Dr. Gunwant Joshi
The Air
Pollution
Local & Global Context
in
Pollution is undesirable change
in the quality of our Environment
(Land, Water & Air)
that adversely affects
Human Life, Our Property,
Trade & Commerce, Industries and
the Life of the Desired Species of
Plants and Animals
Thus Pollution is essentially due to the
Pollution is net result of a chain reaction:
Population Explosion,
Industrialization, Urbanization,
Transmigration from villages,
Over exploitation of the Natural resources
and the Wasteful Use
Defines
Air Pollutants: Solids, Liquids, or Gas
(including Noise) present in Atmosphere
in such concentrations as may be, or
tend to be injurious to humans, other
living creatures, Process plants, property or
the environment.
Thus, Air Pollution is:
The Presence of Pollutants in Atmosphere
0.04 %
Initial Assessment of Impacts
• Provide a description of the status & trends of environmental factorsProvide a description of the status & trends of environmental factors
against which predicted changes can be compared and evaluated inagainst which predicted changes can be compared and evaluated in
terms of importanceterms of importance
• provide a means of detecting actual change by monitoring once aprovide a means of detecting actual change by monitoring once a
project has been initiatedproject has been initiated
Impact Network for Air Environment
PreoperationalPhase OperationalPhase
ReleaseofHeat
Impacton
SoilQuality
Impacton
FloraandFauna
Impacton
Aesthetics
ImpactonAgricultural
Production
ImpactonEconomicOutput ImpactonSocio-CulturalEnvironment
PROJECT
ReleaseofAirPollutants
Changein
AirQuality
Depositionofparticulates
onsoil,water,materials,
vegetation,etc.
LocalandGlobalClimatic
Changes
ImpactonVisibility
Impacton
Materials,Buildings,
Monuments,etc.
Impacton
HumanHealth
MEASUREMENT OF AIR QUALITY
• Ambient Air Quality
• Measurement of Source Emission
• Meteorological Measurement
Pollution Parameter Equipment
Dust fall Dust Fall Jar
Suspended Particulates High Volume Sampler,
Inertial collectors,
Respirable Dust Sampler
Total Sulfur Compounds Lead Candle
Sulphur Dioxide Air Sampling Kit
Hydrogen Sulphide Air Sampling Kit
Oxides of Nitrogen Air Sampling Kit
Wind Direction Recording Vane
Wind Velocity Wind Velocity Meter
Temperature and Humidity Whirling Psychrometer
Thus Pollution is essentially due to the
Pollution is net result of a chain
reaction: Population Explosion,
Industrialization, Urbanization,
Transmigration from villages,
Over exploitation of the Natural
resources
and the Wasteful Use
Why are we so much concerned about
Air Pollution?
Air is the maximum in put required [11K
liters] as compared to 03 liters Water &
01Kg. Food.
We continually breath air throughout our
life at the rate of 6-8 times/minute]
Oxygen we breath through air, combines
with Hemoglobin and is supplied to cells
for intracellular respiration
Pollutants we breath along with air may
adversely affect the life processes
The Human Respiratory System
Body’s Natural Defenses
Role of cilia, mucus, sneezing, and coughing
Major Air Pollution Episodes World
Over
Earlier Major Air Pollution Episodes World Over
Occurrence Time Location Excess Deaths
December,1930 Meuse Valley, Belgium 63 & Most Cattle
October,1948 Donora, Pennsylvania, USA >20
November,1950 Pozarica, Mexico >22
December,1952 London, United Kingdom 400
November,1953 New York, USA 220
January, 1956 London, United Kingdom 1,000
December, 1957 London, United Kingdom 750
December, 1962 London, United Kingdom 700
December, 1963 New York, USA 300
December, 1966 New York, USA >168
December,1984 Bhopal, India 3500+
1991 - 1992 Gulf War, Middle East Not Known
November, 1997 Manila, Philippines >300+
September,2001 WTC Tower,New York 350+
Air Pollutants
• Primary – pollutants directly emitted into the
atmosphere (eg. SO2, NOx, CO, PM)
• Secondary – pollutants that form in the air as
a result of chemical reactions with the other
pollutants & gases (eg. O3, NO2,PAN, Smog)
*PM=particulate matter; SO2=sulfur dioxide; CO=carbon Monoxide;
NO2=nitrogen dioxide; NOx=nitrogen oxides, PAN=Paraoxy Acetyle Nitrate,
Smog = Organics+SPM
•Location -
Indoor & Outdoor Air Pollutants
Air Pollutants
Indoor and Outdoor
• Sources
- cooking
- combustion
- particle re-suspension
- Paints/Polishes
- air conditioning/cleaning
- consumer products
- smoking
- heating
- biological agents
• Pollutants
- NOx, CO, CO2, VOCs,
ozone (O3
-
), bacteria,
mold-byproducts, endotoxins
• Sources
- industrial
- commercial
- mobile
- urban
- regional
- agricultural
- natural
Pollutants
- SO2, O3
-
, NOx, CO,
PM, Spores,VOC
Gaseous Pollutants
• NOx
• SO2
• Ozone
• CO
• CO2
• VOC (volatile organic compounds)
• SVOC (semi-volatile organic compounds)
•SVOC include aldehydes, dioxins, benzene,1,3-butadiene)
•VOC include organic solvents
Sources of Air Pollutants 1
Source / Pollutants SPM SO2 NOx CO HC F
Power Plant ++++ + +++ - - -
Sulfuric Acid - ++++ - - - -
Super Phosphate +++ - - - - ++++
Cement ++++ + +++ + - -
Carbon Black +++ ++ ++ +++ + -
Oil Refinery + ++++ ++ + ++ -
Aluminum +++ + ++ + ++ -
Copper +++ ++++ ++ - - -
Zinc +++ ++++ ++ - - -
Sources of Air Pollutants 2
Source /Pollutants SPM SO2 NOx CO HC Lead
Iron & Steel ++++ ++ +++ +++ ++ -
Brick Kiln +++ + ++ ++ + -
Petrol Automobile - ++ ++ ++++ ++++ +++
Diesel Automobile +++ ++ ++++ - - -
Coal Burning ++ ++ + ++ ++ -
Wood Burning ++ ++ + ++ ++ -
Bio-Gas - - - + - -
LPG - - + - - -
Environmental Fact-Sheet of
Thermal Power Plant at Talcher(200MW)
Oxygen:25,000 MT; Coal : 9,000 MT; Water: 1,10,000 M3
Carbon di Oxide : 50,000 MT, Nitrous Oxide : 9000 Kg
Sulfur di Oxide : 270 Kg, Fly Ash Slurry : 3500 MT
Lead : 208 Kg, Zinc : 56 Kg , Nickel : 56.5Kg, Cobalt :112 Kg
Cadmium : 51 Kg, Copper : 45 Kg, Chromium : 60.6 Kg
Uranium : 4.6 Kg, Thorium : 16.5 Kg
The Effects of Various Air Pollutants
The Cause The Effects
Suspended
Particulate
Matter, [SPM/RD]
Fines [PM10]
Ultra Fines[PM2.5]
Irritation & Adverse effect on the Resp.
System, Visibility & Standing Crops.
Corrosion of Metals, Inconvenience and
Annoyance. Form condensation Nuclei
for Smog
Oxides of Sulfur
[ SO2 ]
Suffocation and Adverse effects on Upper
Respiratory Tract, Acute & Chronic injury to
Plants leaves, Corrosion of Metals,Acid Rains.
Hydrocarbons Carcinogenic, Adverse effect on plants,
Causes Smog [ PAN with NOx ]
Oxides of Nitrogen
[ NOx ]
Irritation of Eyes and Nose, Damage to Plant
leaves, Corrosion of Metals, Acid Rain, Smog
Carbon Monoxide
[CO]
Causes headache, Dizziness, Nausia, Competes
with Oxygen in Respiratory Metabolism
Oxidants eg.[Ozone] Disturbs lung Function, Induces
coughing.
Irritation of Eyes, Nose & Throat.
Discolors
Leaves and Objects. Forms Smog.
