The Agile PMO: Ensuring
visibility and governance of
your Agile projects
Matt Holitza, Agile Technology Evangelist
IBM Rational




                                            stay connected at ibm.com/au/innovate
Agenda
•   Pitfalls that jeopardize an effective PMO
•   Attributes of a successful PMO
•   PMO’s objections to agile
•   How agile benefits PMOs
•   Realizing an agile PMO




                                                stay connected at ibm.com/au/innovate
Pitfalls that jeopardize every PMO


                                                                                         Spreadsheets

   The one way street

   One size fits all

   Not looking in the mirror
Source: CIO.com, 3 PMO Pitfalls That Jeopardize Every Project, Adam Bookman, May, 2010    Email
                                                                                                  stay connected at ibm.com/au/innovate
What does a successful PMO look like?

1. Projects align to organizational goals
2. Projects success rates improve
3. Project management competence improves
4. Standards and templates are developed and
   improved
5. PMO tone is inviting
6. Training is available and continuous learning is
   encouraged



           Source: Strategic IT Planning Blog, 7 Marks of a Best PMO, Alec Satin, 1/27/2009
                                                                                              stay connected at ibm.com/au/innovate
What does it mean to be agile?

                        Agile Values

        •Provides a way to time-box work
        • Sustainable value delivery
        •The entire team commits to the work
        • Empowers and respects teams
        • Continuous quality and adaptation
        • The team self-organizes to do the work
        • Frequent delivery of working software

                                           stay connected at ibm.com/au/innovate
Why PMOs might think agile is not for them…
•   Agile will change the way we work
•   Agile will make our projects unpredictable
•   Constant change means chaos and low quality
•   Customers won’t get what they wanted
•   Agile will negatively impact our governance
•   We can’t run time driven projects without a defined scope




                                                                stay connected at ibm.com/au/innovate
Agile is mainstream and maturing
                                                        Who is adopting?




                                   Why are they adopting?




What challenges are they facing?



                                                stay connected at ibm.com/au/innovate
How can agile help a PMO succeed?
Best Practice                                              How agile helps
Projects align to organizational goals                     Whole team approach - Agile projects are cross functional and better
                                                           align the organization
Projects success rates improve over time                   Agile practices are designed to reduce risk , improve quality and
                                                           increase predictability through more frequent inspections , multi-level
                                                           planning and a focus on transparency
Project management competence improves over time           More frequent retrospectives (aka lessons learned) allow for continuous
                                                           improvement

Standards and templates are developed and improved         Agile projects use standard but adaptable templates that are suited to
                                                           the size and risk of projects

PMO tone is inviting                                       Agile promotes a collaborative and trusting environment between core
                                                           teams, project managers and project stakeholders

Training is available, continuous learning is encouraged   Agile promotes continuous learning and regular training




                                                                                                    stay connected at ibm.com/au/innovate
How do you assure projects align to organization goals?


• Lifecycle process and
  scaling framework
• Whole team approach
  with transparency and
  integrated tooling



                                         stay connected at ibm.com/au/innovate
The IBM Rational Approach: Agility with Discipline
Quid pro quo between teams and project stakeholders
   Software Teams &                               Project
   Practitioners                                  Management Office
                                                  & Project
    Promote Discipline                            Stakeholders
                                                   Empower Team Agility
    • Adopt agile practices     Accelerated       • Achieve predictable
                               Delivery through     outcomes
    • Reuse knowledge,
                                Mutual Trust
      best practices                              • Manage risk
    • Address uncertain/high                      • Ensure compliance
      risk items proactively
                                                  • Improve software
    • Be adaptive to change                         economics
                                                  • Visibility and transparency


                                                              stay connected at ibm.com/au/innovate
Disciplined Agile Delivery: The Core of the IBM Agile Transformation Solution

                           Team size                     Compliance requirement
              Under 10                 1000’s of                                          Critical,
                                                          Low risk
              developers               developers                                         audited


       Geographical distribution                                           Domain Complexity
                                                                         Straight                 Intricate,
       Co-located             Global
                                                Disciplined              -forward                 emerging


        Enterprise discipline
                                                   Agile
                                                                     Organization distribution
         Project              Enterprise         Delivery            (outsourcing, partnerships)
         focus                focus                                   Collaborative               Contractual


             Organizational complexity                        Technical complexity
             Flexible                  Rigid                                        Heterogeneous,
                                                      Homogenous                    legacy


