COST ACCOUNTING (ABC)
Definition
ABC is an approach to the costing and monitoring of
activities which involves tracing resource consumption
and costing final outputs. Resources are assigned to
activities, and activities to cost objects based on
consumption estimates. The latter utilize cost drivers to
attach activity costs to outputs.
CIMA (Chartered Institute of Management
Accountants)
5/14/20143
 Activity-Based Costing (ABC) arose in the 1980s from the
increasing lack of relevance of traditional cost accounting
methods.
 The traditional cost accounting methods were designed
around 1870 - 1920 and in those days industry was labor
intensive, there was no automation, the product variety was
small and the overhead costs in companies were generally
very low compared to today
 However, from the 1960s - particularly 1980s - this changed
rapidly and ABC emerge.
4Cost accounting Sir Abdul Razaq
ABC HIERARCHY
ACTIVITY BASE COST
UNIT-
LEVEL
COSTS
BATCH-
LEVEL
COSTS:
PRODUCT-
LEVEL
COSTS:
FACILITY-
LEVEL
COSTS:
ABC Hierarchy
Unit-level costs:
Unit level cost is the basic material cost if we need more production we have
to use more material and vise versa.
Batch-level costs:
Machine setup costs are often batch-level costs. The time required to prepare
a machine to run one batch of product is usually independent of the number
of units in the batch: the same time is required to prepare the machine to run a
batch of 100 units as a batch of 50 units
Product-level costs:
These costs are usually fixed and direct with respect to a given product
Facility-level costs:
These costs are usually fixed and direct with respect to the facility
6
TRADITIONAL V/S ACTIVITY BASE COSTING
7
*
ABC approach
1. Presence of case and effect
relationship between cost
allocation basis and indirect
pools
2. Rational basis of assigning
indirect costs to various
activities
3. Improved decision making such
as fixing selling price and
pinpointing the area where cost
reduction is possible
Traditional approach
1) Lack of cause and effect
relationship between cost
allocation basis and indirect
costs pool
2) Uses a few pools of indirect
costs resulting in over
costing or under costing of
products
3) Wrong pricing decisions
result in loss of market
share
Traditional V/S ABC
5/14/2014Footer Text 9
Particular With ABC Without ABC
Mfg. O/H cost assign to setups $200,000 $0
No of setups 400 N/A
Mfg. O/H cost per setup $500 $0
Total manufacturing O/H cost $2,000,000 $2,000,000
Less : cost trace to machine setups 200,000 0
Mfg. O/H cost allocated on M/H $1,800,000 $2,000,000
Machine hours 100,000 100,000
Mfg. O/h cost per M/H $18 $20
Mfg. o/H cost allocations $500 setup cost/batch
+$18 per M/H
$20 per M/H
Traditional V/S ABC
Particulars WITH ABC WITHOUT ABC
Mfg. o/h for setting up machine $500 $0
No of units batch 5000 N/A
Mfg. O/H caused by setup per unit $0.10 N/A
Mfg. O/H cost per machine hour $18 $20
No of units produced per machine hour 50 50
Mfg. O/H caused by production. Per unit $0.36 $0.40
Total Mfg. O/H Allocated. Per unit $0.46 $0.40
Particular ABC Without ABC
Mfg. O/H cost assigned to setup $200,000 $0
No of setup 400 N/A
Mfg. O/H cost per setup $500 $0
Mfg. O/H cost caused by procurement/handling $300,000 $0
Pound of material in products $3,000,000 N/A
Mfg. O/H per pound of product material $0.10 $0
Mfg. O/H cost by producing items:
Total mfg. O/H cost $2,000,000 $2,000,000
Less: cost trace to machine setup -200,000 0
Less: cost traced to procurement/handling -300,000 0
Mfg. O/H cost allocated per M/H $1500,000 $2,000,000
Machine hours (M/H) 100,000 100,000
Mfg. O/h cost allocated per M/H $15 $20
Mfg. O/H cost allocation $500 setup cost .batch
+$0.10lb.+ $15 per MH
$20 per M/H
Traditional V/S ABC
5/14/2014 Footer Text 12
Particular ABC(1) ABC(2) NOABC (3)
Mfg. O/H for setting up machine $500 $500 $0
No of units in batch 50,000 50,000 N/A
Mfg. O/H cost by setup units $0.01 $0.01 N/A
Mfg. O/H cost per lb. of product $0.10 $0.10 N/A
Lbs. of material in product 0.5 1.5 N/A
Mfg. O/H caused by weight per units $0.05 $0.15 N/A
Mfg. O/H cost per M/H $15 $15 $20
No of units produced per M/H 50 50 50
Mfg. O/H caused by production per units $0.30 $0.30 $0.40
Total O/H allocated per unit $0.36 $0.46 $0.40
Stages of ABC
Stage 1: Allocation to Activities
The first step in Activity-Based Costing is to divide the expenses of certain
overhead activities to a per-event cost.
Stage 2: Allocation to Production
The second step in activity-based costing is to allocate the activity cost to
each product.
ABC process
Cost pools
CHARACTERISTICS
 Activity based: The ABC system is based on activities. Activities
consist of different functions that are associated with cost objects.
 Activity cost center: This is also called cost pool—the overhead cost is
identified to an activity and assigned to each activity cost center.
 Use of cost drivers: The causes of occurrence of overheads are called
cost drivers. These are used to assign costs to products.
 Accumulation of overhead costs: Accumulation of overheads is done
on the basis of various activities. A single unit—the entire
organization—is not taken into account. No blanket rate is applied.
 Traceability: Overhead costs can be traced easily. Hence, cost data are
more reliable and accurate.
ABC

