled in AIX V5.3
AIX Kernel exploitation of
POWER6 storage keys is
included in AIX 7 and AIX 6
How it can help?What is it?
User
Code
User
Data
Files
WS DB2
Kernel
Code
Kernel
Data
JFS2 LVM VMM . . . SCSI ENT FC
Application
Address Space
AIX DriversAIX Kernel
UNIX Kernel Address Space
User
Code
User
Data
Files
WS DB2
Kernel
Code
Kernel
Data
JFS2 LVM VMM . . . SCSI ENT FC
Application
Address Space
AIX DriversAIX Kernel
UNIX Kernel Address Space
User
Code
User
Data
Files
WS DB2
Kernel
Code
Kernel
Data
JFS2 LVM VMM . . . SCSI ENT FC
Application
Address Space
AIX DriversAIX Kernel
AIX Kernel Address Space
User
Code
User
Data
Files
WS DB2
Kernel
Code
Kernel
Data
JFS2 LVM VMM . . . SCSI ENT FC
Application
Address Space
AIX DriversAIX Kernel
AIX Kernel Address Space
After POWER6 Storage Keys
Before POWER6 Storage Keys
© 2010 IBM Corporation
39 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX probevue Dynamic Tracing
Enables the possibility to
dramatically reduce the amount of
time and effort to debug and tune
applications
Can reduce the performance
impact to the system compared to
using traditional tracing methods
Dynamic tracing offers an entirely
different way for developers and
system administrators to
troubleshoot application problems
The capability to dynamically
extract information about a
program as it is running
Trace points can be added or
removed dynamically without
recompiling or restarting the
application
Includes a new language, vue,
to define the desired action
when a probe point is reached
Support for C, C++, FORTRAN
and Java language programs
How it can help?What is it?
Formatted
I/O
User Kernel
Probe Location
User Process Code
Some thread
hits probe point
(1)
Branches to probe
code (2)
Probe
code
(3)Returns to
probe point
(4)
Thread
continues
execution(5)
Trace Consumer
Trace File
or
Trace Output
Trace Buffers
E-code
© 2010 IBM Corporation
40 This document is for IBM and IBM Business Partners onl
IBM Power Systems
PowerVM Workload Partitions Manager for AIX
Can make it easier to consolidate
workloads from underutilized
servers by providing a single point
of management for all WPARs
and enablement for Live
Application Mobility
Can reduce cost and complexity
through centralized management
of WPARs
Enables increased flexibility by
allowing administrators to quickly
create, clone or delete Workload
Partitions from one system to
another
Supports systems based on
POWER4 or later processors
Policy based relocation and
federated management of WPARs
provides new ways to manage
your IT infrastructure
A product that federates
management of WPARs across
multiple systems
WPARs can be created,
cloned, stopped, started and
monitored from a single location
Includes enablement for Live
Application Mobility
The WPAR Manager is a
advanced manager “plug-in” to
the IBM Systems Director
The WPAR Manager is
available as a component in the
AIX Enterprise Edition or as a
separate product
How it can help?What is it?
WPAR Agent
AIX
System/Application WPARs
WPAR Agent
AIX
System/Application WPARs
WPAR Agent
AIX
System/Application WPARs
WPAR Agent
AIX
System/Application WPARs
WPAR Agent
AIX
System/Application WPARs
WPAR Agent
AIX
System/Application WPARs
IBM
Workload
Partitions
Manager
for AIX
Browser
© 2010 IBM Corporation
41 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Systems Director Console for AIX (pConsole)
Can reduce the amount of effort
and cost associated with
managing the AIX OS
Web access to administrative
tasks can simplify systems
management
Consistent user interface with
IBM Systems Director and the
WPAR Manager can reduce
retraining and other administrative
costs
The combination of Web access
to administration tools and the
ability to execute administrative
tasks on multiple systems can
change the way you manage the
AIX OS
A Web based management
tool that provides easy access
to common system
administration tasks
Administrators can access
Systems Management Interface
Tool (SMIT) menus from a
browser
Graphical user interface is fast
and fully integrated with IBM
Systems Director
All necessary components for
the Console are included in AIX
The Distributed Command
Execution Manager (DCEM)
feature of the Console allows an
administrative task to run on
multiple systems at once
How it can help?What is it?
© 2010 IBM Corporation
42 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Automatic Variable Page Size
Can improve overall system
performance which could improve
the amount of work done per Watt
of energy
Automated page size tuning can
reduce the amount of effort and
cost associated with managing a
key aspect of performance tuning
Since this feature is turned “on”
by default, it improves your ability
to get the most out of your
systems based on POWER6
processors
This “self tuning” aspect of AIX
can improve performance while
reducing administrative workload
AIX exploitation of POWER6 or
later hardware that supports
variable page size
AIX will automatically select
optimal page size to provide
better performance
Kernel will choose between 4K
and 64K pages, including a mix
within a memory region
Supports process data, heap,
stack, shared memory,
anonymous mmap() memory
Enabled by default with
administrative controls to turn
off or change aggressiveness to
“upsize”
Required AIX 7 or AIX 6 and
POWER6 or later processor
based systems
How it can help?What is it?
© 2010 IBM Corporation
43 This document is for IBM and IBM Business Partners onl
IBM Power Systems
System N
AIX 7 Profile Manager (Formerly AIX Runtime Expert)
System A System N System C
SetExtract Compare
Simplified configuration using the AIX Profile Manager
Systems Director plug-in that is designed to simplify consistent AIX
configuration across multiple systems
Traditional server configuration
OS Configuration and Tuning
Environment Variables
Configuration Files
Boot LV Settings
CLI Utilities
Apply and maintain approaches
Scripts, ftp, rsh, ssh, documentation,
3rd party tools, mksysb, etc.
System A System NSystem BSystem A System NSystem B
XML Profiles
Env var XYZ=“Yes”
AIX security profile
.
tuneable N
Env var XYZ=“Yes”
AIX security profile
tuneable N
Env var XYZ=“Yes”
AIX security profile
tuneable N
Env var XYZ=“Yes”
AIX security profile
tuneable N
System AdministratorSystem Administrator
Systems
N
© 2010 IBM Corporation
44 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Configuration Elements managed by AIX Profile Manager
acctctl
alog
authzcfg
authent
chcons
Chdev.sys0
chlicense
chservices
chsys
class
dumpctrl
errdaemon
ewlm
ffdc
filter
ioo
krecovery
lvmo
nfso
mktcpip
nis
probevue
tcp_nw
udp_nw
ip_nw
arp_nw
stream
raso
role
ruser
namerslv
nfs
shconf
schedo
privcmd
privdev
privfile
smtctl
syscorepath
sysdumpdev
traces
tsd
trustchk
vmo
aix.secexpert
mkuser.defuser
chuser
login
chsubserver
gen.param
etc.env
misc.other
probeview
restrictedtrcctlfile.data
© 2010 IBM Corporation
45 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Server Consolidation Pain Points
Pain point Planned AIX Technology
Client workload requires the maximum amount of isolation
between workloads on a single server Micro-partitions
Client needs to consolidate multiple workloads on a single system
for highest efficiency
Micro-partitions or
Workload Partitions
Client needs to consolidate multiple workloads on a single system
for highest efficiency and minimize the number of AIX operating
systems to manage
Workload Partitions
Client needs to consolidate multiple workloads on a single system
for highest efficiency and maximize the flexibility to support
different environments
Micro-partitions
Client needs to balance workloads by relocating workloads
between systems
Live Partition Mobility or
Live Application Mobility
Client needs to balance workloads by relocating workloads
between systems with minimum delay Live Partition Mobility
Client needs automatic, policy based relocation of workloads
between systems Live Application Mobility
Seller
© 2010 IBM Corporation
46 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Security Pain Points
Pain point Planned AIX Technology
Client needs to securely delegate administrative duties to non-
root users
Role Based Access Control or Tivoli
Access Manager for OS
Client needs to securely delegate administrative duties to non-
root users across multiple heterogeneous systems Role Based Access Control or Tivoli
Access Manager for OS
Client workload requires the highest level of multilevel security
including particularly for sensitive government or financial
applications
Trusted AIX
Clients data needs maximum protection, including protection
from stolen backup copies or root user compromise.
Encrypting JFS2 Filesystem
Client needs provide consistent security across their entire
landscape of AIX systems. AIX Security Expert
Client is concerned about SUID programs. Filesystem Permissions tool and Role
Based Access Control
Client needs to set up a server outside the DMZ Secure by Default
Seller
© 2010 IBM Corporation
47 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Manageability Pain Points
Pain point Planned AIX Technology
Client needs to administer AIX remotely System Director Console for AIX
Client is new to AIX and doing an install for the first time
Graphical Installation
Client is concerned about backing up a filesystem before taking
a routine administrative action Integrated Filesystem Snapshot
Client needs to create and manage WPARs on a single system SMIT, command line or
WPAR Manager
Client needs to create and manage WPARs across multiple
systems Workload Partitions Manager
Client wants integrated virtualization management AIX Enterprise Edition
Systems Director Editions
Client wants to manage multiple, heterogeneous systems
Systems Director Editions, Tivoli
Seller
© 2010 IBM Corporation
48 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Select AIX Features: Value and Segment Focus
Feature Potential Benefit Focus Segment
PowerVM Workload Partitions Lower TCO though improved efficiency through
server consolidation.
All.
AIX Live Application Mobility Improved reliability through outage avoidance.
Improved TCO through greater server utilization
All. Enterprise focus
Role Based Access Control Improved security. Reduced security administration
costs through reduced complexity. Greater
administrative efficiency through delegation
All. Finance and Government
focus.
Trusted AIX High degree of security. Required for some
Government environments
Government security agencies,
some Finance
Encrypting Filesystem Improved security. Data protection against
accidental or malicious disclosure
All. Finance and Government
focus.
Concurrent AIX updates Improved reliability by eliminating outage for critical
fixes.
All
POWER6 Storage keys Improved reliability through reduced memory
overlay outages
All. Enterprise focus,
probevue dynamic tracing Improved reliability. Quicker resolution to
performance and software bugs
All. ISV focus
System Director Console Improved TCO through administrative efficiency All
Seller
© 2010 IBM Corporation
49 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX is available in three different editions:
– AIX Standard Edition
• Suitable for most UNIX workloads
• Vertical scalability up to 256 cores (AIX 7)
64 cores (AIX 6)
– AIX Enterprise Edition
• AIX plus enterprise management
• Includes AIX Standard Edition plus
Systems Director Enterprise Edition and
the Workload Partitions Manager for AIX
• Vertical scalability up to 256 cores (AIX 7)
64 cores (AIX 6)
– AIX Express Edition
• Lower priced edition targeted a low end servers and
consolidation of smaller workloads on larger servers
• Includes most of the functionality of AIX Standard Edition
• Vertical scalability is limited to 4 cores and 8GB of memory per core in a single
partition
• Clients can use multiple AIX Express Edition partitions in a single larger server
Clients can mix multiple AIX editions in the same server
AIX Editions
C
apability
AIX Standard
Edition
AIX Enterprise
Edition
AIX Express
Edition
Note: AIX V5.3 is only available in a Standard Edition
© 2010 IBM Corporation
50 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Enterprise Edition
AIX Enterprise Edition includes:
– AIX 7 or AIX 6 Standard Edition plus
– WPAR Manager
– Systems Director Enterprise Edition
• IBM System Director
• Active Energy Manager
• VMControl (including Image Management & System Pools)
• Network Control
• Transition Manager for HP® SIM
• Service and Support Manager
• IBM Tivoli Monitoring
• Tivoli Application Dependency Discovery Manager (TADDM)
AIX Enterprise Edition is a single offering that brings together AIX with key
service management capabilities that are designed to:
 Improve availability through access to relevant real-time information and predictive
monitoring to avoid future problems
 Enhance operational efficiency through visualization of resources and centralized
deployment and management of virtualized AIX environments
 Provide accurate assessment of system resource usage
© 2010 IBM Corporation
51 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Enterprise Edition Key Features
 Live Application Mobility
– Relocate Workload Partitions between systems with almost no client impact
 Energy Management
– Collecting and report current and historical usage, and controlling energy usage
 Virtual Server Management
– Create and manage virtual machines, manage virtual machine relocation, and managing virtual
workloads in system pools
 Manage WPARs across multiple systems
– Centralize the creation, replication, and starting of WPARs across multiple systems
 Automatically discover IT components and their relationships
– Ideal for managing dynamic virtualized environments
 Monitor virtualized resources
– Efficient management begins with comprehensive performance information
 Predictive monitoring and capacity management
– Leverage real time monitoring in data warehouse to provide advanced analytics for capacity planning and
proactive monitoring
 Provides a visual representation of the components
– Assists understanding of complex application dependencies
 Network Management
– Discover, monitor, and manage multi-vendor network devices and automate network management tasks
 Monitor utilization and configuration changes
– Useful for problem determination and failure analysis
© 2010 IBM Corporation
52 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Simplified WPAR Management
AIX Enterprise Edition
© 2010 IBM Corporation
53 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Clients get business-level views and management
of service availability
Consolidated monitoring of physical and virtual resources
IBM Tivoli Monitoring
–Designed to improve mean-time-to-
recovery by relating virtual to physical
resources
–Data warehouse provides Side-by-side
real-time and historical data to assist
problem determination and planning
–Out-of-the-box reporting allows
clients to quickly provide executive
level reports and identify resource
bottlenecks
AIX Enterprise Edition
© 2010 IBM Corporation
54 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Power Systems Monitoring - VIOS View
Shows how
network
interfaces are
mapped to
LPARS
Network and Disk Mapping and Utilization Information
AIX Enterprise Edition
© 2010 IBM Corporation
55 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Overall Frame Utilization
AIX Enterprise Edition
© 2010 IBM Corporation
56 This document is for IBM and IBM Business Partners onl
IBM Power Systems
WPAR Workspace
NOTE: Right button click on Link
icon to access menu of
supplemental WPAR WSs
AIX Enterprise Edition
© 2010 IBM Corporation
57 This document is for IBM and IBM Business Partners onl
IBM Power Systems
 Use existing ITM agents and data that are stored in the
Tivoli Data Warehouse
 Create new metrics based on combining existing date
 Predictive trending and forecast reports
 Pre-configured reports
 Extensible
Scenarios
“What will my resources look like
tomorrow, next week and next month?”
“What IT resources should I worry
about?”
“Will I have enough capacity to get me
through Monday?”
What It Does
• Provide capacity monitoring through the data collected by Tivoli Monitoring
• Automates Performance analysis and reporting
• Enables prediction of application bottlenecks and creation of alerts for potential service threats.
Advanced Performance Analytics
AIX Enterprise Edition
© 2010 IBM Corporation
58 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Predictive Trending
 Predictive trending on key performance
indicators
– Linear trending model
– Configurable
– Simple, open and predictable
 New Tivoli Monitoring attributes for use in
charts and situations
– Trend strength, trend direction
– Time to threshold, value in 7 days, 30 days and
90 days
 Use trend information in situations
– “I predict I have 2 weeks before I hit 95% Disk
Utilization and I am 70% confident and its getting
worse”
 Leverages Tivoli Enterprise Portal
– Overlays to represent Trends
– Icons in Tables
Time
CPU
Predicted trend
Threshold Predicted
CPU Violation
Actual Monitor Data
AIX Enterprise Edition
© 2010 IBM Corporation
59 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Application discovery complements platform
component asset data
Better management through better information
–Discovers the system and application
data center resources
–Discovers the relationships and
dependencies between the system and
application resources
–Visually depict the dependencies between
Data Center between the application and
system resources
–Discovers and tracks changes to data
center resources
IBM Tivoli Application Dependency Discovery Manager (TADDM)
AIX Enterprise Edition
© 2010 IBM Corporation
60 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Reduce the time to deploy workloads using virtual images
Discover and manage heterogeneous AIX image repositories
Import, capture and catalog virtual images from existing systems
Dynamically provision virtual server, storage and network resources
Deploy
Virtual
Machines
Open Virtualization Format (OVF)
Capture
Virtual
Machines
Image
Repository
SoftwareSoftware
applicationapplication
SoftwareSoftware
applicationapplication
OperatingOperating
SystemSystem
OperatingOperating
SystemSystem
MetadataMetadataMetadataMetadata
SoftwareSoftware
applicationapplication
SoftwareSoftware
applicationapplication
OperatingOperating
SystemSystem
OperatingOperating
SystemSystem
MetadataMetadataMetadataMetadata
Virtual image
AIX Enterprise Edition
© 2010 IBM Corporation
61 This document is for IBM and IBM Business Partners onl
IBM Power Systems
61
07/28/15
Balance resources with Live Partition Mobility
 Dynamically adjust virtual machines resource allocations.
- Allowing unallocated resources to be used by a virtual machine.
- Allowing resource allocation adjustments to be made between virtual machine.
 Virtual server mobility between host systems.
- Allocate resources on the target host.
- Move the virtual machine in-memory state to target host.
- De-allocating resources on the source host.
Virtualization
Compute Memory
Virtual MachineVirtual MachineVirtual Machine
Virtualization
Compute MemoryIO / Network
Virtual Machine Virtual MachineVirtual Machine
IO / Network
SW
OS
SW
OS
SW
OS
SW
OS
SW
OS
SW
OS
SW
OS
SW
OS
SW
OS
SW
OS
SW
OS
SW
OS
SW
OS
SW
OS
SW
OS
AIX Enterprise Edition
© 2010 IBM Corporation
62 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Dynamic virtual server placement of workloads
Automates virtual image mobility for optimal utilization and resilience
Optimizes virtual assets for performance, availability and energy use
Integrates server, storage and network virtualization
System pools enable automated mobility for higher
workload availability
Compute Network StorageMemoryCompute Network StorageMemoryCompute Network StorageMemory
Virtualization
Compute Network StorageMemory
Virtualization
Compute Network StorageMemoryCompute Network StorageMemory
IT Resources Virtual Images System Pools
Mobility
Optimized for
 Availability
 Performance
 Energy
AIX Enterprise Edition
© 2010 IBM Corporation
63 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Electrical energy and thermal trending
Report electrical power at the
rack and server level
Manage thermal energy at the
rack and server level
Analyze trends in energy use
Performance per watt display
Calculate energy costs for
targeted resources
Trend electrical power use overTrend electrical power use over
timetime
Trend temperature over timeTrend temperature over time
Note: Energy monitoring and control capabilities
vary by system.