12                                                                                     stay connected at ibm.com/au/innovate
Rational Team Concert: Integrated by Design
                                                   Rational Team Concert

•                                                     Eclipse              Visual Studio           ISPF
  All-in-one agile ALM                 Web



• Unified storage and data                                 Dashboards &
                                                             Reporting
• Full featured clients                 Change                                             Continuous
                                                                Planning
•
                                      Management                                           Integration
  Process templates for agile and
  formal delivery                                               Version
                                                                Control


• Multiple platform and technology
                                         Open Lifecycle Integration Platform
  support
                                                          13




                                                                           stay connected at ibm.com/au/innovate
Personalized interfaces to support the whole team


 Full Visibility for Managers                               Maximize Team Productivity
• Understand real-time status                               • Minimize task switching
  regardless of technology                                  • Enhanced collaboration
• Manage plans, collaborate with                            • Understand cross project impact
  teams and understand risks         Project Manager
                                                              and dependencies



                                   Release       Delivery
                                   Manager        Team




                                                              14
                                                                   stay connected at ibm.com/au/innovate
How do you improve project success and PMO
              competence over time?
•   Bi-directional and real-time
    planning and tracking
•   Improving ability to estimate
    projects
•   Full lifecycle traceability
•   Evaluate projects with
    snapshots
•   Continuous process
    improvement



                                    stay connected at ibm.com/au/innovate
Real-Time Dynamic Project Planning and Tracking




• Plans live outside                  • Plans fully integrated with
  of Agile development environment      execution
• Manual, error-prone updates         • Continuous planning
• Separate from team activities and   • Instantly see the impact of
  assignments                           changes to delivery dates
                                                    16
                                                         stay connected at ibm.com/au/innovate
How do you understand what is happening across projects?
Money That Matters Headquarters

                                               PMO


                                                       Rational
                                                     Team Concert
                                  Business                Acceptance
                                  Analysis                  Testing



Outsourced Vendors
                                             Mobile App
                     MTM Web                                           Middleware
                                              Project
                     (Vendor A)                                        (Vendor C)
                                             (Vendor B)



                                                                          stay connected at ibm.com/au/innovate
Cross project plans connect and track related or dependent projects
                                                                                           Rational
                                                                                         Team Concert




                                                                                                            OSLC adaptors
  Enhanced MS                                                                                                  connect
 Project Importer                                                                                            providers to
provides details of                                                                                           associated
 project progress                                                                                           release plans
                         Git Integration                         JIRA OSLC Integration
                                           MS Project Importer
 Vendor A Plan(Simple)                                                              Vendor B Plan (Scrum)
                                    Vendor C Plan (Formal)




                                                                                               stay connected at ibm.com/au/innovate
Maximize team productivity with multiple planning views
                     Roadmap
                      (Gantt)




     Task Board
                                Work Breakdown




19                                                   stay connected at ibm.com/au/innovate
Traceability provides an at-a-glance view of gaps and risks

 Proactively respond to gaps as they surface through out the project
 Discrepancies and gaps are easily visible for team resolution




20                                                                      stay connected at ibm.com/au/innovate
Continuous Improvement: Improve and automate governance




        Approvals can be enforced or
        ad-hoc to ensure stakeholder
            buy-in and automate
            governance practices

21                                                                                21
                                                stay connected at ibm.com/au/innovate
Continuous Improvement: Predicting and improving estimates on the fly



                                 Probability of delivering using
                                predictive Monte Carlo analysis
                                   – by individual, iteration,
                                        release or team




                 Team members estimate by
                worst case, best case and most
                             likely
                                                                   22stay connected at ibm.com/au/innovate
Continuous Improvement: Improve Project Planning.

 Snapshots provide metrics to
evaluate estimates, understand
project changes over time and
    improve future efforts.




                                                                         Demo
                                                    stay connected at ibm.com/au/innovate
How do you effectively standardize and reuse templates?


• Process templates
• Process and tool
  guides




                                           stay connected at ibm.com/au/innovate
Supporting your projects with adaptable templates
     1   Start a project based on a                  Scrum              Iterative          Traditional
           predefined template
           Get up and running with entire
           environment configured to a
           standard mode of operation               Web Banking
     2   Project and teams adjust to their liking   Team : Core
           Customize the approach for the                         Project : Savings
                                                    Team : UI
           project, team, timeline…
           Customize for                            Team : Benefits          Project : Retail
     3   Reuse, share and improve for
           projects
           Projects can export their template for
           or make is public so others can use
25         their live configuration

                                                                             stay connected at ibm.com/au/innovate
Adapt the pre-defined template to support your practices




                                           Guarded RTC operation




                                                              Team advisor provides in-context
                                                              guidance to users
     Configurable Rules can be
     run to enforce team or                            Verification required


     organizational standards.