 Identifies Wasteful Products
 Improves Business Processes
 Activity-based costing provides a more accurate method of
product/service costing, leading to more accurate pricing
decisions
 Enables improved product and customer profitability
analysis
 It increases understanding of overheads and cost drivers;
and makes costly and non-value adding activities more
visible, allowing managers to reduce or eliminate them.
Advantages
Disadvantages
•Misinterpretation of Data
•Expensive Implementation
•Substantial resources
required to implement
and maintain.
•Does not conform to
GAAP. Two costing
systems may be needed
 http://classes.bus.oregonstate.edu/spring-
07/ba422/Management%20Accounting%20Chapter%2011.htm
 http://www.emblemsvag.com/abc.htm
Cost accounting
Presented to sir Abdul Razaq
Activity-Based Costing (ABC) explained

More Related Content

What's hot (20)

Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Job and batch costing
Job and batch costingJob and batch costing
Job and batch costing
 
Material in cost accounting
Material in cost accountingMaterial in cost accounting
Material in cost accounting
 
Cash Budget
Cash BudgetCash Budget
Cash Budget
 
Method of costing
Method of costingMethod of costing
Method of costing
 
Valuation of shares
Valuation of sharesValuation of shares
Valuation of shares
 
applications of marginal costing
applications of marginal costingapplications of marginal costing
applications of marginal costing
 
Accounts : Marginal Costing
Accounts : Marginal CostingAccounts : Marginal Costing
Accounts : Marginal Costing
 
Target,kizen costing and abc..
Target,kizen costing and abc..Target,kizen costing and abc..
Target,kizen costing and abc..
 
Methods and techniques of Costing
Methods and techniques of CostingMethods and techniques of Costing
Methods and techniques of Costing
 
Standard costing presentation
Standard costing presentationStandard costing presentation
Standard costing presentation
 
Contract Costing
Contract CostingContract Costing
Contract Costing
 
Cost accounting
Cost accountingCost accounting
Cost accounting
 
Job costing
Job costingJob costing
Job costing
 
Absorption costing
Absorption costingAbsorption costing
Absorption costing
 
Overheads
OverheadsOverheads
Overheads
 
EVA - Economic Value Added
EVA - Economic Value AddedEVA - Economic Value Added
EVA - Economic Value Added
 
Dividend policy
Dividend policyDividend policy
Dividend policy
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Dividend policy
Dividend policyDividend policy
Dividend policy
 

Viewers also liked

Activity based costing
Activity based costingActivity based costing
Activity based costingRahul Kumar
 