Energy costEnergy cost
calculatorcalculator
AIX Enterprise Edition
© 2010 IBM Corporation
64 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Platform Management
Integrated network management and monitoring
StorageServerNetwork
Service Management
 Unified view of servers, storage,
and network devices
 Basic lifecycle management of
network switches
 Network device topology collection
and visualization
 Integrated single sign on launch of
vendor - based device
management tools
 Converged Ethernet network
device support (FCoCEE) via
native support and vendor tools
IT environment
AIX Enterprise Edition
© 2010 IBM Corporation
65 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Enterprise Edition
 Provides the foundation for Enterprise Service Management in an easy to
order solution at an attractive price
 Designed to improve operational efficiency of managing a PowerVM™
virtualized environment
 Includes IBM Systems Director Enterprise Edition for comprehensive
platform and service management
© 2010 IBM Corporation
66 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Enterprise Edition seller details
 Provides a easy way to “Super Size” an AIX order with hardware order
– Eliminate separate software sale by selling with new systems
– Also available as MES for existing systems
 Single License PID
– License does not include SWMA but first year of SWMA is mandatory
– All products are under a single SWMA
• 1 Year SWMA Feature
• 3 Year SWMA Feature
• Support calls go to AIX queue to be routed to correct Support team
 Three tiered price structure like AIX Standard Edition
– Available for all tiers, but primary focus on Medium and Large tier servers
– AIX Enterprise Edition bundle is significantly discounted compared to list prices of
individual products
 Only available with AIX 7 and AIX 6
– For AIX 5.3 consider “Systems Director Enterprise Edition” 5765-EEP bundle
Seller AIX Enterprise Edition
© 2010 IBM Corporation
67 This document is for IBM and IBM Business Partners onl
IBM Power Systems
These key contacts can help with selling service
management solutions
Key Contacts
 AIX Offering Manager
Jay Kruemcke
 Power Systems Director Offering Manager
Michael Tabron
Enterprise Edition
Datasheet
AIX Enterprise Edition:AIX Enterprise Edition:
Announcement BriefingAnnouncement Briefing
DatasheetDatasheet
Seller PresentationSeller Presentation
Client presentationClient presentation
In AIX Sales kitIn AIX Sales kit
Seller AIX Enterprise Edition
© 2010 IBM Corporation
68 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Standard
Edition
AIX Standard
Edition
AIX Enterprise
Edition
AIX Enterprise
Edition
AIX Express
Edition
AIX Express
Edition
Capability
AIX Express Edition
 AN edition of AIX priced for smaller workloads
– AIX 6 and 7 feature Express Edition
– AIX 5.3 is only available in a Standard Edition
 Intended for two deployment situations
1. Entry price on entry servers and blades
2. Consolidation of smaller workloads on enterprise servers
 AIX Express Edition terms are designed for small workloads
– Vertical scalability limited to 4 core maximum partition size
– 8 GB memory per core maximum
 Flexibility to optimize for
multiple workloads
– Run any combination
of AIX Editions on a server
AIX Express Edition
© 2010 IBM Corporation
69 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Express Edition can improve the economics of consolidation
Example: Consolidate eight 4-way POWER6 520s into a 24 way POWER7 770
Old price with AIX
Standard Edition
AIX License + SWMA
List price 24 cores x $1,950
Total (list) $46,800
(U.S. prices shown)
With AIX Express
AIX License + SWMA
List price 24 cores x $1,000
Total (list) $24,000
Savings of $22,800
(U.S. prices shown)
AIX Express Edition
© 2010 IBM Corporation
70 This document is for IBM and IBM Business Partners onl
IBM Power Systems
IBM License Metric Tool
 Common IBM monitoring tool for
SWG, Power Systems & Systems
Director software products
 Provides a data center view of IBM
software licenses
 Simplifies customer license tracking,
compliance & audit reporting
 ILMT does NOT report back to IBM
 Tool Provides*:
– Software inventory
– Web-based administration
– Standard & custom license reports
– Audit reports
Required for clients using AIX Express Edition on Medium and Large servers
*Implementation of some features will be staged over time
AIX Express Edition
© 2010 IBM Corporation
71 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX Editions Comparison
AIX Express AIX Standard AIX Enterprise
Value (1) Improved economics to
encourage consolidation of
many small workloads on
larger servers
(2) Lower price point for better
price competition with
Linux/Intel
Core AIX capability for
most workloads
Enterprise class AIX
customers that need the
power of AIX and the
advanced platform and
service management
capabilities of Systems
Director Enterprise Edition
and the WPAR Manager
Capabilities AIX 6 Standard Edition
functionality
Restrictions:
-Limited to a 4 core partition
size maximum
-8 GB memory per core
maximum
-Does not include AIX Profile
Manager
-Cluster Aware AIX can only be
used by PowerHA
SystemMirror
AIX 6 Standard Edition
functionality
AIX 6 Standard Edition
functionality plus:
- WPAR Manager
- Systems Director Enterprise
Edition
Restrictions:
Seller
© 2010 IBM Corporation
72 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX 7 Hardware Support
 Systems based on POWER4, PowerPC® 970, POWER5, POWER6 and
POWER7 processors are supported
 32 and 64-bit applications will continue to run unchanged on AIX 7
 64-bit kernel only
*Complete details on AIX binary compatibility can be found at http://www.ibm.com/servers/aix/os/compatibility/
© 2010 IBM Corporation
73 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX support for POWER7
AIX supports Power 750, 770, and 780 with
POWER7 processors offering more
performance, energy efficiency and scalability
 Initial AIX Levels supported
– AIX 6 Technology Level 4 SP2 (POWER 750/755) (GA 2/12)
– AIX 6 Technology Level 4 SP3 (POWER 770/780) (GA 3/5)
– AIX 5.3 Technology Level 11 SP3 (GA 3/5)
 April AIX Technology Levels
– AIX 6 Technology Level 5 (PS700, PS701, PS702)
– AIX 5.3 Technology Level 12 (PS700, PS701, PS702)
 Prior Technology levels
– AIX 6 Technology Levels 2 and 3
– AIX 5.3 Technology Levels 9 and 10
Plans subject to change without notice
© 2010 IBM Corporation
74 This document is for IBM and IBM Business Partners onl
IBM Power Systems
POWER7 Platform Support
Move up to POWER7 on your current AIX Technology Level!
 POWER7 based Systems provide two modes for each LPAR
– POWER7 mode
• Fully exploit unique POWER7 capabilities
• AIX 6.1 TL4 SP2 (Power 750/755), SP3 (Power 770/780) and later
• AIX 7
– POWER6 & POWER6+ modes
• Allows Live Partition Mobility to POWER6 systems
• AIX 5.3 and AIX 6.1 TL2 & TL3
 POWER7 Features exploited by AIX
- Energy Management (available in all modes)
– Per-Partition energy management
- POWER7 Mode
– 4 thread Simultaneous Multithreading (SMT)
– 1024 Threads / 256 cores partition size (AIX 7 only)
– Double precision Vector Scalar Extension (VSX)
– 32 Storage Protection Keys (8 for applications)
Core
L3
MC0 MC1PowerBus
GX
EI3 (Elastic Interface) I/O
EI3 (Elastic Interface) I/O
MemoryI/OMemoryI/O
MemoryI/OMemoryI/O
GX
L2
 Cores: 8
 L2: On Chip
 L3: On Chip
 Technology: 45nm
 Transistors: >1B
 Size: 567 mm2
© 2010 IBM Corporation
75 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX support for POWER7 Processor Modes
POWER6 & POWER6+ MODE POWER7 MODE POWER7 Client Value
AIX 5.3 AIX 7 & AIX 6
2-Thread SMT 4-Thread SMT Throughput performance,
processor core utilization.
Affinity OFF by Default 3-tier Memory, MicroPartition
Affinity
Improved system performance
for system images spanning
sockets and nodes.
32-core/64-thread Scaling
64-core/128-thread Scaling
32-core / 128-thread Scaling
64-core / 256-thread Scaling
256-core / 1024-thread Scaling
(with AIX 7)
Performance and Scalability
for Large Scale-Up Single
System Image Workloads (e.g.
OLTP, ERP scale-up, WPAR
consolidation).
EnergyScale CPU Idle EnergyScale CPU Idle and Folding
with NAP and SLEEP
Improved Energy Efficiency
Active Memory Expansion Additional memory for
applications
You need more than AIX 5.3 to get the most out of POWER7
© 2010 IBM Corporation
76 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Simplified AIX Hardware Pricing Tiers (February 2010)
G5
E5
C5
H5
F5
D5
Legacy
Tiers
POWER6 – Power 595
POWER7 – Power 780
POWER6 - Power 560 through Power 570 & Power 575
POWER7 – Power 770
POWER6 - Power 550 and below including blades
POWER7 – Power 750, Power 755, PS700, PS701,
PS702
Example Systems
Large
Medium
Small
New Tiers
 Reducing the number of software price tiers from six to three
 Goal is to provide simplified, consistent price tiers across all IBM Power
Systems software
Seller
© 2010 IBM Corporation
77 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Legacy servers: AIX Power Systems software tiers
Models Machine
Types
Proc
Grp
Tier
595 9119 FHA H5 Large
575 9125-F2A F5 Medium
570 9117-
MMA
F5 Medium
570 9406-
MMA
P30 Medium
560 8234-
EMA
E5 Medium
550 8204-E8A E5 Small
550 9409-M50 P20 Small
520 8203-E4A D5 Small
520 9408-M25 P10 Small
520 9407-M15 P05/P10 Small
JS23/4
3
7778-23x C5 Small
JS22 7998-61X C5 Small
JS12 7998-60X C5 Small
Models Machine
Types
Proc Grp Tier
595 9119-595 H5 Large
590 9119-590 G5 Large
570 9117-570 F5 Medium
575 9118-575 F5 Medium
560Q 9116-561 E5 Medium
550 9113-550 D5 Small
520 9111-520 D5 Small
510 9111-51X D5 Small
505 9115-505 D5 Small
JS21 7988-J21 C5 Small
185WS 7047-185 D5 Small
i510 9910-51A D5 Small
i510 9110-510 D5 Small
OP710 9123-710 D5 Small
285WS 9111-285 D5 Small
POWER6 POWER5
Seller
© 2010 IBM Corporation
78 This document is for IBM and IBM Business Partners onl
IBM Power Systems
POWER7 Servers: AIX Power Systems software tiers
POWER7
Models
Software
Tier
780, High End Large
770 Medium
750 Small
755 Small
710, 720, 730, 740 Small
PS700, PS701,
PS702
Small
Seller
© 2010 IBM Corporation
79 This document is for IBM and IBM Business Partners onl
IBM Power Systems
Why should you move up to AIX 7 or AIX 6?
 More performance on POWER7
– AIX 7 and AIX 6 can provide substantially more performance on POWER7 than AIX V5.3
– AIX 7 supports massive workloads with up to 256 cores / 1024 threads
 Access to new features
– Capabilities like WPARs, Role Based Access Control, AIX Profile Manager are designed to
improve security and administrative efficiency
 AIX V5.3 is nearing End of Life
– End of Marketing announced effective April 2011
 AIX 7 will support running AIX 5.2 in a WPAR
– Excellent way to consolidate old workloads running on less efficient hardware
 It’s FREE!
– Customers with software maintenance agreements (SWMA) can upgrade for no additional charge
within an Edition:
• AIX 5.3 to AIX 7 Standard edition
• AIX 6 Express Edition to AIX 7 Express Edition, etc,
© 2010 IBM Corporation
80 This document is for IBM and IBM Business Partners onl
IBM Power Systems
AIX 7: “The Future of UNIX”
ibm.com/aix
© 2010 IBM Corporation
81 This document is for IBM and IBM Business Partners onl
IBM Power Systems
This document was developed for IBM offerings in the United States as of the date of publication. IBM may not make these offerings available
in other countries, and the information is subject to change without notice. Consult your local IBM business contact for information on the IBM
offerings available in your area.
Information in this document concerning non-IBM products was obtained from the suppliers of these products or other public sources.
Questions on the capabilities of non-IBM products should be addressed to the suppliers of those products.
IBM may have patents or pending patent applications covering subject matter in this document. The furnishing of this document does not give
you any license to these patents. Send license inquires, in writing, to IBM Director of Licensing, IBM Corporation, New Castle Drive, Armonk,
NY 10504-1785 USA.
All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives
only.
The information contained in this document has not been submitted to any formal IBM test and is provided "AS IS" with no warranties or
guarantees either expressed or implied.
All examples cited or described in this document are presented as illustrations of the manner in which some IBM products can be used and the
results that may be achieved. Actual environmental costs and performance characteristics will vary depending on individual client configurations
and conditions.
IBM Global Financing offerings are provided through IBM Credit Corporation in the United States and other IBM subsidiaries and divisions
worldwide to qualified commercial and government clients. Rates are based on a client's credit rating, financing terms, offering type, equipment
type and options, and may vary by country. Other restrictions may apply. Rates and offerings are subject to change, extension or withdrawal
without notice.
IBM is not responsible for printing errors in this document that result in pricing or information inaccuracies.
All prices shown are IBM's United States suggested list prices and are subject to change without notice; reseller prices may vary.
IBM hardware products are manufactured from new parts, or new and serviceable used parts. Regardless, our warranty terms apply.
Any performance data contained in this document was determined in a controlled environment. Actual results may vary significantly and are
dependent on many factors including system hardware configuration and software design and configuration. Some measurements quoted in
this document may have been made on development-level systems. There is no guarantee these measurements will be the same on generally-
available systems. Some measurements quoted in this document may have been estimated through extrapolation. Users of this document
should verify the applicable data for their specific environment.
Revised September 26, 2006
Special notices
© 2010 IBM Corporation
82 This document is for IBM and IBM Business Partners onl
IBM Power Systems
The following terms are registered trademarks of International Business Machines Corporation in the United States and/or other countries: AIX, AIX/L, AIX/L (logo), AIX 6
(logo), alphaWorks, AS/400, BladeCenter, Blue Gene, Blue Lightning, C Set++, CICS, CICS/6000, ClusterProven, CT/2, DataHub, DataJoiner, DB2, DEEP BLUE,
developerWorks, DirectTalk, Domino, DYNIX, DYNIX/ptx, e business (logo), e(logo)business, e(logo)server, Enterprise Storage Server, ESCON, FlashCopy, GDDM, i5/OS,
i5/OS (logo), IBM, IBM (logo), ibm.com, IBM Business Partner (logo), Informix, IntelliStation, IQ-Link, LANStreamer, LoadLeveler, Lotus, Lotus Notes, Lotusphere, Magstar,
MediaStreamer, Micro Channel, MQSeries, Net.Data, Netfinity, NetView, Network Station, Notes, NUMA-Q, OpenPower, Operating System/2, Operating System/400, OS/2,
OS/390, OS/400, Parallel Sysplex, PartnerLink, PartnerWorld, Passport Advantage, POWERparallel, Power PC 603, Power PC 604, PowerPC, PowerPC (logo), Predictive
Failure Analysis, pSeries, PTX, ptx/ADMIN, Quick Place, Rational, RETAIN, RISC System/6000, RS/6000, RT Personal Computer, S/390, Sametime, Scalable POWERparallel
Systems, SecureWay, Sequent, ServerProven, SpaceBall, System/390, The Engines of e-business, THINK, Tivoli, Tivoli (logo), Tivoli Management Environment, Tivoli Ready
(logo), TME, TotalStorage, TURBOWAYS, VisualAge, WebSphere, xSeries, z/OS, zSeries.
The following terms are trademarks of International Business Machines Corporation in the United States and/or other countries: Advanced Micro-Partitioning, AIX 5L, AIX
PVMe, AS/400e, Calibrated Vectored Cooling, Chiphopper, Chipkill, Cloudscape, DataPower, DB2 OLAP Server, DB2 Universal Database, DFDSM, DFSORT, DS4000,
DS6000, DS8000, e-business (logo), e-business on demand, EnergyScale, Enterprise Workload Manager, eServer, Express Middleware, Express Portfolio, Express Servers,
Express Servers and Storage, General Purpose File System, GigaProcessor, GPFS, HACMP, HACMP/6000, IBM Systems Director Active Energy Manager, IBM TotalStorage
Proven, IBMLink, IMS, Intelligent Miner, iSeries, Micro-Partitioning, NUMACenter, On Demand Business logo, POWER, PowerExecutive, PowerVM, PowerVM (logo), Power
Architecture, Power Everywhere, Power Family, POWER Hypervisor, Power PC, Power Systems, Power Systems (logo), Power Systems Software, Power Systems Software
(logo), PowerPC Architecture, PowerPC 603, PowerPC 603e, PowerPC 604, PowerPC 750, POWER2, POWER2 Architecture, POWER3, POWER4, POWER4+, POWER5,
POWER5+, POWER6, POWER6+, pure XML, Quickr, Redbooks, Sequent (logo), SequentLINK, Server Advantage, ServeRAID, Service Director, SmoothStart, SP, System i,
System i5, System p, System p5, System Storage, System z, System z9, S/390 Parallel Enterprise Server, Tivoli Enterprise, TME 10, TotalStorage Proven, Ultramedia,
VideoCharger, Virtualization Engine, Visualization Data Explorer, Workload Partitions Manager, X-Architecture, z/Architecture, z/9.
A full list of U.S. trademarks owned by IBM may be found at: http://www.ibm.com/legal/copytrade.shtml.
The Power Architecture and Power.org wordmarks and the Power and Power.org logos and related marks are trademarks and service marks licensed by Power.org.
UNIX is a registered trademark of The Open Group in the United States, other countries or both.
Linux is a trademark of Linus Torvalds in the United States, other countries or both.
Microsoft, Windows, Windows NT and the Windows logo are registered trademarks of Microsoft Corporation in the United States, other countries or both.
Intel, Itanium, Pentium are registered trademarks and Xeon is a trademark of Intel Corporation or its subsidiaries in the United States, other countries or both.
AMD Opteron is a trademark of Advanced Micro Devices, Inc.
Java and all Java-based trademarks and logos are trademarks of Sun Microsystems, Inc. in the United States, other countries or both.
TPC-C and TPC-H are trademarks of the Transaction Performance Processing Council (TPPC).
SPECint, SPECfp, SPECjbb, SPECweb, SPECjAppServer, SPEC OMP, SPECviewperf, SPECapc, SPEChpc, SPECjvm, SPECmail, SPECimap and SPECsfs are trademarks
of the Standard Performance Evaluation Corp (SPEC).
NetBench is a registered trademark of Ziff Davis Media in the United States, other countries or both.
AltiVec is a trademark of Freescale Semiconductor, Inc.
Cell Broadband Engine is a trademark of Sony Computer Entertainment Inc.
InfiniBand, InfiniBand Trade Association and the InfiniBand design marks are trademarks and/or service marks of the InfiniBand Trade Association.
Other company, product and service names may be trademarks or service marks of others.
Revised January 15, 2008
Special notices (cont.)

Aix The Future of UNIX

  • 1.
    © 2010 IBMCorporation This document is for IBM and IBM Business Partners only. It is not for client distribution. © 2008 IBM Corporation AIX: The Future of UNIX Name Title Seller
  • 2.
    © 2010 IBMCorporation 2 This document is for IBM and IBM Business Partners onl IBM Power Systems As the world gets smarter, infrastructure demands will grow Smart traffic systems Smart water management Smart energy grids Smart healthcare Smart food systems Intelligent oil field technologies Smart regions Smart weather Smart countries Smart supply chains Smart cities Smart retail
  • 3.
    © 2010 IBMCorporation 3 This document is for IBM and IBM Business Partners onl IBM Power Systems Consolidating with AIX on Power Systems enables clients to… Server consolidation improves service to clients by delivering flexible performance, dynamic provisioning and enabling clients to avoid disruption Server consolidation with shared resources enables high system utilization, which lowers the cost of ownership by reducing networking, energy, floor space, and software costs. REDUCE COST IMPROVE SERVICE MANAGE RISK Server consolidation manages IT risk by improving security, increasing business resiliency and simplifying operations. AIX, Power™ Systems and PowerVM™ are designed to deliver effective consolidation in the most demanding data centers
  • 4.