                                                                         26
                                                                                                                 26
                                                                               stay connected at ibm.com/au/innovate
How do you make the tone of the PMO more inviting?
• Full project transparency
• Collaboration in-context




                                        stay connected at ibm.com/au/innovate
Transparency: Putting it all together
Know what’s going on without having to ask…
                                                        Customizable
                                                      dashboards – with
                                                       plan status at a
                                                           glance


      Track the throughput or “velocity” of project
        teams over time and monitor work item
             “burndown” of projects in flight




                                                                                View risks, issues
                                                                                 and defects for
                                                                               Cross Project Plans
 28                                                                       stay connected at ibm.com/au/innovate
Collaborate in real-time and in context of project work - maximize progress

                                                            Avoid Duplication
                                                     • Find potential duplicates
                                                     • Subscribe team members
      Team Awareness                                 • Move / Copy work between projects
• Shows team members and
  their online status
• Discussions kept with work for
  all time
                                                                       Change Awareness
                                                                    • Automatically links to
                                                                      changes if mentioned in
                                                                      chat
                                                                    • Drag and drop any work
                                                                      item or query into chat


                                                              29
                                                                   stay connected at ibm.com/au/innovate
How do add new capabilities as your agile practice evolves

 • Capabilities and practices that extend across the lifecycle
 • Training and services tailored to your needs




                                                                 stay connected at ibm.com/au/innovate
Agile extensions – capabilities to address your evolving needs
                                    Business
                                  Collaboration


                                                   Portfolio
                      Help Desk
                                                  Management




                                   Team                    Requirements
             Deployment                                    Management
                                                          and Envisioning
                                  Concert


                      Test and
                                                  Prototyping
                       Quality
                                                  and Design
                     Management

                                   Enterprise
                                  Development
                                   and Build

                                                                            stay connected at ibm.com/au/innovate
Extending agile across the delivery lifecycle: Banking Example
Scenario: Large global bank with strict compliance mandates                  Solution:
                                                                              Basic and roll based agile training for new teams
Existing Practices and Tools:
      Practices: Scrum focused delivery                                       Disciplined Agile Delivery process training
      Tooling: Mixture of open source and commercial tooling
Scaling Needs:                                                                Deployment and training for Rational CLM and
      Support rollout to all worldwide delivery centers, with two
                                                                               Rational Automation Framework
      independent testing centers, support regulations in five different
      countries and standardize deployment to six global production server
                                                                             Collaborative Lifecycle Management
      farms.
                                                                                                       Your
                                                                                                       Tools

                                                                                Reqts Mgmt &                             Independent
                                                                                                   Agile ALM
                                                                                Prototyping                              Testing


                                                                                                   Continuous
                                                                                                   Deployment



                                                                                    Open Lifecycle Integration Platform

                                                                                                  32


                                                                                                       stay connected at ibm.com/au/innovate
Training and services to support your Agile Transformation

  Consult: Services tailored to your unique needs
  Educate: Get your teams up to speed with agile
  training
  Support: Dedicated assistance to keep you
  moving forward
  Success: Ongoing support and coaching to
  ensure you achieve your goals




                                                    stay connected at ibm.com/au/innovate
Agile resources to help you get started

          Get your complementary copy of
          Agile for Dummies

                                Learn
                                Agile                Download Rational Team Concert
                                                                  10 Free Licenses
                                           Be Lean                       on jazz.net

                                Talk
Join the Agile Transformation
Community on developerWorks     Agile
http://ibm.co/beagile

                                                           stay connected at ibm.com/au/innovate
www.ibm.com/software/rational
© Copyright IBM Corporation 2012. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind, express or implied.
IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have the effect of, creating any warranties
or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in these materials to IBM
products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in these materials may change at any time at IBM’s
sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the
Telelogic logo, and other IBM products and services are trademarks of the International Business Machines Corporation, in the United States, other countries or both. Other company, product, or service names may be
trademarks or service marks of others.
                                                                                                                                                                     stay connected at ibm.com/au/innovate
www.ibm.com/software/rational