Hydrogen Fluorides[HF] Hydrogen Sulfides[H2S] Chlorine[ Cl2 ]Lead[Pb]
The
Cause
The Effects
SuspendedParticulate
Matter, [SPM/RD]
Fines [PM10]
Ultra Fines [PM2.5]
Eye Irritation and Adverse effect on the
Respiratory System, Visibility & Standing Crops.
Corrosion of Metals, Inconvenience & Annoyance.
Form condensation Nuclei for Smog
Oxides of Sulfur [ SO2 ] Suffocation and Adverse effects on Upper
Respiratory Tract, Acute & Chronic injury to Plants
leaves, Corrosion of Metals,Acid Rains.
Hydrocarbons [HS] Carcinogenic, Adverse effect on plants, Causes
Smog [ PAN with NOx ]
Oxides of Nitrogen [ NOx ] Irritation of Eyes and Nose, Damage to Plant
leaves, Corrosion of Metals, Acid Rain, Smog
Carbon Monoxide
[CO]
Causes headache, Dizziness, Nausia, Competes
with Oxygen in Respiratory Metabolism
Oxidants eg.[Ozone] Disturbs lung Function, Induces coughing.
Air Quality:Cause & Effect Monitoring
Ambient Air Monitoring Instruments
The Stack Emission Monitoring Provisions
Air Quality Monitoring Sites at Indore
City
Source & Effect Monitoring Activity
• A term used to describe a mixture of smoke and fog.
• Occurs when high concentrations of moisture is combined with
smoke (often containing oxides of sulfur and nitrogen) in the
presence of high temperatures or thermal inversions and the
absence of wind.
• These conditions cause polluted air to stagnate over industrial
areas causing potential respiratory health hazards.
• Large coastal industrial centers with surrounding high ground
are more prone to smog.
• There is often a diurnal variation in smog formation as a
necessary component for its formation is sunlight.
Air Pollutants : Smog
• VOCs + NO2 + Heat +
Sunlight yields
Photochemical Smog
• Chemical composition
–Aldehydes
–Other secondary pollutants
– Ground level O3 and other photochemical oxidants
Smog in Santiago, Chile
• Pollutants mix in the air to form industrial smog, mostly
result of burning coal, and photochemical smog, caused
by motor vehicle, industrial, and power plant emissions.
Photochemical
Smog
Air Pollutants :Acid Deposition
• Acid deposition is caused mainly by coal-burning
power plant and motor vehicle emissions, and in
some regions, threatens human health, aquatic life
and ecosystems,forests,and human-built structures.
• Human respiratory disorders
• Aquatic ecosystems affected
• Release of toxic metals
• Leaching of soil nutrients
• Loss of crops and trees
• Damage to buildings,
statues & monuments
Acid Deposition : Harmful Effects
• Bomb tests blasts across the Globe causing
Nuclear energy diffusion across the Globe,
• O3 (Ozone) layer depletion in stratosphere [first
found in 1956] causing incresedUltra-Violet
penetration into Earth’s atmosphere,
• Deforestation across the Globe and resultant
Lack of enough growth of trees (to take carbon
oxides) due to lack of enough rains
Some more subtle Causes of Air Pollution
Role Of Pollution And Global Warming On
Natural Allergen Production
• Climate change has been demonstrated to
cause some weed plants to grow faster, flower
earlier and produce greater amounts of pollen
• This effect was greater in urban areas where
CO2 levels and temperatures were higher
compared to rural areas
• Doubling the atmospheric concentration of CO2
in ragweed pollen production by 61%
Pollutants: sulfur dioxide, nitrogen dioxide, nitric oxide,
carbon monoxide, photochemical oxidants, toxic metals.
• Health Effects: wheezing, coughing, lungs/breathing
quality, dust allergy, sleeplessness (insomnia).
• Long-term Health Effects: emphysema, bronchitis,
asthma, weakness, stamina loss, skin irritation/diseases.
• Effect on Generations: reduced stamina, reduced strength
and energy, reduced bone tissue strength, reduced health,
prone to diseases and bacterial infection, reduced life,
birth with deformation.
Air Pollution - Health Effects
Mechanisms Of Pollutant-Related
Adverse Health Effects
• PM or ozone induced airway inflammation
• Oxidative stress induced by transition metals or
polyaromatic hydrocarbons
• Covalent modifications of intracellular
proteins/enzymes
• Biologic compounds (glucans, endotoxin) effect on the
innate immune response and inflammation
• Stimulation of the autonomic nervous system
• Adjuvant effects
• Procoagulant activity of ultrafine PM
• Suppression of normal defense mechanisms
Asthma and Air Pollution
Air pollution has been associated with:
• Increased bronchial hyper-responsiveness
• Increased airway inflammation
• Decreased lung function
• Increased hospital admissions and ER visits
• Enhancing airway inflammation induced by
allergen exposure
• Priming of the airways to allergic responses
Effects of Diesel Exhaust on Respiratory System
•Physician diagnosed asthma has been reported to be
more frequent among children living within 100 meters.
• Higher rates of allergic sensitization are found in
children playing more than one hour/day near major
traffic thoroughfares.
Sulfur Dioxide, Nitrogen Dioxide, Carbon Monoxide
• Epidemiologic studies have demonstrated that
exposure to SO2, NO2 & CO increase the
Cardiopulmonary mortality, Respiratory and
Cardiovascular hospital admissions caused by
stroke (NO2) and Myocardial infarction (NO2 & CO)
The Human Lungs retrieved from
Person
who lived in
Un polluted & Polluted
Environment
Seasonal Changes in SPM Concentration’2000
Air Quality Monitoring Sites at
Indore City
Status of Air Pollution at Indore
LOCATION AP STD. 1993 -96 1997 1998 - K1
POLOGROUND
Industrial Area
TSPM 500 µg / m3
PM 10 200 µg / m3 - -
SO 2 120 µg / m3 7.9 6.0 18.6
NO x 120 µg / m3 11.6 10.0 23.2
KOTHARI
MARKET
Commercial Area
TSPM 200 µg / m3
PM 10 100 µg / m3 -
SO 2 80 µg / m3 6.9 6.5 18.6
NO x 80 µg / m3 11.4 9.5 22.1
TELEPHONE
NAGAR
Residential Area
TSPM 200 µg / m3
PM 10 100 µg / m3 - -
SO 2 80 µg / m3 4.7 5.2 13.9
NO x 80 µg / m3 9.0 8.8 16.9
National Ambient Air Quality
Standards
National Ambient Air Quality Standards
Name of the
Pollutant
Time
weighted
Average
Industrial
Areas
Residential,Rural
& Other Areas
Sensitive
Area
Sulfur di
Oxide (SO2)
Annual Avg.*
24 hrs. Avg.**
80 µg/m3
100 µg/m3
60 µg/m3
80 µg/m3
15 µg/m3
30 µg/m3
Oxides of
Nitrogen (NOx)
Annual Avg.*
24 hrs. Avg.**
80 µg/m3
100 µg/m3
60 µg/m3
80 µg/m3
15 µg/m3
30 µg/m3
Total Suspended
Particulate matter
(TSPM)
Annual Avg.*
24 hrs. Avg.**
360 µg/m3
500 µg/m3
140 µg/m3
200 µg/m3
70 µg/m3
100 µg/m3
Respirable Dust
( RPM or PM10 )
Annual Avg.*
24 hrs. Avg.**
120 µg/m3
150 µg/m3
60 µg/m3
100 µg/m3
50 µg/m3
75 µg/m3
Lead (Pb) Annual Avg.*
24 hrs. Avg.**
1.0 µg/m3
1.5 µg/m3
0.75 µg/m3
1.0 µg/m3
0.5 µg/m3
0.75 µg/m3
Carbon Monoxide
(CO)
Annual Avg.*
24 hrs. Avg.**
100 µg/m3
100 µg/m3
100 µg/m3
100 µg/m3
100 µg/m3
100 µg/m3
Concentrations in mg/m3
etic Mean of minimum 104 measurements in year twice a week, 24 hourly
/ 8 hourly values shall be met 98 % time in year. Only 2 % of time it may
scribed values but not on two consecutive days
New National Ambient Air Quality
Standards
 
Pollutant
Time Weighted
Average
Concentration in Ambient Air Method of Measurement
Industrial
Area
Residential,
Rural and other
Areas
Sensitive
Area
Sulphur Dioxide
(SO2
)
Annual Average* 80 µg/m3
60 µg/m3
15 µg/m3
1. Improved West and Gaeke Method
2. Ultraviolet Fluorescence
24 Hours
Average**
120 µg/m3 80 µg/m3 30 µg/m3
Oxides of Nitrogen
as NO2
Annual Average* 80 µg/m3
60 µg/m3
15 µg/m3
1. Jacob & Hochheiser modified (NaOH-
NaAsO2
) Method
2. Gas Phase Chemiluminiscence24 Hours
Average**
120 µg/m3
80 µg/m3
30 µg/m3
Suspended
Particulate
Matter (SPM)
Annual Average* 360 µg/m3
140 µg/m3
70 µg/m3
High Volume Sampling (Average flow rate
not less than 1.1m3
/minute)
24 Hours
Average**
500 µg/m3
200 µg/m3
100 µg/m3
Respirable
Particulate Matter
(Size less than
10µm) (RPM)
Annual Average* 120 µg/m3
60 µg/m3
50 µg/m3
Respirable Particulate Matter Sampler
24 Hours
Average**
150 µg/m3
100 µg/m3
75 µg/m3
Lead (Pb) Annual Average* 1.0 µg/m3
0.75 µg/m3
0.50 µg/m3
AAS Method after sampling using EPM
2000
or equivalent filter paper24 Hour
Average**
1.5 µg/m3
1.0 µg/m3
0.75 µg/m3
Carbon Monoxide
(CO)
8 Hours Average** 5.0 mg/m3
2.0 mg/m3
1.0 mg/m3
Non dispersive Infrared Spectroscopy
1 Hour Average 10.0mg/m
3
4.0 mg/m3
2.0 mg/m3
Ammonia (NH3
) Annual Average* 0.1 mg/m3
-
24 Hour
Average**
0.4 mg/m3
* Annual Arithmetic mean of minimum 104 measurements in a year twice a week 24 hourly at uniform interval.
