“Traditional” IT Project Management

◊ Process and tools
◊ Comprehensive documentation
◊ Contract negotiations
◊ Following a plan

This is how we control projects….




                                      3
Waterfall Development

Requirements


               Design



                        Develop



                                  Test



                                         Deploy



                                                  4
Industry Success Rate



  IT Industry average success rate?

  Success rate ~ __%
                 33%




  From 2010 report from The Standish Group
                                             5
Problems with Waterfall

 Requirements                   What happens if something goes wrong?


                       Design



                                         Develop


 “I believe in this concept,
                                                              Test
 but the implementation described
 above is risky and invites failure”
          – Dr. Winston Royce                                                Deploy


  Managing the Development of Large Software Systems, Winston Royce (1970)
                                                                                      6
“Traditional” IT Project Management

◊ Process and tools
◊ Comprehensive documentation
◊ Contract negotiations
◊ Following a plan

Designed to minimize risk and control change




                                               7
Agile Manifesto
We are uncovering better ways of developing software by doing
it and helping others do it. Through this work we have come to
value:
Individuals and interactions       over   Process and tools

                Working software   over   Comprehensive documentation

       Customer collaboration      over   Contract negotiation

         Responding to change      over   Following a plan

That is, while there is value in the items on the right, we value
the items on the left more.
 http://agilemanifesto.org/
                                                                        8
1. Our highest priority is to satisfy the customer through early and continuous delivery of
   valuable software.
2. Welcome changing requirements, even late in development. Agile processes harness
   change for the customer's competitive advantage.
3. Deliver working software frequently, from a couple of weeks to a couple of months, with
   a preference to the shorter timescale.
4. Business people and developers must work together daily throughout the project.
5. Build projects around motivated individuals. Give them the environment and support they need,
   and trust them to get the job done.
6. The most efficient and effective method of conveying information to and within a development
   team is face-to-face conversation.
7. Working software is the primary measure of progress. Agile processes promote
   sustainable development.
8. The sponsors, developers, and users should be able to maintain a constant pace indefinitely.
9. Continuous attention to technical excellence and good design enhances agility.
10. Simplicity--the art of maximizing the amount of work not done--is essential.
11. The best architectures, requirements, and designs emerge from self-organizing teams.
12. At regular intervals, the team reflects on how to become more effective, then tunes and
    adjusts its behavior accordingly.
                                                                                                  9
Agile Principles (paraphrased)
1. Satisfy the customer        7. Working software is the
   through early and               primary measure of
   continuous delivery             progress
2. Welcome changing            8. Sustainable constant
   requirements                    pace
3. Deliver frequently,         9. Technical excellence and
   preferring a shorter            good design enhances
   timescale                       agility
4. Business & technical team   10. Simplicity; maximizing the
   working together daily          amount of work not done
5. Pick the right team,        11. Best results emerge from
   support them & trust them       self organizing teams
6. Face-to-Face                12. Regularly reflect & adjust
   communication                   to become more effective 10
Agile Methodologies


                        Agile

       Scrum – Iterative method used by most teams
       XP – The software engineering practices

  Kanban – Often used in operations

  Lean – Concepts used for organizational Agile


                                                     11
Scrum Overview
Project development is performed in 2 to 4 week iterations
Product Owner creates a prioritized backlog of features
Highest priority features delivered first
At the end of the iteration, the deliverables are reviewed by the business customers
The team reflects on the process
This is repeated until the project is completed




* Diagram from Mountain Goat Software
                                                                                       12
Advantages of Scrum
◊ Adaptability (Scrum) over Predictability (Waterfall)
   – Waterfall makes it expensive to make changes to the project
   – Scrum development minimizes the cost of change

◊ Showing tangible results throughout the project

◊ Continuous Improvement

◊ Shorter feedback loop

◊ Identify and resolve problems faster

◊ Lessons learned and applied during each iteration instead of at the
  end of the project

◊ High assurance of product vision due to continual inspection by
  business representatives
                                                                    13
Scrum Framework