                                stay connected at ibm.com/au/innovate
stay connected at ibm.com/au/innovate
stay connected at ibm.com/au/innovate
The Agile PMO: Ensuring visibility and governance

The Agile PMO: Ensuring visibility and governance

  • 2.
    The Agile PMO:Ensuring visibility and governance of your Agile projects Matt Holitza, Agile Technology Evangelist IBM Rational stay connected at ibm.com/au/innovate
  • 3.
    Agenda • Pitfalls that jeopardize an effective PMO • Attributes of a successful PMO • PMO’s objections to agile • How agile benefits PMOs • Realizing an agile PMO stay connected at ibm.com/au/innovate
  • 4.
    Pitfalls that jeopardizeevery PMO Spreadsheets The one way street One size fits all Not looking in the mirror Source: CIO.com, 3 PMO Pitfalls That Jeopardize Every Project, Adam Bookman, May, 2010 Email stay connected at ibm.com/au/innovate
  • 5.
    What does asuccessful PMO look like? 1. Projects align to organizational goals 2. Projects success rates improve 3. Project management competence improves 4. Standards and templates are developed and improved 5. PMO tone is inviting 6. Training is available and continuous learning is encouraged Source: Strategic IT Planning Blog, 7 Marks of a Best PMO, Alec Satin, 1/27/2009 stay connected at ibm.com/au/innovate
  • 6.
    What does itmean to be agile? Agile Values •Provides a way to time-box work • Sustainable value delivery •The entire team commits to the work • Empowers and respects teams • Continuous quality and adaptation • The team self-organizes to do the work • Frequent delivery of working software stay connected at ibm.com/au/innovate
  • 7.
    Why PMOs mightthink agile is not for them… • Agile will change the way we work • Agile will make our projects unpredictable • Constant change means chaos and low quality • Customers won’t get what they wanted • Agile will negatively impact our governance • We can’t run time driven projects without a defined scope stay connected at ibm.com/au/innovate
  • 8.
    Agile is mainstreamand maturing Who is adopting? Why are they adopting? What challenges are they facing? stay connected at ibm.com/au/innovate
  • 9.
    How can agilehelp a PMO succeed? Best Practice How agile helps Projects align to organizational goals Whole team approach - Agile projects are cross functional and better align the organization Projects success rates improve over time Agile practices are designed to reduce risk , improve quality and increase predictability through more frequent inspections , multi-level planning and a focus on transparency Project management competence improves over time More frequent retrospectives (aka lessons learned) allow for continuous improvement Standards and templates are developed and improved Agile projects use standard but adaptable templates that are suited to the size and risk of projects PMO tone is inviting Agile promotes a collaborative and trusting environment between core teams, project managers and project stakeholders Training is available, continuous learning is encouraged Agile promotes continuous learning and regular training stay connected at ibm.com/au/innovate
  • 10.
    How do youassure projects align to organization goals? • Lifecycle process and scaling framework • Whole team approach with transparency and integrated tooling stay connected at ibm.com/au/innovate
  • 11.
    The IBM RationalApproach: Agility with Discipline Quid pro quo between teams and project stakeholders Software Teams & Project Practitioners Management Office & Project Promote Discipline Stakeholders Empower Team Agility • Adopt agile practices Accelerated • Achieve predictable Delivery through outcomes • Reuse knowledge, Mutual Trust best practices • Manage risk • Address uncertain/high • Ensure compliance risk items proactively • Improve software • Be adaptive to change economics • Visibility and transparency stay connected at ibm.com/au/innovate
  • 12.
    Disciplined Agile Delivery:The Core of the IBM Agile Transformation Solution Team size Compliance requirement Under 10 1000’s of Critical, Low risk developers developers audited Geographical distribution Domain Complexity Straight Intricate, Co-located Global Disciplined -forward emerging Enterprise discipline Agile Organization distribution Project Enterprise Delivery (outsourcing, partnerships) focus focus Collaborative Contractual Organizational complexity Technical complexity Flexible Rigid Heterogeneous, Homogenous legacy 12 stay connected at ibm.com/au/innovate
  • 13.
    Rational Team Concert:Integrated by Design Rational Team Concert • Eclipse Visual Studio ISPF All-in-one agile ALM Web • Unified storage and data Dashboards & Reporting • Full featured clients Change Continuous Planning • Management Integration Process templates for agile and formal delivery Version Control • Multiple platform and technology Open Lifecycle Integration Platform support 13 stay connected at ibm.com/au/innovate
  • 14.
    Personalized interfaces tosupport the whole team Full Visibility for Managers Maximize Team Productivity • Understand real-time status • Minimize task switching regardless of technology • Enhanced collaboration • Manage plans, collaborate with • Understand cross project impact teams and understand risks Project Manager and dependencies Release Delivery Manager Team 14 stay connected at ibm.com/au/innovate
  • 15.
    How do youimprove project success and PMO competence over time? • Bi-directional and real-time planning and tracking • Improving ability to estimate projects • Full lifecycle traceability • Evaluate projects with snapshots • Continuous process improvement stay connected at ibm.com/au/innovate
  • 16.
    Real-Time Dynamic ProjectPlanning and Tracking • Plans live outside • Plans fully integrated with of Agile development environment execution • Manual, error-prone updates • Continuous planning • Separate from team activities and • Instantly see the impact of assignments changes to delivery dates 16 stay connected at ibm.com/au/innovate
  • 17.
