2018 Water and Wastewater
Rate Study and Financial Forecast
Public Hearing
City of Alamo Heights
October 22, 2018
Why are Water/WW Rates Increasing?
• Inflation
• General increases in the cost of doing
business
• Environmental and other regulations
• Capital Improvement Plan needed to
repair and expand system
• AWWA forecasts that water and
wastewater rates across USA will triple in
the next 15 years
Page: 1
City of Alamo Heights
Initial Observations
 City has not increased its water and wastewater operating rate
since 2007
 The only rate increases over the past decade have been to pass
through SAWS wastewater increases (typically 3-5% per year
on wastewater rates only)
 City’s water and wastewater monthly charges are lower than
many neighboring communities and below the state average
 Revenues are now recovering nominally less than cost of
providing water and wastewater service
Page: 2
City of Alamo Heights
Current Water Rate Structure
Page: 3
5/8" 3.00$ Volume Rate (per 100 Cubic Feet) Volume Rate (per 100 Cubic Feet)
3/4" 9.00 - 500 0.83$ - 500 1.18$
1" 15.00 501 1,000 1.13 501 1,000 1.48
1 1/2" 37.50 1,001 2,300 1.63 1,001 2,300 1.98
2" 60.00 2,301 Above 2.76 2,301 Above 1.98
3" 150.00
4" 225.00 Volume Rate (per 1,000 Gallons) Volume Rate (per 1,000 Gallons)
6" 225.00 - 3,740 1.11$ - 3,740 1.58$
3,741 7,481 1.51 3,741 7,481 1.98
7,482 17,205 2.18 7,482 17,205 2.65
17,206 Above 3.69 17,206 Above 2.65
Minimum Charge 18.27$ Minimum Charge 18.27$
500 Cubic Feet 3,740 Gallons
Volume Rate 3.05 Volume Rate 4.08
per 100 Cubic Feet per 1,000 Gallons
Monthly Charge Commercial
Water Rates
Residential and Irrigation
Wastewater -- All Customers
Monthly Residential Charges
12,000 Gal/1,604 Cubic Feet Water and Wastewater
5/8“ Meter
Page: 4
EAA(Water) SAWS(WW) SAWS(Water) SAWS(WW) Other
Monthly Commercial Charges
25,000 Gal or 3,342 ft3 Water and Wastewater
2“ Meter
Page: 5
OtherEAA(Water) SAWS(WW) SAWS(Water) SAWS(WW)
Historical and Forecast Annual
Total Water Accounts
Page: 6
Average Annual Increase = 20 accounts (0.65%)
Accounts
Historical and Forecast Annual
Water Billed Consumption (Cubic Feet)
Page: 7
Cubic Feet
Avg Residential Monthly Usage
Gallons = 11,019
Cubic Feet = 1,473
5 Year Forecast
Primary Assumptions
• Most personnel and operating expenses will increase 2% per year
• Some expenses (insurance/workers comp/health care) will
increase at higher rates
• Certain expenses will increase with volume and customer growth
(electricity/chemicals)
• SAWS wastewater increases: assumed 8.0% 2019, 5.0% 2020 --
2027
• Biggest impact on rate plan: how much capital expenditures
the City chooses to finance
Page: 8
Capital Outlays Funded
Through Proposed Rate Plan
Page: 9
TY FY FY FY FY FY FY FY FY FY
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Water
Moving Water Line 4x2 (TCEQ) 150,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 200,000$ 300,000$ 400,000$
Misc. Capital Outlays 60,000 - - - - - - - - -
Recondition w ater tow er - - - - - - - - 225,000 225,000
Repaint and Blast 2 w ater tow er - - - - - - - 200,000 200,000 -
Meter Change Out - - - - - 550,000 550,000 - - -
Wastewater
Sew er Improvements 250,000 - - - - - - 300,000 300,000 300,000
Water/ Wastewater
Backhoe - 128,980 - - - - - - - -
8 Yard Dump Truck - 95,248 - - - - - - - -
Pothole Patch Truck - - 65,751 - - - - - - -
F-150 Ext Cab - - 33,222 - - - - - - -
Skid Loader S205 - - - - - 36,000 - - - -
12 Yard Dump Truck - - - - - - 62,500 - - -
F-250 Crew Cab SS - - - - - - - 37,999 - -
Bobcat-S750 - - - - - - - - 79,337 -
Crew Cab Flat Bed w / - - - - - - - - - 61,288
Crew Cab 4x4 - - - - - - - - - 52,775
Vactor Truck - 275,000 - - - - - - - -