                  14
Scrum Framework




* Diagram from Scrum Primer
   From the Scrum Primer
                              15
from 2011 VersionOne survey   16
                                16
Metrics based on Industry Studies
                                                        Waterfall    Agile
Agile Productivity
                               Person Months                 540       54
   – Productivity increase
                               Lines of Code               58,000   51,000
     34% to 200%
   – 3x to 6x greater          Function Points (FP)          900      959
     productivity gain on
                               FP per Developer Month        1.7     17.8
     coached teams over non-
     coached
Metrics based on Industry Studies

Feature Usage in Software
  – 20% of features always
    or often used
                                        Often
  – 60% of features never or            13%
    rarely used
                                                Some-
                               Never            times
                               45%               16%

                                                 Always
                                                   7%

                                       Rarely
                                        19%
Metrics based on Industry Studies

◊ Faster return on
  investment




◊ Project Success
      – Industry Average:                            33% success rate
      – Agile project:                               75% success rate

Sources:
Business Value of Agile Metrics, Dr. David Rico (2009)     Standish Group Study, Jim Johnson (2002)
Rolling out Agile in a Large Enterprise, Gabrielle         Software By Numbers, Mark Denne and Jane Cleland-Huang
Benefield (2008)                                           (2003)
Agile Development in the Enterprise, Dr. Jeff Sutherland   Why Incremental Development Is Better, John Scumniotales
(2009)                                                     (2009)
User Stories Applied, Mike Cohn (2004)                     The State of Agile Development, VersionOne (2008)
Agile & PMI
• PMI Agile Community of Practice
      http://agile.vc.pmi.org/Public/Home.aspx

• PMI Agile Certified Practitioner (PMI-ACP)
      http://www.pmi.org/en/Certification/New-PMI-Agile-Certification.aspx

"Good practice means there is general agreement that the application of
project management processes has been shown to enhance the chances of
success over a wide range of projects ..."

"...Good practice does not mean that the knowledge, skills and processes
described should always be applied uniformly on all projects. For any given
project, the project manager, in collaboration with the project team, is
always responsible for determining which processes are appropriate, and
the appropriate degree of rigor for each process.“
                                  - PMBOK 4th Edition Chapter 1 – 1.1



                                                                              20
Agile & PMBOK




from Sliger, PMI Global Congress 2008 North America
                                                      21
Agile & CMMI

“…Scrum has a significant, palpable positive effect on
project governance and product quality…..”

“…The inherent benefit of using Scrum is its ability to
incorporate new practices and show results quickly….”
     - Excella Client, SEI CMMI current state analysis report




                                                                22
Agile & CMMI
           CMMI Level 2                                     CMMI Level 3
                                                             Requirements Development
           Requirements Management
                                                                 Technical Solution
                 Project Planning                               Product Integration

                                                                    Verification
          Project Monitoring and Control
                                                                     Validation

         Supplier Agreement Management                      Organizational Process Focus

                                                       Organizational Process Definition
            Measurement and Analysis
                                                               Organizational Training

           Process and Product Quality                  Integrated Project Management
                   Assurance
                                                                 Risk Management
            Configuration Management                    Decision Analysis and Resolution

 Agile Project Management with Scrum, Ken Schwaber (2004)                                  23
Federal CIO 25 Point Plan

   “Modular development delivers functionality in
 shorter timeframes and has long been considered
best practice in the private sector and in some areas
 of government; in fact, both Raines Rules and the
  Federal Acquisition Regulation (FAR) advise
    agencies to plan programs in this way ……

 Evidence shows that modular development leads
to increased success and reduced risk . However,
    because this is a new way of thinking about IT
   programs for some groups within government, it
  requires additional training, templates, and tools.”
  http://www.cio.gov/documents/25-Point-Implementation-Plan-to-Reform-Federal%20IT.pdf   24
DoD CIO’s 10-Pt Plan for IT Modernization




                                            25
Agile & Government

Federal CIO 25 Point Plan
   http://www.cio.gov/documents/25-Point-Implementation-Plan-to-
   Reform-Federal%20IT.pdf