    How do youunderstand what is happening across projects? Money That Matters Headquarters PMO Rational Team Concert Business Acceptance Analysis Testing Outsourced Vendors Mobile App MTM Web Middleware Project (Vendor A) (Vendor C) (Vendor B) stay connected at ibm.com/au/innovate
  • 18.
    Cross project plansconnect and track related or dependent projects Rational Team Concert OSLC adaptors Enhanced MS connect Project Importer providers to provides details of associated project progress release plans Git Integration JIRA OSLC Integration MS Project Importer Vendor A Plan(Simple) Vendor B Plan (Scrum) Vendor C Plan (Formal) stay connected at ibm.com/au/innovate
  • 19.
    Maximize team productivitywith multiple planning views Roadmap (Gantt) Task Board Work Breakdown 19 stay connected at ibm.com/au/innovate
  • 20.
    Traceability provides anat-a-glance view of gaps and risks  Proactively respond to gaps as they surface through out the project  Discrepancies and gaps are easily visible for team resolution 20 stay connected at ibm.com/au/innovate
  • 21.
    Continuous Improvement: Improveand automate governance Approvals can be enforced or ad-hoc to ensure stakeholder buy-in and automate governance practices 21 21 stay connected at ibm.com/au/innovate
  • 22.
    Continuous Improvement: Predictingand improving estimates on the fly Probability of delivering using predictive Monte Carlo analysis – by individual, iteration, release or team Team members estimate by worst case, best case and most likely 22stay connected at ibm.com/au/innovate
  • 23.
    Continuous Improvement: ImproveProject Planning. Snapshots provide metrics to evaluate estimates, understand project changes over time and improve future efforts. Demo stay connected at ibm.com/au/innovate
  • 24.
    How do youeffectively standardize and reuse templates? • Process templates • Process and tool guides stay connected at ibm.com/au/innovate
  • 25.
    Supporting your projectswith adaptable templates 1 Start a project based on a Scrum Iterative Traditional predefined template Get up and running with entire environment configured to a standard mode of operation Web Banking 2 Project and teams adjust to their liking Team : Core Customize the approach for the Project : Savings Team : UI project, team, timeline… Customize for Team : Benefits Project : Retail 3 Reuse, share and improve for projects Projects can export their template for or make is public so others can use 25 their live configuration stay connected at ibm.com/au/innovate
  • 26.
    Adapt the pre-definedtemplate to support your practices Guarded RTC operation Team advisor provides in-context guidance to users Configurable Rules can be run to enforce team or Verification required organizational standards. 26 26 stay connected at ibm.com/au/innovate
  • 27.
    How do youmake the tone of the PMO more inviting? • Full project transparency • Collaboration in-context stay connected at ibm.com/au/innovate
  • 28.
    Transparency: Putting itall together Know what’s going on without having to ask… Customizable dashboards – with plan status at a glance Track the throughput or “velocity” of project teams over time and monitor work item “burndown” of projects in flight View risks, issues and defects for Cross Project Plans 28 stay connected at ibm.com/au/innovate
  • 29.
    Collaborate in real-timeand in context of project work - maximize progress Avoid Duplication • Find potential duplicates • Subscribe team members Team Awareness • Move / Copy work between projects • Shows team members and their online status • Discussions kept with work for all time Change Awareness • Automatically links to changes if mentioned in chat • Drag and drop any work item or query into chat 29 stay connected at ibm.com/au/innovate
  • 30.
    How do addnew capabilities as your agile practice evolves • Capabilities and practices that extend across the lifecycle • Training and services tailored to your needs stay connected at ibm.com/au/innovate
  • 31.
    Agile extensions –capabilities to address your evolving needs Business Collaboration Portfolio Help Desk Management Team Requirements Deployment Management and Envisioning Concert Test and Prototyping Quality and Design Management Enterprise Development and Build stay connected at ibm.com/au/innovate
  • 32.
    Extending agile acrossthe delivery lifecycle: Banking Example Scenario: Large global bank with strict compliance mandates Solution:  Basic and roll based agile training for new teams Existing Practices and Tools: Practices: Scrum focused delivery  Disciplined Agile Delivery process training Tooling: Mixture of open source and commercial tooling Scaling Needs:  Deployment and training for Rational CLM and Support rollout to all worldwide delivery centers, with two Rational Automation Framework independent testing centers, support regulations in five different countries and standardize deployment to six global production server Collaborative Lifecycle Management farms. Your Tools Reqts Mgmt & Independent Agile ALM Prototyping Testing Continuous Deployment Open Lifecycle Integration Platform 32 stay connected at ibm.com/au/innovate
  • 33.
    Training and servicesto support your Agile Transformation Consult: Services tailored to your unique needs Educate: Get your teams up to speed with agile training Support: Dedicated assistance to keep you moving forward Success: Ongoing support and coaching to ensure you achieve your goals stay connected at ibm.com/au/innovate
  • 34.
    Agile resources tohelp you get started Get your complementary copy of Agile for Dummies Learn Agile Download Rational Team Concert 10 Free Licenses Be Lean on jazz.net Talk Join the Agile Transformation Community on developerWorks Agile http://ibm.co/beagile stay connected at ibm.com/au/innovate
  • 35.
    www.ibm.com/software/rational © Copyright IBMCorporation 2012. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others. stay connected at ibm.com/au/innovate
  • 36.
    www.ibm.com/software/rational stay connected at ibm.com/au/innovate
  • 37.
    stay connected atibm.com/au/innovate
  • 38.
    stay connected atibm.com/au/innovate