    © 2010 IBMCorporation 4 This document is for IBM and IBM Business Partners onl IBM Power Systems Winn-Dixie Strengthening the infrastructure with an IBM consolidation solution Business challenge: Winn-Dixie, a Jacksonville, Florida-based grocery chain based with more than 600 retail locations throughout the southeastern U.S., needed a cost-effective and easily managed solution to replace its aging distributed IT infrastructure and quickly enable disaster recovery. Solution: The solution consolidated more than 600 stand-alone servers at individual grocery stores into a centralized data center at Winn Dixie headquarters using IBM AIX® and IBM PowerVM™ virtualization technologies to support 16 stores on a single IBM BladeCenter® JS22 blade server, mirrored to a nearby facility as well as to a remote disaster recovery location. Benefits:  Redirected $5 million capital cost savings to store remodelling  Improved application performance by 5 to 10 times, enabling better service  Reduced disaster recovery time from days to hours “We thought the IBM solution gave us the most flexibility not only for now, but going forward. It accommodated our existing application portfolio while providing a very rich upgrade path in our infrastructure.” – Barry Kirk, director of architecture, Winn-Dixie Solution components:  IBM BladeCenter® JS22 blades in IBM BladeCenter H  IBM PowerVM™  IBM AIX® POP03046-USEN-00
  • 5.
    © 2010 IBMCorporation 5 This document is for IBM and IBM Business Partners onl IBM Power Systems Baylor College of Medicine improves performance and sets the stage for an SAP upgrade with IBM servers Business challenge: When Baylor College of Medicine (Baylor) decided to build a new hospital, it also planned to upgrade its existing data center in order to ease space constraints and replace end-of-life Sun servers. It needed a smooth migration that would provide uninterrupted access to its SAP ERP system and other supporting systems. Solution: Baylor engaged IBM Premier Business Partner Mark III and brought in the IBM Migration Factory team to provide the transition of workloads from 32 legacy Sun servers onto three IBM Power™ 570 servers, running the IBM AIX® operating system. IBM Migration Factory performed the server consolidation and migration of Baylor’s software applications from the old Sun hardware platform to the new IBM platform. Benefits:  Achieves a 60 percent reduction in rack space footprint and better than 40 percent savings in both cooling and power  Improves overall performance by 30 percent  Improves payroll processing time by 213 percent “Nobody else had as eloquent and simple a design as IBM did. They also offered very cost-effective solutions.” — Al Reineking, executive director of IT operations and technical services, Baylor College of Medicine Solution components:  SAP ERP  IBM Migration Factory  IBM Power 570
  • 6.
    © 2010 IBMCorporation 6 This document is for IBM and IBM Business Partners onl IBM Power Systems The Coca-Cola Bottling Company of Egypt IBM enables growth with powerful, scalable solutions Business Challenge: The Coca-Cola Bottling Company of Egypt’s hardware infrastructure hosted their enterprise resource planning system, Oracle E-Business Suite. As they grew and added modules, server performance failed to meet business needs. They needed to implement a high performance, scalable infrastructure, including a centralized storage system. Solution: The company implemented two IBM Power™ 570 servers — one each for the main site and the remote site — both running IBM AIX® . They implemented IBM PowerVM™ Dynamic Logical Partitioning and Micro-Partitioning to minimize server administration and to minimize the number of processors needed. They also implemented IBM System Storage™ DS4800. Benefits:  Improves performance while reducing the number of processors from 16 to 7  Reduces risk and reduces the number of servers needed for disaster recovery  Increases server utilization by 35 percent and supports 71 percent more users “Our new IBM infrastructure provides us with improved performance, availability and scalability to manage our growth.” — The Coca-Cola Bottling Company of Egypt Solution Components:  IBM Power 570  IBM AIX  IBM PowerVM Dynamic Logical Partitioning and Micro Partitioning  IBM System Storage DS4800 MUP03005-USEN-00
  • 7.
    © 2010 IBMCorporation 7 This document is for IBM and IBM Business Partners onl IBM Power Systems University of Pittsburgh Medical Center (UPMC) Rewriting the rules on IT investment to facilitate tomorrow’s healthcare innovations Business Challenge UPMC, Pennsylvania’s largest integrated healthcare delivery network, sought to lower the cost and complexity of IT infrastructure to enable the continued investment in next-generation clinical systems and to lay the foundation for the best possible patient care. Solution Now in the middle of a landmark, 8-year strategic partnership with IBM, UPMC is transforming its systems through consolidation, standardization and virtualization. Relying on IBM products and services, the mid-stream effort has already resulted in the reduction of hundreds of servers across the UPMC network and achieved more than a quantum improvement in resource efficiency. It has fundamentally changed the link between processing and resource needs — enabling it to meet an ambitious clinical agenda with a far lower rate of IT investment growth. Benefits  $30 million in capital and operating cost reductions 150 percent increase in processing capacity with no increase in IT support costs  40 percent reduction in IT infrastructure floor space requirements, freeing up space for revenue generating services  67 percent reduction in number of physical servers “ Considering that IBM and UPMC are only midway through this trans- formation project, the results have been impressive. We have already proven that standardization, along with aggressive implementation of virtualization, yields unprecedented productivity and efficiency.” – Paul Sikora, VP of IT Transformation, UPMC Solution Components  IBM BladeCenter®  IBM Component Infrastructure Roadmap  IBM Global Technology Services  IBM Healthcare and Life Sciences  IBM Research  IBM STG Services  IBM SWG Services  IBM System p™, System x™, System z™  IBM Tivoli® product suite  IBM TotalStorage® Enterprise Storage  IBM WebSphere Business Integration  IBM WebSphere® Application Server © 2008 IBM Corporation
  • 8.
    © 2010 IBMCorporation 8 This document is for IBM and IBM Business Partners onl IBM Power Systems IBM Power Systems Success Stories Power technologies provide real business value Annual savings of over $500,000 + accelerated new services deployment from 1 month to 2 days Reduced application downtime + increased flexibility to dynamically scale and change workload capacity Fewer processor cores than previous Sun servers reduced software and management costs + PowerVM simplified the effort to deploy or scale new services Consolidated and virtualized 76 servers to 6 – reducing complexity and total cost of ownership of global IT infrastructure
  • 9.
    © 2010 IBMCorporation 9 This document is for IBM and IBM Business Partners onl IBM Power Systems IBM’S 10-year march to UNIX leadership 15% 20% 25% 30% 35% 40% 45% Q 100 Q 300 Q 101 Q 301 Q 102 Q 302 Q 103 Q 303 Q 104 Q 304 Q 105 Q 305 Q 106 Q 306 Q 107 Q 307 Q 108 Q 308 Q 109 Q 309 Q 110 HP Sun IBM UNIX Server Rolling Four Quarter Average Revenue Share POWER4 Dynamic LPARsDynamic LPARs POWER6 Live PartitionLive Partition MobilityMobility POWER5 Micro-PartitioningMicro-Partitioning POWER7 Workload OptimizedWorkload Optimized LeadershipLeadership dot.com bubble burst global economic recession …the largest shift of customer spending in UNIX history
  • 10.
    © 2010 IBMCorporation 10 This document is for IBM and IBM Business Partners onl IBM Power Systems Why AIX is the Premier UNIX® Platform Today Strong, stable, non-disruptive roadmap Improved Efficiency through Virtualization Outstanding Performance Innovation through integrated Development
  • 11.
    © 2010 IBMCorporation 12 This document is for IBM and IBM Business Partners onl IBM Power Systems Network Centric Computing AIX V2 & V3 Establishment in the market: - RISC Support - UNIX credibility - Open Sys. Stds.. - Dynamic Kernel - JFS and LVM - SMIT AIX V3.2.5 Maturity: - Stability - Quality AIX V4.1/4.2 SMP Scalability: - POWERPC spt. - 4-8 way SMP - Kernel Threads - Client/Server pkg - NFS V3 - CDE - UNIX95 branded - NIM - > 2GB filesystems -HACMP Clustering - POSIX 1003.1, 1003.2, XPG4 - Runtime Linking - Java 1.1.2 AIX V4.3 Higher levels of scalability: - 24-way SMP - 64-bit HW support - 96 GB memory - UNIX98 branded - TCP/IP V6 - IPsec - Web Sys. Mgr. - LDAP Dir. Server. - Workload Mgr - Java JDT/JIT - Direct I/O - Alt. Disk Install - Exp/Bonus CDs Distributed Client-Server 1986-19921986-1992 1994-19961994-1996 1997-19991997-1999 Flexible Resource Management: - POWER4+ spt. - Dynamic LPAR - Dynamic CUoD - New 64bit kernel - 512GB mem - JFS2 - 16 TB filesystems - UNIX03 branded - Concurrent I/O - MultiPath I/O - Flex LDAP Client - XSSO PAM spt e-Business Computing Open Systems Workstations AIX Evolution – Over Twenty years of Progress AIX/6000 Uni-processor 4-8 way SMP 24-way SMP 32-way SMP AIX 7 Future of UNIX: -256 core/1024 tread scalability -POWER7 Exploitation -Domain based RBAC - AIX Profile Manager -WPAR enhancements -AIX 5.2 in a WPAR -PowerVM virtualized storage -LVM SSD support -Terabyte segment 20102010 On Demand Business 2001-20022001-2002 64/256-way SMT AIX 5L V5.3 Advanced Virtualization: - POWER5 support - 64-way SMP - SMT - MicroPartitions™ - Virt I/O Server - Partition Load Mgr - NFS Version 4 - Adv. Accounting - Scaleable VG - JFS2 Shrink - SUMA - SW RAS features - POSIX Realtime 2004-20052004-2005 AIX 5L V5.1/5.2 Smarter Planet 20072007 AIX 6 Enterprise RAS: -POWER6 support -Workload Partitions -Application Mobility -Continuous Avail. -Storage Keys -Dynamic tracing -Software FFDC -Recovery Rtns -Concurrent MX -Trusted AIX -RBAC -Encrypting JFS2 -AIX Security Expert -Director Console New Enterprise Data Center 1024-way SMT4
  • 12.
    © 2010 IBMCorporation 13 This document is for IBM and IBM Business Partners onl IBM Power Systems PowerVM Virtualization Architecture Networks and network storage On demand resources Power Hypervisor Service processor Processors Memory Linux partitions Virtual Network AIX Dedicated partitions Expansion slots Virtual processors Virtual adapters Local devices & storage Workload management and provisioning WPAR WPAR WPAR Virtual I/O server Virtual network & storage SLICLinux kernels AIX Shared partitions AIX kernels Virtual I/O server Virtual network & storage IBM i
  • 13.
    © 2010 IBMCorporation 14 This document is for IBM and IBM Business Partners onl IBM Power Systems What is new for August 2010  AIX 7 – The Future of UNIX  AIX 5.2 Workload Partitions for AIX 7 – A new way to consolidate older workloads on POWER7
  • 14.
    © 2010 IBMCorporation 15 This document is for IBM and IBM Business Partners onl IBM Power Systems  Workload-Optimizing Systems – Vertical scalability for massive workloads with up to 256 cores/1024 threads in a single AIX partition  Virtualization without limits – Run AIX 5.2 in a WPAR to simplify consolidation of legacy environments on POWER7  Resiliency without downtime – Built in clustering to simplify configuration and management of scale-out workloads and high availability solutions  Management with Automation – Profile based configuration management eases the management of pools of AIX systems AIX 7 -- The Future of UNIX *All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only. Some features require the purchase of additional software components.
  • 15.
    © 2010 IBMCorporation 16 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Binary Compatibility Guarantee
  • 16.
    © 2010 IBMCorporation 17 This document is for IBM and IBM Business Partners onl IBM Power Systems Moving up to AIX 7 AIX 7 runs on your existing hardware – Fully exploits POWER7 processor-based systems – Also exploits systems based on POWER4™, POWER5™, POWER6 processors AIX 7 runs your existing applications – Current applications will continue to run – no need to recompile applications * – Even supports 32 bit applications created on AIX versions prior to AIX V5 – Binary compatibility guarantee Upgrade process – Prior upgrade tools will support upgrade to AIX 7 – Clients can upgrade directly to AIX 7 from AIX 6 and AIX V5 – Free upgrade for customers with Software Maintenance Agreements (SWMA) –Upgrades are no charge within the same edition: AIX 5.3 to AIX 7 Standard edition AIX 6 Express Edition to AIX 7 Express Edition, etc, *See general conditions at ibm.com/systems/power/software/aix/compatibility
  • 17.
    © 2010 IBMCorporation 18 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Scalability Evolution AIX/6000 UniprocessorUniprocessor 2424 ThreadsThreads 4-84-8 ThreadsThreads 256256 ThreadsThreads 32-12832-128 ThreadsThreads 10241024 ThreadsThreads
  • 18.
    © 2010 IBMCorporation 19 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX 7* Hardware Enablement and Support  Terabyte Segment support – Designed to improve performance for workloads that use large amounts of memory  AIX kernel memory pinning – AIX 7 memory pinned by default to enhance performance  Hardware acceleration for Encrypting Filesystems, IPSec and Trusted Execution – Reduce processor workload for encryption  LVM Solid State Disk Support – SSD only Volume Groups, enhancements to filemon to identify SSD candiates  Shared Memory interface to Barrier Synchronous Register – Reduce need for kernel extensions for BSR access * These features are also available in AIX 6 Technology Level 6
  • 19.
    © 2010 IBMCorporation 20 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Workload Partitions (WPAR)  WPARs are designed to save administrator work by reducing the number of AIX instances to patch  WPARs have much lower memory resource requirements: 68 MB vs 1GB for an LPAR  WPAR takes seconds to create and LPARs minutes  Application mobility much simpler to organize than LPM  Lots of WPARs on one AIX is simpler to monitor and control than monitoring across many LPARs.  Rapid cloning is easy and lets you use "disposable images" - simple to create, experiment and throw away Virtualized AIX operating system environments within a single AIX image Each WPAR shares the single AIX operating system AIX 7 added the capability to run AIX 5.2 in a WPAR* Applications and users inside a WPAR cannot affect resources outside the WPAR* Each WPAR can have a regulated share of processor, memory and other resources Two types of WPAR - System WPARs have separate security and appear like a completely separate OS - Application WPARs are manageability wrappers around a single application Top reasons to use WPARsWhat is it? * Requires purchase of the AIX 5.2 WPARs for AIX 7 product NetworksDisk or NFS storage NetworksDisk or NFS storage
  • 20.
    © 2010 IBMCorporation 21 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Workload Partitions can be used in LPARs LPAR Asia LPAR LPAR EMEA LPAR Americas VIO Server Dedicated Processor LPAR Finance Dedicated Processor LPAR Planning WPAR #1 Business Intelligence WPAR #1 MFG WPAR #2 Planning WPAR #1 eMail WPAR #3 Billing WPAR #2 Test Micro-partition Processor Pool POWER Hypervisor™POWER Hypervisor™
  • 21.
    © 2010 IBMCorporation 22 This document is for IBM and IBM Business Partners onl IBM Power Systems WPAR Shared Applications Enables Administrative Efficiency Workload Partition App Server #1 Workload Partition Billing Workload Partition BI Global filesystems / /etc /usr application code /opt application code (or here) /var /tmp /appserver application code (or here) System WPAR filesystems / r/w - unique per WPAR /etc r/w - unique per WPAR /usr r/o from global (typically) /opt r/o from global (typically) /var r/w - unique per WPAR /tmp r/w - unique per WPAR Global FS / /etc /usr /opt /var /tmp /appsvr WPAR FS App Server 1 Workload Partition App Server #2 Workload Partition Web Server Application installed in Global instance and used by multiple WPARs WPAR FS App Server 1 / /etc /var /tmp /config / /etc /var /tmp /config NFS AIX global Instance
  • 22.
    © 2010 IBMCorporation 23 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX 7 WPAR Enhancements  Export of Fibre channel adapters to WPARs – NPIV-like, but can work on any Fibre Channel adapter – Adds support for Fibre Channel tape  Kernel Extensions for WPARs – Trusted kernel extensions may be loaded by the WPAR administrator – Extensions can be only for one WPAR or for entire system  Support for VIOS disks in WPARs – VSCSI disks can be exported to a WPAR – This feature also available in AIX 6 Technology Level 6  Run AIX 5.2 inside of a Workload Partition – Consolidate older environments on POWER7 processor-based systems – Requires AIX 5.2 WPARs for AIX 7 – available separately from AIX 7
  • 23.
    © 2010 IBMCorporation 24 This document is for IBM and IBM Business Partners onl IBM Power Systems Introducing: AIX 5.2 Workload Partitions for AIX 7  A new licensed program product offering that allows customers to simplify migrating their old, AIX 5.2 workloads to POWER7 – Runs on top of AIX 7 and POWER7 processor-based server  Customer value – Simplify consolidation of old workloads on new hardware – Reclaim floor space and eliminate hardware support for obsolete servers – Protects customer investment in application stacks – Offering includes phone and fix support for AIX 5.2 – Enables advanced capabilities such as SMT4, Live Application Mobility and Live Partition Mobility – Provides a way for AIX 5.2 clients to move up to POWER7
  • 24.
    © 2010 IBMCorporation 25 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX 5.2 WPARs for AIX 7  Client simply backs up existing legacy AIX 5.2 environment and restores into an AIX 7 WPAR  Client applications continue to run in AIX 5.2 environment with AIX 5.2 libraries  The SWMA for this offering will also provide how- to and limited defect support for the AIX 5.2 operating system  POWER7 exploitation: SMT4, VIOS, MicroPartitioning and Mobility  Managed via IBM Systems Director Workload Partitions Manager or command line AIX 5.2 WPARs for AIX 7 will be a separately charged product built on AIX 7AIX 5.2 WPARs for AIX 7 will be a separately charged product built on AIX 7 *All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only. Some features require the purchase of additional software components. PO W ER7 AIX 5.2 Versioned Environm ent 5.2 syscall compatibility layer AIX 7 Native Environm ent AIX 7 native syscalls W PAR A / /var /tm p /hom e W PAR B / /var /tm p /hom e W PAR D / /var /tm p /hom e W PAR C / /var /tm p /hom e AIX 7 Kernel /usr /opt /usr /opt /usr /opt m ksysb backup from AIX 5.2 legacy system
  • 25.
    © 2010 IBMCorporation 26 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX 5.2 WPARs for AIX 7  This offering requires AIX 7 and POWER7 so the client has to purchase those items separately  Client provides their own backup of an AIX 5.2 environment – IBM does not supply AIX 5.2 media or backup image  Most applications should run in this environment. Notable exceptions: – Applications that require the AIX 5.2 kernel or 32 bit kernel exceptions – Applications that require hardware that is not supported by AIX 7 (e.g. Token ring) – Applications that are locked to a machine serial number – PowerHA SystemMirror and HACMP are not supported inside the WPAR  Because the performance commands and libraries are used from AIX 7, applications that are sensitive to output from these commands may not work  The SWMA for this offering provides limited support for the AIX 5.2 operating system including phone support and limited new fix support – Fix support is limited to security and critical issues and may not always be possible Seller
  • 26.
    © 2010 IBMCorporation 27 This document is for IBM and IBM Business Partners onl IBM Power Systems When to use Workload Partitions Requirement MicroPartitions Workload Partitions Hardware enforced Isolation Minimal number of AIX images Server Consolidation Greatest Flexibility Cross system workload management Move workload between systems Most efficient use of hardware resources Run AIX V5.2 on POWER7
  • 27.
    © 2010 IBMCorporation 28 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Live Application Mobility Can make it easier to consolidate workloads from underutilized servers Can provide increased flexibility to manage workloads by easily moving the workload to another system Facilitates increased reliability by allowing workloads to be moved away during planned outages Automated, policy based relocation can reduce administrative workload Provides a way to manage availability and workload of your IT infrastructure without significantly impacting end users The capability to relocate a running Workload Partition from one system to another without restarting the application The application running inside the WPAR resumes running after the relocation is complete Works with systems based on POWER7, POWER6, POWER5 and POWER4 processors Requires the IBM PowerVM Workload Partitions Manager for AIX product, a Systems Director advanced manager Manual or automatic, policy based relocation How it can help?What is it? Workload Partition QA AIX # 2 Workload Partition Data Mining Workload Partition App Server Workload Partition Web AIX # 1 Workload Partition Dev Workload Partition e-mail PowerVM™ Workload Partitions Manager for AIX Policy Workload Partition Billing Shared Storage (SAN or NFS)
  • 28.