** 24 hourly/8 hourly values should be met 98% of the time in a year. However, 2% of the time, it may exceed but not on two consecutive days.
NOTE
1. National Ambient Air Quality Standard : The levels of air quality necessary with an adequate margin of safety, to protect the public health, vegetation and property.
2. Whenever and wherever two consecutive values exceed the limit specified above for the respective category, it would be considered adequate reason to institute regular/continuous monitoring and
further investigations.
3. The State Government / State Board shall notify the sensitive and other areas in the respective states within a period of six months from the date of notification of National Ambient Air Quality
Standards.
Percentage accidence of Observed values at
Indore City Over the Prescribed Limits
Locality [Limits] TSPM
[ mean range ]
PM10
[ mean range]
SO2 & Nox
[ mean range]
Telephone Nagar [Residential]
[ TSPM : 200 µg/m3
]
[ PM10 : 100 µg/m3
]
[ SO2 and NoX : 80 µg/m3
]
88.6
[253 - 406]
98.0
[177 - 347]
Well
within
Limits
Kothari Market [Commercial]
[ TSPM : 200 µg/m3
]
[ PM10 : 100 µg/m3
]
[ SO2 and NoX : 80 µg/m3
]
95.0
[327 - 579]
98.5
[308 - 492]
Well
within
Limits
Pologround [Industrial]
[ TSPM : 500 µg/m3
]
[ PM10 : 150 µg/m3
]
[ SO2 and NoX : 120 µg/m3
]
56.4
[458 - 635]
97.0
[360 - 529]
Well
within
Limits
Pollution Status of Suspended
Particulates in Residential Area
Pollution Status of Suspended
Particulates in Residential Area
Parameter
[Limits]
Status Concentration
[ in µg/m3
]
Percentage of
the Values
Observed
Total Suspended
Particulate
Matter
[ TSPM : 200 µg/m3
]
Low
Moderate
High
Critical
00 to 70
71 to 140
141 to 210
>210
0.31 Percent
3.39 Percent
9.70 Percent
86.6 Percent
Respirable Dust
or PM10
[ PM10 : 100 µg/m3
]
Low
Moderate
High
Critical
00 to 30
31 to 60
61 to 90
>91
0.02 Percent
0.32 Percent
0.56 Percent
99.1 Percent
1997,Road Side Ambient Air Quality
Road Side Ambient Air Quality (µg/m3
)
Locality Time
M/N/E
Time
(minuets)
PM10
TSPM
OBSERVED
TSPM
EQUATED24Hrs
.
Palasia Square M 110 369.88 1425.88 621.5
Palasia Square N 106 225.49 1281.83 608.5
Palasia Square E 85 150.70 1207.04 588.78
Gandhi Pratima M 224 709.19 4531.47 886.7
Palika Square M 178 193.78 962.14 605.32
Kothari Market E 71 1496.3 5021.08 775.2
Nagar Nigam Square E 51 1472.1 766.66 806.87
Rajbada E 148 3783.4 5394.75 789.07
Subhash Pratima E 139 2476.2 3584.3 847.41
Patel Pratima M 100 824.83 2091.43 661.69
Bambai Bazar E 129 596.49 1868.41 672.65
Road Side Ambient Air Quality
Locality TSPM
[TSPM : 200 µg/m3
]
PM10
[ PM10 : 100 µg/m3
]
Khajrana Chauki 529.9 95.06
Vijay Nagar Chauki 610.13 90.65
Palasia Square 907.50 401.72
Chhavani 1157.60 322.34
University Campus 698.51 164.26
Marimata Square 992.18 130.87
Laxmibai Nagar 1470.14 249.99
Kalani Nagar 1187.79 194.28
Sethi Gate 916.42 115.9
Chandan Nagar 1493.05 649.92
CAT Campus 953.45 39.78
Traffic on some important City Roads
Name of
Road
Place Road
Width
Capacity
(P.C.U.)
Actual Road
Traffic(PCU)
A.B. Road DIG Banglow 12 (m) 4,000 7,200
Sanwer Road Banganga 07 (m) 2,000 3,300
M.G. Road High-Court 10 (m) 3,000 5,200
Jawahar Mrg. Gurudwara 07 (m) 2,000 5,100
Subhash Mrg. Smruti Cinema 07 (m) 2,000 4,900
Sawarkar Mrg. University 07 (m) 2,000 4,500
Khandwa Road Rajbada 07 (m) 2,000 7,300
Bhanwar Kua Sindhi Colony 10 (m) 3,000 8,000
Public Awareness Campaign
Public Awareness Campaign
public Awareness CampaignPublic Awareness Campaign
Air Quality Monitoring Sites at
Indore City
Steps to Reduce Vehicular Pollution
1. Lead in Petrol :--0.56 g/l1990
> 0.15 g/l1994
> 0.013 g/l2000
2. Compulsion of Catalytic Converters in Exhaust pipes
3. Sulfur in Diesel :--0.75%1995
> 0.5%1996
> 0.25%1999
4. Banning loose 2T Oil & Promoting Oil Dispensers
5. BTX [Benzene,Toluene & Xylene] in Petrol :--0.5%1999
> 0.3%2000
6. Promoting use of CNG, LPG, Gasohol, Bio-Diesel and
new generation Oxygenates & other Fuel additives.
7. Improvement of Roads & Traffic system
8. Regulation and Planning of Urban growth centers and also
the Industrial & Commercial activity
Air Quality Monitoring Sites at
Indore City
CATEGORY
A INDUSTRIAL
B COMMERCIAL
C RESIDENTIAL
D SILENCE ZONE
dB Typical Situation Descriptio
n
140 Military Jet Taking Off at 30 m Intolerable
130 Pneumatic Chipping & Riveting Intolerable
110 Sheet Metal shop, Hand Grinding Very Noisy
100 Automatic Lathe shop, Metro Rail Station Very Noisy
90 Heavy lorries at 6 m, Pneumatic Drill Very Noisy
80 Max.T.V.Volume [Fight & Song scene] Very Noisy
70 Loud Radio & Stereo Audio Output Noisy
60 Restaurants & Shopping Malls Noisy
50 Conversational speech, Office, Lowest T V Quiet
Duration perday
(Hrs)
dBA
slow response
8.0 90
6.0 92
4.0 95
3.0 97
2.0 100
1.5 102
1.0 105
0.5 110
0.25 or less 115
When the daily noise exposure is
composed of two or more periods of
noise exposure of different levels, their
combined effect should be considered,
rather than the individual effect of each.