Predictive Costing: Plan for future cost and capacity levels with ABC using A...
Predictive Costing: Plan for future cost and capacity levels with ABC using A...Predictive Costing: Plan for future cost and capacity levels with ABC using A...
Predictive Costing: Plan for future cost and capacity levels with ABC using A...Anaplan
 
Biaya dan keputusan keluaran jangka panjang
Biaya dan keputusan keluaran jangka panjangBiaya dan keputusan keluaran jangka panjang
Biaya dan keputusan keluaran jangka panjangLucky Maharani Safitri
 
Perhitungan baiya berdasarkan aktivitas
Perhitungan baiya berdasarkan aktivitasPerhitungan baiya berdasarkan aktivitas
Perhitungan baiya berdasarkan aktivitasWawan Gunawan
 
Pajak Penghasilan Umum
Pajak Penghasilan UmumPajak Penghasilan Umum
Pajak Penghasilan UmumDharaniKassapa
 
Soal latiahan bab 2 semester 3
Soal latiahan bab 2 semester 3Soal latiahan bab 2 semester 3
Soal latiahan bab 2 semester 3Asep suryadi
 
BAB 3 PERILAKU BIAYA AKTIVITAS
BAB 3 PERILAKU BIAYA AKTIVITASBAB 3 PERILAKU BIAYA AKTIVITAS
BAB 3 PERILAKU BIAYA AKTIVITASEmilia Wati
 
Calcul du coût de revient selon la méthode ABC
Calcul du coût de revient selon la méthode ABCCalcul du coût de revient selon la méthode ABC
Calcul du coût de revient selon la méthode ABCCécile PETIT
 
Perilaku biaya aktivitas
Perilaku biaya aktivitasPerilaku biaya aktivitas
Perilaku biaya aktivitasIsmha Mhanyun
 

Viewers also liked (10)

Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Predictive Costing: Plan for future cost and capacity levels with ABC using A...
Predictive Costing: Plan for future cost and capacity levels with ABC using A...Predictive Costing: Plan for future cost and capacity levels with ABC using A...
Predictive Costing: Plan for future cost and capacity levels with ABC using A...
 
Gpk
GpkGpk
Gpk
 
Biaya dan keputusan keluaran jangka panjang
Biaya dan keputusan keluaran jangka panjangBiaya dan keputusan keluaran jangka panjang
Biaya dan keputusan keluaran jangka panjang
 
Perhitungan baiya berdasarkan aktivitas
Perhitungan baiya berdasarkan aktivitasPerhitungan baiya berdasarkan aktivitas
Perhitungan baiya berdasarkan aktivitas
 
Pajak Penghasilan Umum
Pajak Penghasilan UmumPajak Penghasilan Umum
Pajak Penghasilan Umum
 
Soal latiahan bab 2 semester 3
Soal latiahan bab 2 semester 3Soal latiahan bab 2 semester 3
Soal latiahan bab 2 semester 3
 
BAB 3 PERILAKU BIAYA AKTIVITAS
BAB 3 PERILAKU BIAYA AKTIVITASBAB 3 PERILAKU BIAYA AKTIVITAS
BAB 3 PERILAKU BIAYA AKTIVITAS
 
Calcul du coût de revient selon la méthode ABC
Calcul du coût de revient selon la méthode ABCCalcul du coût de revient selon la méthode ABC
Calcul du coût de revient selon la méthode ABC
 
Perilaku biaya aktivitas
Perilaku biaya aktivitasPerilaku biaya aktivitas
Perilaku biaya aktivitas
 

Similar to Activity-Based Costing (ABC) explained

Chapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product CostingChapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product CostingYesica Adicondro
 
Activity based costing
Activity based costingActivity based costing
Activity based costingRao Rehman
 
Job Costing & ABC costing
Job Costing & ABC costingJob Costing & ABC costing
Job Costing & ABC costingRakesh Singh
 
Ch14 Managerial accounting aiou mba mcom 8508
Ch14 Managerial accounting aiou mba mcom 8508Ch14 Managerial accounting aiou mba mcom 8508
Ch14 Managerial accounting aiou mba mcom 8508Ali Imran Awan MBA (IT)
 