    © 2010 IBMCorporation 29 This document is for IBM and IBM Business Partners onl IBM Power Systems PowerVM Live Partition Mobility Can make it easier to consolidate workloads from underutilized servers by facilitating the transfer of workloads with almost no end user impact Can provide increased flexibility to manage workloads by easily moving the workload to another system Facilitates increased reliability by allowing workloads to be moved away during planned outages PowerVM Live Partition Mobility can provide for a much more flexible and responsive IT infrastructure by reducing the cost and risk of rebalancing workloads A PowerVM Enterprise Edition feature that allows an entire Logical Partition (LPAR) to be relocated from one system to another with almost no impact to the end user The end user effect is a single delay of two seconds when the relocation is completed Supported by AIX 7, AIX 6, AIX V5.3 and Linux® PowerVM Live Partition Mobility requires that all I/O be virtualized through the Virtual I/O server at the time of the relocation How it can help?What is it? Movement to a different server with no loss of service Virtualized SAN and Network InfrastructureVirtualized SAN and Network Infrastructure Live Partition Mobility requires the purchase of the optional PowerVM Enterprise Edition.
  • 29.
    © 2010 IBMCorporation 30 This document is for IBM and IBM Business Partners onl IBM Power Systems Live Application Mobility Live Mobility on Power Systems Movement of the OS and applications to a different server with no loss of service Virtualized SAN and Network InfrastructureVirtualized SAN and Network Infrastructure PowerVM Live Partition Mobility • Move an entire Logical Partition from one system to another while it is running with almost no impact to end users • Moves the entire LPAR including the operating system • Requires systems based on the POWER6 or POWER7 processors, PowerVM Enterprise Edition, and all I/O must be through the Virtual I/O Server • Works with partitions running AIX 7, AIX 6, AIX V5.3 and Linux Live Partition Mobility AIX Live Application Mobility • Move a Workload Partition from one AIX system to another AIX system while running with almost no impact to end users • Moves only the WPAR, the AIX operating system is not moved • Requires the PowerVM Workload Partitions Manager, and all WPAR filesystems must be on shared storage • Works on systems based on POWER4 processors and later Potential Benefits Improved application availability Energy saving Better workload management Workload Partition QA AIX # 2 Workload Partition Data Mining Workload Partition App Server Workload Partition Web AIX # 1 Workload Partition Dev Workload Partition e-mail PowerVM™ Workload Partitions Manager for AIX Policy Workload Partition Billing Shared Storage (SAN or NFS)
  • 30.
    © 2010 IBMCorporation 31 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Role Based Access Control (RBAC) with Domains Can reduce the cost and complexity of security administration by allowing secure delegation of administrative tasks to non-privileged users Enables a more secure IT infrastructure by reducing the need for so many privileged administrators Assigning roles to programs can reduce the need for security exposures such as the use of setuid for programs Allows for new ways to delegate administration duties between system administrators and non- administrative users A capability of AIX that allows privileged administration tasks to be delegated to non- privileged users Access to system resources are associated with roles that are assigned to non-privileged users Many roles are predefined which can reduce the effort of implementing RBAC Roles can also be associated with programs Domain access can further limit administrators to only work with resources for a particular organization (AIX 7/AIX 6 TL6) How it can help?What is it? UsersUsers Roles PRINT AIX Resources AIX Resources BACKUP Company A DBA Company A BACKUP Company Z Company Z Data DBA Company Z Company A Data Domain support Provides more granularity for multi-tenant IT shops
  • 31.
    © 2010 IBMCorporation 32 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Encrypting Filesystem Enables improved security by reducing unauthorized access to data, even by privileged users Secure backups reduces the exposure of data compromised when backup media is taken outside of secure facilities Automatic management of protection keys can reduce the administrative effort of using encrypted data Provides the capability for additional security for applications that may have security design exposures Automatically encrypt data in a JFS2 filesystem Data can be protected from access by privileged users Backup in encrypted or clear formats Automated key management - integrated into AIX security authentication Each file encrypted with a unique key Hardware offload to Cryptographic adapter No keys stored in clear in kernel memory A variety of AES, and RSA cryptography keys supported How it can help?What is it? Always encrypted on disk Data in clear in memory. VMM J2 Filesystem CLiC Crypto Lib User and Group Key Stores Crypto Kernext Kernel ucred open key store Login Authentication Module Key Store Mgt Cmds BOS Cmds Backup/Restore Cp, mv, crfs, etc
  • 32.
    © 2010 IBMCorporation 33 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Security Expert Can reduce the cost and complexity of security administration by allowing federated management of security profiles across multiple servers Enables a more secure IT infrastructure by reducing the effort of maintaining system security “Check” functionality can provide additional security by validating that the security profile for each system matches the actual security settings Allows for new ways to efficiently manage security across multiple AIX systems A centralized security management tool that can control over 300 security settings from a single console Administrators can start from a “Low”, “Medium”, “High” or “Sarbanes-Oxley” security template and customize settings to met business requirements Security settings can be exported and imported as a security profile to multiple systems Security profiles can be stored in an LDAP directory for ease of distribution AIX Security Expert was first included in AIX V5.3 TL5 How it can help?What is it?
  • 33.
    © 2010 IBMCorporation 34 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX & Power Systems Security Certifications AIX 5200-06 CAPP/EAL4+ Application: 01/11/05 Final report: 10/26/05 Certificate: 12/14/05 AIX 5L 5200-05 and Pitbull LSPP/EAL4+ Application :01/11/05 Certificate issued: 05/16/06 AIX 5300-05 LSPP/EAL4+ Pitbull product Supports P5, P4 Certificate issued: 12/19/06Pitbull MLS Ported to AIX 5300-03 Pitbull product available to customers Dec 31, 05 AIX 5300-04 CAPP/EAL4+ Supports P5, P4 Certificate issued: 12/19/06 AIX 7100-00) CAPP/RBACPP/LSPP/EAL 4+ Supports P7, P6, P5, P4 Legend AIX V5.2 AIX V5.3 AIX 6 AIX 7 (Planned) VIOS POWER6 Certification History AIX 4.2 C2: Apr 24, 1997 AIX 4.3 C2: May 6, 19987 AIX 5.2 CAPP/EAL4+ : Nov 4, 2002 POWER4 HW CAPP/EAL4+ : Apr 2003 AIX 5.2 ML1 CAPP/EAL4+ : Sept 8, 2003 AIX 5.2 ML6 CAPP/EAL4+ : Dec 14, 2005 AIX 5.2 ML5 and Pitbull LSPP: May 16, 2006 AIX 5.3 TL5 and Pitbull LSPP: May 16, 2006 AIX 5.2 TL4 & VIOS CAPP/EAL4+: Dec 16, 2006 POWER6: Dec, 2007 AIX 6: May 26, 2008 AIX 7: Planned 2010 *All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only VIOS EAL4+ Included with AIX 53.00-04 CAPP/EAL4+ POWER6 Hardware EAL4+ Dynamic LPAR with MicroPartitioning AIX 6100-00) CAPP/RBACPP/LSPP/EAL 4+ MLS capabilities integrated into standard AIX product One certification for 3 Protection Profiles Supports P6, P5, P4 2006 2007 20102005
  • 34.
    © 2010 IBMCorporation 35 This document is for IBM and IBM Business Partners onl IBM Power Systems Cluster Aware AIX  Easily create clusters of AIX instances for scale-out computing or high availability  Designed to: – Significantly simplify cluster configuration, construction, and maintenance – Designed to improve availability by reducing the time to discover failures – Capabilities such as common device naming help simplify administration – Built in event management and monitoring  A foundation for future AIX capabilities and the next generation of PowerHA SystemMirror and PowerVM Designed to simplify construction and management of clusters of AIX systems for scale-out computing and high availability
  • 35.
    © 2010 IBMCorporation 36 This document is for IBM and IBM Business Partners onl IBM Power Systems Cluster Aware AIX Exploiters Legacy AIX PowerHA System Mirror TSA HMC IBM Storage HPC DB2 IBM Director Monitoring API Cluster Monitoring Group Services Cluster Admin UI Cluster CFG Repository Resource Mgr Services Bundled Resource Managers Cluster Messaging Messaging API Legacy RSCT RSCT Consumers VIOS Monitoring API Cluster Monitoring Group Services Cluster Admin UI Cluster CFG Repository Resource Mgr Services Bundled Resource Managers Cluster Messaging Messaging API RSCT With Cluster Aware AIX Cluster Aware AIX Cluster Repository Cluster Messaging Cluster Monitoring Cluster Events CAA APIs and UIs Redesigned Layers Integrated to CAA Capabilities  RSCT and Cluster Aware AIX together provide the foundation of strategic Power Systems SW  RSCT-CAA integration enables compatibility with a diverse set of dependent IBM products  RSCT integration with CAA extends simplified cluster management along with optimized and robust cluster monitoring, failure detection, and recovery to RSCT exploiters on Power / AIX
  • 36.
    © 2010 IBMCorporation 37 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Non-intrusive Reliability Features  Designed to increase availability by reducing problem determination time and effort Can reduce the impact of problems by minimizing the intrusiveness of problem determination compared to traditional methods  These new service features provide an infrastructure that can fundamentally change the OS problem determination process for the better A number of new reliability, availability and serviceability features that are designed to improve system and application reliability  New features include:  Live Dump  Firmware Assisted Dump  Enhanced First Failure Data Capture (FFDC) for AIX Enhanced features:  Lightweight malloc debug  Lightweight memory trace  Consistency checkers  Component trace How it can help?What is it?
  • 37.
    © 2010 IBMCorporation 38 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Storage Keys Can provide for higher AIX availability by reducing the number of unplanned outages due to intermittent memory overlay Enables complex applications that use large amounts of memory to protect core functions from memory overlay This new capability can reduce the likelihood of an entire class of intermittent application and AIX problems Exploitation of a POWER7 and POWER6 processors hardware feature to provide additional isolation of kernel and application data Storage keys can prevent invalid changes to memory cause by programming errors Application use of storage keys is enabled in AIX V5.3 AIX Kernel exploitation of POWER6 storage keys is included in AIX 7 and AIX 6 How it can help?What is it? User Code User Data Files WS DB2 Kernel Code Kernel Data JFS2 LVM VMM . . . SCSI ENT FC Application Address Space AIX DriversAIX Kernel UNIX Kernel Address Space User Code User Data Files WS DB2 Kernel Code Kernel Data JFS2 LVM VMM . . . SCSI ENT FC Application Address Space AIX DriversAIX Kernel UNIX Kernel Address Space User Code User Data Files WS DB2 Kernel Code Kernel Data JFS2 LVM VMM . . . SCSI ENT FC Application Address Space AIX DriversAIX Kernel AIX Kernel Address Space User Code User Data Files WS DB2 Kernel Code Kernel Data JFS2 LVM VMM . . . SCSI ENT FC Application Address Space AIX DriversAIX Kernel AIX Kernel Address Space After POWER6 Storage Keys Before POWER6 Storage Keys
  • 38.
    © 2010 IBMCorporation 39 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX probevue Dynamic Tracing Enables the possibility to dramatically reduce the amount of time and effort to debug and tune applications Can reduce the performance impact to the system compared to using traditional tracing methods Dynamic tracing offers an entirely different way for developers and system administrators to troubleshoot application problems The capability to dynamically extract information about a program as it is running Trace points can be added or removed dynamically without recompiling or restarting the application Includes a new language, vue, to define the desired action when a probe point is reached Support for C, C++, FORTRAN and Java language programs How it can help?What is it? Formatted I/O User Kernel Probe Location User Process Code Some thread hits probe point (1) Branches to probe code (2) Probe code (3)Returns to probe point (4) Thread continues execution(5) Trace Consumer Trace File or Trace Output Trace Buffers E-code
  • 39.
    © 2010 IBMCorporation 40 This document is for IBM and IBM Business Partners onl IBM Power Systems PowerVM Workload Partitions Manager for AIX Can make it easier to consolidate workloads from underutilized servers by providing a single point of management for all WPARs and enablement for Live Application Mobility Can reduce cost and complexity through centralized management of WPARs Enables increased flexibility by allowing administrators to quickly create, clone or delete Workload Partitions from one system to another Supports systems based on POWER4 or later processors Policy based relocation and federated management of WPARs provides new ways to manage your IT infrastructure A product that federates management of WPARs across multiple systems WPARs can be created, cloned, stopped, started and monitored from a single location Includes enablement for Live Application Mobility The WPAR Manager is a advanced manager “plug-in” to the IBM Systems Director The WPAR Manager is available as a component in the AIX Enterprise Edition or as a separate product How it can help?What is it? WPAR Agent AIX System/Application WPARs WPAR Agent AIX System/Application WPARs WPAR Agent AIX System/Application WPARs WPAR Agent AIX System/Application WPARs WPAR Agent AIX System/Application WPARs WPAR Agent AIX System/Application WPARs IBM Workload Partitions Manager for AIX Browser
  • 40.
    © 2010 IBMCorporation 41 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Systems Director Console for AIX (pConsole) Can reduce the amount of effort and cost associated with managing the AIX OS Web access to administrative tasks can simplify systems management Consistent user interface with IBM Systems Director and the WPAR Manager can reduce retraining and other administrative costs The combination of Web access to administration tools and the ability to execute administrative tasks on multiple systems can change the way you manage the AIX OS A Web based management tool that provides easy access to common system administration tasks Administrators can access Systems Management Interface Tool (SMIT) menus from a browser Graphical user interface is fast and fully integrated with IBM Systems Director All necessary components for the Console are included in AIX The Distributed Command Execution Manager (DCEM) feature of the Console allows an administrative task to run on multiple systems at once How it can help?What is it?
  • 41.
    © 2010 IBMCorporation 42 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Automatic Variable Page Size Can improve overall system performance which could improve the amount of work done per Watt of energy Automated page size tuning can reduce the amount of effort and cost associated with managing a key aspect of performance tuning Since this feature is turned “on” by default, it improves your ability to get the most out of your systems based on POWER6 processors This “self tuning” aspect of AIX can improve performance while reducing administrative workload AIX exploitation of POWER6 or later hardware that supports variable page size AIX will automatically select optimal page size to provide better performance Kernel will choose between 4K and 64K pages, including a mix within a memory region Supports process data, heap, stack, shared memory, anonymous mmap() memory Enabled by default with administrative controls to turn off or change aggressiveness to “upsize” Required AIX 7 or AIX 6 and POWER6 or later processor based systems How it can help?What is it?
  • 42.
    © 2010 IBMCorporation 43 This document is for IBM and IBM Business Partners onl IBM Power Systems System N AIX 7 Profile Manager (Formerly AIX Runtime Expert) System A System N System C SetExtract Compare Simplified configuration using the AIX Profile Manager Systems Director plug-in that is designed to simplify consistent AIX configuration across multiple systems Traditional server configuration OS Configuration and Tuning Environment Variables Configuration Files Boot LV Settings CLI Utilities Apply and maintain approaches Scripts, ftp, rsh, ssh, documentation, 3rd party tools, mksysb, etc. System A System NSystem BSystem A System NSystem B XML Profiles Env var XYZ=“Yes” AIX security profile . tuneable N Env var XYZ=“Yes” AIX security profile tuneable N Env var XYZ=“Yes” AIX security profile tuneable N Env var XYZ=“Yes” AIX security profile tuneable N System AdministratorSystem Administrator Systems N
  • 43.
    © 2010 IBMCorporation 44 This document is for IBM and IBM Business Partners onl IBM Power Systems Configuration Elements managed by AIX Profile Manager acctctl alog authzcfg authent chcons Chdev.sys0 chlicense chservices chsys class dumpctrl errdaemon ewlm ffdc filter ioo krecovery lvmo nfso mktcpip nis probevue tcp_nw udp_nw ip_nw arp_nw stream raso role ruser namerslv nfs shconf schedo privcmd privdev privfile smtctl syscorepath sysdumpdev traces tsd trustchk vmo aix.secexpert mkuser.defuser chuser login chsubserver gen.param etc.env misc.other probeview restrictedtrcctlfile.data
  • 44.
    © 2010 IBMCorporation 45 This document is for IBM and IBM Business Partners onl IBM Power Systems Server Consolidation Pain Points Pain point Planned AIX Technology Client workload requires the maximum amount of isolation between workloads on a single server Micro-partitions Client needs to consolidate multiple workloads on a single system for highest efficiency Micro-partitions or Workload Partitions Client needs to consolidate multiple workloads on a single system for highest efficiency and minimize the number of AIX operating systems to manage Workload Partitions Client needs to consolidate multiple workloads on a single system for highest efficiency and maximize the flexibility to support different environments Micro-partitions Client needs to balance workloads by relocating workloads between systems Live Partition Mobility or Live Application Mobility Client needs to balance workloads by relocating workloads between systems with minimum delay Live Partition Mobility Client needs automatic, policy based relocation of workloads between systems Live Application Mobility Seller
  • 45.
    © 2010 IBMCorporation 46 This document is for IBM and IBM Business Partners onl IBM Power Systems Security Pain Points Pain point Planned AIX Technology Client needs to securely delegate administrative duties to non- root users Role Based Access Control or Tivoli Access Manager for OS Client needs to securely delegate administrative duties to non- root users across multiple heterogeneous systems Role Based Access Control or Tivoli Access Manager for OS Client workload requires the highest level of multilevel security including particularly for sensitive government or financial applications Trusted AIX Clients data needs maximum protection, including protection from stolen backup copies or root user compromise. Encrypting JFS2 Filesystem Client needs provide consistent security across their entire landscape of AIX systems. AIX Security Expert Client is concerned about SUID programs. Filesystem Permissions tool and Role Based Access Control Client needs to set up a server outside the DMZ Secure by Default Seller
  • 46.
    © 2010 IBMCorporation 47 This document is for IBM and IBM Business Partners onl IBM Power Systems Manageability Pain Points Pain point Planned AIX Technology Client needs to administer AIX remotely System Director Console for AIX Client is new to AIX and doing an install for the first time Graphical Installation Client is concerned about backing up a filesystem before taking a routine administrative action Integrated Filesystem Snapshot Client needs to create and manage WPARs on a single system SMIT, command line or WPAR Manager Client needs to create and manage WPARs across multiple systems Workload Partitions Manager Client wants integrated virtualization management AIX Enterprise Edition Systems Director Editions Client wants to manage multiple, heterogeneous systems Systems Director Editions, Tivoli Seller
  • 47.
    © 2010 IBMCorporation 48 This document is for IBM and IBM Business Partners onl IBM Power Systems Select AIX Features: Value and Segment Focus Feature Potential Benefit Focus Segment PowerVM Workload Partitions Lower TCO though improved efficiency through server consolidation. All. AIX Live Application Mobility Improved reliability through outage avoidance. Improved TCO through greater server utilization All. Enterprise focus Role Based Access Control Improved security. Reduced security administration costs through reduced complexity. Greater administrative efficiency through delegation All. Finance and Government focus. Trusted AIX High degree of security. Required for some Government environments Government security agencies, some Finance Encrypting Filesystem Improved security. Data protection against accidental or malicious disclosure All. Finance and Government focus. Concurrent AIX updates Improved reliability by eliminating outage for critical fixes. All POWER6 Storage keys Improved reliability through reduced memory overlay outages All. Enterprise focus, probevue dynamic tracing Improved reliability. Quicker resolution to performance and software bugs All. ISV focus System Director Console Improved TCO through administrative efficiency All Seller
  • 48.