DoD CIO’s 10-Point Plan for IT Modernization
   http://dodcio.defense.gov/Portals/0/Documents/ITMod/CIO_10_P
   oint_Plan_for_IT_Modernization.pdf

Agile Defense Adoption Proponents Team (ADAPT)
   http://www.afei.org/WORKINGGROUPS/ADAPT/

DoD CIO Agile Handbook
   TBD
                                                               26
DoD Resources
   Lockheed               F-35 Lightning                                                        F-22 Raptor
 (Zwicker 2007)
    MITRE                 National Senior Leadership Decision Support                           DCGS – Marine Corps (DCGS-MC)
(Northern 2010)           Svc                                                                   DCGS – Intelligence Backbone (DIB)
                          Joint Space Operations Center Mission System                          DCGS – Intelligence Community (DCGS-IC)
                          Joint Communications Support Element                                  Joint Operational Planning & Execution
                          Air and Space Operations Center (ASOC)                                System (JOPES)
                          Global Command and Control System (GCCS)
      SEI                 Joint Mission Planning System (JMPS)                                  Virtual Mission Operations Center (VMOC)
 (Lapham 2010)            Single Integrated Air Picture (SIAP)                                  FIST Applications
                          Operationally Responsive Space (ORS)                                  Warfighter’s Edge (WEdge)

     NRC                  Force XXI Battle Command Brigade and Below                            Command Post of the Future (CPOF)
(Campbell 2010)           Blue Force Tracker (BFT)                                              Tactical Ground Reporting System (TIGR)
                          Joint Network Node (JNN)
     DISA                 Forge.Mil                                                             Storefront Widget Framework (SWF)
(Risacher 2010)
 USTRANSCOM               Corporate Services Vision (CSV)                                       Agile Transportation XXI (AT21)
 (Kinney 2010)
Zwicker, M. (2007). War stories: Fighter jets and agile development at lockheed martin. Orange Park, FL: Agile Journal.
Northern, C. et al. (2010). Handbook for implementing agile in DoD information technology acquisition. McLean, VA: MITRE.
Lapham, M. A. et al. (2010). Considerations for using agile in DoD acquisition (CMU/SEI-2010-TN-002). Pittsburgh, PA: SEI.
Campbell, W. H. (2010). Achieving effective acquisition of information technology in the department of defense . Washington, DC: NRC.
Risacher, D. (2010). ASD(NII)/DoD CIO storefront agile open source. DoD Agile Development Conference, Alexandria, VA, USA.
Kinney, R. (2010). Corporate services vision and agile transport 21. DoD Agile Development Conference, Alexandria, VA, USA.             27
Book Resources
Agile Project Management with      Agile Project Management:
Scrum                              Creating Innovative Products
Ken Schwaber                       Jim Highsmith
ISBN #073561993X                   ISBN #0321658396

Agile Estimating and Planning      The Art of Agile Development
Mike Cohn                          James Shore
ISBN #0131479415                   ISBN #0596527675

The Software Project Manager’s
Bridge to Agility
Michele Sliger, Stacia Broderick
ISBN #0321502752


                                                                  28
Upcoming Events in the DC area

◊ 10/23 – AgileDC Conference – http://agiledc.org/
◊ 11/5 – Inter-Agency Agile Event (Baltimore) - TBD
◊ 11/19 – 11/20 – Certified Scrum Product Owner Training
  featuring Innovation Games - http://dc-cspo-training-
  eorg.eventbrite.com/
◊ 11/28 – ADAPT Agile Government Conference -
  http://afei.org/WorkingGroups/ADAPT/Pages/default.aspx
◊ 12/7 - DC Agile Engineering Conference and Global Day of
  Code Retreat - http://dc-agile-engineering-conference-
  eorg.eventbrite.com/
◊ 12/17 – 12/18 – Certified ScrumMaster training - http://dc-
  certified-scrummaster-training.eventbrite.com/

