R O O F C U R B I N S TA L L AT I O N I N S T R U C T I O N S :
                                            R - PA N E L S




p: (800) 284-1412   f: (903) 759-3598   w: www.lmcurbs.com   address: 827 fisher rd longview, tx 75604
ROOF CURB
                                                                                   INSTALLATION INSTRUCTIONS
                                                                                                     R-PANEL

Installation Check List:
  _____Attach Sub-frame(s)                                                                                              Step 1
  _____Layout Curb(s) on Roof Panel                                                                                     Step 2
  _____Mount Back-up Channels                                                                                           Step 3
  _____Apply Sealants & Set Curb in Place                                                                               Step 4
  _____Fasten Curb to Back-up Channels                                                                                  Step 5


                                                                PARTS LIST
                             Flat Washer                                           Polyurethane Sealant Caulk


                             Nut
                                                                                   14 Gauge Galvinized Steel Subframe
                                                                                   5-1/2” tall
                             3/8” x 1” bolts                                       Length is equal to the purlin spacing minus
                                                                                   1-3/8”
                             #14 - 1 1/8” Neoprene
                                Self-Tap Screw

                                                                                   Back-up Channel
                             Triple Bead Sealant Tape




                                        BEGIN INSTALLATION
     1 ATTACH SUB-FRAMES
    Attach sub-frames to purlins (see drawing 1.1 and 1.2). Finger
    tighten all hardware, then upset threads to secure nuts. Attach
    sub-frames using the nuts, bolts, and washers.
                                                                       Sub-frame
                    Washer
                                                          Nut
                   Bolt




                                                                                                          Drawing 1.2


                                                Roof Purlin
         Drawing 1.1

                                                                                     *NOTICE* Sub-frame max. loading 500 lbs.

     WARNING!                                                                                                              Page 1
ALWAYS USE FALL PROTECTION WHILE
WORKING AROUND ROOF OPENINGS.
ROOF CURB
                                                                                                                                 INSTALLATION INSTRUCTIONS
                                                                                                                                                   R-PANEL
                                                                                                                                                                Cut Line will be 2 1/2”
     2 LAYOUT CURB ON ROOF PANEL                                                                                                                                less than outer edge of
    Mark base ange locations and throat area cut lines by setting roof                                                                                          upslope/downslope
                                                                                                                                                                curb base ange.
    curb in place on roof panel (DO NOT USE LEAD PENCIL).
    Upslope/downslope cut lines will be 2 1/2” less than outer edge of
    base ange.


    Note #1: For uninsulated curb(s), throat opeing is actual I.D. of curb.
    For insulated curb(s), use actual I.D. and add 1 3/4” to each side.

                                                                                                                                                                     Drawing 2.1
                                                                Top View                                         Roof Panel

                                                                                                                                                                         Throat Opening
                                                                                              Remove Insulation leaving insulation facing                                (see note #1)
Roof Opening
                                                                                              in place. Cut insulation facing diago-
                                                                                              nally   and    tuck    sections
                                                                                              under roof panels to
      Insulation
                                                                                              trim roof openings.             Cu
                                                                                                                                 rb
                                                                                                                                      Ba
                                                                                                                                           se
                                                                                                                                              Fla                                           n   ge
                                                                                                                                                  ng                                    Fla
                                                               Drawing 2.2                                                                          e                           B   ase
                                                                                                                                                                           rb
                                                                                                                                                                         Cu
                                                                                                                                Drawing 2.3
*Notice* Sub-frames and back-up channels not shown in the above picture.

                                                                                                                                                            Roof Panel
     3 MOUNT BACK-UP CHANNELS
    Center back-up channels with the center roof opening(s). Cut slots                                                                                           Back-up Channels (under
                                                                                                                                                                 roof panels)
    in back-up channels to slide over sub-frame(s) (see drawing 4.1).


    Back-up channels are not be screwed to sub-frame or
    purlin. Slide back-up channels underneath roof
    panel (see drawing 4.2). Back-up channels are to be
      ush with roof opening as showing in drawing 4.2.