Editor's Notes

  • #3 Introduction – Background – never project manager, never posed as a project manager, automated
  • #4 Pitfalls that jeopardize an effective PMO (1 slide)Attributes of a successful PMO (1 slide)The impact of agile adoption on the PMO (1 slide)Agile benefits to PMOs (1 slide)Retrospectives, whole team approach, reduced risk, greater predictabilityThe Rational Solution: Agility with governance and discipline (DAD and RTC focused, with one slide for extensions) (10 slides)Disciplined Agile Delivery process (DAD overview, focus on practices impacting PMODefining appropriate processes for different projects based on size, risk, complianceProcess automation, approvals and living documentationLifecycle traceability to meet compliance and understand inter dependencies Real-time project planning and tracking (for individual projects and across projects) 5 slidesBasic planning, planning linked to execution, bottoms up estimates, schedule risk assessment, cross project planning and tracking, import/export MS ProjectInformation radiators with live status 1 slideContinuous improvement to evaluate and improve project performance(baselining), estimation and best practices, retrospectivesExtending RTC to fit your unique needsSummary (1 slide)
  • #5 The One-Way StreetStatus information only flowing to PMOLack of cross project visibility to dependenciesLack of whole team environment, hand-offs, gates, lack of collaborationOne size does not fit allOne process for all projects, regardless of size or risk, lack of flexibility (new or greenfield vs maintenance vs mission critical projects)Not looking in the mirror – lack of transparency and self reflectionManually intensive status reportingInformation radiators with inaccurate or dated informationIneffective and inconsistent lessons learned/retrospectivesNo PMO self evaluations
  • #6 On the flip side what do successful PMOs do?Projects align to organizational goals – they assure that the projects they are working on will contribute to the organizationProjects success rates improve – they work to not only improve their projects ability to deliver on time, on budget and on functionality but they also measure their successProject management competence improves – this goes back to the self reflection from the prior slide, how often are PMOs looking at and measuring their processes, making sure they are still valid and improving them (organization – placemat story)Standards and templates are developed and improved PMO tone is inviting – doesthe organization use a top down command and control (motivated by fear) or is it a collaborative team first approach (motivated by success) Training is available and continuous learning is encouraged
  • #9 We recently sponsored a survey of agile practitioners by the Scrum Alliance and the results were very interesting, we found that 44% of the respondents identified themselves as Project Managers, that their main reason for adopting was to position the organization to change and that they needed a better way to interact with their customers, you can see others here like visibility to projects, improved communication, better deliverables. And finally the most interesting statistic from my perspective is that 54% of the resp. say that their biggest challenged in adopting agile is the cultural change agile will bring to the org.
  • #10 So how can agile help a PMO, well agile is built to address many of the concerns from the previous page and this is how it roughly aligns to the success factors I discussed earlier.
  • #11 So let’s look at each one and look at how IBM’s solution can help PMOs embrace these success factors…
  • #12 To realize accelerated delivery requires organizations build a trusting relationship between the PMO and project stakeholders and IT (software teams, practitioners), while PMO must ensure governance it’s also in their best interest to empower the delivery teams and practitioners to they must also empower and support IT in their adoption of agile practices. On the flip side, software teams and practitioners must embrace a disciplined agile approach, so they deliver the right software following the right procedure.Work together, not in silos.