                                                                29
Tuckman’s Stages of Group Development




                                               4. Performing
                                  3. Norming


                    2. Storming



       1. Forming
Dedicated Scrum Teams

     Work flows into the teams     Dedicated Scrum Teams

                                   • Managing work instead of managing
                                     people

                                   • Dedicated teams provide known rate
                                     of work (capacity)

                                   • Team ramp-up costs only absorbed
                                     once
 Team 1      Team 2       Team 3   • Builds cross functionality

                                   • All work is prioritized at the team
                                     level, meaning team members only
                                     being directed by one person
Functional and Project Team

                                             Project Verticals
                                             • Project team verticals are where
                            System Analyst     team members live day to day
                                             • Work is driven by the project
                                               teams
                            Developers
                                             • This is where the company
                                               accomplishes its goals

                            Testers          Functional Horizontals
                                             • Functional horizontals are
                                               designed to help employees grow
                                               their skillsets
                            PMO
                                             • Share best practices and ideas
                                             • Functional horizontals support
                                               employees and the project
 Team 1   Team 2   Team 3                      verticals
Agile and EVM
EVM is   not inherently anti-Agile, issues are with implementations of EVM
    –     Phase based on a waterfall SDLC
    –     Not being able to change line items
    –     Measurement of value

  Req
            Design                 From this to                Requirements           Development
                     Dev           this…
                              QA                                                         Development
                                   Release


               EVM Timeline                                                EVM Timeline

                                                   Sprint 1
                                                                            To this….
                                                              Sprint 2
                                                                           Sprint 3
                                                                                         …
                                                                                                Sprint N

                                                                         EVM Timeline
Metrics for Business Initiatives

First Quarter Initiatives
Effort Area                 Story Points   Percentage


Foundational                78             22%


Maintenance                 9              3%


Optimization                168            48%


New Product                 98             28%
Metrics for Business Value

Features    Story Points   Business Points   Comment

Feature 1   40             8                 High effort, mid
                                             value

Feature 2   20             13                High effort, good
                                             value



Feature 3   4              8                 Low effort, mid
                                             value

Feature 4   13             40                Mid effort, high
                                             value

Feature 5   5              20                Low effort, high
                                             value
Metrics for the Project

Project Burn Down / Burn Up Chart
Metrics for the Sprint
Metrics for Team Performance
Metrics for Team Performance
Metrics for Team Performance

For a Scrum team, key goals include:
  1. Achieving a high completion percentage
     (actual velocity / projected velocity)
  2. Stabilizing velocity
  3. Increasing velocity (after 1 and 2)
Cumulative Flow Diagram
Upcoming Classes
◊ 3/14 – 3/15 - Agile Engineering Practices Training
   – http://dc-agile-engineering.eventbrite.com

◊ 4/16 – 4/17 - Train the Trainers - Sharon Bowman's Training
  from the Back of the Room!
   – http://training-back-of-room-sharon-bowman.eventbrite.com

◊ 4/18 – 4/19 - Agile Testing Training
   – http://dc-agile-testing.eventbrite.com

◊ 4/22 – 4/23: Advanced Certified Scrum Product Owner (CSPO)
  Training
   – http://certified-scrum-product-owner-cspo-washington-dc.eventbrite.com/

◊ 4/25 – 4/26: Advanced Certified Scrum Product Owner (CSPO)
  Training
   – http://certified-scrum-product-owner-cspo-washington-dc.eventbrite.com/
Contact Information

Richard K Cheng
richard.cheng@excella.com
703-967-8620
http://www.excella.com
Twitter: @RichardKCheng