Total Capital Outlays 460,000 599,228 198,973 100,000 100,000 686,000 712,500 737,999 1,104,337 1,039,063
Total = $5,738,100
Future Debt Assumptions
Page: 10
Term = 20 Years
Interest = 3.5%
Issuing Cost = 1%
Annual Reserve Years = 5 Years
Fixed P&I
Water = $1,500,000
WW = $1,000,000
Future Bond Issues
* Possible future bond
issue for the Broadway
street project
Forecast Cost of Service
Page: 11
Notes on Rate Proposal
 Rate plan adjustments:
 Water – 5.0%
 Wastewater – 5.0% plus SAWS
increases
 Plan will enable City to fund
$5,734,000 in capital projects over
next ten years
Page: 12
Effective Effective Effective Effective Effective
Current Sep-18 Sep-19 Sep-20 Sep-21 Sep-22
Monthly Minimum Charge --All Customer Classes
5/8" 3.00$ 3.15$ 3.31$ 3.47$ 3.65$ 3.83$
3/4" 9.00 9.45 9.92 10.42 10.94 11.49
1" 15.00 15.75 16.54 17.36 18.23 19.14
1 1/2" 37.50 39.38 41.34 43.41 45.58 47.86
2" 60.00 63.00 66.15 69.46 72.93 76.58
Residential and Irrigation
Volume Rate Per 100 Cubic Feet
- 500 0.83 0.87 0.92 0.96 1.01 1.06
501 1,000 1.13 1.19 1.25 1.31 1.37 1.44
1,001 2,300 1.63 1.71 1.80 1.89 1.98 2.08
2,301 Above 2.76 2.90 3.05 3.20 3.36 3.53
Volume Rate Per 1,000 Gallons
- 3,740 1.11 1.17 1.22 1.28 1.35 1.42
3,741 7,481 1.51 1.59 1.67 1.75 1.84 1.93
7,482 17,205 2.18 2.29 2.40 2.52 2.65 2.78
17,206 Above 3.69 3.88 4.07 4.28 4.49 4.71
Commercial
Volume Rate Per 100 Cubic Feet
- 500 1.18 1.24 1.30 1.37 1.43 1.51
501 1,000 1.48 1.55 1.63 1.71 1.80 1.89
1,001 2,300 1.98 2.08 2.18 2.29 2.41 2.53
2,301 Above 1.98 3.27 3.43 3.61 3.79 3.98
Volume Rate Per 1,000 Gallons
- 3,740 1.58 1.66 1.74 1.83 1.92 2.01
3,741 7,481 1.98 2.08 2.18 2.29 2.40 2.53
7,482 17,205 2.65 2.78 2.92 3.06 3.22 3.38
17,206 Above 2.65 4.37 4.59 4.82 5.06 5.32
Proposed Water Rate Plan
Page: 13
NOTE: 5.0% annual adjustments required 2023-2027
Proposed Wastewater Rate Plan
Page: 14
Effective Effective Effective Effective Effective
Current Sep-18 Sep-19 Sep-20 Sep-21 Sep-22
Wastewater Rates - All Customers
Monthly Minimum Charge 18.93$ 21.39$ 23.53$ 25.88$ 28.47$ 31.31$
(Includes 500 Cubic Feet/3,740 Gallons
Volume Rate per 100 Cubic Feet 3.16 3.57 3.93 4.32 4.75 5.23
Volume Rate per 1,000 Gallons 4.22 4.77 5.25 5.78 6.35 6.99
NOTE: 5.0% annual adjustments required 2023-2027
Impact on Monthly Charges
Page: 15
NOTE: 5.0% annual adjustments required 2023-2027
Effective Effective Effective Effective Effective
Current Sep-18 Sep-19 Sep-20 Sep-21 Sep-22
Residential Average Monthly Bill - 5/8"
5,000 Gal Water 9.05$ 9.51$ 9.98$ 10.48$ 11.00$ 11.55$
(668.4 ft³) Wastew ater 24.25 27.40 30.14 33.16 36.47 40.12
Total 33.30 36.91 40.12 43.64 47.48 51.67
Increase -- $ 3.61 3.22 3.51 3.84 4.20
12,000 Gal Water 22.65$ 23.78$ 24.97$ 26.22$ 27.53$ 28.91$
(1,604.2 ft³) Wastew ater 53.82 60.81 66.89 73.58 80.94 89.04
Total 76.47 84.59 91.86 99.80 108.47 117.94
Increase -- $ 8.13 7.27 7.94 8.67 9.47
Commercial Monthly Bill - 2"
25,000 Gal Water 119.67$ 125.66$ 131.94$ 138.54$ 145.46$ 152.74$
(3,342 ft³) Wastew ater 108.73 122.86 135.15 148.67 163.53 179.89
Total 228.40 248.52 267.09 287.20 308.99 332.62
Increase -- $ 20.12 18.57 20.11 21.79 23.63
Percent Residential Increase 10.8% 8.7% 8.8% 8.8% 8.8%
Page: 16
Monthly Residential Charges Forecast
12,000 Gal/1,604 Cubic Feet Water and Wastewater
5/8“ Meter; Assuming the Same Rate Increases
NOTE: Based on published plans; subject to change
Summary
How Will Rate Plan Benefit City?
Page: 17
• Will enable the City to maintain a financially
healthy utility
• Will allow City to fund increasing SAWS and
operating costs
• Will allow City to invest $5.7 million in capital
improvements to system
• City’s rates will continue to compare
favorably to SAWS and other utilities