 Annoyance, headache, fatigue,
Sleeplessness, Mental restlessness.
 Upsets Chemical balance & Cholesterol
levels.
 Dilates Blood vessels affecting Brain & Heart.
 General uneasiness, Errors in the Motor Performances and the Visual
perceptions of Size and Distance of the Objects.
 Shift in Hearing threshold, Auditory Fatigue, Gradual loss of Hearing,
Loss of Sensitivity to certain frequencies, Acoustic Trauma.
As Ecological Processes do not
respect National Boundaries,
and
The Environmental problems often
have impacts beyond Borders.
50
Once released,
Pollutants are free to wander
Factors causing Decrease or Increase in Air Pollution
• Air pollution may be decreased by
– Settling of particles due to gravity
– Wind, Rain and snow
– Salty spray from oceans
– Chemical reactions
– Topography of region
– Temperature inversions
– Urban high rise buildings
– Emissions of VOCs from certain trees and plants
– Grasshopper effect
• May be increased
by
Canyon street phenomena
Inversions The brown haze from NO2 and other pollutants makes
an excellent marker for inversion identification
Elevated inversionSurface inversion
Atmosphere is Dynamic System with 4 Layers
• Troposphere, supports life
– 75–80% of the earth’s air mass
– Closest to the earth's surface
– Chemical composition of air
– Rising & falling air currents: weather and
climate
– Involved in chemical cycling
• Stratosphere, protective O3 layer.
– Similar composition but
• Much less water
• O3, ozone layer, filters UV
varies in Density, Temperature & Atmospheric pressure
Global Circulation
• Driven by tropical heating
– Strong convection in tropics
(aids rainfall)
– Strong downward air near
sub-tropics (dries air)
– Influences general placement of
certain ecosystems
(Deserts & Rain forests, for
example)
Pressure Systems
• High pressure system air movement
– Clockwise,Downward,Outward
• It often create
– Clear skies (Canadian high)
– Hazy skies (Continental high)
– Limited vertical mixing
– Stagnation
– Counter clockwise, Upward, Inward
• It often create
– Rain/storms,Strong mixing
– Dispersion,Improved air quality
in Northern hemisphere
• Low pressure system air movement
Oceanic Circulations
1998
Trans-Pacific
Dust Transport
The dust cloud moved
in the Pacific in 6
days at about 4 km
altitude
As the dust reached
North America, it got
grounded gradually
“ The extent of Environmental impact of
a Nation state in jurisdiction beyond
it’s sovereign control ”
(Dauvergne, 1997)
often casts what is known as
The onset of
INDOEX. 1999
The Asian Brown Cloud describes the brown
haze occurring over the S. Asian region,
tropical Indian Ocean, Arabian sea and
the Bay of Bengal.
http://www.cnn.com/video/data/2.0/video/world/2009/08/21/vause.big.brown.cloud.cnn.html
http://videosfromindia.smashits.com/view/3305/air-pollution-causes-eye-ailments-in-a-village&page=1&viewtype=basic&category=mr
Some more smog photos
HTTP://WWW.hat.net/album/asia/india/05cities_&_maharajas/29_agra/0412271
Himalayas & Mt. Everest
Brown Cloud in Shanghai,
China, in 2004
Mumbai wakes up to a strange weather on 22.03.2012
ACE-Asia (NSF) & TRACE-P (NASA)Spring 2001 Experiments
NASA/GTE DC-8
CFORS
Grass Hopper effect
of Air Pollution
• Global distillation or the grasshopper
effect is the Geochemical process by
which certain chemicals, most notably
Persistant Organic Pollutants (POPs),
are transported from warmer to colder
regions of the Earth, particularly the
Poles and mountain tops.
• Global distillation explains why
relatively high concentrations of POPs
have been found in the Arctic
environment and in the bodies of
animals and people who live there,
even though most of the chemicals
have not been used in the region in
appreciable amounts.
Air Pollution Is a Big Killer
• 3 Million deaths per year world-wide Mostly in Asia
• Legal, economic, and technological tools can help to
clean up air pollution, but much greater emphasis should
be focused on prevention.
• Raise fuel-efficiency for cars, SUVs, & light trucks
• Better regulation of emissions
• intense pressure needed from citizens to make improvements?
• Stricter emission standards for diesel-powered vehicles
• Link between international trade and air pollution - Cargo ships
and Air Transport
• Emission trading or cap-and-trade program
When will We Realize?
Till when last river is polluted
Till when last lake is dried-up
Till when last game is hunted down
Till when last tree is chopped off
We will not realize that
The money can’t be eaten
Please think
What do we leave for our children?
Air pollution in local & global context

Air pollution in local & global context

  • 1.
    Dr. Gunwant Joshi TheAir Pollution Local & Global Context in
  • 2.
    Pollution is undesirablechange in the quality of our Environment (Land, Water & Air) that adversely affects Human Life, Our Property, Trade & Commerce, Industries and the Life of the Desired Species of Plants and Animals
  • 3.
    Thus Pollution isessentially due to the Pollution is net result of a chain reaction: Population Explosion, Industrialization, Urbanization, Transmigration from villages, Over exploitation of the Natural resources and the Wasteful Use
  • 4.
    Defines Air Pollutants: Solids,Liquids, or Gas (including Noise) present in Atmosphere in such concentrations as may be, or tend to be injurious to humans, other living creatures, Process plants, property or the environment. Thus, Air Pollution is: The Presence of Pollutants in Atmosphere
  • 5.
  • 6.
    Initial Assessment ofImpacts • Provide a description of the status & trends of environmental factorsProvide a description of the status & trends of environmental factors against which predicted changes can be compared and evaluated inagainst which predicted changes can be compared and evaluated in terms of importanceterms of importance • provide a means of detecting actual change by monitoring once aprovide a means of detecting actual change by monitoring once a project has been initiatedproject has been initiated
  • 7.
    Impact Network forAir Environment PreoperationalPhase OperationalPhase ReleaseofHeat Impacton SoilQuality Impacton FloraandFauna Impacton Aesthetics ImpactonAgricultural Production ImpactonEconomicOutput ImpactonSocio-CulturalEnvironment PROJECT ReleaseofAirPollutants Changein AirQuality Depositionofparticulates onsoil,water,materials, vegetation,etc. LocalandGlobalClimatic Changes ImpactonVisibility Impacton Materials,Buildings, Monuments,etc. Impacton HumanHealth
  • 8.
    MEASUREMENT OF AIRQUALITY • Ambient Air Quality • Measurement of Source Emission • Meteorological Measurement Pollution Parameter Equipment Dust fall Dust Fall Jar Suspended Particulates High Volume Sampler, Inertial collectors, Respirable Dust Sampler Total Sulfur Compounds Lead Candle Sulphur Dioxide Air Sampling Kit Hydrogen Sulphide Air Sampling Kit Oxides of Nitrogen Air Sampling Kit Wind Direction Recording Vane Wind Velocity Wind Velocity Meter Temperature and Humidity Whirling Psychrometer
  • 9.
    Thus Pollution isessentially due to the Pollution is net result of a chain reaction: Population Explosion, Industrialization, Urbanization, Transmigration from villages, Over exploitation of the Natural resources and the Wasteful Use Why are we so much concerned about Air Pollution? Air is the maximum in put required [11K liters] as compared to 03 liters Water & 01Kg. Food. We continually breath air throughout our life at the rate of 6-8 times/minute] Oxygen we breath through air, combines with Hemoglobin and is supplied to cells for intracellular respiration Pollutants we breath along with air may adversely affect the life processes
  • 10.
    The Human RespiratorySystem Body’s Natural Defenses Role of cilia, mucus, sneezing, and coughing
  • 11.