Chapter 11 : Activity Based Costing and Accounting Information
Chapter 11 : Activity Based Costing and Accounting InformationChapter 11 : Activity Based Costing and Accounting Information
Chapter 11 : Activity Based Costing and Accounting InformationPeleZain
 
Activity Based Costing.pptx
Activity Based Costing.pptxActivity Based Costing.pptx
Activity Based Costing.pptx1986anu
 
Activity Based costing
Activity Based costingActivity Based costing
Activity Based costingJoseph Mary
 
0324663854 151818
0324663854 1518180324663854 151818
0324663854 151818Nhu Le
 
16-02-2023 accounting presentation.pptx
16-02-2023 accounting presentation.pptx16-02-2023 accounting presentation.pptx
16-02-2023 accounting presentation.pptxAqsaJaved52
 
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...Ahmad Hassan
 
Management accounting(NKB Publications)
Management accounting(NKB Publications)Management accounting(NKB Publications)
Management accounting(NKB Publications)Noble Kasonde Bwembya
 

Similar to Activity-Based Costing (ABC) explained (20)

Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
PPT on PM_Unit 1 .pptx.
PPT                  on PM_Unit 1 .pptx.PPT                  on PM_Unit 1 .pptx.
PPT on PM_Unit 1 .pptx.
 
Chapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product CostingChapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product Costing
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Job Costing & ABC costing
Job Costing & ABC costingJob Costing & ABC costing
Job Costing & ABC costing
 
Ch14 Managerial accounting aiou mba mcom 8508
Ch14 Managerial accounting aiou mba mcom 8508Ch14 Managerial accounting aiou mba mcom 8508
Ch14 Managerial accounting aiou mba mcom 8508
 
Chapter 11 : Activity Based Costing and Accounting Information
Chapter 11 : Activity Based Costing and Accounting InformationChapter 11 : Activity Based Costing and Accounting Information
Chapter 11 : Activity Based Costing and Accounting Information
 
Activity Based Costing.pptx
Activity Based Costing.pptxActivity Based Costing.pptx
Activity Based Costing.pptx
 
Chap005 abc
Chap005 abcChap005 abc
Chap005 abc
 
A b c
A b cA b c
A b c
 
Activity Based costing
Activity Based costingActivity Based costing
Activity Based costing
 
Abc costing
Abc costingAbc costing
Abc costing
 
0324663854 151818
0324663854 1518180324663854 151818
0324663854 151818
 
16-02-2023 accounting presentation.pptx
16-02-2023 accounting presentation.pptx16-02-2023 accounting presentation.pptx
16-02-2023 accounting presentation.pptx
 
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
| Managerial Accounting | Chapter 7 | Systems Design: Activity-Based Costing ...
 
cc.ppt
cc.pptcc.ppt
cc.ppt
 
Management accounting(NKB Publications)
Management accounting(NKB Publications)Management accounting(NKB Publications)
Management accounting(NKB Publications)
 
Ch04 m 06_09_10
Ch04 m 06_09_10Ch04 m 06_09_10
Ch04 m 06_09_10
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
7594572.ppt
7594572.ppt7594572.ppt
7594572.ppt
 

More from Tanweer Sudhan

Financia managment project slides
Financia managment project slidesFinancia managment project slides
Financia managment project slidesTanweer Sudhan
 
Marketing plan for new product.
Marketing plan for new product.Marketing plan for new product.
Marketing plan for new product.Tanweer Sudhan
 
Human resource managment ORG (Pakistan poverty alivation fund)
Human resource managment ORG (Pakistan poverty alivation fund)Human resource managment ORG (Pakistan poverty alivation fund)
Human resource managment ORG (Pakistan poverty alivation fund)Tanweer Sudhan
 
Word of mouth and brand loyalty
Word of mouth and brand loyaltyWord of mouth and brand loyalty
Word of mouth and brand loyaltyTanweer Sudhan
 
Erns and young case study
Erns and young case studyErns and young case study
Erns and young case studyTanweer Sudhan
 