More Related Content

What's hot

City Council March 5, 2013 Risk Management 2012 Claims History
City Council March 5, 2013 Risk Management 2012 Claims HistoryCity Council March 5, 2013 Risk Management 2012 Claims History
City Council March 5, 2013 Risk Management 2012 Claims HistoryCity of San Angelo Texas
 
City of Rehoboth Beach Proposed Water and Wastewater Rate Structure
City of Rehoboth Beach Proposed Water and Wastewater Rate StructureCity of Rehoboth Beach Proposed Water and Wastewater Rate Structure
City of Rehoboth Beach Proposed Water and Wastewater Rate Structurerehobothbeachde
 
Nw domestic brochure_b_additional_improvements
Nw domestic brochure_b_additional_improvementsNw domestic brochure_b_additional_improvements
Nw domestic brochure_b_additional_improvementsKeith Crane
 
High Operating Costs
High  Operating  CostsHigh  Operating  Costs
High Operating Costssolardude
 
Blue%20 star%20presentation
Blue%20 star%20presentationBlue%20 star%20presentation
Blue%20 star%20presentationKolby Kates
 
DS-17-044 - Quarterly Finance Report
DS-17-044 - Quarterly Finance ReportDS-17-044 - Quarterly Finance Report
DS-17-044 - Quarterly Finance ReportCityofKilleen
 
Study Session December 14, 2016- KPMG Financial Review
Study Session December 14, 2016- KPMG Financial ReviewStudy Session December 14, 2016- KPMG Financial Review
Study Session December 14, 2016- KPMG Financial ReviewCity of Corona
 
Demand Meter Customer xyz
Demand Meter Customer xyzDemand Meter Customer xyz
Demand Meter Customer xyzMike Harrison
 
Rev enrollment recap 9 23-13 quarter end
Rev enrollment recap 9 23-13 quarter endRev enrollment recap 9 23-13 quarter end
Rev enrollment recap 9 23-13 quarter endGregory T. Holsinger
 

What's hot (14)

City Council March 5, 2013 Risk Management 2012 Claims History
City Council March 5, 2013 Risk Management 2012 Claims HistoryCity Council March 5, 2013 Risk Management 2012 Claims History
City Council March 5, 2013 Risk Management 2012 Claims History
 
City of Rehoboth Beach Proposed Water and Wastewater Rate Structure
City of Rehoboth Beach Proposed Water and Wastewater Rate StructureCity of Rehoboth Beach Proposed Water and Wastewater Rate Structure
City of Rehoboth Beach Proposed Water and Wastewater Rate Structure
 
Nw domestic brochure_b_additional_improvements
Nw domestic brochure_b_additional_improvementsNw domestic brochure_b_additional_improvements
Nw domestic brochure_b_additional_improvements
 
High Operating Costs
High  Operating  CostsHigh  Operating  Costs
High Operating Costs
 