    Major Air PollutionEpisodes World Over Earlier Major Air Pollution Episodes World Over Occurrence Time Location Excess Deaths December,1930 Meuse Valley, Belgium 63 & Most Cattle October,1948 Donora, Pennsylvania, USA >20 November,1950 Pozarica, Mexico >22 December,1952 London, United Kingdom 400 November,1953 New York, USA 220 January, 1956 London, United Kingdom 1,000 December, 1957 London, United Kingdom 750 December, 1962 London, United Kingdom 700 December, 1963 New York, USA 300 December, 1966 New York, USA >168 December,1984 Bhopal, India 3500+ 1991 - 1992 Gulf War, Middle East Not Known November, 1997 Manila, Philippines >300+ September,2001 WTC Tower,New York 350+
  • 12.
    Air Pollutants • Primary– pollutants directly emitted into the atmosphere (eg. SO2, NOx, CO, PM) • Secondary – pollutants that form in the air as a result of chemical reactions with the other pollutants & gases (eg. O3, NO2,PAN, Smog) *PM=particulate matter; SO2=sulfur dioxide; CO=carbon Monoxide; NO2=nitrogen dioxide; NOx=nitrogen oxides, PAN=Paraoxy Acetyle Nitrate, Smog = Organics+SPM •Location - Indoor & Outdoor Air Pollutants
  • 13.
    Air Pollutants Indoor andOutdoor • Sources - cooking - combustion - particle re-suspension - Paints/Polishes - air conditioning/cleaning - consumer products - smoking - heating - biological agents • Pollutants - NOx, CO, CO2, VOCs, ozone (O3 - ), bacteria, mold-byproducts, endotoxins • Sources - industrial - commercial - mobile - urban - regional - agricultural - natural Pollutants - SO2, O3 - , NOx, CO, PM, Spores,VOC
  • 14.
    Gaseous Pollutants • NOx •SO2 • Ozone • CO • CO2 • VOC (volatile organic compounds) • SVOC (semi-volatile organic compounds) •SVOC include aldehydes, dioxins, benzene,1,3-butadiene) •VOC include organic solvents
  • 15.
    Sources of AirPollutants 1 Source / Pollutants SPM SO2 NOx CO HC F Power Plant ++++ + +++ - - - Sulfuric Acid - ++++ - - - - Super Phosphate +++ - - - - ++++ Cement ++++ + +++ + - - Carbon Black +++ ++ ++ +++ + - Oil Refinery + ++++ ++ + ++ - Aluminum +++ + ++ + ++ - Copper +++ ++++ ++ - - - Zinc +++ ++++ ++ - - -
  • 16.
    Sources of AirPollutants 2 Source /Pollutants SPM SO2 NOx CO HC Lead Iron & Steel ++++ ++ +++ +++ ++ - Brick Kiln +++ + ++ ++ + - Petrol Automobile - ++ ++ ++++ ++++ +++ Diesel Automobile +++ ++ ++++ - - - Coal Burning ++ ++ + ++ ++ - Wood Burning ++ ++ + ++ ++ - Bio-Gas - - - + - - LPG - - + - - -
  • 17.
    Environmental Fact-Sheet of ThermalPower Plant at Talcher(200MW) Oxygen:25,000 MT; Coal : 9,000 MT; Water: 1,10,000 M3 Carbon di Oxide : 50,000 MT, Nitrous Oxide : 9000 Kg Sulfur di Oxide : 270 Kg, Fly Ash Slurry : 3500 MT Lead : 208 Kg, Zinc : 56 Kg , Nickel : 56.5Kg, Cobalt :112 Kg Cadmium : 51 Kg, Copper : 45 Kg, Chromium : 60.6 Kg Uranium : 4.6 Kg, Thorium : 16.5 Kg
  • 18.
    The Effects ofVarious Air Pollutants The Cause The Effects Suspended Particulate Matter, [SPM/RD] Fines [PM10] Ultra Fines[PM2.5] Irritation & Adverse effect on the Resp. System, Visibility & Standing Crops. Corrosion of Metals, Inconvenience and Annoyance. Form condensation Nuclei for Smog Oxides of Sulfur [ SO2 ] Suffocation and Adverse effects on Upper Respiratory Tract, Acute & Chronic injury to Plants leaves, Corrosion of Metals,Acid Rains. Hydrocarbons Carcinogenic, Adverse effect on plants, Causes Smog [ PAN with NOx ] Oxides of Nitrogen [ NOx ] Irritation of Eyes and Nose, Damage to Plant leaves, Corrosion of Metals, Acid Rain, Smog Carbon Monoxide [CO] Causes headache, Dizziness, Nausia, Competes with Oxygen in Respiratory Metabolism Oxidants eg.[Ozone] Disturbs lung Function, Induces coughing. Irritation of Eyes, Nose & Throat. Discolors Leaves and Objects. Forms Smog. Hydrogen Fluorides[HF] Hydrogen Sulfides[H2S] Chlorine[ Cl2 ]Lead[Pb] The Cause The Effects SuspendedParticulate Matter, [SPM/RD] Fines [PM10] Ultra Fines [PM2.5] Eye Irritation and Adverse effect on the Respiratory System, Visibility & Standing Crops. Corrosion of Metals, Inconvenience & Annoyance. Form condensation Nuclei for Smog Oxides of Sulfur [ SO2 ] Suffocation and Adverse effects on Upper Respiratory Tract, Acute & Chronic injury to Plants leaves, Corrosion of Metals,Acid Rains. Hydrocarbons [HS] Carcinogenic, Adverse effect on plants, Causes Smog [ PAN with NOx ] Oxides of Nitrogen [ NOx ] Irritation of Eyes and Nose, Damage to Plant leaves, Corrosion of Metals, Acid Rain, Smog Carbon Monoxide [CO] Causes headache, Dizziness, Nausia, Competes with Oxygen in Respiratory Metabolism Oxidants eg.[Ozone] Disturbs lung Function, Induces coughing.
  • 19.
    Air Quality:Cause &Effect Monitoring Ambient Air Monitoring Instruments The Stack Emission Monitoring Provisions
  • 20.
    Air Quality MonitoringSites at Indore City Source & Effect Monitoring Activity • A term used to describe a mixture of smoke and fog. • Occurs when high concentrations of moisture is combined with smoke (often containing oxides of sulfur and nitrogen) in the presence of high temperatures or thermal inversions and the absence of wind. • These conditions cause polluted air to stagnate over industrial areas causing potential respiratory health hazards. • Large coastal industrial centers with surrounding high ground are more prone to smog. • There is often a diurnal variation in smog formation as a necessary component for its formation is sunlight. Air Pollutants : Smog
  • 21.
    • VOCs +NO2 + Heat + Sunlight yields Photochemical Smog • Chemical composition –Aldehydes –Other secondary pollutants – Ground level O3 and other photochemical oxidants Smog in Santiago, Chile • Pollutants mix in the air to form industrial smog, mostly result of burning coal, and photochemical smog, caused by motor vehicle, industrial, and power plant emissions. Photochemical Smog
  • 22.
    Air Pollutants :AcidDeposition • Acid deposition is caused mainly by coal-burning power plant and motor vehicle emissions, and in some regions, threatens human health, aquatic life and ecosystems,forests,and human-built structures. • Human respiratory disorders • Aquatic ecosystems affected • Release of toxic metals • Leaching of soil nutrients • Loss of crops and trees • Damage to buildings, statues & monuments Acid Deposition : Harmful Effects
  • 23.
    • Bomb testsblasts across the Globe causing Nuclear energy diffusion across the Globe, • O3 (Ozone) layer depletion in stratosphere [first found in 1956] causing incresedUltra-Violet penetration into Earth’s atmosphere, • Deforestation across the Globe and resultant Lack of enough growth of trees (to take carbon oxides) due to lack of enough rains Some more subtle Causes of Air Pollution
  • 24.
    Role Of PollutionAnd Global Warming On Natural Allergen Production • Climate change has been demonstrated to cause some weed plants to grow faster, flower earlier and produce greater amounts of pollen • This effect was greater in urban areas where CO2 levels and temperatures were higher compared to rural areas • Doubling the atmospheric concentration of CO2 in ragweed pollen production by 61%
  • 25.