  • #17 MattSo on the left side is BAD, on the right side is GOOD. When you’re looking at an Agile development management tool, one of the biggest ways to reduce friction for the Agile teams is to get a planning tool that is linked to execution, what that means is that as developers are closing work items, checking in code your plans automatically reflect those changes. There’s no additional step to update a plan, contribute to a spreadsheet or attend a status meeting. Plus this makes daily standups less about status and more about issues and removing barriers for the team. Continuous planning is basically the ability to both see how your plans have evolved over time and the ability to actively manage them with the knowledge that they are accurate, and since the leads, product owners and stakeholders are armed with the latest information they can see the impact of changes to delivery dates.
  • #18 So let’s look at an example of a PMO in an organization in Australia, let’s say that this is a banking company and that they primarily rely on outsourced vendors to develop their solutions. So they have a web app project, a mobile app project and middleware project… all of these projects must work together in the end to provide the customer with a seamless experience and must follow many business rules to assure customers financials are accurate and reflect the most current information. One team is using Git, another Jira and the middleware project uses MS Project. How do they look across these different projects and understand the dependencies and risks proactively.
  • #20 MattAlso when looking at tools, look at the ability for the tools to provide different views of plans based on different needs or team roles. So here we see a roadmap view for looking at interdependencies and how the overall release will progress over time, then we have a work breakdown view to see how different members of the team are progressing and whether or not they need help, a taskboard view to run virtual standup meetings.The following three images show the same sprint plan BRM Sprint 2 (1.0 ) Plan using different views. Using different views helps the team balance the work, plan effectively, understand dependencies and respond to changes more quickly.Image 1 – Roadmap view: -show dependencies between work items In this example you can see the dependency between 3 tasks between Marco and Deb. Image 2 – Task board view: shows current progress for daily stand-upsImage 3 – Planned Time view: Shows the work load for each individuals. In this example you can clearly see that Deb and Marco are over worked. Bob and Tanuj have no work assigned to them.
  • #21 BernieThe image shows a traceability view in Release Plan containing links to requirements and test cases. It also has a column to identify defects affecting the plan items. This demonstrates an integrated plan with traceability reporting. Rather than relying on stale and occasionally run traceability reports, using an integrated plan with a built-in traceability view makes the gaps are obvious and easy to address through out the project.Benefits: Creating a shared vision delivers what the stakeholders want Ensuring coverage improves quality for the release and each sprint Whole team buy-in improves team trust, efficiency and focus
  • #27 Template – over time tailor the template to the way you want to work.So a little more about this process enactment provides… these are a few of the endless automations you can make… the process guidance is built in, so team members know what they need to change and provides options for fixing the problem. At the bottom is an example of a configurable rule, in this case you can specify what rules to apply to delivery of a client change set like descriptions for change sets or successful execution of Junit tests.Process enactment, enforce processes that your teams use, Junit test required when adding change sets to integration stream, Establish and enforce approval and review checkpoints in your change workflow, Require approvals and reviews before a workflow state change or or add e-signatures to comply with regulations or audits.Example: Rejecting a submitted workitem, moving a defect from submitted to planned, moving an enhancement from resolved to implementedEstablish multiple approvals and reviews integrating comments and discussionRequire an electronic signature when changing the stateExample: As part of an approval, when moving an enhancement or defect from submitted to rejected or accepted.
  • #29 Matt