BVSWMA FY20 Budget
BVSWMA FY20 BudgetBVSWMA FY20 Budget
BVSWMA FY20 Budget
 
Blue%20 star%20presentation
Blue%20 star%20presentationBlue%20 star%20presentation
Blue%20 star%20presentation
 
FY17 City of College Station Budget
FY17 City of College Station BudgetFY17 City of College Station Budget
FY17 City of College Station Budget
 
DS-17-044 - Quarterly Finance Report
DS-17-044 - Quarterly Finance ReportDS-17-044 - Quarterly Finance Report
DS-17-044 - Quarterly Finance Report
 
Study Session December 14, 2016- KPMG Financial Review
Study Session December 14, 2016- KPMG Financial ReviewStudy Session December 14, 2016- KPMG Financial Review
Study Session December 14, 2016- KPMG Financial Review
 
Demand Meter Customer xyz
Demand Meter Customer xyzDemand Meter Customer xyz
Demand Meter Customer xyz
 
Slide Share
Slide ShareSlide Share
Slide Share
 
Water Authority Lawsuit Against MWD Water Rates
Water Authority Lawsuit Against MWD Water RatesWater Authority Lawsuit Against MWD Water Rates
Water Authority Lawsuit Against MWD Water Rates
 
17.3 The end of an asset’s “useful life”
17.3 The end of an asset’s “useful life”17.3 The end of an asset’s “useful life”
17.3 The end of an asset’s “useful life”
 
Rev enrollment recap 9 23-13 quarter end
Rev enrollment recap 9 23-13 quarter endRev enrollment recap 9 23-13 quarter end
Rev enrollment recap 9 23-13 quarter end
 

Similar to AH CCM 10.22.18 Item #4 AH Rate Study

Winter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyWinter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyVictoriaColangelo
 
2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study PresentationVictoriaColangelo
 
Anders, Water Rates
Anders, Water RatesAnders, Water Rates
Anders, Water RatesTWCA
 
ICI Presentation Grad**
ICI Presentation Grad**ICI Presentation Grad**
ICI Presentation Grad**Allison Pasch
 
How Come My Rates Keep Going Up When I'm Saving Water?: Conservation Limits R...
How Come My Rates Keep Going Up When I'm Saving Water?: Conservation Limits R...How Come My Rates Keep Going Up When I'm Saving Water?: Conservation Limits R...
How Come My Rates Keep Going Up When I'm Saving Water?: Conservation Limits R...Texas Living Waters Project
 
Commercial Sample Proposal
Commercial Sample ProposalCommercial Sample Proposal
Commercial Sample ProposalCooper Bortz
 
How to perform a commercial water audit
How to perform a commercial water auditHow to perform a commercial water audit
How to perform a commercial water auditTroy Aichele
 
PPT Item # 12 & 13 - Groundwater Use Reduction Program & Fees
PPT Item # 12 & 13 - Groundwater Use Reduction Program & FeesPPT Item # 12 & 13 - Groundwater Use Reduction Program & Fees
PPT Item # 12 & 13 - Groundwater Use Reduction Program & Feesahcitycouncil
 
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsMichael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsJohn Blue
 
Ace 10 high efficiency plumbing fixtures are flush with savings
Ace 10 high efficiency plumbing fixtures are flush with savingsAce 10 high efficiency plumbing fixtures are flush with savings
Ace 10 high efficiency plumbing fixtures are flush with savingsTroy Aichele
 
Q1 2017 - Chicago Suburbs Office Reports
Q1 2017 - Chicago Suburbs Office ReportsQ1 2017 - Chicago Suburbs Office Reports
Q1 2017 - Chicago Suburbs Office ReportsHailey Harrington
 
Cecil County Public Schools FY16 CMP & FY17 CIP
Cecil County Public Schools FY16 CMP & FY17 CIPCecil County Public Schools FY16 CMP & FY17 CIP
Cecil County Public Schools FY16 CMP & FY17 CIPFrances Bowman
 
Water and Sewer Management & Compliance in New York City
Water and Sewer  Management & Compliance  in New York CityWater and Sewer  Management & Compliance  in New York City
Water and Sewer Management & Compliance in New York CityRyan Slack
 
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CasePV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CaseFadi Maalouf, PMP
 