                            45

Introduction to Agile

  • 2.
    Richard Cheng ◊ Agile trainer & coach ◊ Excella Agile Center of Excellence Lead ◊ Member of PMI, Scrum Alliance, Agile Alliance, Agile Leadership Network ◊ PMP, CSM, CSPO, CSP, PMI-ACP ◊ Founder & executive committee member of Agile Defense Adoption Proponents Team (ADAPT), an Agile DoD Task Force ◊ Deep expertise in Federal and commercial Agile transformations 2
  • 3.
    “Traditional” IT ProjectManagement ◊ Process and tools ◊ Comprehensive documentation ◊ Contract negotiations ◊ Following a plan This is how we control projects…. 3
  • 4.
    Waterfall Development Requirements Design Develop Test Deploy 4
  • 5.
    Industry Success Rate IT Industry average success rate? Success rate ~ __% 33% From 2010 report from The Standish Group 5
  • 6.
    Problems with Waterfall Requirements What happens if something goes wrong? Design Develop “I believe in this concept, Test but the implementation described above is risky and invites failure” – Dr. Winston Royce Deploy Managing the Development of Large Software Systems, Winston Royce (1970) 6
  • 7.
    “Traditional” IT ProjectManagement ◊ Process and tools ◊ Comprehensive documentation ◊ Contract negotiations ◊ Following a plan Designed to minimize risk and control change 7
  • 8.
    Agile Manifesto We areuncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value: Individuals and interactions over Process and tools Working software over Comprehensive documentation Customer collaboration over Contract negotiation Responding to change over Following a plan That is, while there is value in the items on the right, we value the items on the left more. http://agilemanifesto.org/ 8
  • 9.
    1. Our highestpriority is to satisfy the customer through early and continuous delivery of valuable software. 2. Welcome changing requirements, even late in development. Agile processes harness change for the customer's competitive advantage. 3. Deliver working software frequently, from a couple of weeks to a couple of months, with a preference to the shorter timescale. 4. Business people and developers must work together daily throughout the project. 5. Build projects around motivated individuals. Give them the environment and support they need, and trust them to get the job done. 6. The most efficient and effective method of conveying information to and within a development team is face-to-face conversation. 7. Working software is the primary measure of progress. Agile processes promote sustainable development. 8. The sponsors, developers, and users should be able to maintain a constant pace indefinitely. 9. Continuous attention to technical excellence and good design enhances agility. 10. Simplicity--the art of maximizing the amount of work not done--is essential. 11. The best architectures, requirements, and designs emerge from self-organizing teams. 12. At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly. 9
  • 10.
    Agile Principles (paraphrased) 1.Satisfy the customer 7. Working software is the through early and primary measure of continuous delivery progress 2. Welcome changing 8. Sustainable constant requirements pace 3. Deliver frequently, 9. Technical excellence and preferring a shorter good design enhances timescale agility 4. Business & technical team 10. Simplicity; maximizing the working together daily amount of work not done 5. Pick the right team, 11. Best results emerge from support them & trust them self organizing teams 6. Face-to-Face 12. Regularly reflect & adjust communication to become more effective 10
  • 11.
    Agile Methodologies Agile Scrum – Iterative method used by most teams XP – The software engineering practices Kanban – Often used in operations Lean – Concepts used for organizational Agile 11
  • 12.
    Scrum Overview Project developmentis performed in 2 to 4 week iterations Product Owner creates a prioritized backlog of features Highest priority features delivered first At the end of the iteration, the deliverables are reviewed by the business customers The team reflects on the process This is repeated until the project is completed * Diagram from Mountain Goat Software 12
  • 13.
    Advantages of Scrum ◊Adaptability (Scrum) over Predictability (Waterfall) – Waterfall makes it expensive to make changes to the project – Scrum development minimizes the cost of change ◊ Showing tangible results throughout the project ◊ Continuous Improvement ◊ Shorter feedback loop ◊ Identify and resolve problems faster ◊ Lessons learned and applied during each iteration instead of at the end of the project ◊ High assurance of product vision due to continual inspection by business representatives 13
  • 14.
  • 15.
    Scrum Framework * Diagramfrom Scrum Primer From the Scrum Primer 15
  • 16.
  • 17.
