If we go back 10 years, clients separately purchased x86 servers, storage, switches, cables, racks, etc… For Enterprise Data Centers, a “new deployment” typically resulted in a room full of boxes, which clients had to unpack, configure, install SW, test and – finally – days to weeks later, get up and running.
- Client performed integration work; result was slower time to value; additional many managers.
IBM introduced BladeCenter systems to help clients get faster time to value on deployments of up to 14 servers. These systems integrated the switch, storage and management. Clients sought even higher levels of integration, so we introduced iDataPlex to integrate over 100 servers, storage, network and management.
- Pre-packaged chassis & rack (Server, storage and network); Higher density compute than rack optimized; result was faster time to value and a single chassis manager for 10s to 100s of servers.
Clients are now seeking multi-rack solutions that come pre-packaged with servers, storage, network and management. These systems must also support converged and virtualized fabrics that automate manual tasks. The manage of these systems must also be able to support Cloud Service manager integration.
- Pre-packaged Integrated System, that scales to 100s of servers; Automated converged and virtualized infrastructure Platform manager, that is easy to install and maintain, with an Optional Cloud manager
IBM Systems Director Network Control V1.3 provides advanced network
management functions for network devices. Functions include discovery, inventory,
network topology, health and status monitoring, and configuration of network
devices.
- List of questions
- Virtualization Mgmt – which hypervisor -
- What do you like most about the Next Generation Platform Management Appliance?
What do you least like or concerns you the most about the Next Generation Platform Management Appliance?
- How important is it for Next Generation Platform Management Appliance to be able to manage...
at least 4 chassis?
at least 8 chassis?
at least 16 chassis?
additional chassis types?
additional types of resources?
Is it OK for IBM to fully constrain, test, and optimize the Next Generation Platform Management Appliance to only manage a limNoded set of resources? Please elaborate.
Would you allow your Next Generation Platform Management Appliance to have an internet connection?
The Next Generation Platform Management Appliance will require 32Gb of memory and local highly-available RAIDed storage. Is this a concern or issue? Any suggestions?
- How important is it that the Next Generation Platform Management Appliance management software also be available:
on a rack-optimized 1U or 2U server (not a next-gen blade)?
as a software appliance that could be installed on any x86 server?
Runnable as a VM?
- Would you like to also run VMware vCenter on the Next Generation Platform Management Appliance (to avoid having to buy separate hardware to run vCenter)?
- Please describe what would approximately be a fair price for the Next Generation Platform Management Appliance?
Would you and your organization likely purchase an Next Generation Platform Management Appliance (assuming a fair price)?
Need to integrate ISV management tools into Next Generation Platform Management Appliance or Install on a different server with Launch from Next Generation Platform Management Appliance
Vendor specific versions of Next Generation Platform Management Appliance ?
VMware Vcenter
Microsoft system center
What, if any, changes or additions would need to be made to the Next Generation Platform Management Appliance before you would likely purchase and use it?
In a non-HA (High Availability) environment how long would it be acceptable for the Next Generation Platform Management Appliance to be down for updating/rebooting?
How important is HA (High Availability) for the Next Generation Platform Management Appliance?
How likely would you purchase Next Generation Platform Management Appliances in pairs for management redundancy (High Availability)?
- For the Next Generation Platform Management Appliance, how important would the following factors be when making the purchase decision? Proportionally allocate 100 point based on each factor's importance in the purchase decision.
Price
Buying experience
Packaging
Product Features
Hardware Ease of Use
Software and Systems Management Ease of Use
Reliability, Warranty, Service
Time to value
Life cycle costs
Vendor reputation
VMControl Enterprise Edition provides a broad range of capabilities related to system pools, including the ability to create and manage system pools, organize automated relocation of virtual workloads within system pools, and add or remove physical hosts from system pools without disruption to running workloads.
VMControl Enterprise Edition supports Power running AIX and Linux