PPT Item # 7 - Water Surcharge Fee Amendment
PPT Item # 7 - Water Surcharge Fee AmendmentPPT Item # 7 - Water Surcharge Fee Amendment
PPT Item # 7 - Water Surcharge Fee Amendmentahcitycouncil
 

Similar to AH CCM 10.22.18 Item #4 AH Rate Study (20)

Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Winter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate StudyWinter Springs 2023 Water and Wastewater Rate Study
Winter Springs 2023 Water and Wastewater Rate Study
 
2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation2023 Winter Springs Water and Wastewater Rate Study Presentation
2023 Winter Springs Water and Wastewater Rate Study Presentation
 
Anders, Water Rates
Anders, Water RatesAnders, Water Rates
Anders, Water Rates
 
ICI Presentation Grad**
ICI Presentation Grad**ICI Presentation Grad**
ICI Presentation Grad**
 
How Come My Rates Keep Going Up When I'm Saving Water?: Conservation Limits R...
How Come My Rates Keep Going Up When I'm Saving Water?: Conservation Limits R...How Come My Rates Keep Going Up When I'm Saving Water?: Conservation Limits R...
How Come My Rates Keep Going Up When I'm Saving Water?: Conservation Limits R...
 
Commercial Sample Proposal
Commercial Sample ProposalCommercial Sample Proposal
Commercial Sample Proposal
 
How to perform a commercial water audit
How to perform a commercial water auditHow to perform a commercial water audit
How to perform a commercial water audit
 
PPT Item # 12 & 13 - Groundwater Use Reduction Program & Fees
PPT Item # 12 & 13 - Groundwater Use Reduction Program & FeesPPT Item # 12 & 13 - Groundwater Use Reduction Program & Fees
PPT Item # 12 & 13 - Groundwater Use Reduction Program & Fees
 
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine FarmsMichael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
Michael Reese - Electric and Thermal Energy Strategies for Minnesota Swine Farms
 
PWP2006
PWP2006PWP2006
PWP2006
 
Ace 10 high efficiency plumbing fixtures are flush with savings
Ace 10 high efficiency plumbing fixtures are flush with savingsAce 10 high efficiency plumbing fixtures are flush with savings
Ace 10 high efficiency plumbing fixtures are flush with savings
 
Q1 2017 - Chicago Suburbs Office Reports
Q1 2017 - Chicago Suburbs Office ReportsQ1 2017 - Chicago Suburbs Office Reports
Q1 2017 - Chicago Suburbs Office Reports
 
Cecil County Public Schools FY16 CMP & FY17 CIP
Cecil County Public Schools FY16 CMP & FY17 CIPCecil County Public Schools FY16 CMP & FY17 CIP
Cecil County Public Schools FY16 CMP & FY17 CIP
 
Water and Sewer Management & Compliance in New York City
Water and Sewer  Management & Compliance  in New York CityWater and Sewer  Management & Compliance  in New York City
Water and Sewer Management & Compliance in New York City
 
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CasePV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline Case
 
MRWD Water Production Proposals Comparison
MRWD Water Production Proposals ComparisonMRWD Water Production Proposals Comparison
MRWD Water Production Proposals Comparison
 
PPT Item # 7 - Water Surcharge Fee Amendment
PPT Item # 7 - Water Surcharge Fee AmendmentPPT Item # 7 - Water Surcharge Fee Amendment
PPT Item # 7 - Water Surcharge Fee Amendment
 
Impact Fee Semi-Annual Report
Impact Fee Semi-Annual ReportImpact Fee Semi-Annual Report
Impact Fee Semi-Annual Report
 

More from ahcitycouncil

PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23ahcitycouncil
 
Item # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial ReportItem # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial Reportahcitycouncil
 
Item # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation PlanItem # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation Planahcitycouncil
 
PPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation PlanPPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation Planahcitycouncil
 
PPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdfPPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdfahcitycouncil
 
Item # 6 - Public Health Authority Designation
Item # 6 - Public Health Authority DesignationItem # 6 - Public Health Authority Designation
Item # 6 - Public Health Authority Designationahcitycouncil
 
Item # 5 - VIA Telecom Tax Exemption Repeal
Item # 5 - VIA Telecom Tax Exemption RepealItem # 5 - VIA Telecom Tax Exemption Repeal
Item # 5 - VIA Telecom Tax Exemption Repealahcitycouncil
 