    Pollutants: sulfur dioxide,nitrogen dioxide, nitric oxide, carbon monoxide, photochemical oxidants, toxic metals. • Health Effects: wheezing, coughing, lungs/breathing quality, dust allergy, sleeplessness (insomnia). • Long-term Health Effects: emphysema, bronchitis, asthma, weakness, stamina loss, skin irritation/diseases. • Effect on Generations: reduced stamina, reduced strength and energy, reduced bone tissue strength, reduced health, prone to diseases and bacterial infection, reduced life, birth with deformation. Air Pollution - Health Effects
  • 26.
    Mechanisms Of Pollutant-Related AdverseHealth Effects • PM or ozone induced airway inflammation • Oxidative stress induced by transition metals or polyaromatic hydrocarbons • Covalent modifications of intracellular proteins/enzymes • Biologic compounds (glucans, endotoxin) effect on the innate immune response and inflammation • Stimulation of the autonomic nervous system • Adjuvant effects • Procoagulant activity of ultrafine PM • Suppression of normal defense mechanisms
  • 27.
    Asthma and AirPollution Air pollution has been associated with: • Increased bronchial hyper-responsiveness • Increased airway inflammation • Decreased lung function • Increased hospital admissions and ER visits • Enhancing airway inflammation induced by allergen exposure • Priming of the airways to allergic responses
  • 28.
    Effects of DieselExhaust on Respiratory System •Physician diagnosed asthma has been reported to be more frequent among children living within 100 meters. • Higher rates of allergic sensitization are found in children playing more than one hour/day near major traffic thoroughfares. Sulfur Dioxide, Nitrogen Dioxide, Carbon Monoxide • Epidemiologic studies have demonstrated that exposure to SO2, NO2 & CO increase the Cardiopulmonary mortality, Respiratory and Cardiovascular hospital admissions caused by stroke (NO2) and Myocardial infarction (NO2 & CO)
  • 29.
    The Human Lungsretrieved from Person who lived in Un polluted & Polluted Environment
  • 30.
    Seasonal Changes inSPM Concentration’2000
  • 31.
    Air Quality MonitoringSites at Indore City Status of Air Pollution at Indore LOCATION AP STD. 1993 -96 1997 1998 - K1 POLOGROUND Industrial Area TSPM 500 µg / m3 PM 10 200 µg / m3 - - SO 2 120 µg / m3 7.9 6.0 18.6 NO x 120 µg / m3 11.6 10.0 23.2 KOTHARI MARKET Commercial Area TSPM 200 µg / m3 PM 10 100 µg / m3 - SO 2 80 µg / m3 6.9 6.5 18.6 NO x 80 µg / m3 11.4 9.5 22.1 TELEPHONE NAGAR Residential Area TSPM 200 µg / m3 PM 10 100 µg / m3 - - SO 2 80 µg / m3 4.7 5.2 13.9 NO x 80 µg / m3 9.0 8.8 16.9
  • 32.
    National Ambient AirQuality Standards National Ambient Air Quality Standards Name of the Pollutant Time weighted Average Industrial Areas Residential,Rural & Other Areas Sensitive Area Sulfur di Oxide (SO2) Annual Avg.* 24 hrs. Avg.** 80 µg/m3 100 µg/m3 60 µg/m3 80 µg/m3 15 µg/m3 30 µg/m3 Oxides of Nitrogen (NOx) Annual Avg.* 24 hrs. Avg.** 80 µg/m3 100 µg/m3 60 µg/m3 80 µg/m3 15 µg/m3 30 µg/m3 Total Suspended Particulate matter (TSPM) Annual Avg.* 24 hrs. Avg.** 360 µg/m3 500 µg/m3 140 µg/m3 200 µg/m3 70 µg/m3 100 µg/m3 Respirable Dust ( RPM or PM10 ) Annual Avg.* 24 hrs. Avg.** 120 µg/m3 150 µg/m3 60 µg/m3 100 µg/m3 50 µg/m3 75 µg/m3 Lead (Pb) Annual Avg.* 24 hrs. Avg.** 1.0 µg/m3 1.5 µg/m3 0.75 µg/m3 1.0 µg/m3 0.5 µg/m3 0.75 µg/m3 Carbon Monoxide (CO) Annual Avg.* 24 hrs. Avg.** 100 µg/m3 100 µg/m3 100 µg/m3 100 µg/m3 100 µg/m3 100 µg/m3 Concentrations in mg/m3 etic Mean of minimum 104 measurements in year twice a week, 24 hourly / 8 hourly values shall be met 98 % time in year. Only 2 % of time it may scribed values but not on two consecutive days
  • 33.
    New National AmbientAir Quality Standards   Pollutant Time Weighted Average Concentration in Ambient Air Method of Measurement Industrial Area Residential, Rural and other Areas Sensitive Area Sulphur Dioxide (SO2 ) Annual Average* 80 µg/m3 60 µg/m3 15 µg/m3 1. Improved West and Gaeke Method 2. Ultraviolet Fluorescence 24 Hours Average** 120 µg/m3 80 µg/m3 30 µg/m3 Oxides of Nitrogen as NO2 Annual Average* 80 µg/m3 60 µg/m3 15 µg/m3 1. Jacob & Hochheiser modified (NaOH- NaAsO2 ) Method 2. Gas Phase Chemiluminiscence24 Hours Average** 120 µg/m3 80 µg/m3 30 µg/m3 Suspended Particulate Matter (SPM) Annual Average* 360 µg/m3 140 µg/m3 70 µg/m3 High Volume Sampling (Average flow rate not less than 1.1m3 /minute) 24 Hours Average** 500 µg/m3 200 µg/m3 100 µg/m3 Respirable Particulate Matter (Size less than 10µm) (RPM) Annual Average* 120 µg/m3 60 µg/m3 50 µg/m3 Respirable Particulate Matter Sampler 24 Hours Average** 150 µg/m3 100 µg/m3 75 µg/m3 Lead (Pb) Annual Average* 1.0 µg/m3 0.75 µg/m3 0.50 µg/m3 AAS Method after sampling using EPM 2000 or equivalent filter paper24 Hour Average** 1.5 µg/m3 1.0 µg/m3 0.75 µg/m3 Carbon Monoxide (CO) 8 Hours Average** 5.0 mg/m3 2.0 mg/m3 1.0 mg/m3 Non dispersive Infrared Spectroscopy 1 Hour Average 10.0mg/m 3 4.0 mg/m3 2.0 mg/m3 Ammonia (NH3 ) Annual Average* 0.1 mg/m3 - 24 Hour Average** 0.4 mg/m3 * Annual Arithmetic mean of minimum 104 measurements in a year twice a week 24 hourly at uniform interval. ** 24 hourly/8 hourly values should be met 98% of the time in a year. However, 2% of the time, it may exceed but not on two consecutive days. NOTE 1. National Ambient Air Quality Standard : The levels of air quality necessary with an adequate margin of safety, to protect the public health, vegetation and property. 2. Whenever and wherever two consecutive values exceed the limit specified above for the respective category, it would be considered adequate reason to institute regular/continuous monitoring and further investigations. 3. The State Government / State Board shall notify the sensitive and other areas in the respective states within a period of six months from the date of notification of National Ambient Air Quality Standards.
  • 34.
    Percentage accidence ofObserved values at Indore City Over the Prescribed Limits Locality [Limits] TSPM [ mean range ] PM10 [ mean range] SO2 & Nox [ mean range] Telephone Nagar [Residential] [ TSPM : 200 µg/m3 ] [ PM10 : 100 µg/m3 ] [ SO2 and NoX : 80 µg/m3 ] 88.6 [253 - 406] 98.0 [177 - 347] Well within Limits Kothari Market [Commercial] [ TSPM : 200 µg/m3 ] [ PM10 : 100 µg/m3 ] [ SO2 and NoX : 80 µg/m3 ] 95.0 [327 - 579] 98.5 [308 - 492] Well within Limits Pologround [Industrial] [ TSPM : 500 µg/m3 ] [ PM10 : 150 µg/m3 ] [ SO2 and NoX : 120 µg/m3 ] 56.4 [458 - 635] 97.0 [360 - 529] Well within Limits
  • 35.