    © 2010 IBMCorporation 49 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX is available in three different editions: – AIX Standard Edition • Suitable for most UNIX workloads • Vertical scalability up to 256 cores (AIX 7) 64 cores (AIX 6) – AIX Enterprise Edition • AIX plus enterprise management • Includes AIX Standard Edition plus Systems Director Enterprise Edition and the Workload Partitions Manager for AIX • Vertical scalability up to 256 cores (AIX 7) 64 cores (AIX 6) – AIX Express Edition • Lower priced edition targeted a low end servers and consolidation of smaller workloads on larger servers • Includes most of the functionality of AIX Standard Edition • Vertical scalability is limited to 4 cores and 8GB of memory per core in a single partition • Clients can use multiple AIX Express Edition partitions in a single larger server Clients can mix multiple AIX editions in the same server AIX Editions C apability AIX Standard Edition AIX Enterprise Edition AIX Express Edition Note: AIX V5.3 is only available in a Standard Edition
  • 49.
    © 2010 IBMCorporation 50 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Enterprise Edition AIX Enterprise Edition includes: – AIX 7 or AIX 6 Standard Edition plus – WPAR Manager – Systems Director Enterprise Edition • IBM System Director • Active Energy Manager • VMControl (including Image Management & System Pools) • Network Control • Transition Manager for HP® SIM • Service and Support Manager • IBM Tivoli Monitoring • Tivoli Application Dependency Discovery Manager (TADDM) AIX Enterprise Edition is a single offering that brings together AIX with key service management capabilities that are designed to:  Improve availability through access to relevant real-time information and predictive monitoring to avoid future problems  Enhance operational efficiency through visualization of resources and centralized deployment and management of virtualized AIX environments  Provide accurate assessment of system resource usage
  • 50.
    © 2010 IBMCorporation 51 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Enterprise Edition Key Features  Live Application Mobility – Relocate Workload Partitions between systems with almost no client impact  Energy Management – Collecting and report current and historical usage, and controlling energy usage  Virtual Server Management – Create and manage virtual machines, manage virtual machine relocation, and managing virtual workloads in system pools  Manage WPARs across multiple systems – Centralize the creation, replication, and starting of WPARs across multiple systems  Automatically discover IT components and their relationships – Ideal for managing dynamic virtualized environments  Monitor virtualized resources – Efficient management begins with comprehensive performance information  Predictive monitoring and capacity management – Leverage real time monitoring in data warehouse to provide advanced analytics for capacity planning and proactive monitoring  Provides a visual representation of the components – Assists understanding of complex application dependencies  Network Management – Discover, monitor, and manage multi-vendor network devices and automate network management tasks  Monitor utilization and configuration changes – Useful for problem determination and failure analysis
  • 51.
    © 2010 IBMCorporation 52 This document is for IBM and IBM Business Partners onl IBM Power Systems Simplified WPAR Management AIX Enterprise Edition
  • 52.
    © 2010 IBMCorporation 53 This document is for IBM and IBM Business Partners onl IBM Power Systems Clients get business-level views and management of service availability Consolidated monitoring of physical and virtual resources IBM Tivoli Monitoring –Designed to improve mean-time-to- recovery by relating virtual to physical resources –Data warehouse provides Side-by-side real-time and historical data to assist problem determination and planning –Out-of-the-box reporting allows clients to quickly provide executive level reports and identify resource bottlenecks AIX Enterprise Edition
  • 53.
    © 2010 IBMCorporation 54 This document is for IBM and IBM Business Partners onl IBM Power Systems Power Systems Monitoring - VIOS View Shows how network interfaces are mapped to LPARS Network and Disk Mapping and Utilization Information AIX Enterprise Edition
  • 54.
    © 2010 IBMCorporation 55 This document is for IBM and IBM Business Partners onl IBM Power Systems Overall Frame Utilization AIX Enterprise Edition
  • 55.
    © 2010 IBMCorporation 56 This document is for IBM and IBM Business Partners onl IBM Power Systems WPAR Workspace NOTE: Right button click on Link icon to access menu of supplemental WPAR WSs AIX Enterprise Edition
  • 56.
    © 2010 IBMCorporation 57 This document is for IBM and IBM Business Partners onl IBM Power Systems  Use existing ITM agents and data that are stored in the Tivoli Data Warehouse  Create new metrics based on combining existing date  Predictive trending and forecast reports  Pre-configured reports  Extensible Scenarios “What will my resources look like tomorrow, next week and next month?” “What IT resources should I worry about?” “Will I have enough capacity to get me through Monday?” What It Does • Provide capacity monitoring through the data collected by Tivoli Monitoring • Automates Performance analysis and reporting • Enables prediction of application bottlenecks and creation of alerts for potential service threats. Advanced Performance Analytics AIX Enterprise Edition
  • 57.
    © 2010 IBMCorporation 58 This document is for IBM and IBM Business Partners onl IBM Power Systems Predictive Trending  Predictive trending on key performance indicators – Linear trending model – Configurable – Simple, open and predictable  New Tivoli Monitoring attributes for use in charts and situations – Trend strength, trend direction – Time to threshold, value in 7 days, 30 days and 90 days  Use trend information in situations – “I predict I have 2 weeks before I hit 95% Disk Utilization and I am 70% confident and its getting worse”  Leverages Tivoli Enterprise Portal – Overlays to represent Trends – Icons in Tables Time CPU Predicted trend Threshold Predicted CPU Violation Actual Monitor Data AIX Enterprise Edition
  • 58.
    © 2010 IBMCorporation 59 This document is for IBM and IBM Business Partners onl IBM Power Systems Application discovery complements platform component asset data Better management through better information –Discovers the system and application data center resources –Discovers the relationships and dependencies between the system and application resources –Visually depict the dependencies between Data Center between the application and system resources –Discovers and tracks changes to data center resources IBM Tivoli Application Dependency Discovery Manager (TADDM) AIX Enterprise Edition
  • 59.
    © 2010 IBMCorporation 60 This document is for IBM and IBM Business Partners onl IBM Power Systems Reduce the time to deploy workloads using virtual images Discover and manage heterogeneous AIX image repositories Import, capture and catalog virtual images from existing systems Dynamically provision virtual server, storage and network resources Deploy Virtual Machines Open Virtualization Format (OVF) Capture Virtual Machines Image Repository SoftwareSoftware applicationapplication SoftwareSoftware applicationapplication OperatingOperating SystemSystem OperatingOperating SystemSystem MetadataMetadataMetadataMetadata SoftwareSoftware applicationapplication SoftwareSoftware applicationapplication OperatingOperating SystemSystem OperatingOperating SystemSystem MetadataMetadataMetadataMetadata Virtual image AIX Enterprise Edition
  • 60.
    © 2010 IBMCorporation 61 This document is for IBM and IBM Business Partners onl IBM Power Systems 61 07/28/15 Balance resources with Live Partition Mobility  Dynamically adjust virtual machines resource allocations. - Allowing unallocated resources to be used by a virtual machine. - Allowing resource allocation adjustments to be made between virtual machine.  Virtual server mobility between host systems. - Allocate resources on the target host. - Move the virtual machine in-memory state to target host. - De-allocating resources on the source host. Virtualization Compute Memory Virtual MachineVirtual MachineVirtual Machine Virtualization Compute MemoryIO / Network Virtual Machine Virtual MachineVirtual Machine IO / Network SW OS SW OS SW OS SW OS SW OS SW OS SW OS SW OS SW OS SW OS SW OS SW OS SW OS SW OS SW OS AIX Enterprise Edition
  • 61.
    © 2010 IBMCorporation 62 This document is for IBM and IBM Business Partners onl IBM Power Systems Dynamic virtual server placement of workloads Automates virtual image mobility for optimal utilization and resilience Optimizes virtual assets for performance, availability and energy use Integrates server, storage and network virtualization System pools enable automated mobility for higher workload availability Compute Network StorageMemoryCompute Network StorageMemoryCompute Network StorageMemory Virtualization Compute Network StorageMemory Virtualization Compute Network StorageMemoryCompute Network StorageMemory IT Resources Virtual Images System Pools Mobility Optimized for  Availability  Performance  Energy AIX Enterprise Edition
  • 62.
    © 2010 IBMCorporation 63 This document is for IBM and IBM Business Partners onl IBM Power Systems Electrical energy and thermal trending Report electrical power at the rack and server level Manage thermal energy at the rack and server level Analyze trends in energy use Performance per watt display Calculate energy costs for targeted resources Trend electrical power use overTrend electrical power use over timetime Trend temperature over timeTrend temperature over time Note: Energy monitoring and control capabilities vary by system. Energy costEnergy cost calculatorcalculator AIX Enterprise Edition
  • 63.
    © 2010 IBMCorporation 64 This document is for IBM and IBM Business Partners onl IBM Power Systems Platform Management Integrated network management and monitoring StorageServerNetwork Service Management  Unified view of servers, storage, and network devices  Basic lifecycle management of network switches  Network device topology collection and visualization  Integrated single sign on launch of vendor - based device management tools  Converged Ethernet network device support (FCoCEE) via native support and vendor tools IT environment AIX Enterprise Edition
  • 64.
    © 2010 IBMCorporation 65 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Enterprise Edition  Provides the foundation for Enterprise Service Management in an easy to order solution at an attractive price  Designed to improve operational efficiency of managing a PowerVM™ virtualized environment  Includes IBM Systems Director Enterprise Edition for comprehensive platform and service management
  • 65.
    © 2010 IBMCorporation 66 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Enterprise Edition seller details  Provides a easy way to “Super Size” an AIX order with hardware order – Eliminate separate software sale by selling with new systems – Also available as MES for existing systems  Single License PID – License does not include SWMA but first year of SWMA is mandatory – All products are under a single SWMA • 1 Year SWMA Feature • 3 Year SWMA Feature • Support calls go to AIX queue to be routed to correct Support team  Three tiered price structure like AIX Standard Edition – Available for all tiers, but primary focus on Medium and Large tier servers – AIX Enterprise Edition bundle is significantly discounted compared to list prices of individual products  Only available with AIX 7 and AIX 6 – For AIX 5.3 consider “Systems Director Enterprise Edition” 5765-EEP bundle Seller AIX Enterprise Edition
  • 66.
    © 2010 IBMCorporation 67 This document is for IBM and IBM Business Partners onl IBM Power Systems These key contacts can help with selling service management solutions Key Contacts  AIX Offering Manager Jay Kruemcke  Power Systems Director Offering Manager Michael Tabron Enterprise Edition Datasheet AIX Enterprise Edition:AIX Enterprise Edition: Announcement BriefingAnnouncement Briefing DatasheetDatasheet Seller PresentationSeller Presentation Client presentationClient presentation In AIX Sales kitIn AIX Sales kit Seller AIX Enterprise Edition
  • 67.
    © 2010 IBMCorporation 68 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Standard Edition AIX Standard Edition AIX Enterprise Edition AIX Enterprise Edition AIX Express Edition AIX Express Edition Capability AIX Express Edition  AN edition of AIX priced for smaller workloads – AIX 6 and 7 feature Express Edition – AIX 5.3 is only available in a Standard Edition  Intended for two deployment situations 1. Entry price on entry servers and blades 2. Consolidation of smaller workloads on enterprise servers  AIX Express Edition terms are designed for small workloads – Vertical scalability limited to 4 core maximum partition size – 8 GB memory per core maximum  Flexibility to optimize for multiple workloads – Run any combination of AIX Editions on a server AIX Express Edition
  • 68.
    © 2010 IBMCorporation 69 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Express Edition can improve the economics of consolidation Example: Consolidate eight 4-way POWER6 520s into a 24 way POWER7 770 Old price with AIX Standard Edition AIX License + SWMA List price 24 cores x $1,950 Total (list) $46,800 (U.S. prices shown) With AIX Express AIX License + SWMA List price 24 cores x $1,000 Total (list) $24,000 Savings of $22,800 (U.S. prices shown) AIX Express Edition
  • 69.
    © 2010 IBMCorporation 70 This document is for IBM and IBM Business Partners onl IBM Power Systems IBM License Metric Tool  Common IBM monitoring tool for SWG, Power Systems & Systems Director software products  Provides a data center view of IBM software licenses  Simplifies customer license tracking, compliance & audit reporting  ILMT does NOT report back to IBM  Tool Provides*: – Software inventory – Web-based administration – Standard & custom license reports – Audit reports Required for clients using AIX Express Edition on Medium and Large servers *Implementation of some features will be staged over time AIX Express Edition
  • 70.
    © 2010 IBMCorporation 71 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX Editions Comparison AIX Express AIX Standard AIX Enterprise Value (1) Improved economics to encourage consolidation of many small workloads on larger servers (2) Lower price point for better price competition with Linux/Intel Core AIX capability for most workloads Enterprise class AIX customers that need the power of AIX and the advanced platform and service management capabilities of Systems Director Enterprise Edition and the WPAR Manager Capabilities AIX 6 Standard Edition functionality Restrictions: -Limited to a 4 core partition size maximum -8 GB memory per core maximum -Does not include AIX Profile Manager -Cluster Aware AIX can only be used by PowerHA SystemMirror AIX 6 Standard Edition functionality AIX 6 Standard Edition functionality plus: - WPAR Manager - Systems Director Enterprise Edition Restrictions: Seller
  • 71.
    © 2010 IBMCorporation 72 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX 7 Hardware Support  Systems based on POWER4, PowerPC® 970, POWER5, POWER6 and POWER7 processors are supported  32 and 64-bit applications will continue to run unchanged on AIX 7  64-bit kernel only *Complete details on AIX binary compatibility can be found at http://www.ibm.com/servers/aix/os/compatibility/
  • 72.
    © 2010 IBMCorporation 73 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX support for POWER7 AIX supports Power 750, 770, and 780 with POWER7 processors offering more performance, energy efficiency and scalability  Initial AIX Levels supported – AIX 6 Technology Level 4 SP2 (POWER 750/755) (GA 2/12) – AIX 6 Technology Level 4 SP3 (POWER 770/780) (GA 3/5) – AIX 5.3 Technology Level 11 SP3 (GA 3/5)  April AIX Technology Levels – AIX 6 Technology Level 5 (PS700, PS701, PS702) – AIX 5.3 Technology Level 12 (PS700, PS701, PS702)  Prior Technology levels – AIX 6 Technology Levels 2 and 3 – AIX 5.3 Technology Levels 9 and 10 Plans subject to change without notice
  • 73.
    © 2010 IBMCorporation 74 This document is for IBM and IBM Business Partners onl IBM Power Systems POWER7 Platform Support Move up to POWER7 on your current AIX Technology Level!  POWER7 based Systems provide two modes for each LPAR – POWER7 mode • Fully exploit unique POWER7 capabilities • AIX 6.1 TL4 SP2 (Power 750/755), SP3 (Power 770/780) and later • AIX 7 – POWER6 & POWER6+ modes • Allows Live Partition Mobility to POWER6 systems • AIX 5.3 and AIX 6.1 TL2 & TL3  POWER7 Features exploited by AIX - Energy Management (available in all modes) – Per-Partition energy management - POWER7 Mode – 4 thread Simultaneous Multithreading (SMT) – 1024 Threads / 256 cores partition size (AIX 7 only) – Double precision Vector Scalar Extension (VSX) – 32 Storage Protection Keys (8 for applications) Core L3 MC0 MC1PowerBus GX EI3 (Elastic Interface) I/O EI3 (Elastic Interface) I/O MemoryI/OMemoryI/O MemoryI/OMemoryI/O GX L2  Cores: 8  L2: On Chip  L3: On Chip  Technology: 45nm  Transistors: >1B  Size: 567 mm2
  • 74.
    © 2010 IBMCorporation 75 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX support for POWER7 Processor Modes POWER6 & POWER6+ MODE POWER7 MODE POWER7 Client Value AIX 5.3 AIX 7 & AIX 6 2-Thread SMT 4-Thread SMT Throughput performance, processor core utilization. Affinity OFF by Default 3-tier Memory, MicroPartition Affinity Improved system performance for system images spanning sockets and nodes. 32-core/64-thread Scaling 64-core/128-thread Scaling 32-core / 128-thread Scaling 64-core / 256-thread Scaling 256-core / 1024-thread Scaling (with AIX 7) Performance and Scalability for Large Scale-Up Single System Image Workloads (e.g. OLTP, ERP scale-up, WPAR consolidation). EnergyScale CPU Idle EnergyScale CPU Idle and Folding with NAP and SLEEP Improved Energy Efficiency Active Memory Expansion Additional memory for applications You need more than AIX 5.3 to get the most out of POWER7
  • 75.
    © 2010 IBMCorporation 76 This document is for IBM and IBM Business Partners onl IBM Power Systems Simplified AIX Hardware Pricing Tiers (February 2010) G5 E5 C5 H5 F5 D5 Legacy Tiers POWER6 – Power 595 POWER7 – Power 780 POWER6 - Power 560 through Power 570 & Power 575 POWER7 – Power 770 POWER6 - Power 550 and below including blades POWER7 – Power 750, Power 755, PS700, PS701, PS702 Example Systems Large Medium Small New Tiers  Reducing the number of software price tiers from six to three  Goal is to provide simplified, consistent price tiers across all IBM Power Systems software Seller
  • 76.
    © 2010 IBMCorporation 77 This document is for IBM and IBM Business Partners onl IBM Power Systems Legacy servers: AIX Power Systems software tiers Models Machine Types Proc Grp Tier 595 9119 FHA H5 Large 575 9125-F2A F5 Medium 570 9117- MMA F5 Medium 570 9406- MMA P30 Medium 560 8234- EMA E5 Medium 550 8204-E8A E5 Small 550 9409-M50 P20 Small 520 8203-E4A D5 Small 520 9408-M25 P10 Small 520 9407-M15 P05/P10 Small JS23/4 3 7778-23x C5 Small JS22 7998-61X C5 Small JS12 7998-60X C5 Small Models Machine Types Proc Grp Tier 595 9119-595 H5 Large 590 9119-590 G5 Large 570 9117-570 F5 Medium 575 9118-575 F5 Medium 560Q 9116-561 E5 Medium 550 9113-550 D5 Small 520 9111-520 D5 Small 510 9111-51X D5 Small 505 9115-505 D5 Small JS21 7988-J21 C5 Small 185WS 7047-185 D5 Small i510 9910-51A D5 Small i510 9110-510 D5 Small OP710 9123-710 D5 Small 285WS 9111-285 D5 Small POWER6 POWER5 Seller
  • 77.
    © 2010 IBMCorporation 78 This document is for IBM and IBM Business Partners onl IBM Power Systems POWER7 Servers: AIX Power Systems software tiers POWER7 Models Software Tier 780, High End Large 770 Medium 750 Small 755 Small 710, 720, 730, 740 Small PS700, PS701, PS702 Small Seller
  • 78.
    © 2010 IBMCorporation 79 This document is for IBM and IBM Business Partners onl IBM Power Systems Why should you move up to AIX 7 or AIX 6?  More performance on POWER7 – AIX 7 and AIX 6 can provide substantially more performance on POWER7 than AIX V5.3 – AIX 7 supports massive workloads with up to 256 cores / 1024 threads  Access to new features – Capabilities like WPARs, Role Based Access Control, AIX Profile Manager are designed to improve security and administrative efficiency  AIX V5.3 is nearing End of Life – End of Marketing announced effective April 2011  AIX 7 will support running AIX 5.2 in a WPAR – Excellent way to consolidate old workloads running on less efficient hardware  It’s FREE! – Customers with software maintenance agreements (SWMA) can upgrade for no additional charge within an Edition: • AIX 5.3 to AIX 7 Standard edition • AIX 6 Express Edition to AIX 7 Express Edition, etc,
  • 79.