PPT Item # 5 - VIA Repeal Telecom Tax Exemption
PPT Item # 5 - VIA Repeal Telecom Tax ExemptionPPT Item # 5 - VIA Repeal Telecom Tax Exemption
PPT Item # 5 - VIA Repeal Telecom Tax Exemptionahcitycouncil
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpointahcitycouncil
 
Item # 1a - April 09, 2024 CCM Minutes.pdf
Item # 1a - April 09, 2024 CCM Minutes.pdfItem # 1a - April 09, 2024 CCM Minutes.pdf
Item # 1a - April 09, 2024 CCM Minutes.pdfahcitycouncil
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processesahcitycouncil
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfahcitycouncil
 
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfPPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfahcitycouncil
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpointahcitycouncil
 
Item # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure ProcessesItem # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure Processesahcitycouncil
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Servicesahcitycouncil
 
Item # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. ReplatItem # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. Replatahcitycouncil
 
Item # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM MinutesItem # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM Minutesahcitycouncil
 

More from ahcitycouncil (20)

PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23
 
Item # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial ReportItem # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial Report
 
Item # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation PlanItem # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation Plan
 
PPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation PlanPPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation Plan
 
PPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdfPPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdf
 
Item # 6 - Public Health Authority Designation
Item # 6 - Public Health Authority DesignationItem # 6 - Public Health Authority Designation
Item # 6 - Public Health Authority Designation
 
Item # 5 - VIA Telecom Tax Exemption Repeal
Item # 5 - VIA Telecom Tax Exemption RepealItem # 5 - VIA Telecom Tax Exemption Repeal
Item # 5 - VIA Telecom Tax Exemption Repeal
 
PPT Item # 5 - VIA Repeal Telecom Tax Exemption
PPT Item # 5 - VIA Repeal Telecom Tax ExemptionPPT Item # 5 - VIA Repeal Telecom Tax Exemption
PPT Item # 5 - VIA Repeal Telecom Tax Exemption
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Item # 1a - April 09, 2024 CCM Minutes.pdf
Item # 1a - April 09, 2024 CCM Minutes.pdfItem # 1a - April 09, 2024 CCM Minutes.pdf
Item # 1a - April 09, 2024 CCM Minutes.pdf
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processes
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
 
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdfPPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
PPT Item # 4&5 - 415 & 423 Evans Ave. Replat.pdf
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Item # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure ProcessesItem # 7 - Demolition & Replacement Structure Processes
Item # 7 - Demolition & Replacement Structure Processes
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Services
 
Item # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. ReplatItem # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. Replat
 
Item # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM MinutesItem # 1a --- March 25, 2024 CCM Minutes
Item # 1a --- March 25, 2024 CCM Minutes
 

Recently uploaded

Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at workChristina Parmionova
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.Christina Parmionova
 

Recently uploaded (20)

Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
 

AH CCM 10.22.18 Item #4 AH Rate Study

  • 1. 2018 Water and Wastewater Rate Study and Financial Forecast Public Hearing City of Alamo Heights October 22, 2018
  • 2. Why are Water/WW Rates Increasing? • Inflation • General increases in the cost of doing business • Environmental and other regulations • Capital Improvement Plan needed to repair and expand system • AWWA forecasts that water and wastewater rates across USA will triple in the next 15 years Page: 1
  • 3. City of Alamo Heights Initial Observations  City has not increased its water and wastewater operating rate since 2007  The only rate increases over the past decade have been to pass through SAWS wastewater increases (typically 3-5% per year on wastewater rates only)  City’s water and wastewater monthly charges are lower than many neighboring communities and below the state average  Revenues are now recovering nominally less than cost of providing water and wastewater service Page: 2
  • 4. City of Alamo Heights Current Water Rate Structure Page: 3 5/8" 3.00$ Volume Rate (per 100 Cubic Feet) Volume Rate (per 100 Cubic Feet) 3/4" 9.00 - 500 0.83$ - 500 1.18$ 1" 15.00 501 1,000 1.13 501 1,000 1.48 1 1/2" 37.50 1,001 2,300 1.63 1,001 2,300 1.98 2" 60.00 2,301 Above 2.76 2,301 Above 1.98 3" 150.00 4" 225.00 Volume Rate (per 1,000 Gallons) Volume Rate (per 1,000 Gallons) 6" 225.00 - 3,740 1.11$ - 3,740 1.58$ 3,741 7,481 1.51 3,741 7,481 1.98 7,482 17,205 2.18 7,482 17,205 2.65 17,206 Above 3.69 17,206 Above 2.65 Minimum Charge 18.27$ Minimum Charge 18.27$ 500 Cubic Feet 3,740 Gallons Volume Rate 3.05 Volume Rate 4.08 per 100 Cubic Feet per 1,000 Gallons Monthly Charge Commercial Water Rates Residential and Irrigation Wastewater -- All Customers
  • 5. Monthly Residential Charges 12,000 Gal/1,604 Cubic Feet Water and Wastewater 5/8“ Meter Page: 4 EAA(Water) SAWS(WW) SAWS(Water) SAWS(WW) Other
  • 6. Monthly Commercial Charges 25,000 Gal or 3,342 ft3 Water and Wastewater 2“ Meter Page: 5 OtherEAA(Water) SAWS(WW) SAWS(Water) SAWS(WW)
  • 7. Historical and Forecast Annual Total Water Accounts Page: 6 Average Annual Increase = 20 accounts (0.65%) Accounts
  • 8. Historical and Forecast Annual Water Billed Consumption (Cubic Feet) Page: 7 Cubic Feet Avg Residential Monthly Usage Gallons = 11,019 Cubic Feet = 1,473
  • 9. 5 Year Forecast Primary Assumptions • Most personnel and operating expenses will increase 2% per year • Some expenses (insurance/workers comp/health care) will increase at higher rates • Certain expenses will increase with volume and customer growth (electricity/chemicals) • SAWS wastewater increases: assumed 8.0% 2019, 5.0% 2020 -- 2027 • Biggest impact on rate plan: how much capital expenditures the City chooses to finance Page: 8
  • 10. Capital Outlays Funded Through Proposed Rate Plan Page: 9 TY FY FY FY FY FY FY FY FY FY 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Water Moving Water Line 4x2 (TCEQ) 150,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 200,000$ 300,000$ 400,000$ Misc. Capital Outlays 60,000 - - - - - - - - - Recondition w ater tow er - - - - - - - - 225,000 225,000 Repaint and Blast 2 w ater tow er - - - - - - - 200,000 200,000 - Meter Change Out - - - - - 550,000 550,000 - - - Wastewater Sew er Improvements 250,000 - - - - - - 300,000 300,000 300,000 Water/ Wastewater Backhoe - 128,980 - - - - - - - - 8 Yard Dump Truck - 95,248 - - - - - - - - Pothole Patch Truck - - 65,751 - - - - - - - F-150 Ext Cab - - 33,222 - - - - - - - Skid Loader S205 - - - - - 36,000 - - - - 12 Yard Dump Truck - - - - - - 62,500 - - - F-250 Crew Cab SS - - - - - - - 37,999 - - Bobcat-S750 - - - - - - - - 79,337 - Crew Cab Flat Bed w / - - - - - - - - - 61,288 Crew Cab 4x4 - - - - - - - - - 52,775 Vactor Truck - 275,000 - - - - - - - - Total Capital Outlays 460,000 599,228 198,973 100,000 100,000 686,000 712,500 737,999 1,104,337 1,039,063 Total = $5,738,100