    Metrics based onIndustry Studies Waterfall Agile Agile Productivity Person Months 540 54 – Productivity increase Lines of Code 58,000 51,000 34% to 200% – 3x to 6x greater Function Points (FP) 900 959 productivity gain on FP per Developer Month 1.7 17.8 coached teams over non- coached
  • 18.
    Metrics based onIndustry Studies Feature Usage in Software – 20% of features always or often used Often – 60% of features never or 13% rarely used Some- Never times 45% 16% Always 7% Rarely 19%
  • 19.
    Metrics based onIndustry Studies ◊ Faster return on investment ◊ Project Success – Industry Average: 33% success rate – Agile project: 75% success rate Sources: Business Value of Agile Metrics, Dr. David Rico (2009) Standish Group Study, Jim Johnson (2002) Rolling out Agile in a Large Enterprise, Gabrielle Software By Numbers, Mark Denne and Jane Cleland-Huang Benefield (2008) (2003) Agile Development in the Enterprise, Dr. Jeff Sutherland Why Incremental Development Is Better, John Scumniotales (2009) (2009) User Stories Applied, Mike Cohn (2004) The State of Agile Development, VersionOne (2008)
  • 20.
    Agile & PMI •PMI Agile Community of Practice http://agile.vc.pmi.org/Public/Home.aspx • PMI Agile Certified Practitioner (PMI-ACP) http://www.pmi.org/en/Certification/New-PMI-Agile-Certification.aspx "Good practice means there is general agreement that the application of project management processes has been shown to enhance the chances of success over a wide range of projects ..." "...Good practice does not mean that the knowledge, skills and processes described should always be applied uniformly on all projects. For any given project, the project manager, in collaboration with the project team, is always responsible for determining which processes are appropriate, and the appropriate degree of rigor for each process.“ - PMBOK 4th Edition Chapter 1 – 1.1 20
  • 21.
    Agile & PMBOK fromSliger, PMI Global Congress 2008 North America 21
  • 22.
    Agile & CMMI “…Scrumhas a significant, palpable positive effect on project governance and product quality…..” “…The inherent benefit of using Scrum is its ability to incorporate new practices and show results quickly….” - Excella Client, SEI CMMI current state analysis report 22
  • 23.
    Agile & CMMI CMMI Level 2 CMMI Level 3 Requirements Development Requirements Management Technical Solution Project Planning Product Integration Verification Project Monitoring and Control Validation Supplier Agreement Management Organizational Process Focus Organizational Process Definition Measurement and Analysis Organizational Training Process and Product Quality Integrated Project Management Assurance Risk Management Configuration Management Decision Analysis and Resolution Agile Project Management with Scrum, Ken Schwaber (2004) 23
  • 24.
    Federal CIO 25Point Plan “Modular development delivers functionality in shorter timeframes and has long been considered best practice in the private sector and in some areas of government; in fact, both Raines Rules and the Federal Acquisition Regulation (FAR) advise agencies to plan programs in this way …… Evidence shows that modular development leads to increased success and reduced risk . However, because this is a new way of thinking about IT programs for some groups within government, it requires additional training, templates, and tools.” http://www.cio.gov/documents/25-Point-Implementation-Plan-to-Reform-Federal%20IT.pdf 24
  • 25.
    DoD CIO’s 10-PtPlan for IT Modernization 25
  • 26.
    Agile & Government FederalCIO 25 Point Plan http://www.cio.gov/documents/25-Point-Implementation-Plan-to- Reform-Federal%20IT.pdf DoD CIO’s 10-Point Plan for IT Modernization http://dodcio.defense.gov/Portals/0/Documents/ITMod/CIO_10_P oint_Plan_for_IT_Modernization.pdf Agile Defense Adoption Proponents Team (ADAPT) http://www.afei.org/WORKINGGROUPS/ADAPT/ DoD CIO Agile Handbook TBD 26
  • 27.
    DoD Resources Lockheed F-35 Lightning F-22 Raptor (Zwicker 2007) MITRE National Senior Leadership Decision Support DCGS – Marine Corps (DCGS-MC) (Northern 2010) Svc DCGS – Intelligence Backbone (DIB) Joint Space Operations Center Mission System DCGS – Intelligence Community (DCGS-IC) Joint Communications Support Element Joint Operational Planning & Execution Air and Space Operations Center (ASOC) System (JOPES) Global Command and Control System (GCCS) SEI Joint Mission Planning System (JMPS) Virtual Mission Operations Center (VMOC) (Lapham 2010) Single Integrated Air Picture (SIAP) FIST Applications Operationally Responsive Space (ORS) Warfighter’s Edge (WEdge) NRC Force XXI Battle Command Brigade and Below Command Post of the Future (CPOF) (Campbell 2010) Blue Force Tracker (BFT) Tactical Ground Reporting System (TIGR) Joint Network Node (JNN) DISA Forge.Mil Storefront