    © 2010 IBMCorporation 80 This document is for IBM and IBM Business Partners onl IBM Power Systems AIX 7: “The Future of UNIX” ibm.com/aix
  • 80.
    © 2010 IBMCorporation 81 This document is for IBM and IBM Business Partners onl IBM Power Systems This document was developed for IBM offerings in the United States as of the date of publication. IBM may not make these offerings available in other countries, and the information is subject to change without notice. Consult your local IBM business contact for information on the IBM offerings available in your area. Information in this document concerning non-IBM products was obtained from the suppliers of these products or other public sources. Questions on the capabilities of non-IBM products should be addressed to the suppliers of those products. IBM may have patents or pending patent applications covering subject matter in this document. The furnishing of this document does not give you any license to these patents. Send license inquires, in writing, to IBM Director of Licensing, IBM Corporation, New Castle Drive, Armonk, NY 10504-1785 USA. All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only. The information contained in this document has not been submitted to any formal IBM test and is provided "AS IS" with no warranties or guarantees either expressed or implied. All examples cited or described in this document are presented as illustrations of the manner in which some IBM products can be used and the results that may be achieved. Actual environmental costs and performance characteristics will vary depending on individual client configurations and conditions. IBM Global Financing offerings are provided through IBM Credit Corporation in the United States and other IBM subsidiaries and divisions worldwide to qualified commercial and government clients. Rates are based on a client's credit rating, financing terms, offering type, equipment type and options, and may vary by country. Other restrictions may apply. Rates and offerings are subject to change, extension or withdrawal without notice. IBM is not responsible for printing errors in this document that result in pricing or information inaccuracies. All prices shown are IBM's United States suggested list prices and are subject to change without notice; reseller prices may vary. IBM hardware products are manufactured from new parts, or new and serviceable used parts. Regardless, our warranty terms apply. Any performance data contained in this document was determined in a controlled environment. Actual results may vary significantly and are dependent on many factors including system hardware configuration and software design and configuration. Some measurements quoted in this document may have been made on development-level systems. There is no guarantee these measurements will be the same on generally- available systems. Some measurements quoted in this document may have been estimated through extrapolation. Users of this document should verify the applicable data for their specific environment. Revised September 26, 2006 Special notices
  • 81.
    © 2010 IBMCorporation 82 This document is for IBM and IBM Business Partners onl IBM Power Systems The following terms are registered trademarks of International Business Machines Corporation in the United States and/or other countries: AIX, AIX/L, AIX/L (logo), AIX 6 (logo), alphaWorks, AS/400, BladeCenter, Blue Gene, Blue Lightning, C Set++, CICS, CICS/6000, ClusterProven, CT/2, DataHub, DataJoiner, DB2, DEEP BLUE, developerWorks, DirectTalk, Domino, DYNIX, DYNIX/ptx, e business (logo), e(logo)business, e(logo)server, Enterprise Storage Server, ESCON, FlashCopy, GDDM, i5/OS, i5/OS (logo), IBM, IBM (logo), ibm.com, IBM Business Partner (logo), Informix, IntelliStation, IQ-Link, LANStreamer, LoadLeveler, Lotus, Lotus Notes, Lotusphere, Magstar, MediaStreamer, Micro Channel, MQSeries, Net.Data, Netfinity, NetView, Network Station, Notes, NUMA-Q, OpenPower, Operating System/2, Operating System/400, OS/2, OS/390, OS/400, Parallel Sysplex, PartnerLink, PartnerWorld, Passport Advantage, POWERparallel, Power PC 603, Power PC 604, PowerPC, PowerPC (logo), Predictive Failure Analysis, pSeries, PTX, ptx/ADMIN, Quick Place, Rational, RETAIN, RISC System/6000, RS/6000, RT Personal Computer, S/390, Sametime, Scalable POWERparallel Systems, SecureWay, Sequent, ServerProven, SpaceBall, System/390, The Engines of e-business, THINK, Tivoli, Tivoli (logo), Tivoli Management Environment, Tivoli Ready (logo), TME, TotalStorage, TURBOWAYS, VisualAge, WebSphere, xSeries, z/OS, zSeries. The following terms are trademarks of International Business Machines Corporation in the United States and/or other countries: Advanced Micro-Partitioning, AIX 5L, AIX PVMe, AS/400e, Calibrated Vectored Cooling, Chiphopper, Chipkill, Cloudscape, DataPower, DB2 OLAP Server, DB2 Universal Database, DFDSM, DFSORT, DS4000, DS6000, DS8000, e-business (logo), e-business on demand, EnergyScale, Enterprise Workload Manager, eServer, Express Middleware, Express Portfolio, Express Servers, Express Servers and Storage, General Purpose File System, GigaProcessor, GPFS, HACMP, HACMP/6000, IBM Systems Director Active Energy Manager, IBM TotalStorage Proven, IBMLink, IMS, Intelligent Miner, iSeries, Micro-Partitioning, NUMACenter, On Demand Business logo, POWER, PowerExecutive, PowerVM, PowerVM (logo), Power Architecture, Power Everywhere, Power Family, POWER Hypervisor, Power PC, Power Systems, Power Systems (logo), Power Systems Software, Power Systems Software (logo), PowerPC Architecture, PowerPC 603, PowerPC 603e, PowerPC 604, PowerPC 750, POWER2, POWER2 Architecture, POWER3, POWER4, POWER4+, POWER5, POWER5+, POWER6, POWER6+, pure XML, Quickr, Redbooks, Sequent (logo), SequentLINK, Server Advantage, ServeRAID, Service Director, SmoothStart, SP, System i, System i5, System p, System p5, System Storage, System z, System z9, S/390 Parallel Enterprise Server, Tivoli Enterprise, TME 10, TotalStorage Proven, Ultramedia, VideoCharger, Virtualization Engine, Visualization Data Explorer, Workload Partitions Manager, X-Architecture, z/Architecture, z/9. A full list of U.S. trademarks owned by IBM may be found at: http://www.ibm.com/legal/copytrade.shtml. The Power Architecture and Power.org wordmarks and the Power and Power.org logos and related marks are trademarks and service marks licensed by Power.org. UNIX is a registered trademark of The Open Group in the United States, other countries or both. Linux is a trademark of Linus Torvalds in the United States, other countries or both. Microsoft, Windows, Windows NT and the Windows logo are registered trademarks of Microsoft Corporation in the United States, other countries or both. Intel, Itanium, Pentium are registered trademarks and Xeon is a trademark of Intel Corporation or its subsidiaries in the United States, other countries or both. AMD Opteron is a trademark of Advanced Micro Devices, Inc. Java and all Java-based trademarks and logos are trademarks of Sun Microsystems, Inc. in the United States, other countries or both. TPC-C and TPC-H are trademarks of the Transaction Performance Processing Council (TPPC). SPECint, SPECfp, SPECjbb, SPECweb, SPECjAppServer, SPEC OMP, SPECviewperf, SPECapc, SPEChpc, SPECjvm, SPECmail, SPECimap and SPECsfs are trademarks of the Standard Performance Evaluation Corp (SPEC). NetBench is a registered trademark of Ziff Davis Media in the United States, other countries or both. AltiVec is a trademark of Freescale Semiconductor, Inc. Cell Broadband Engine is a trademark of Sony Computer Entertainment Inc. InfiniBand, InfiniBand Trade Association and the InfiniBand design marks are trademarks and/or service marks of the InfiniBand Trade Association. Other company, product and service names may be trademarks or service marks of others. Revised January 15, 2008 Special notices (cont.)

Editor's Notes

  • #2 This chart deck is intended for education related to AIX in 2Q 2010 This is the Seller presentation and is not intended for use with clients Jay Kruemcke AIX Program Director [email_address] Austin, TX
  • #3 <number> All around the world, businesses, governments and institutions are investing to reduce costs, drive innovation and transform their infrastructure. The economic downturn has intensified this trend, as leaders seek not simply to repair what is broken, but to prepare for a 21st Century economy. IBM has been talking about our vision for a smarter planet for close to a year now- and working with thousands of clients - with great success and traction taking hold. There’s no doubt that in almost any industry today, digital and physical infrastructures are coming together more and more. To some extent – today - almost anything – any person, object, process or service -- can become digitally aware and connected. Every industry is experiencing the benefits, and feeling the challenges, being presented by a smarter planet that is more instrumented, interconnected and intelligent. For example: Cities large and small depend on the ability of Power Systems™ to sift through the data needed to not only solve crimes and respond to emergencies, but to help prevent them. Power Systems help manage traffic, share information across city agencies, keep citizens informed and give them access to services.
  • #4 <number>
  • #5 <number> Winn-Dixie is a Jacksonville, Florida-based grocery chain with more than 600 retail locations throughout the southeastern U.S. Stores range from 25,000 to 50,000 square feet. Faced with an aging IT infrastructure with one server supporting each retail store, Winn-Dixie’s distributed environment was costly to maintain, and individual stores could experience extended outages. For example, when one server went down, a server often had to be sent from a warehouse in another state and then brought up by store staff members. As a result, store outages could last for days. Shopping for the perfect solutionA long-time IBM Power Systems™ client with key store applications running on AIX, Winn-Dixie investigated both the replacement of individual store servers and the implementation of a consolidated solution in a central location. The substantial cost savings, management simplicity, and redundancy options afforded with a centralized data center approach led the team to consolidate more than 600 servers into three IBM BladeCenter H chassis with JS22 blade servers, each supporting 16 individual stores using PowerVM. “We decided on the IBM BladeCenter using the JS22 blades because of the capabilities that come with that package—including virtualization and redundancy—because uptime is very important,” says Barry Kirk, director of architecture for Winn-Dixie. “We thought the IBM solution gave us the most flexibility not only for now, but going forward. It accommodated our existing application portfolio while providing a very rich upgrade path in our infrastructure.”Savings all across Winn-DixieBy consolidating onto JS22 blade servers, Winn-Dixie avoided more than US$5 million in capital costs. They eliminated the need for staff members to perform server administration at each store, as well the associated energy costs for each location.“All of that saved capital went back into our store remodeling program. So it made what would’ve been an expense into a revenue-generation proposal,” says Charlie Will, CIO for Winn-Dixie. “And our daily maintenance has been reduced considerably because we’ve cut out all of the maintenance that went into those stores. The labor savings is huge, and power usage is greatly reduced.”Simplifying for better manageabilityCentralizing all store processing into a single data center has provided Winn-Dixie with a more dynamic infrastructure. IT staff members at the centralized data center in Jacksonville can now more easily manage the processing needs for all stores through the built-in PowerVM virtualization capabilities on the JS22 blade servers. “In the old days, two years ago, when we wanted to add a new store or remodel a store, we had to procure equipment,” explains Gary Klingerman, senior manager of platform engineering at Winn-Dixie. “We had to send people to the store to install the equipment, operating systems and applications. Now when we add a store, we simply create a new LPAR on our JS22 blades, and we’re ready and cooking.”Implementing a comprehensive disaster recovery strategyWinn-Dixie is currently running a total of 39 BladeCenter JS22 blade servers with 16 store locations on each blade in the BladeCenter H chassis. There are three blades (one per chassis) that serve as hot standby blades to be used in case of failures.With its centralized data center in Florida, the company faces the potential threat of hurricanes wiping out their entire IT infrastructure. Winn-Dixie’s first tier of disaster recovery is an exact mirror of the headquarters solution at a nearby facility in Baldwin, Florida. Integrated tagging ensures that all LPARS are running with the exact same IP used at headquarters. As soon as IT staff members make the network changeover, they can be up and running at the Baldwin facility.Winn-Dixie also has a second tier of disaster recovery that consists of this BladeCenter solution at a facility in Gaithersburg, Florida. This location is also on standby in case the company should lose all computing capabilities at both the Jacksonville and Baldwin facilities.Gaining a competitive edge with high performanceSince the implementation of the JS22 blade servers with IBM POWER6™ processors, Winn-Dixie has benefited from a significant performance increase over their previous systems. “We’ve made our data centralized, and our performance has gone up five to ten times on our applications in the store,” says Klingerman. “We have some applications that used to run in excess of two hours. They now run in around ten minutes on the JS22 blades. Store associates that are using handheld inventory scanners are getting faster response times, so they have more time on the sales floor to provide service to customers.”A reliable solution from a trusted partnerWinn-Dixie IT staff members relied upon the partnership they have with IBM to provide the best answer to their business challenge. “IBM understood the business goals we were fighting for. We were not just getting a piece of hardware,” says Will. “They were instrumental in helping us come up with the components to make this solution work holistically.”
  • #6 <number> Baylor College of Medicine (Baylor) was building a new hospital as an adjunct to its medical school and research and clinical facilities. Its plans included upgrading its existing data center, thereby easing space constraints and at the same time, replacing end-of-life Sun servers. A number of vendors were considered, but IBM was selected for its IBM Power servers and its data migration expertise, which includes the ability to maintain constant access to Baylor's SAP ERP system, medical records and billing systems, patient management systems, as well as systems that support its research facilities, grant management and e-mail systems. "We are responsible for the infrastructure to support all these missions, and we take that very seriously," says Jenifer Jarriel, vice president of IT and chief information officer of Baylor. "When we look at partnerships, we look at companies that have the same kind of alignment with our customer service perspective on excellence." Back to top Solution implementation IBM Premier Business Partner Mark III was engaged and brought in the IBM Migration Factory to provide the transition of workloads from 32 legacy Sun servers onto three IBM Power 570 servers, running the IBM AIX operating system. Al Reineking, executive director of IT operations and technical services at Baylor, said, "When the rubber hit the road, the Migration Factory produced exactly what they said they would with no problems at all. They took the pain and more importantly the risk out of migrating very sophisticated software applications from one hardware platform to a new one. In reality, it was a piece of cake." Back to top Benefit of the solution Immediate benefits ensued. There was a 60 percent reduction in footprint relative to the rack space of the SAP environment and more than 40 percent savings in both cooling and power. The consolidation of 32 legacy Sun servers onto the three IBM Power servers and the virtualization of a variety of core business applications enabled the college to reduce its data center footprint from eight racks to three. Managing and maintaining the three new servers has proven to be dramatically simpler. The new ease of management has enabled Baylor to focus on more high-value projects, including making preparations to extend IT services to accommodate the new hospital.The critical nature of patient records and research meant that the new solution needed to be able to provide services to the college's client base around the clock. The IBM solution helps provide fault tolerance and high levels of redundancy to minimize single points of failure in the infrastructure. It also enables capacity on demand to help meet changing processing requirements. "I feel much better about the resources that we're using and the efficiency that we've been able to create," adds Jenifer Jarriel. "And we will continue that direction - we will continue to look at minimizing our footprint and gaining all the benefits we can from virtualization." Solutions/Offerings Hardware: Power Systems: Power 570, Power Systems running AIX Solutions: ISV/Alliance Partners: SAP ERP
  • #7 <number> This case study shows how The Coca-Cola Bottling Company of Egypt implemented two IBM Power ™ 570 servers running IBM AIX®, IBM PowerVM™ Dynamic Logical Partitioning and Micro-Partitioning, and IBM System Storage™ DS4800 to improve performance, scalability and availability. The Coca-Cola Bottling Company of Egypt's legacy hardware infrastructure, based on Competitive servers, hosted the company's Enterprise Resource Planning solution (Oracle e-Business Suite). However, due to an increase in the business expansion and implementation of new modules, the servers failed to perform satisfactorily and adequately meet business needs.The Coca-Cola Bottling Company of Egypt wanted to replace its legacy infrastructure with a high performance, scalable hardware solution. The company also wanted a centralized data storage system to reduce its administration work, while improving its performance. Back to top Solution implementation The Coca-Cola Bottling Company of Egypt chose IBM Power Systems and IBM System Storage technologies to upgrade its server environment. The company implemented two IBM Power 570 servers running AIX, one for the main site to host its production environment, and the other at the disaster recovery (DR) site. The Coca Cola's core business applications are now running on these servers. The company leveraged IBM PowerVM Dynamic Logical Partitioning and Micro Partitioning and implemented it on both servers. It used different logical partitions (LPAR) at the main site server to leverage the flexibility of partitioning, while minimizing server administration. Coca-Cola also implemented PowerVM Micro-Partitioning at its disaster recovery site to decrease the number of used processors to the minimum acceptable, since this server is only used in case of disaster and Testing.IBM System Storage DS4800 was used at the main site as well as the disaster recovery site, to store all the data which includes the company’s production, financial and sales data as well as the ERP solution (Oracle e-Business Suite). This IBM technology provided a robust and highly-available storage environment, ensuring that the Coca-Cola company's data is secure.The IBM Rational Performance Tester 7.0.1.1 together with our European benchmark center was chosen to assess the infrastructure capabilities to ensure that the solution meets the performance required by Coca Cola. Five predefined scenarios, representing the Coca-Cola's core business, were captured and rerun. 1200 "heavy users" connected to the application were executed to assess the solution performance. Rational Performance Tester with the BSD extensions allowed the benchmarking facility to simplify load testing by capturing and managing workload against Coca-Cola's application. The team was able to record and playback test scripts, drive different types of user data against the application, define various user loads, set verification points to validate application usage, and analyze the various performance reports in terms of throughput and user load. Metrics were collected to evaluate the scalability of the proposed platform. Back to top Benefit of the solution By implementing IBM Power 570 servers running the AIX operating system, IBM System Storage DS4800 and IBM PowerVM technologies, The Coca-Cola Bottling Company of Egypt replaced it legacy infrastructure with a flexible solution that supported its ERP solution, providing outstanding performance and high scalability.Some of the other benefits are:- IBM Power 570 servers decreased the server utilization to 65% supporting 600 Users instead of 100% with 350 users on the replaced HP Systems.- Reduced the total number of processors from 16 competitive processors to only 7 IBM Power6 processors.- IBM Power 570 servers running AIX ensure support for the company’s future growth, which is expected to double by the end of 2009.- Consolidating the servers on to one server with logical partitioning enhanced the system management and administration. Solutions/Offerings Hardware: Power Systems: Power 570, Power Systems running AIXStorage - Disk: Storage: DS4800 Software: PowerVM: PowerVM Dynamic Logical Partitioning, PowerVM Micro-Partitioning Solutions: ISV/Alliance Partners: Oracle EBS Other
  • #8 <number> University of Pittsburgh Medical Center Rewriting the rules on IT investment to facilitate tomorrow’s healthcare innovations Business Challenge: University of Pittsburgh Medical Center’s (UPMC) predominant focus is on transforming its entire IT infrastructure to lay the groundwork for the future, an effort that is far reaching in scope and subject to major challenges—most or all of which are shared by major healthcare providers today. UPMC, Pennsylvania’s largest integrated healthcare delivery network, sought to lower the cost and complexity of IT infrastructure to enable the continued investment in next-generation clinical systems and to lay the foundation for the best possible patient care. Solution: UPMC joined with IBM in an 8-year, $402 million partnership designed to transform its IT infrastructure. The deal was viewed as a watershed in how IT vendors and their customers work together. The most telling indicator of the project’s success is the difference between UPMC’s actual capital and operating costs (related to IT) and those that would have been incurred had it taken no action. A key backdrop for this comparison is the surge in processing and storage volume that resulted from the faster-than-projected expansion in the scope of UPMC’s industry-leading electronic health records adoption. Had no action been taken—UPMC would have needed to more than double its number of servers. Instead, it was able to reduce the number of servers by two thirds, and the consequent reduction and avoidance of $30 million in capital and operating costs. By simplifying its IT infrastructure through virtualization, UPMC is able to support more server capacity without the need to hire any additional support staff. On top of that, the server consolidation afforded by its virtualization strategy enabled UPMC to reduce its floor space requirements. The transformation making these benefits possible is being implemented by IBM Global Technology Services. The modular, standardized nature of the solution means UPMC can integrate new acquisitions into its network faster—enabling the more prompt realization of the acquisition’s operational and clinical goals. Benefits: $30 million in capital and operating cost reductions through virtualization-driven efficiencies 150 percent increase in processing capacity with no increase in IT support costs 40 percent reduction in IT infrastructure floor space requirements, freeing up space for revenue generating services 67 percent reduction in number of physical servers Expected increase in average utilization per server from three percent to nearly 80 percent Faster integration of acquired healthcare operations Why it Matters:: By transforming its IT infrastructure through consolidation and virtualization, UPMC has achieved more than a quantum improvement in resource efficiency. It has fundamentally changed the link between processing and resource needs—enabling it to meet an ambitious clinical agenda with a far lower rate of IT investment growth. Usage level: Win/Ongoing project/Completed project: External Complete Industry: Healthcare
  • #9 <number>
  • #10 <number>
  • #11 Let me summarize why AIX is the premier UNIX platform today. Our concurrent development of AIX with the POWER microprocessor, system hardware and firmware drives a level of innovation and performance that the competition simply can’t match. Solaris and HP-UX development and support are split across multiple platforms whereas we are highly focused with a premium offering. AIX and POWER deliver sheer performance in production environments that the competition cannot match. Our leadership across dozens of industry benchmarks validates this point. AIX with Advanced Power Virtualization delivers tremendous flexibility and drives workload consolidation for higher system utilization. Virtualization is clearly a strong trend in IT and AIX is very well positioned. Finally, a clear differentiator is our stable AIX roadmap. I’ll go through our roadmap in more detail in a few slides, but let me say that AIX has a predictable roadmap well into the next decade. We proactively communicate the timing of our releases and have established guidelines for lifecycle planning. This makes life much easier for customers, especially those who are wrestling with the uncertainty of Sun and HP roadmaps. Now, let’s talk about where AIX is going. Please turn to the next slide. Let me try and summarize why AIX is the premier UNIX platform today. Our concurrent development of AIX with the POWER microprocessor, system hardware and firmware drives a level of innovation and performance that the competition simply can’t match. Solaris and HP-UX development and support are split across multiple platforms whereas we are highly focused with a premium offering. AIX and POWER deliver sheer performance in production environments that the competition cannot match. Our leadership across dozens of industry benchmarks validates this point. AIX with Advanced Power Virtualization delivers tremendous flexibility and drives workload consolidation for higher system utilization. Virtualization is clearly a strong trend in IT and AIX is very well positioned. Finally, a clear differentiator is our stable AIX roadmap. I’ll go through our roadmap in more detail in a few slides, but let me say that AIX has a predictable roadmap well into the next decade. We proactively communicate the timing of our releases and have established guidelines for lifecycle planning. This makes life much easier for customers, especially those who are wrestling with the uncertainty of Sun and HP roadmaps. Now, let’s talk about where AIX is going. Please turn to the next slide.