  • 11. Future Debt Assumptions Page: 10 Term = 20 Years Interest = 3.5% Issuing Cost = 1% Annual Reserve Years = 5 Years Fixed P&I Water = $1,500,000 WW = $1,000,000 Future Bond Issues * Possible future bond issue for the Broadway street project
  • 12. Forecast Cost of Service Page: 11
  • 13. Notes on Rate Proposal  Rate plan adjustments:  Water – 5.0%  Wastewater – 5.0% plus SAWS increases  Plan will enable City to fund $5,734,000 in capital projects over next ten years Page: 12
  • 14. Effective Effective Effective Effective Effective Current Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 Monthly Minimum Charge --All Customer Classes 5/8" 3.00$ 3.15$ 3.31$ 3.47$ 3.65$ 3.83$ 3/4" 9.00 9.45 9.92 10.42 10.94 11.49 1" 15.00 15.75 16.54 17.36 18.23 19.14 1 1/2" 37.50 39.38 41.34 43.41 45.58 47.86 2" 60.00 63.00 66.15 69.46 72.93 76.58 Residential and Irrigation Volume Rate Per 100 Cubic Feet - 500 0.83 0.87 0.92 0.96 1.01 1.06 501 1,000 1.13 1.19 1.25 1.31 1.37 1.44 1,001 2,300 1.63 1.71 1.80 1.89 1.98 2.08 2,301 Above 2.76 2.90 3.05 3.20 3.36 3.53 Volume Rate Per 1,000 Gallons - 3,740 1.11 1.17 1.22 1.28 1.35 1.42 3,741 7,481 1.51 1.59 1.67 1.75 1.84 1.93 7,482 17,205 2.18 2.29 2.40 2.52 2.65 2.78 17,206 Above 3.69 3.88 4.07 4.28 4.49 4.71 Commercial Volume Rate Per 100 Cubic Feet - 500 1.18 1.24 1.30 1.37 1.43 1.51 501 1,000 1.48 1.55 1.63 1.71 1.80 1.89 1,001 2,300 1.98 2.08 2.18 2.29 2.41 2.53 2,301 Above 1.98 3.27 3.43 3.61 3.79 3.98 Volume Rate Per 1,000 Gallons - 3,740 1.58 1.66 1.74 1.83 1.92 2.01 3,741 7,481 1.98 2.08 2.18 2.29 2.40 2.53 7,482 17,205 2.65 2.78 2.92 3.06 3.22 3.38 17,206 Above 2.65 4.37 4.59 4.82 5.06 5.32 Proposed Water Rate Plan Page: 13 NOTE: 5.0% annual adjustments required 2023-2027
  • 15. Proposed Wastewater Rate Plan Page: 14 Effective Effective Effective Effective Effective Current Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 Wastewater Rates - All Customers Monthly Minimum Charge 18.93$ 21.39$ 23.53$ 25.88$ 28.47$ 31.31$ (Includes 500 Cubic Feet/3,740 Gallons Volume Rate per 100 Cubic Feet 3.16 3.57 3.93 4.32 4.75 5.23 Volume Rate per 1,000 Gallons 4.22 4.77 5.25 5.78 6.35 6.99 NOTE: 5.0% annual adjustments required 2023-2027
  • 16. Impact on Monthly Charges Page: 15 NOTE: 5.0% annual adjustments required 2023-2027 Effective Effective Effective Effective Effective Current Sep-18 Sep-19 Sep-20 Sep-21 Sep-22 Residential Average Monthly Bill - 5/8" 5,000 Gal Water 9.05$ 9.51$ 9.98$ 10.48$ 11.00$ 11.55$ (668.4 ft³) Wastew ater 24.25 27.40 30.14 33.16 36.47 40.12 Total 33.30 36.91 40.12 43.64 47.48 51.67 Increase -- $ 3.61 3.22 3.51 3.84 4.20 12,000 Gal Water 22.65$ 23.78$ 24.97$ 26.22$ 27.53$ 28.91$ (1,604.2 ft³) Wastew ater 53.82 60.81 66.89 73.58 80.94 89.04 Total 76.47 84.59 91.86 99.80 108.47 117.94 Increase -- $ 8.13 7.27 7.94 8.67 9.47 Commercial Monthly Bill - 2" 25,000 Gal Water 119.67$ 125.66$ 131.94$ 138.54$ 145.46$ 152.74$ (3,342 ft³) Wastew ater 108.73 122.86 135.15 148.67 163.53 179.89 Total 228.40 248.52 267.09 287.20 308.99 332.62 Increase -- $ 20.12 18.57 20.11 21.79 23.63 Percent Residential Increase 10.8% 8.7% 8.8% 8.8% 8.8%
  • 17. Page: 16 Monthly Residential Charges Forecast 12,000 Gal/1,604 Cubic Feet Water and Wastewater 5/8“ Meter; Assuming the Same Rate Increases NOTE: Based on published plans; subject to change
  • 18. Summary How Will Rate Plan Benefit City? Page: 17 • Will enable the City to maintain a financially healthy utility • Will allow City to fund increasing SAWS and operating costs • Will allow City to invest $5.7 million in capital improvements to system • City’s rates will continue to compare favorably to SAWS and other utilities