Widget Framework (SWF) (Risacher 2010) USTRANSCOM Corporate Services Vision (CSV) Agile Transportation XXI (AT21) (Kinney 2010) Zwicker, M. (2007). War stories: Fighter jets and agile development at lockheed martin. Orange Park, FL: Agile Journal. Northern, C. et al. (2010). Handbook for implementing agile in DoD information technology acquisition. McLean, VA: MITRE. Lapham, M. A. et al. (2010). Considerations for using agile in DoD acquisition (CMU/SEI-2010-TN-002). Pittsburgh, PA: SEI. Campbell, W. H. (2010). Achieving effective acquisition of information technology in the department of defense . Washington, DC: NRC. Risacher, D. (2010). ASD(NII)/DoD CIO storefront agile open source. DoD Agile Development Conference, Alexandria, VA, USA. Kinney, R. (2010). Corporate services vision and agile transport 21. DoD Agile Development Conference, Alexandria, VA, USA. 27
  • 28.
    Book Resources Agile ProjectManagement with Agile Project Management: Scrum Creating Innovative Products Ken Schwaber Jim Highsmith ISBN #073561993X ISBN #0321658396 Agile Estimating and Planning The Art of Agile Development Mike Cohn James Shore ISBN #0131479415 ISBN #0596527675 The Software Project Manager’s Bridge to Agility Michele Sliger, Stacia Broderick ISBN #0321502752 28
  • 29.
    Upcoming Events inthe DC area ◊ 10/23 – AgileDC Conference – http://agiledc.org/ ◊ 11/5 – Inter-Agency Agile Event (Baltimore) - TBD ◊ 11/19 – 11/20 – Certified Scrum Product Owner Training featuring Innovation Games - http://dc-cspo-training- eorg.eventbrite.com/ ◊ 11/28 – ADAPT Agile Government Conference - http://afei.org/WorkingGroups/ADAPT/Pages/default.aspx ◊ 12/7 - DC Agile Engineering Conference and Global Day of Code Retreat - http://dc-agile-engineering-conference- eorg.eventbrite.com/ ◊ 12/17 – 12/18 – Certified ScrumMaster training - http://dc- certified-scrummaster-training.eventbrite.com/ 29
  • 30.
    Tuckman’s Stages ofGroup Development 4. Performing 3. Norming 2. Storming 1. Forming
  • 31.
    Dedicated Scrum Teams Work flows into the teams Dedicated Scrum Teams • Managing work instead of managing people • Dedicated teams provide known rate of work (capacity) • Team ramp-up costs only absorbed once Team 1 Team 2 Team 3 • Builds cross functionality • All work is prioritized at the team level, meaning team members only being directed by one person
  • 32.
    Functional and ProjectTeam Project Verticals • Project team verticals are where System Analyst team members live day to day • Work is driven by the project teams Developers • This is where the company accomplishes its goals Testers Functional Horizontals • Functional horizontals are designed to help employees grow their skillsets PMO • Share best practices and ideas • Functional horizontals support employees and the project Team 1 Team 2 Team 3 verticals
  • 33.
    Agile and EVM EVMis not inherently anti-Agile, issues are with implementations of EVM – Phase based on a waterfall SDLC – Not being able to change line items – Measurement of value Req Design From this to Requirements Development Dev this… QA Development Release EVM Timeline EVM Timeline Sprint 1 To this…. Sprint 2 Sprint 3 … Sprint N EVM Timeline
  • 35.
    Metrics for BusinessInitiatives First Quarter Initiatives Effort Area Story Points Percentage Foundational 78 22% Maintenance 9 3% Optimization 168 48% New Product 98 28%
  • 36.
    Metrics for BusinessValue Features Story Points Business Points Comment Feature 1 40 8 High effort, mid value Feature 2 20 13 High effort, good value Feature 3 4 8 Low effort, mid value Feature 4 13 40 Mid effort, high value Feature 5 5 20 Low effort, high value
  • 37.
    Metrics for theProject Project Burn Down / Burn Up Chart
  • 38.
  • 39.
    Metrics for TeamPerformance
  • 40.
    Metrics for TeamPerformance
  • 41.
    Metrics for TeamPerformance For a Scrum team, key goals include: 1. Achieving a high completion percentage (actual velocity / projected velocity) 2. Stabilizing velocity 3. Increasing velocity (after 1 and 2)
  • 42.
  • 44.
    Upcoming Classes ◊ 3/14– 3/15 - Agile Engineering Practices Training – http://dc-agile-engineering.eventbrite.com ◊ 4/16 – 4/17 - Train the Trainers - Sharon Bowman's Training from the Back of the Room! – http://training-back-of-room-sharon-bowman.eventbrite.com ◊ 4/18 – 4/19 - Agile Testing Training – http://dc-agile-testing.eventbrite.com ◊ 4/22 – 4/23: Advanced Certified Scrum Product Owner (CSPO) Training – http://certified-scrum-product-owner-cspo-washington-dc.eventbrite.com/ ◊ 4/25 – 4/26: Advanced Certified Scrum Product Owner (CSPO) Training – http://certified-scrum-product-owner-cspo-washington-dc.eventbrite.com/
  • 45.
    Contact Information Richard KCheng richard.cheng@excella.com 703-967-8620 http://www.excella.com Twitter: @RichardKCheng 45

