Advanced AdvaPlank - Plank PVC Ceiling                                                                                                                 Installation and Fitting



        Hollow space feature prevents condensation and provides                                                  Planks are manufactured from ‘FOOD SAFE’ PVC and
        good insulation properties.                                                                              have a Class 1 fire rating.




        The specially designed jointing system ensures the best                                                  A complimentary range of PVC fixing accessories allow
        possible seal between each plank and allows for thorough                                                 fast, easy installation with minimal loss of valuable
        and regular cleaning.                                                                                    production time.



  Six easy to work components

  •    Enhances appearance of production
       areas as well as increasing
       hygiene levels
  •    Satisfies all current food safety                                                       PVC Plank                                           Batten                                Edge Trim
                                                                                 5m length x 200mm width                                         3m length                               3m length
       legislation
  •    Temperature range -300c to +800c
  •    Available in White, Beige and Cream

                                                                                                  Division Bar                             Outside Corner                            Inside Corner
                                                                                                    3m length                                   3m length                                3m length



  Four simple procedures to install

1 A framework of PVC battens must first be fastened to the existing ceiling                                                                          A
  or suspended from purlins at 40-60cm intervals. Battens must also be run                                                                                        Batten
  around the perimeter of the ceiling area. NB Battens must run at right
  angles to the desired direction of your ceiling planks.                                                                                                         Tacker / Fixing Edge
                                                                                                                                                     B
2 Using 12mm - 14mm stainless steel staples, fix the edge trim around the                                                                                                   Edge Trim
  perimeter batten as close as possible to the walls. Calculate the length
  of plank required by measuring from edge trim on wall (A) to edge trim
  on wall (B).
3 Deduct 2cm from this length and cut your plank to this size. Insert plank
  with the tongue into edge trim and push into position. Now staple plank
  into place at each batten by fastening through the planks fixing edge.                                                                 Plank
                                                                                                                                                                  1. Fixing the final plank
4 Once the first plank is in place, simply push the remaining planks into
  the groove of the preceeding plank and staple into position as before.
  Before installing final plank, ensure you trim the plank to the desired
  width, then work into the edge trim with a pallet knife.
                                                                                                                                                                 3. Work final plank back
                                                                                                                        2. Cut final plank to desired            to firmly locate in edge of
                                                                                                                        width and push into edge trim            preceeding plank.



  Advanced Hygienic Contracting reserve the right to change any product specification, design or description without prior notice.
  No responsibility or liability can be accepted for any loss or damage arising from any error or omission contained in this document.




  T 0330 100 0313 F 0330 100 0314 advanced@cladding.co.uk www.cladding.co.uk
  Advanced Hygienic Contracting Ltd, Unit A1, Greengate, Cardale Park, Harrogate HG3 1GY                                                                 Registered in England No. 3046845 VAT No. 664810624

Advanced pvc ceilings(1)

  • 1.
    Advanced AdvaPlank -Plank PVC Ceiling Installation and Fitting Hollow space feature prevents condensation and provides Planks are manufactured from ‘FOOD SAFE’ PVC and good insulation properties. have a Class 1 fire rating. The specially designed jointing system ensures the best A complimentary range of PVC fixing accessories allow possible seal between each plank and allows for thorough fast, easy installation with minimal loss of valuable and regular cleaning. production time. Six easy to work components • Enhances appearance of production areas as well as increasing hygiene levels • Satisfies all current food safety PVC Plank Batten Edge Trim 5m length x 200mm width 3m length 3m length legislation • Temperature range -300c to +800c • Available in White, Beige and Cream Division Bar Outside Corner Inside Corner 3m length 3m length 3m length Four simple procedures to install 1 A framework of PVC battens must first be fastened to the existing ceiling A or suspended from purlins at 40-60cm intervals. Battens must also be run Batten around the perimeter of the ceiling area. NB Battens must run at right angles to the desired direction of your ceiling planks. Tacker / Fixing Edge B 2 Using 12mm - 14mm stainless steel staples, fix the edge trim around the Edge Trim perimeter batten as close as possible to the walls. Calculate the length of plank required by measuring from edge trim on wall (A) to edge trim on wall (B). 3 Deduct 2cm from this length and cut your plank to this size. Insert plank with the tongue into edge trim and push into position. Now staple plank into place at each batten by fastening through the planks fixing edge. Plank 1. Fixing the final plank 4 Once the first plank is in place, simply push the remaining planks into the groove of the preceeding plank and staple into position as before. Before installing final plank, ensure you trim the plank to the desired width, then work into the edge trim with a pallet knife. 3. Work final plank back 2. Cut final plank to desired to firmly locate in edge of width and push into edge trim preceeding plank. Advanced Hygienic Contracting reserve the right to change any product specification, design or description without prior notice. No responsibility or liability can be accepted for any loss or damage arising from any error or omission contained in this document. T 0330 100 0313 F 0330 100 0314 advanced@cladding.co.uk www.cladding.co.uk Advanced Hygienic Contracting Ltd, Unit A1, Greengate, Cardale Park, Harrogate HG3 1GY Registered in England No. 3046845 VAT No. 664810624