    Pollution Status ofSuspended Particulates in Residential Area Pollution Status of Suspended Particulates in Residential Area Parameter [Limits] Status Concentration [ in µg/m3 ] Percentage of the Values Observed Total Suspended Particulate Matter [ TSPM : 200 µg/m3 ] Low Moderate High Critical 00 to 70 71 to 140 141 to 210 >210 0.31 Percent 3.39 Percent 9.70 Percent 86.6 Percent Respirable Dust or PM10 [ PM10 : 100 µg/m3 ] Low Moderate High Critical 00 to 30 31 to 60 61 to 90 >91 0.02 Percent 0.32 Percent 0.56 Percent 99.1 Percent
  • 36.
    1997,Road Side AmbientAir Quality Road Side Ambient Air Quality (µg/m3 ) Locality Time M/N/E Time (minuets) PM10 TSPM OBSERVED TSPM EQUATED24Hrs . Palasia Square M 110 369.88 1425.88 621.5 Palasia Square N 106 225.49 1281.83 608.5 Palasia Square E 85 150.70 1207.04 588.78 Gandhi Pratima M 224 709.19 4531.47 886.7 Palika Square M 178 193.78 962.14 605.32 Kothari Market E 71 1496.3 5021.08 775.2 Nagar Nigam Square E 51 1472.1 766.66 806.87 Rajbada E 148 3783.4 5394.75 789.07 Subhash Pratima E 139 2476.2 3584.3 847.41 Patel Pratima M 100 824.83 2091.43 661.69 Bambai Bazar E 129 596.49 1868.41 672.65
  • 37.
    Road Side AmbientAir Quality Locality TSPM [TSPM : 200 µg/m3 ] PM10 [ PM10 : 100 µg/m3 ] Khajrana Chauki 529.9 95.06 Vijay Nagar Chauki 610.13 90.65 Palasia Square 907.50 401.72 Chhavani 1157.60 322.34 University Campus 698.51 164.26 Marimata Square 992.18 130.87 Laxmibai Nagar 1470.14 249.99 Kalani Nagar 1187.79 194.28 Sethi Gate 916.42 115.9 Chandan Nagar 1493.05 649.92 CAT Campus 953.45 39.78
  • 38.
    Traffic on someimportant City Roads Name of Road Place Road Width Capacity (P.C.U.) Actual Road Traffic(PCU) A.B. Road DIG Banglow 12 (m) 4,000 7,200 Sanwer Road Banganga 07 (m) 2,000 3,300 M.G. Road High-Court 10 (m) 3,000 5,200 Jawahar Mrg. Gurudwara 07 (m) 2,000 5,100 Subhash Mrg. Smruti Cinema 07 (m) 2,000 4,900 Sawarkar Mrg. University 07 (m) 2,000 4,500 Khandwa Road Rajbada 07 (m) 2,000 7,300 Bhanwar Kua Sindhi Colony 10 (m) 3,000 8,000
  • 39.
  • 40.
  • 41.
    Air Quality MonitoringSites at Indore City Steps to Reduce Vehicular Pollution 1. Lead in Petrol :--0.56 g/l1990 > 0.15 g/l1994 > 0.013 g/l2000 2. Compulsion of Catalytic Converters in Exhaust pipes 3. Sulfur in Diesel :--0.75%1995 > 0.5%1996 > 0.25%1999 4. Banning loose 2T Oil & Promoting Oil Dispensers 5. BTX [Benzene,Toluene & Xylene] in Petrol :--0.5%1999 > 0.3%2000 6. Promoting use of CNG, LPG, Gasohol, Bio-Diesel and new generation Oxygenates & other Fuel additives. 7. Improvement of Roads & Traffic system 8. Regulation and Planning of Urban growth centers and also the Industrial & Commercial activity
  • 42.
    Air Quality MonitoringSites at Indore City CATEGORY A INDUSTRIAL B COMMERCIAL C RESIDENTIAL D SILENCE ZONE
  • 43.
    dB Typical SituationDescriptio n 140 Military Jet Taking Off at 30 m Intolerable 130 Pneumatic Chipping & Riveting Intolerable 110 Sheet Metal shop, Hand Grinding Very Noisy 100 Automatic Lathe shop, Metro Rail Station Very Noisy 90 Heavy lorries at 6 m, Pneumatic Drill Very Noisy 80 Max.T.V.Volume [Fight & Song scene] Very Noisy 70 Loud Radio & Stereo Audio Output Noisy 60 Restaurants & Shopping Malls Noisy 50 Conversational speech, Office, Lowest T V Quiet
  • 44.
    Duration perday (Hrs) dBA slow response 8.090 6.0 92 4.0 95 3.0 97 2.0 100 1.5 102 1.0 105 0.5 110 0.25 or less 115 When the daily noise exposure is composed of two or more periods of noise exposure of different levels, their combined effect should be considered, rather than the individual effect of each.  Annoyance, headache, fatigue, Sleeplessness, Mental restlessness.  Upsets Chemical balance & Cholesterol levels.  Dilates Blood vessels affecting Brain & Heart.  General uneasiness, Errors in the Motor Performances and the Visual perceptions of Size and Distance of the Objects.  Shift in Hearing threshold, Auditory Fatigue, Gradual loss of Hearing, Loss of Sensitivity to certain frequencies, Acoustic Trauma.
  • 46.
    As Ecological Processesdo not respect National Boundaries, and The Environmental problems often have impacts beyond Borders.
  • 47.
  • 48.
    Factors causing Decreaseor Increase in Air Pollution • Air pollution may be decreased by – Settling of particles due to gravity – Wind, Rain and snow – Salty spray from oceans – Chemical reactions – Topography of region – Temperature inversions – Urban high rise buildings – Emissions of VOCs from certain trees and plants – Grasshopper effect • May be increased by Canyon street phenomena
  • 49.
    Inversions The brownhaze from NO2 and other pollutants makes an excellent marker for inversion identification Elevated inversionSurface inversion
  • 50.
    Atmosphere is DynamicSystem with 4 Layers • Troposphere, supports life – 75–80% of the earth’s air mass – Closest to the earth's surface – Chemical composition of air – Rising & falling air currents: weather and climate – Involved in chemical cycling • Stratosphere, protective O3 layer. – Similar composition but • Much less water • O3, ozone layer, filters UV varies in Density, Temperature & Atmospheric pressure
  • 51.
    Global Circulation • Drivenby tropical heating – Strong convection in tropics (aids rainfall) – Strong downward air near sub-tropics (dries air) – Influences general placement of certain ecosystems (Deserts & Rain forests, for example)
  • 52.
    Pressure Systems • Highpressure system air movement – Clockwise,Downward,Outward • It often create – Clear skies (Canadian high) – Hazy skies (Continental high) – Limited vertical mixing – Stagnation – Counter clockwise, Upward, Inward • It often create – Rain/storms,Strong mixing – Dispersion,Improved air quality in Northern hemisphere • Low pressure system air movement Oceanic Circulations
  • 53.
    1998 Trans-Pacific Dust Transport The dustcloud moved in the Pacific in 6 days at about 4 km altitude As the dust reached North America, it got grounded gradually
  • 54.
    “ The extentof Environmental impact of a Nation state in jurisdiction beyond it’s sovereign control ” (Dauvergne, 1997) often casts what is known as The onset of INDOEX. 1999 The Asian Brown Cloud describes the brown haze occurring over the S. Asian region, tropical Indian Ocean, Arabian sea and the Bay of Bengal. http://www.cnn.com/video/data/2.0/video/world/2009/08/21/vause.big.brown.cloud.cnn.html http://videosfromindia.smashits.com/view/3305/air-pollution-causes-eye-ailments-in-a-village&page=1&viewtype=basic&category=mr
  • 55.
    Some more smogphotos HTTP://WWW.hat.net/album/asia/india/05cities_&_maharajas/29_agra/0412271 Himalayas & Mt. Everest Brown Cloud in Shanghai, China, in 2004
  • 56.
    Mumbai wakes upto a strange weather on 22.03.2012
  • 57.
    ACE-Asia (NSF) &TRACE-P (NASA)Spring 2001 Experiments NASA/GTE DC-8 CFORS
  • 58.