Editor's Notes

  • #3 This is what we do today
  • #4 Everyone standup>90% sit>80% 50% 30% 20% 10%Stand up on your handsIf I’m a basket ball player, this is a good stat
  • #5 Download paper from wikipedia. Easy readyIterate through it and get your feedback from customer
  • #6 Story of Agile Manifesto:
  • #10 Note the highlights about delivery, this puts the business in control
  • #22 This research provided by Michelle Sliger demonstrates how traditional Project Management Body of Knowledge based practices and Agile based practices map back to project management areas.
  • #24 A responsible Scrum implementation provides solid base for CMMI level 2 and level 3 ratings. CMMI level 4 and level 5 speak more to organizational models and Excella can work with AAMVA to create an Agile organizational process that can provide a foundation for higher level CMMI ratings.Arguments can be made against the N/As. The N/A in SAM can be addressed via the Agile principle. The organizational stuff can also be addressed.The next version of CMMI 1.3 will have more Agile examples built in
  • #25 Kundra 25 point planDOD CIO 10 point planDOD CIO Agile HandbookJITC
  • #26 Kundra 25 point planDOD CIO 10 point planDOD CIO Agile HandbookJITCRico’s tableJITCDOD CIO handbookADAPT
  • #28 Shift of focus results in loss of productivityInstead on managing people we want to manage work through teams
  • #29 Cross functional teams. Move from specialists to generalistsCoE makes us better
  • #30 Shows similarity between Agile Projects and how BPA/IDIQ contracts are structuredWhat are the issues with Agile and EVM?EVM on monthly cycle. Problem with baseline and how you earn value?
  • #36 Identify where the effort was spent
  • #38 displays the Project Burn Up and Project Burn Down chart for the same project. The Burn Up line displays the story points completed. The Burn Down line displays story points remaining. For organizations that are familiar with EVM type tracking, these Burn Up and Burn Down values can often be translated to EVM measures.Warning on burn down charts, does not give you whole picture
  • #39 The Iteration Burn Up and Iteration Burn Down chart is similar to the Project Burn Up and Project Burn Down charts, but the iteration chart tracks the work at an iteration level. We are tracking the iteration based on hours completed and hours remaining. We can see that at the end of the iteration, there was 94 hours work of work that was not completed.
  • #40 Good for on-going teams without start and end
  • #41 Good for on-going teams without start and end