  • #12 <number> Now let’s look at reliability, availability, and serviceability. A recent survey of 400 IT users worldwide by ITIC showed that the combination of AIX and Power Systems provides the best result in each of these categories. Our availability is 99.997% - 2 ½ times the next best UNIX alternative and 10 times better than Windows on x86. AIX/Power reliability was best with less than one outage per year per system. This is particularly impressive when you consider that Power systems dominates the midrange and highend and so the average configuration of our systems is much larger than the competitive systems. We have more hardware to fail but it doesn’t bring the system down because of the way our HW, firmware, and OS work together. This survey only measured one aspect of serviceability – patch time to the OS – and AIX on Power was the best at that as well with only 11 minutes average time to install a patch. 54% of IT execs surveyed say they need 99.99% availability or better. With these kind of results it is no wonder that more and more of them are choosing Power systems. Let’s go to next chart and lok at why this is happening.
  • #13 <number> Over the years AIX has evolved from an engineering workstation operating system to a solid dependable server operating system
  • #14 <number> POWER Hardware has an optional, separately chargeable hardware feature called “PowerVM” that enables some of the advanced virtualization capabilities of the POWER hardware including: - Enables (turns on) Micro-Partitioning - Includes new support software, the Virtual I/O Server - Includes automated load balancing software, the Partition Load Manager PowerVM is managed through IBM Systems Director
  • #15 <number> AIX 7 builds on the capabilities of previous releases of AIX, like AIX 6, to provide new capability to clients we are also announcing a new way for clients to consolidate old workloads on AIX 7, with the new product AIX 5.2 WPARs for AIX 7
  • #16 <number> AIX can’t continue to grow without providing even more value to our clients. That is why IBM is providing a preview of the next version: AIX 7. AIX 7 represents over three years of work by the AIX development team. Although there are enhancements across the entire operating system – four key areas are highlighted in this release: Vertical scalability, Virtualization, Resiliency and management automation. Many of the features of AIX 7 are also available in AIX 6 technology level 6
  • #17 <number> IBM issues a guarantee that if your applications are will run on AIX 7 if they ran on previous releases of AIX assuming reasonable coding practices are used
  • #18 As stated earlier, AIX 7 will be binary compatible with applications created on AIX 5L and will run on Power4 and later systems. To smooth the transition to AIX 7 we have a number of activities planned - First, we are previewing this release with our clients months before it becomes generally available - Second, we have an Open Beta that will allow virtually any client to download and test AIX 7 - Third, we have extensive activities underway with our ISVs to insure that they understand the AIX 6 is binary compatible and to help them exploit some of the new features of AIX 7 - We also have a number of other activities, both for clients and ISVs to introduce this new version of AIX We believe that these activities will increase the adoption of AIX 7 by our clients and ISVs As you can see from the slide, clients with a software maintenance agreement will be able to upgrade to AIX 6 at no added charge when it becomes generally available. Finally, the upgrade process for AIX7 will be exactly the same as if it were named AIX 6.2 – existing tools such as alt disk install can be used to perform a straightforward upgrade to AIX7 with a minimum of disruption and risk.
  • #19 <number> Over the past 20 years, AIX has moved from processing a single thread of work at a time, to being able to handle 1024 threads of work simultaneously running – delivering the capabity to handle the largest workload required by your business.
  • #20 <number> 6C5 – AIX TB Segment Support (AIX 7.1 and 6.1L)AIX V7.1 and AIX V6.1 with the 6100-06 Technology Level introduce a new memory scaling feature that exploits the Power MMU and reduces SLB misses. Large memory workloads running on Power 7 systems will benefit the most from this feature. Not enabled by default on AIX 6 Tl6. 0DE – AIX kernel memory pinning (AIX 7.1 and 6.1L)AIX V7.1 pins kernel memory by default and includes support allowing applications to pin their kernel stack. Pinning kernel memory and the kernel stack for applications with real-time requirements can provide performance improvements by ensuring that the kernel memory and kernel stack for an application is not paged out. This feature can also be enabled in AIX version 6.1 with the 6100-06 Technology Level. 117 - Enable hardware acceleration support for Encrypted File Systems, IPSec and Trusted Execution (Saurabh Desai) (AIX 7.1 and 6.1L) The state of the art security technologies implemented in the earlier versions of AIX namely the Encrypted File Systems (EFS), IP security (IPSec) and Trusted Execution (TE) use software-based cryptographic algorithms. The AIX Cryptographic Framework (ACF) is a cyrptographic provider in AIX. This feature enables these key security technologies to exploit the hardware cryptographic acceleration facility provided by the ACF. 7K4 – LVM Flash Support (AIX 7.1 and 6.1L)AIX V7.1 includes enhanced support in the AIX Logical Volume Manager (LVM) and JFS2 filesystem for Solid State Disks (SSDs). This includes the capability for LVM to restrict a volume group (VG) to only contain SSDs and the ability to report that a VG only contains SSDs. JFS2 has been enhanced with the capability to capture and report per-file statistics related to hot-file detection that can be used to determine if a file should be placed on an SSD. These capabilities allow for applications to monitor and determine optimal file placement. This feature is also available on AIX V6.1 with the 6100-06 Technology Level. The changes made to LVM are just that; changes to various commands that allow a system administrator restrict a VG to only contain PVs whose underlying media (disk) is SSD. We put this in specifically to support requests from DB2 to be able to determine if a VG is of type SSD (which is supported via lsvg and programmatically). Thus there are changes to mkvg, chvg, and lsvg to support this functionality.............doing a search on the 7.1 pubs for "SSD“To generate the hotness report, a new option “–O hot” needs to be added as an argument to filemon command. – Note that this is supported in Automated offline and manual offline modes only. – For example: To generate hotness report in automated offline mode, run the following command: Filemon –O hot –A –r fmon –o fmon.out “sleep 20” 092 – Shared Memory Interface to Barrier Synchronous Register SR (AIX 7.1 and 6.1L) AIX V7.1 provides support for accessing the POWER7 Barrier Synchronous Register (BSR) via shared memory interfaces from user space. This allows utilization of the BSR without requiring a kernel extension to be loaded. This support is also available on AIX V6.1 with the 6100-06 Technology Level.
  • #21 <number> What is it Virtualized AIX operating system environments within a single AIX image – each with unique network addresses. Each WPAR shares the single AIX operating system but can be separately managed Applications and users inside a WPAR cannot affect resources outside the WPAR Each WPAR can have a regulated share of processor, memory and other resources Two types of WPAR System WPARs have separate security and appear like a completely separate OS Application WPARs are manageability wrappers around a single application # WPAR takes seconds to create and LPARs minutes # LPARs need setting VIOS LV or LUNs but WPARs add simpler NFS mount points, or can just use Global AIX diskspace options # LPAR needs 512 to 1GB to boot AIX and a WPAR takes just ~60 MB (yes sixty megabytes) # You can share application code say 1 GB in each and every LPAR (40 LPAR = 40 GB) or just one shared read-only copy for all WPARs 40 WPAR = 1 GB).This saves man-power in maintenance, disk space AND memory (if the application is loaded in the Global AIX then there is only one copy in RAM) # Maintenance of one Global AIX plus syncwpar command is much less work than say updating 40 copies of AIX # Especially if you run WPAR buckets:This means instead of running say 40 LPARs you run three Global AIX LPARs for different 3 AIX 6 Technology Levels that you need - WPARs can be move between these as they are updated to high TL's. Eventually, you empty the lowest one and remove it. Then create a new Global AIX for the next new TL as it becomes available # Application mobility much simpler to organise than LPM # Global AIX admin can see and change ALL the filesystems of the WPARs - for example, adding a tool to /usr/local/bin is a simple "cp" command away. # Lots of WPARs on one AIX is simpler to monitor and control than monitoring across many LPARs. # Rapid cloning is easy and lets you use "disposable images" - simple to create, experiment and throw away # If you mess up a WPAR, you can enter it from the Global AIX to fix it - if you mess up an LPAR it may not boot! # Backups are much easier and smaller than a LPAR mksysb - a default WPAR is around 75 MB as a backup file. Of course, more if you have applications + data but the 2 GB of AIX does not have to be included in the backup
  • #22 <number> This slide shows the use of Workload Partitions within Dedicated LPARs and MicroPartitions. The leverages the best capabilities of each technology. We expect that this will be the dominant usage model for WPARs since it leverages the advantages of hardware isolated LPARs and virtual I/O with the flexibility and potential administrative savings of WPARs For example, the Finance LPAR needs the highest degree of isolation and the workload demands a dedicated set of processor resources. The Planning workload also requires a dedicated number of processors, but the adminstrator has decided to create a System WPAR for the Business Development team – maybe they require root level authority to install new software. By setting up a WPAR for the Business Development workload, the administrator could have reduced her workload because she doesn’t have to be involved in the day to day activity of managing the WPAR. Because all the “Finance workloads” are using a single AIX image, there is less system administration work required to keep AIX up to date. Another example is in the “Americas” LPAR. The administrator has created two WPARs one for the Manufacturing operation and one for the Planning team. The administrator might have created these two WPARs just so that he can create billing records to capture the amount of resources each one of those workloads consume, for chargeback or capacity planning purposes. As you can see, clients can use the combination of LPARs and WPARs to improve efficiency. You don’t have to use LPARs and WPARs together, but it does make sense in many cases.
  • #23 <number> Workload Partitions not only enables administrative efficiency by potentially reducing the number of AIX images to maintain, but that same technique can also be applied to applications that support a shared installation. By installing the application into the global instance and then sharing the application files (in read only mode) with WPARs, potentially multiple independent instances of the application can be run in separate WPARs.
  • #24 <number> 6ET – Support for export of Fibre Channel adapters to WPARs (AIX 7.1 Only) AIX V7.1 includes support for exporting a virtual or physical fibre channel adapter to a WPAR. The adapter is exported to the WPAR in the same manner as storage devices. When the WPAR is started, all child devices will be discovered and configured inside the WPAR, which provides several advantages. SAN devices can be directly provisioned to the WPAR's N-port with no need to provision to the Global partition first and then export to the WPAR. Multipath management can be done within the WPAR. Fibre channel tape systems using the "atape" driver are also supported inside the WPAR in this configuration. Whether it is a physical FC adapter or a virtual adapter such as a NPIV FC exported from a VIOS, this is what is exported to the WPAR, and the associated WWPN goes with it. Any LUN zoned to that WWPN will be visible to the WPAR and not the Global. 0ZY – VIOS disk support in a WPAR (AIX 7.1 & 6.1L) With this release of AIX, VIO SCSI disks are now supported in a WPAR in the same manner as Fibre Channel disks. VIO SCSI disks configured in the Global partition can be exported to a WPAR for use as a data disk or as the rootvg for the WPAR. Any disk type supported by the VIOS can be exported in this manner to a WPAR. In addition, Live Application Mobility is supported for a rootvg WPAR on VIOS SCSI disks as long as the source and target LPARs are both clients of VIO server(s) with access to the disks. 6E6 - Trusted Kernel Extension Loading and Config from WPAR (AIX 7.1 Only) AIX V7.1 provides the capability for a Global administrator to export specific kernel extensions for a WPAR administrator to have the ability to load and configure from inside the WPAR. A signature for the specified extensions is computed at the time of export to ensure only the exported extensions can be loaded. The exported extensions can be specified as to whether they are loaded in a local WPAR namespace, or globally, and therefore accessible by the global and other WPARs. This capability removes a barrier for some application stacks that require a kernel extension so that they can function in a WPAR environment. For AIX V7.1, Live Application Mobility for a WPAR with an exported kernel extension is not supported.
  • #25 <number>
  • #26 <number>
  • #27 <number>
  • #28 <number>
  • #29 <number> Live Application Mobility allows you to move workload partitions from one system to another without restarting the application. This enables greater application availability by allowing you to move workloads away from a system that has a planned outage. It can also be used for workload balancing.
  • #30 <number> Live Partition Mobility also allows you to relocate an entire presentation including the operating system from one system to another. Live Par- tition Mobility provides the ability to relocate a running LPAR from one physical machine to another physical machine without disrupting the LPAR's operation. Live Partition Mobility provides clients significant flexibility in their management of workloads. Live Partition Mobility can be used to balance loads between physical servers without incurring downtime. It can also be used to move LPARs off of a server in order to perform planned maintenance on the server without incurring an outage. Live Partition Mobility can also improve system availability by allowing LPARs to be moved off of a server in response to a pending system out- age.
  • #32 <number>
  • #33 <number> The IBM Journaled Filesystem Extended (JFS2) provides for even greater data security with the addition of a new capability to en- crypt the data in a filesystem. Clients can select from a number of different encryption algorithms. The encrypted data can be backed up in encrypted format, reducing the risk of data being compromised if backup media is lost or stolen. The JFS2 encrypting filesystem can also prevent the compromise of data even to root-level users.
  • #34 <number> The AIX Security Expert was introduced with Technology Level 5 up- date to the AIX V5.3 OS and provides clients with the capability to manage more than 300 system security settings from a single inter- face and the ability to export and import those security settings between systems. AIX 6 includes an enhancement to the Security Ex- pert to store security templates in a Lightweight Directory Protocol (LDAP) directory for use across a client's enterprise.
  • #36 <number> AIX 7.1 (Standard Edition and above) supports built-in clustering capabilities. Administrators can use the operating system provided primitives to cluster a set of AIX nodes and take advantage of the capabilities of the clustering. Some of the functions supported by Cluster Aware AIX include: Commands and APIs to create the cluster across a set of AIX systems: Kernel based heartbeats and messages provide a robust cluster infrastructure and by default exploit multi channel communication between the nodes using the network and SAN physical links. Advanced cluster-wide event management: AIX event management is enhanced to support cluster wide event notifications for certain events (for example, Network/disk errors). Global Device View support: When managed by Cluster aware AIX, device files associated with the disks shared across the nodes in the cluster will have a common name across the nodes in the cluster that have access to the disks. Cluster wide command operation: Many of security and storage related AIX commands have been enhanced to support the operation across the cluster These clustering capabilities are also available on AIX V6.1 with the 6100-06 Technology Level when using PowerHA SystemMirror (formerly known as HACMP).
  • #37 <number> Although new releases of PowerHA SystemMirror and PowerVM VIOS will directly use the Cluster Aware AIX interfaces, existing programs that use the legacy RSCT (Reliable Scalable Cluster Technology) interfaces will continue to work unchanged.
  • #38 <number> Nonintrusive Service Aids: AIX V6.1 serviceability aids are designed to minimally impact performance and availability. Second failure data capture (SFDC) technology involves building diagnostic and data capture features into the product code, but only enabling them after problem diagnosis has started. These aids are tunable and can be localized to specific subsystems, further mitigating any performance impact. The result is faster, less-disruptive problem determination, without the need to install special debug code. AIX 6 also introduces a mainframe-inspired live dump facility. This allows se- lected subsystems to dump their diagnostic information for subse- quent service analysis, without requiring a full system dump and partition outage. AIX V6.1 continues to build upon the first failure data capture and nondisruptive service aid features introduced in prior AIX releases. A new live dump feature allows selected subsystems to dump their mem- ory state and traces to the file system for subsequent service analysis, without requiring a full system dump and outage. As for those problems that still require a partition restart in or- der to recover, AIX V6.1 provides a firmware-assisted dump mode. In this new mode, AIX cooperates with system firmware to write the FFDC information to the dump device using the restarted AIX image, rather than writing to the dump device using the failed AIX image. The intended result is fewer dump failures and a more reliable system dump facility.
  • #39 <number> POWER6 Storage Keys: POWER6 Storage Keys exploitation of the POWER6 processor storage key feature brings a mainframe-inspired reliability and capability to the UNIX market for the first time. Storage keys can reduce the number of intermittent outages associated with undetected memory overlays inside the kernel. Applications can also use the POWER6 Storage Key feature to in- crease the reliability of large, complex applications running under the AIX V5.3 or AIX V6.1 operating system.
  • #40 <number> Dynamic tracing with Probevue: AIX V6.1 provides a new dynamic tracing capability that is designed to simplify debugging com- plex system or application code without requiring code changes and recompilation. This dynamic tracing facility will be intro- duced via a new tracing command, Probevue, that allows a devel- oper or system administrator to dynamically insert trace break-points in existing code without having to recompile the code. A developer or system administrator can use Probevue to dynamically place probes in existing code, and specify the data to be captured at probe point.