    Grass Hopper effect ofAir Pollution • Global distillation or the grasshopper effect is the Geochemical process by which certain chemicals, most notably Persistant Organic Pollutants (POPs), are transported from warmer to colder regions of the Earth, particularly the Poles and mountain tops. • Global distillation explains why relatively high concentrations of POPs have been found in the Arctic environment and in the bodies of animals and people who live there, even though most of the chemicals have not been used in the region in appreciable amounts.
  • 60.
    Air Pollution Isa Big Killer • 3 Million deaths per year world-wide Mostly in Asia • Legal, economic, and technological tools can help to clean up air pollution, but much greater emphasis should be focused on prevention. • Raise fuel-efficiency for cars, SUVs, & light trucks • Better regulation of emissions • intense pressure needed from citizens to make improvements? • Stricter emission standards for diesel-powered vehicles • Link between international trade and air pollution - Cargo ships and Air Transport • Emission trading or cap-and-trade program
  • 61.
    When will WeRealize? Till when last river is polluted Till when last lake is dried-up Till when last game is hunted down Till when last tree is chopped off We will not realize that The money can’t be eaten
  • 62.
    Please think What dowe leave for our children?

Editor's Notes

  • #2 The process of globalization is now around the world. Globalization combines international and multinational elements as a more advanced stage of integration between countries. All the dimensions of globalization somehow affect the natural environment. The vital issues of today are global warming, problem of greenhouse gases and climate change that affect the sustainable development. Scientists working in Antarctic have confirmed that levels of key greenhouse gases that contribute to global warming are higher today than at any time in the past 650,000 years Trans-boundary movement of atmospheric pollutants has international policy, economic, human health, and environmental ramifications. Atmospheric pollutants, such as aerosols, persistent bio-accumulative toxics, and gaseous pollutants, have significant impact on human and environmental health. A new generation of ground monitoring systems in connection with new satellite imaging systems provides an opportunity to investigate, design and implement effective monitoring strategies for these atmospheric pollutants. Atmospheric pollutants are of particular concern since air masses flow freely across borders, leaving the geographic and political jurisdiction of the originating country and becoming the responsibility of another. For example, sulfur dioxide emissions from one industrial region may be transported hundreds of miles and ultimately deposited as acidic compounds into a neighbor’s ecosystem. Wind blown desert dust and forest fire smoke cross international borders and increase particulate matter concentrations to levels that may exceed regulatory standards and harm human health. The stable chemical properties of persistent organic pollutants (POPs) promote their long range transport and their ability to bioaccumulate, which may increase toxicity in environments where they have never been used or produced. There Is Growing Awareness That We Now Face Pollution At The Global Scale and Urban Environments Are Key Drivers Of Air Quality, We are learning that Megacities have large environmental footprints and Regional Control Strategies are needed to meet local air quality targets
  • #6 The Generally stable normal composition of the Naturally occurring air at the earth’s surface contains approximately 78% of Nitrogen, 21 % of oxygen and o.93% of Argon and rest, a mixture of several other gases as shown in the slide. The water vapour content of the atmosphere varies drastically with time and space ,and there fore, is not included in being highly variable.
  • #10 The average adult at rest inhales and exhales something like 7 or 8 liters (about one-fourth of a cubic foot) of air per minute. That totals something like 11,000 liters of air (388 cubic feet) in a day. The air that is inhaled is about 20-percent oxygen, and the air that is exhaled is about 15-percent oxygen, so about 5-percent of the volume of air is consumed in each breath and converted to carbon dioxide. Therefore, a human being uses about 550 liters of pure oxygen (19 cubic feet) per day. A person who is exercising obviously uses a lot more oxygen than that. You could determine how much air is moving through your lungs by exhaling into a plastic bag of known volume at each breath and seeing how long it takes to fill the bag.
  • #11 The human body has its own way of keeping the pollutants away from entering in to the system such as nasal hairs and eye lashes, Mucous secretions, Sneezing and coughing process to expel the pollutants out. These are known as body’s natural defence mechanism but dhere is a limit to it’s effectiveness and It has been observed that the continued onslaught of the atmospheric pollutants take their toll as once in side the lungs there is hardly anything that body could do to expel these pollutants and once inside they usually remain in side the alveoli of the lungs in form of deposits hampering normal function of breatheing.
  • #16 There are various kinds of industrial activities associated with different types of Air pollutants such as Particulates, oxides of sulfur,Nitrogen and Carbon, un-burnt Hydrocarbons and specific air pollutanta such as fluorine etc.
  • #17 In addition to industrial emissions, the burning of fossil fuels are also a major reason for the air pollution. The Bio gas and LPG are much cleaner fuels.
  • #19 Pollutant and their health impacts Different Health Impacts are caused from Short-Term Contact and the progressive Long-Term Contact Suspended Particles (PM10 \PM2.5)* Lung inflammation * Respiratory symptoms * Adverse effects on the cardiovascular system * Increased need for medication* Increased likelihood of hospitalization * Increased chance of short-term morality rate * Increased risk of cardiopulmonary and lung cancer mortality rate * Increased lower respiratory symptoms and reduction in child lung capacity * Increase in chronic obstructive pulmonary disease, and reduced lung function in adults Nitrogen Dioxide (NO2) * Changes in asthma patients’ lung function * Increased bronchial sensitivity in asthma patients * Reduced lung capacity * Increased risk of respiratory symptoms Sulfur Dioxide (SO2) * Changes in the pulmonary function and respiratory symptoms of asthma patients * Increased mortality rate Carbon Monoxide (CO)* Causes fatigue * Causes chest pain in heart disease patients * Impaired vision and coordination * High concentrations can lead to death * Impacts the cardiovascular system* Impacts the central nervous system
  • #30 The human body has its own way of keeping the pollutants away from entering in to the system such as nasal hairs and eye lashes, Mucous secretions, Sneezing and coughing process to expel the pollutants out. These are known as body’s natural defence mechanism but dhere is a limit to it’s effectiveness and It has been observed that the continued onslaught of the atmospheric pollutants take their toll as once in side the lungs there is hardly anything that body could do to expel these pollutants and once inside they usually remain in side the alveoli of the lungs in form of deposits hampering normal function of breatheing.
  • #50 Global Environmental Challenges are complex and have multiple causal and consequential pathways. For Example, deforestation is an environmental degrading outcome, but it is also a cause of global warming, biodiversity loss, and desertification. In turn, GW and desertification (acid rain, toxins, ozone depletion) contribute to deforestation. Environmental issues are also linked with Economic ones (e.g. globalization of trade, commerce, transportation has increased fossil fuel use leading to greater environmental damage. According to UNEP “Human activities are progressively reducing the planet’s life-supporting capacity at a time when rising human numbers and consumption are making increasingly heavy demands on it. The combined destructive impacts of a poor majority struggling to stay alive and an affluent minority consuming most of the world’s resources and undermining the very means by which all people can survive and flourish.” 2 Driving Forces of Environmental Change: 1. Overuse or misuse of resources 2. Increases in pollutive outputs (mercury, GHGs, CFCs, Toxic Chems, etc) This has led to affluence (in the North) without responsibility for the consequences: 1. underwritten by the degradation of people (South and lower classes in North) and land, biosphere, and environment. 2. While in the South, factors such as increased population and low technology also caused environmental stress. So, many scholars see that environment problems are tethered to larger social, moral, ethical issues in which these environmental problems are embedded.
  • #58 What makes Global environment Susceptible Abuse of the ‘Commons’--areas beyond the sovereign control of a territory Widespread Transboundary pollution Local Assets important to all people (e.g. Grand Canyon, Amazon, African Plains) Local or National Environmental Threats best handled at the global scale Hardin’s ‘Tragedy of Commons’ Commons: are the areas beyond the sovereignty of any nation which produces a conflict between individuals and the common good over resources and protecting spaces. Examples: Oceans, subsoil, atmosphere, outer space, Antarctic ‘Tragedy’: It’s rational to use, which leads to exploitation, of these areas without reciprocation or regeneration Positive : the herder receives all of the proceeds from each additional animal Negative : the pasture is slightly degraded by each add’l animal