                                                                                Roof Purlin

       6”


                                                                                              Fold cut tabs up 90 degrees                     DRAWING 4.2
                    11
                          / 2”             BA                                                  underneath the back-up
                                             CK
                                                  -UP
            OU                   CE                     CH
               T   SID
                      E
                                   NT
                                      ER            NE
                                                      L
                                                          AN                                   channels as shown.
                          DIM       OF
                             EN         SU
                               SIO         B-F
                                  NO           RA
                                     FB          ME
                                        AC
                                           K-U
                                               PC
                                                  HA
                                                     NN
                                                        ELL

                                                                           1”
                                 DRAWING 4.1
                                                                                                                                                                         DRAWING 4.3
                                                                                *NOTICE* DO NOT SCREW BACK-UP CHANNELS TO SUB-FRAMES!


     WARNING!                                                                                                                                                                                    Page 2
ALWAYS USE FALL PROTECTION WHILE
WORKING AROUND ROOF OPENINGS.
ROOF CURB
                                                                                            INSTALLATION INSTRUCTIONS
                                                                                                              R-PANEL
                                                                              The upslode highs are to be installed
     4 APPLY SEALANTS & SET CURB IN PLACE
                                                                              UNDER the roof panel.
    Apply a strip of sealant tape on the upslope side of the roof curb(s)
    and on downslope side of the roof panel before setting roof
    curb(s) in place (see drawing 4.1).

                                                                                     Roof Curb




                                                             Roof Panel
    The downslope highs are to be installed

    OVER the roof panel.
                                                                                                                                         Caulk
                                                                                                                                      (apply as shown)




                                                                                                                            Sealant Tape


                                                                                                            Sealant tape on both
                                                                                                            sides of roof opening.
                                                                                         Drawing 4.1
*NOTICE* Sub-frames and back-up channels not shown in the above picture(s).

     5 FASTEN CURB TO BACK-UP CHANNELS

    Fasten curb(s) to back-up channels and roof panel using self-tap                                            Roof Panel
    screws (see drawing 5.2). DO NOT FASTEN CURB, ROOF PANEL, OR
    BACK-UP CHANNELS TO SUB-FRAMES.



                          Drawing 5.2




                                                                                                                                 Self Tap Screws




                                                                                          Drawing 5.1
Back-up Channels (under
roof panels)
*NOTICE* Sub-frames and back-up channels not shown in the above picture(s).


     WARNING!                                                                                                                                     Page 3
ALWAYS USE FALL PROTECTION WHILE
WORKING AROUND ROOF OPENINGS.
ROOF CURB
                                   INSTALLATION INSTRUCTIONS
                                                     R-PANEL
     COMPLETED INSTALLATION




     WARNING!                                            Page 4
ALWAYS USE FALL PROTECTION WHILE
WORKING AROUND ROOF OPENINGS.