  • #41 <number>
  • #42 <number> AIX V6.1 provide a new graphical systems console, the IBM Systems Director Console for AIX. The Systems Director Con- sole for AIX provides a responsive Web access to common systems man- agement tools such as the Systems Management Interface Tool (SMIT) and offers integration into the IBM Systems Director. The Systems Director Console for AIX is included with AIX V6.1. The IBM Systems Director Con- sole for AIX is built on a lightweight infrastructure and provides an easy-to-use interface for the Web-enabled administration of AIX management tasks. The console provides a single user interface for system management and administration operations and can be accessed from any supported Web browser. IBM Systems Director Console for AIX gives the user a powerful interface to manage AIX servers and software and provides a graphical Web-based interface to enable the user to manage remote systems and resources. The IBM Systems Director Console includes these features: o AIX V6.1 provides browser-based access to the popular System Management Interface Tool (SMIT). Users can access AIX operating system management functions in a Web browser. o Distributed Command Execution Manager provides the capability to securely execute systems management commands on multiple sys- tems. AIX V6.1 includes all the infrastructure needed for the IBM Systems Director Console for AIX. The Console is not a prerequisite for IBM Systems Director, but it is designed to have a similar management interface and shares a common technol- ogy base.
  • #43 <number> With Automatic Variable Page size support, AIX will automatically select optimal page sizes that will result in better performance for some ap- plications. All of this is done transparently to the applications and does not require any application changes or recompilation. AIX will choose optimal page sizes for an applications data, heap, stack, shared memory, and anonymous mmap() memory dynamically based on reference and use patterns. POWER6 systems are required for this feature, as AIX ex- ploits a new capability of the POWER6 processor to dynamically promote, demote, and mix 4 KB and 64 KB page sizes within the same memory region. This feature is active by default and includes system administrator controls to disable or to tell AIX to be even more aggressive with this new page promotion feature.
  • #44 <number> AIX Profile Manager is an Advanced Manager of IBM Systems Director 6.2. It is provided as a feature of AIX, distributed with Standard and Enterprise Editions. AIX Profile Manager provides "dashboard" views and runtime configuration profile management over groups of networked systems. The profile management capability includes capturing the runtime configurations, applying the new runtime control values, and comparing the run-time configurations with a given profile or between systems. AIX Profile Manager manages the client AIX systems using the AIX Runtime Expert technology. It also provides "copy machine" like simplicity for distributing OS properties to many systems. Profile Manager installs on all supported Director platforms (Windows, Linux, AIX). The Profile Manager leverages the AIX Runtime Expert infrastructure First introduced with AIX 6 Technology Level 4. AIX Runtime Expert provides a simplified solution for managing runtime properties of one or more AIX instances. AIX Runtime Expert in AIX V7.1 provides several enhancements, including improvement in performance, ability to set the version of the configuration profiles to maintain multiple versions, ability to set customized descriptors to the profiles. It also provides the ability to be managed by AIX Profile Manager from an IBM Systems Director. This feature is also available on AIX V6.1 with the 6100-06 Technology Level.
  • #45 <number>
  • #46 <number> As you can see from this chart, there are a number of cases where a customer can use either LPARS/MicroPartitions or Workload Partitions. IBM is offering clients additional capability that they can choose to use when appropriate. Feedback from our clients indicates that many intend to use WPARs and LPARs in their environment. We understand that there isn’t a single solution to every problem but that by providing customers with a broad range of virtualization capabilities across our entire product line, out clients will have the tools to more efficiently run their IT operations.
  • #47 <number> AIX 6 includes many important security capabilities, but remember, if your client wants to manage security on systems other than just AIX, or they want to take an enterprise approach to managing security even just on AIX – the client should be made aware of the numerous security management offerings from Tivoli including Tivoli Access Manager.
  • #48 <number>
  • #49 <number> This chart summarizes some of value provided by select AIX 6 features and any particular segments that might be particularly interested in that feature. As you can see, most of the functionality provided by AIX 6 are of general interest to all of our clients.
  • #51 <number> AIX Enterprise Edition is a single offering that includes AIX 6 and several key manageability products that are designed to: Improve availability Enhance operational efficiency Measure resource usage in a virtualized environment Enterprise Edition consists of: AIX 6 operating system PowerVM™ Workload Partitions Manager for AIX (WPAR Manager), Tivoli® Application Dependency Discovery Manager (TADDM) IBM Tivoli Monitoring IBM Usage and Accounting Manager Virtualization Edition for Power Systems. IBM Service Management is an approach to managing information technology (IT) that views IT resources from the perspective of how those resources support business objectives. AIX Enterprise Edition provides a sound basis for Service Management by enabling a better understand of how IT components affect the delivery of business services. The IBM Systems Director family of products are designed to provide consistent platform management across all IBM systems. AIX Enterprise Edition is designed to complement the platform management capabilities of IBM Systems Director. The AIX Enterprise Edition is designed to simply the process of managing virtualized AIX environments by including AIX 6 and enterprise management functions into a single, easy to order offering. By offering AIX 6 in conjunction with enterprise management capabilities, clients can get all of the virtualization, security, availability and manageability features associated with AIX 6, and all the enterprise management features of the WPAR Manager, TADDM, Tivoli Monitoring and Usage and Accounting at an attractive price compared to purchasing the individual products separately. The AIX Enterprise Edition includes integration between the products such as ITM and TADDM that is not available in the standalone products. AIX Enterprise Edition is designed to be used in conjunction with IBM Systems Director to provide platform management capabilities. AIX Enterprise Edition is ideal for clients who are moving up to AIX 6, and adopting PowerVM™ virtualization technologies to control IT complexity and growth.
  • #52 <number> AIX Enterprise Edition is designed to improve the manageability of a virtualized AIX environment. Potential benefits include: Improved service availability through access to relevant, real time information about IT resources Enhanced operational efficiency though visualization of the relationships of IT resources and applications Improved operational efficiency by centralizing monitoring and automating the response to service issues Improved customer satisfaction by providing accurate information of the IT resources used to support business workloads. Better utilization of IT resources through consolidated views of virtualized resource usage Improved service availability through Live Application Mobility. Simplified ordering of AIX and essential service management tools at an attractive price.
  • #54 <number> ITM 6.2 gives the Power Systems administrator the ability to be alerted or notified when something goes wrong. ITM uses agent technology, and therefore has the capability to determine the health and availability of the entire Power System, right down to the network interface card. ITM provides the administrator the ability to monitor both the physical and logical resources of the Power System, including the disk and network that sits behind the Virtual I/O Server (VIOS). It can do this because with every VIOS server shipped from IBM, there’s an ITM agent embedded in the VIOS to enable ITM to monitor the disks and network. Included with ITM is a data warehouse tool that allows the customer to store as much historical data as they desire. This DB information allows the customer to go back and compare current system performance and utilization to past performance and utilization. In addition, ITM includes a vast number of reporting templates that can be easily customized for individual customer requirements
  • #55 <number> Tivoli Monitoring is virtualization aware – it can show the relationships between virtual resources and physical resources.
  • #56 Problem: “Total Monitored Memory Used Pct” value is higher than it should be since it was calculated compared to total “monitored” memory rather than total CEC memory. This will be fixed in an APAR.
  • #57 <number>
  • #59 <number> Out of the box situations: If the LPAR, nw or storage will reach a limit in 7 days with strength of 3 (confidence + # of samples). Limit for attribute collected and time period System_pSeries_LogPart_TTCT_1W System_pSeries_LogPart_TTCT_1W predicts if the monitored logical partition, network or storage will reach a defined critical limit within the next seven days, and the prediction is strong (Strength >= 3) or moderate 2. The limit is set in the analytical task and the period is set in the situation. System_pSeries_LogPart_TTWT_1W System_pSeries_LogPart_TTWT_1W predicts if the monitored logical partition will reach a defined warning limit within the next seven days, and the prediction is moderate (Strength >= 2). The limit is set in the analytical task and the period is set in the situation. System_pSeries_Network_TTCT_1W System_pSeries_Network_TTCT_1W predicts if the monitored networking will reach a defined critical limit within the next seven days, and the prediction is strong (Strength >= 3). The limit is set in the analytical task and the period is set in the situation. System_pSeries_Network_TTWT_1W System_pSeries_Network_TTWT_1W predicts if the monitored networking will reach a defined warning limit within the next seven days, and the prediction is moderate (Strength >= 2). The limit is set in the analytical task and the period is set in the situation. System_pSeries_Storage_TTCT_1W System_pSeries_Storage_TTCT_1W predicts if the monitored storage will reach a defined critical limit within the next seven days, and the prediction is strong (Strength >= 3). The limit is set in the analytical task and the period is set in the situation. System_pSeries_Storage_TTWT_1W System_pSeries_Storage_TTWT_1W predicts if the monitored storage will reach a defined warning limit within the next seven days, and the prediction is moderate (Strength >= 2). The limit is set in the analytical task and the period is set in the situation.
  • #60 <number> TADDM is the product that helps you discover the Power Systems resources in the enterprise. TADDM is an agent-less technology, that actually uses sensors to go out and discovers all the Power resources and associated applications in the enterprise, and then builds a topography map of the Power configuration. It builds the map, with the associated data from both a physical viewpoint and a logical viewpoint right down to the application level. It also discovers the relationships between the systems. So if for example you had a mission-critical business application running on a Power 595 that accessed a database running on a Power 560, and you lost the 560, you would be able to discover the full impact of losing that server from a business service perspective. TADDM also tracks changes down to the file level. A study by IBM determined that 80% of all problems that occurred happened because something in the environment changed. With TADDM you would be able to track all changes, compare those changes with a “Golden Master”, and quickly determine if the source of the problem is the change that was made.
  • #61 <number> IBM® Systems Director Standard Edition provides virtualization management for clients that have broadly deployed virtualized resources in a production environment. It allows IT managers to create and manage a standardized set of virtual appliances – virtual machines containing a complete ready-to-run workload comprising OS, middleware and applications – and maintain these within a centralized library or repository. This approach allows a small set of ‘golden master’ virtual appliances to be maintained, which are ready for instant deployment as business needs change. It also streamlines upgrades and patches, thereby eliminating redundancy and ensuring consistency across the virtualized infrastructure.
  • #62 <number> In order to respond to changing workloads and business requirements, Power servers have the ability to dynamically optimize your virtual resources. With IBM Systems Director Editions, you can move workloads from heavily loaded servers to servers that have spared capacity. The ability to move running partitions from one server to another offers you the ability to balance these workloads and resources. For example, if an application’ s resource requirements peak unexpectedly to a point where there is contention for server resources, you might move it to a more powerful server or move other, less critical, partitions to different servers, and use the freed-up resources to absorb the peak. Systems Director Editions provides the simplified management needed to automate this mobility.
  • #63 <number> IBM® Systems Director Enterprise Edition adds a new layer of client value by introducing the concept of system pools – groups of virtual appliances deployed across multiple physical servers which can be managed as a single entity. Virtual appliances include servers, storage, and network resources. You now have the ability to create and remove system pools across multiple physical servers. It also provides a dashboard view of the overall health and status of the pool and deployed workloads along with simplified monitoring and visualization of the aggregate capacity and utilization for the systems within a pool. Management of system pools also allows relocation of virtual workloads in response to predicted host system failures without disruption. This enables workload resilience for planned and unplanned downtime. Systems Director Enterprise Edition is designed to help provide increased system utilization, availability, and improved energy efficiencies through pooling and automation.
  • #64 <number> Systems Director Editions enables you to monitor and control energy usage on supported systems and Intelligent Power Distribution Units (PDUs). With Standard and Enterprise Editions: You can get information on energy usage on single servers or across a rack of servers. You can get information on thermal characteristics including inlet and exhaust temperatures, You can also look at trends over time, because a temporary spike in electrical energy use or heat may not be a problem unless it happens frequently or is increasing over time. You can calculate energy costs for targeted resources The Energy Cost Calculator allows you to display the amount of energy used for a given resource or group of resources over a specified period of time and calculates the corresponding cost of that energy. It provides a visual indicator of the amount of energy consumed by the resource or group of resources over the specified time period. This is compared to what would have been consumed had nameplate power been drawn over that entire period. This is just some of the information available that can help you build a more energy efficient IT operations center, in that it helps you to identify potential trouble spots, and to not waste time and resources on areas that are not a problem. Note that energy management features vary by system.
  • #65 <number> Systems Director Standard and Enterprise Editions also provides integration of server, storage, and network management for virtualization environments across platforms. Network management is a key component of an integrated data center management strategy, which is required for a dynamic infrastructure. These Editions allow you to manage, monitor, and configure vendor based network devices as well as integrate of vendor applications. It also helps protect your IT investment through its open design and support for industry standards, which enables heterogeneous physical and virtual management with support for multiple platforms and operating systems. The following network devices are supported with Systems Director Standard and Enterprise Editions: IBM BladeCenter supported switches and Blade NICs Brocade® Converged Ethernet network switches (FCoCEE) and Brocade® Fiber Channel switches QLogic® FCoCEE switches and adapters
  • #66 <number>
  • #67 <number> It’s all on the slide.
  • #68 <number> Here are some contacts and a sales kit to help you with information on AIX Enterprise Edition .
  • #69 <number>
  • #70 <number> This chart shows the advantages that AIX Express Edition provides when consolidating smaller workloads on larger servers. Using AIX Standard Edition, a client would have to spend up to $46,800 for AIX licenses for the consolidated environment. If they use AIX Express Edition the cost of AIX licenses is reduced to $22,800. US prices are shown, so the difference may be more or less in your country, but the basic message is the same – AIX Express can help you save money!
  • #71 IBM License Metric Tool is a no-charge offering that is designed to help clients maintain an inventory of Processor Value Unit (PVU) based and per processor core based software licenses. ILMT is designed to assist clients to complying with the AIX Express Edition license requirements restricting the amount of processor capacity in cores available to run AIX Express Edition in an LPAR. The IBM License Metric Tool has been available for several years and is the strategic license management tool for IBM. Clients that have used IBM software such as DB2 or WebSphere are likely to be familiar with the IBM License Metric Tool. ILMT is designed to simplify license management by helping clients: Track and manage processor capacity available to the AIX and Power Systems Software products: Use the reports to help determine if you have the appropriate capacity (Full and Sub-capacity) for each of your Power Systems products including AIX that are installed in your IT environment. Lower liability risks: Reduce the risk of not meeting your per processor core contractual licensing conditions as well as the unplanned cost of license compliance payments. Track software inventory: Helps maintain a continuously updated inventory of where IBM software assets are installed in your environment. For now, in Power Systems Software, the requirement is limited only to clients running AIX Express Edition on a medium (P570, Power 770) or high tier server (P595, Power 780). Clients in this scenario are required to download, install, and use the IBM License Management Tool (ILMT) within 180 days of deployment, to help them manage compliance with the AIX Express Edition license restrictions. AIX Express Edition is the first product that is specifically limited in vertical scalability by the license. Since there is no hard coded limit inside AIX Express Edition that programmatically prevents it from being used in partitions larger than 4 cores and 8GB of memory per core, it would be easy for a client to unintentionally exceed the license restriction. The IBM License Metric Tool is provided to help clients maintain license compliance. AIX Express Edition is targeted for smaller installations as is reflected in the price point. Thus, it is restricted to availability for 4 processor-core partitions only.
  • #72 <number>
  • #73 AIX 6 will support systems based on the PPC970, POWER4, Power5, Power6 and POWER7 processors at all chip frequencies. Since almost all AIX 6 features will be available on all systems, clients may decide to move up to AIX 6 on older hardware just to take advantage of the new features such as WPARs, Application Mobility and Role Based Access control. AIX 6 will only run the 64 bit kernel. This will enable even greater scalability in the future. Just like on AIX 5L, 32 bit and 64 bit applications will continue to run on AIX 6 – no recompilation is necessary. Because AIX 6 only includes the 64bit kernel, 32 bit device drivers and kernel extensions will not be supported on AIX 6. Most device drivers and kernel extensions are already available in 64-bit format, so we are expecting few issues related to the discontinuing of the 32-bit kernel
  • #75 <number> Power7 provides 4-SMT threads; Vector Scalar Extension support; and 32 storage key support Benefits Power7 provides 4-SMT threads; Vector Scalar Extension support; 32 storage key support; and P6 Compatibility mode Benefits 4-Thread SMT thread capability further improves throughput performance and processor core utilization; and AIX/Hypervisor dynamically optimize SMT mode based on load providing better single-thread performance when not all of the SMT threads across all of the cores are needed. 32 Storage Keys Support providing better granularity of storage key isolation providing for 32 concurrent protection regions. New Vector Scalar Extension (VSX) computation support allowing two independent 2-way SIMD FP operations (double-precision) per cycle, using a 64-entry, 128-bit wide VSR architected register file. Provides enhanced Scalar FP support with a 64-deep register file. Power 7 AIX Process/Thread Enhanced Memory Affinity Memory locality provides performance improvements. AIX will take advantage of local/near/far memory hierarchy and CPU affinity will be provided in a micro-partitioned environment. Additional affinitization of kernel memory will be provided. Autonomic application affinity improvements. AIX provides application affinity framework enhancements Middleware opportunity for improved performance Extension of existing APIs for better managing affinity P6 Compatible Mode enabes support for running prior Technology Levels on Power7 enables support for Live LPAR Mobility from Power6 systems to Power7 systems and vice-versa 64-Core/256-way Power 7 Performance Scaling Targeted performance scaling improvements for 128/256-way environments Known scaling issues 128-way performance issues Analysis, Identification of 256-way performance issues and implementation of targeted improvements 256-core/1024-CPU Enablement in AIX AIX scales and runs on a fully configured Titan HE (256-cores/1024 SMT threads) 256-core/1024-CPU Power 7 Scaling Sap 2-Tier Benchmark Represents a single OS image measure of multiple SAP Application Servers and a single Database server. Customers use SAP 2-Tier to measure server capacity and use it to construct 3-tier configurations Customers use SAP 2-Tier as a measure of generic server capacity (beyond ERP) Database Scaling Most high end customers deploy SAP in 3-tier configuration Database scaling work is included to support customer SAP deployment Benefits AIX will continue to scale and provide industry leading performance for large workloads. AIX 6 TL2 and AIX 5.3 TL9 will be supported on any Power7 system that ships in the first half of 2010. These TLs will be supported in P6 mode.They will not be supported on systems that ship the second half because those TL levels will be getting too old.AIX 6 TL4 and up will support P7 mode....prior AIX 6 TLs will not. AIX 5.3 will not support P7 mode, only P6 modeAIX 5.3 will be supported by the Power7 models (at least though 2010) and will be w/d 4/2011AIX 7 will only support P7 mode and extreme scalability (up to 256 cores)Power 7 Exploitation features– Energy Management– Per-Partition energy management– 4 thread Simultaneous Multithreading (SMT)– 1024 Threads / 256 cores partition size– Double precision Vector Scalar Extension (VSX) – 32 Storage Protection KeysAIX version support for POWER7– AIX 6.1 TL2 and later (1st half 2010 only, then TL3 and later moving forward in 2nd half)– AIX 5.3 TL9 and later (1st half 2010 only, then TL10 and later moving forward in 2nd half) – AIX 7POWER7 provides two modes– Power7 mode* AIX 6.1 TL4 and later* AIX 7 – Power6 mode * AIX 5.3 and AIX 6.1 TL3
  • #77 <number>
  • #78 <number>
  • #79 <number>
  • #80 <number>
  • #81 <number>
  • #82 <number>