LMCurbs Roof Curb Installation Instructions For R-Panel Metal Roof

  • 1.
    R O OF C U R B I N S TA L L AT I O N I N S T R U C T I O N S : R - PA N E L S p: (800) 284-1412 f: (903) 759-3598 w: www.lmcurbs.com address: 827 fisher rd longview, tx 75604
  • 2.
    ROOF CURB INSTALLATION INSTRUCTIONS R-PANEL Installation Check List: _____Attach Sub-frame(s) Step 1 _____Layout Curb(s) on Roof Panel Step 2 _____Mount Back-up Channels Step 3 _____Apply Sealants & Set Curb in Place Step 4 _____Fasten Curb to Back-up Channels Step 5 PARTS LIST Flat Washer Polyurethane Sealant Caulk Nut 14 Gauge Galvinized Steel Subframe 5-1/2” tall 3/8” x 1” bolts Length is equal to the purlin spacing minus 1-3/8” #14 - 1 1/8” Neoprene Self-Tap Screw Back-up Channel Triple Bead Sealant Tape BEGIN INSTALLATION 1 ATTACH SUB-FRAMES Attach sub-frames to purlins (see drawing 1.1 and 1.2). Finger tighten all hardware, then upset threads to secure nuts. Attach sub-frames using the nuts, bolts, and washers. Sub-frame Washer Nut Bolt Drawing 1.2 Roof Purlin Drawing 1.1 *NOTICE* Sub-frame max. loading 500 lbs. WARNING! Page 1 ALWAYS USE FALL PROTECTION WHILE WORKING AROUND ROOF OPENINGS.
  • 3.
    ROOF CURB INSTALLATION INSTRUCTIONS R-PANEL Cut Line will be 2 1/2” 2 LAYOUT CURB ON ROOF PANEL less than outer edge of Mark base ange locations and throat area cut lines by setting roof upslope/downslope curb base ange. curb in place on roof panel (DO NOT USE LEAD PENCIL). Upslope/downslope cut lines will be 2 1/2” less than outer edge of base ange. Note #1: For uninsulated curb(s), throat opeing is actual I.D. of curb. For insulated curb(s), use actual I.D. and add 1 3/4” to each side. Drawing 2.1 Top View Roof Panel Throat Opening Remove Insulation leaving insulation facing (see note #1) Roof Opening in place. Cut insulation facing diago- nally and tuck sections under roof panels to Insulation trim roof openings. Cu rb Ba se Fla n ge ng Fla Drawing 2.2 e B ase rb Cu Drawing 2.3 *Notice* Sub-frames and back-up channels not shown in the above picture. Roof Panel 3 MOUNT BACK-UP CHANNELS Center back-up channels with the center roof opening(s). Cut slots Back-up Channels (under roof panels) in back-up channels to slide over sub-frame(s) (see drawing 4.1). Back-up channels are not be screwed to sub-frame or purlin. Slide back-up channels underneath roof panel (see drawing 4.2). Back-up channels are to be ush with roof opening as showing in drawing 4.2. Roof Purlin 6” Fold cut tabs up 90 degrees DRAWING 4.2 11 / 2” BA underneath the back-up CK -UP OU CE CH T SID E NT ER NE L AN channels as shown. DIM OF EN SU SIO B-F NO RA FB ME AC K-U PC HA NN ELL 1” DRAWING 4.1 DRAWING 4.3 *NOTICE* DO NOT SCREW BACK-UP CHANNELS TO SUB-FRAMES! WARNING! Page 2 ALWAYS USE FALL PROTECTION WHILE WORKING AROUND ROOF OPENINGS.
  • 4.
    ROOF CURB INSTALLATION INSTRUCTIONS R-PANEL The upslode highs are to be installed 4 APPLY SEALANTS & SET CURB IN PLACE UNDER the roof panel. Apply a strip of sealant tape on the upslope side of the roof curb(s) and on downslope side of the roof panel before setting roof curb(s) in place (see drawing 4.1). Roof Curb Roof Panel The downslope highs are to be installed OVER the roof panel. Caulk (apply as shown) Sealant Tape Sealant tape on both sides of roof opening. Drawing 4.1 *NOTICE* Sub-frames and back-up channels not shown in the above picture(s). 5 FASTEN CURB TO BACK-UP CHANNELS Fasten curb(s) to back-up channels and roof panel using self-tap Roof Panel screws (see drawing 5.2). DO NOT FASTEN CURB, ROOF PANEL, OR BACK-UP CHANNELS TO SUB-FRAMES. Drawing 5.2 Self Tap Screws Drawing 5.1 Back-up Channels (under roof panels) *NOTICE* Sub-frames and back-up channels not shown in the above picture(s). WARNING! Page 3 ALWAYS USE FALL PROTECTION WHILE WORKING AROUND ROOF OPENINGS.
  • 5.
    ROOF CURB INSTALLATION INSTRUCTIONS R-PANEL COMPLETED INSTALLATION WARNING! Page 4 ALWAYS USE FALL PROTECTION WHILE WORKING AROUND ROOF OPENINGS.