Erns and young case study
Erns and young case studyErns and young case study
Erns and young case studyTanweer Sudhan
 
Tanweer kabeer (tide detergent)
Tanweer kabeer (tide detergent) Tanweer kabeer (tide detergent)
Tanweer kabeer (tide detergent) Tanweer Sudhan
 
PAK CHINA ECONOMIC CORRIDOR
PAK CHINA ECONOMIC CORRIDOR PAK CHINA ECONOMIC CORRIDOR
PAK CHINA ECONOMIC CORRIDOR Tanweer Sudhan
 
Tanweer (pak iran gas pipe line project)
Tanweer (pak iran gas pipe line project)Tanweer (pak iran gas pipe line project)
Tanweer (pak iran gas pipe line project)Tanweer Sudhan
 
Organization behavior presentation on ORGANIZATION BEHAVIOR OF FRANCE
Organization behavior presentation on ORGANIZATION BEHAVIOR OF FRANCE Organization behavior presentation on ORGANIZATION BEHAVIOR OF FRANCE
Organization behavior presentation on ORGANIZATION BEHAVIOR OF FRANCE Tanweer Sudhan
 
Organic farming (business communication project)
Organic farming (business communication project)Organic farming (business communication project)
Organic farming (business communication project)Tanweer Sudhan
 
Ob presentation on case study
Ob presentation on case studyOb presentation on case study
Ob presentation on case studyTanweer Sudhan
 

More from Tanweer Sudhan (13)

Financia managment project slides
Financia managment project slidesFinancia managment project slides
Financia managment project slides
 
Marketing plan for new product.
Marketing plan for new product.Marketing plan for new product.
Marketing plan for new product.
 
Human resource managment ORG (Pakistan poverty alivation fund)
Human resource managment ORG (Pakistan poverty alivation fund)Human resource managment ORG (Pakistan poverty alivation fund)
Human resource managment ORG (Pakistan poverty alivation fund)
 
Word of mouth and brand loyalty
Word of mouth and brand loyaltyWord of mouth and brand loyalty
Word of mouth and brand loyalty
 
Taxation
TaxationTaxation
Taxation
 
Erns and young case study
Erns and young case studyErns and young case study
Erns and young case study
 
Erns and young case study
Erns and young case studyErns and young case study
Erns and young case study
 
Tanweer kabeer (tide detergent)
Tanweer kabeer (tide detergent) Tanweer kabeer (tide detergent)
Tanweer kabeer (tide detergent)
 
PAK CHINA ECONOMIC CORRIDOR
PAK CHINA ECONOMIC CORRIDOR PAK CHINA ECONOMIC CORRIDOR
PAK CHINA ECONOMIC CORRIDOR
 
Tanweer (pak iran gas pipe line project)
Tanweer (pak iran gas pipe line project)Tanweer (pak iran gas pipe line project)
Tanweer (pak iran gas pipe line project)
 
Organization behavior presentation on ORGANIZATION BEHAVIOR OF FRANCE
Organization behavior presentation on ORGANIZATION BEHAVIOR OF FRANCE Organization behavior presentation on ORGANIZATION BEHAVIOR OF FRANCE
Organization behavior presentation on ORGANIZATION BEHAVIOR OF FRANCE
 
Organic farming (business communication project)
Organic farming (business communication project)Organic farming (business communication project)
Organic farming (business communication project)
 
Ob presentation on case study
Ob presentation on case studyOb presentation on case study
Ob presentation on case study
 

Recently uploaded

Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 

Recently uploaded (20)

Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 

Activity-Based Costing (ABC) explained

  • 3. Definition ABC is an approach to the costing and monitoring of activities which involves tracing resource consumption and costing final outputs. Resources are assigned to activities, and activities to cost objects based on consumption estimates. The latter utilize cost drivers to attach activity costs to outputs. CIMA (Chartered Institute of Management Accountants) 5/14/20143
  • 4.  Activity-Based Costing (ABC) arose in the 1980s from the increasing lack of relevance of traditional cost accounting methods.  The traditional cost accounting methods were designed around 1870 - 1920 and in those days industry was labor intensive, there was no automation, the product variety was small and the overhead costs in companies were generally very low compared to today  However, from the 1960s - particularly 1980s - this changed rapidly and ABC emerge. 4Cost accounting Sir Abdul Razaq
  • 5. ABC HIERARCHY ACTIVITY BASE COST UNIT- LEVEL COSTS BATCH- LEVEL COSTS: PRODUCT- LEVEL COSTS: FACILITY- LEVEL COSTS:
  • 6. ABC Hierarchy Unit-level costs: Unit level cost is the basic material cost if we need more production we have to use more material and vise versa. Batch-level costs: Machine setup costs are often batch-level costs. The time required to prepare a machine to run one batch of product is usually independent of the number of units in the batch: the same time is required to prepare the machine to run a batch of 100 units as a batch of 50 units Product-level costs: These costs are usually fixed and direct with respect to a given product Facility-level costs: These costs are usually fixed and direct with respect to the facility 6
  • 7. TRADITIONAL V/S ACTIVITY BASE COSTING 7
  • 8. * ABC approach 1. Presence of case and effect relationship between cost allocation basis and indirect pools 2. Rational basis of assigning indirect costs to various activities 3. Improved decision making such as fixing selling price and pinpointing the area where cost reduction is possible Traditional approach 1) Lack of cause and effect relationship between cost allocation basis and indirect costs pool 2) Uses a few pools of indirect costs resulting in over costing or under costing of products 3) Wrong pricing decisions result in loss of market share
  • 9. Traditional V/S ABC 5/14/2014Footer Text 9 Particular With ABC Without ABC Mfg. O/H cost assign to setups $200,000 $0 No of setups 400 N/A Mfg. O/H cost per setup $500 $0 Total manufacturing O/H cost $2,000,000 $2,000,000 Less : cost trace to machine setups 200,000 0 Mfg. O/H cost allocated on M/H $1,800,000 $2,000,000 Machine hours 100,000 100,000 Mfg. O/h cost per M/H $18 $20 Mfg. o/H cost allocations $500 setup cost/batch +$18 per M/H $20 per M/H
  • 10. Traditional V/S ABC Particulars WITH ABC WITHOUT ABC Mfg. o/h for setting up machine $500 $0 No of units batch 5000 N/A Mfg. O/H caused by setup per unit $0.10 N/A Mfg. O/H cost per machine hour $18 $20 No of units produced per machine hour 50 50 Mfg. O/H caused by production. Per unit $0.36 $0.40 Total Mfg. O/H Allocated. Per unit $0.46 $0.40
  • 11. Particular ABC Without ABC Mfg. O/H cost assigned to setup $200,000 $0 No of setup 400 N/A Mfg. O/H cost per setup $500 $0 Mfg. O/H cost caused by procurement/handling $300,000 $0 Pound of material in products $3,000,000 N/A Mfg. O/H per pound of product material $0.10 $0 Mfg. O/H cost by producing items: Total mfg. O/H cost $2,000,000 $2,000,000 Less: cost trace to machine setup -200,000 0 Less: cost traced to procurement/handling -300,000 0 Mfg. O/H cost allocated per M/H $1500,000 $2,000,000 Machine hours (M/H) 100,000 100,000 Mfg. O/h cost allocated per M/H $15 $20 Mfg. O/H cost allocation $500 setup cost .batch +$0.10lb.+ $15 per MH $20 per M/H
  • 12. Traditional V/S ABC 5/14/2014 Footer Text 12 Particular ABC(1) ABC(2) NOABC (3) Mfg. O/H for setting up machine $500 $500 $0 No of units in batch 50,000 50,000 N/A Mfg. O/H cost by setup units $0.01 $0.01 N/A Mfg. O/H cost per lb. of product $0.10 $0.10 N/A Lbs. of material in product 0.5 1.5 N/A Mfg. O/H caused by weight per units $0.05 $0.15 N/A Mfg. O/H cost per M/H $15 $15 $20 No of units produced per M/H 50 50 50 Mfg. O/H caused by production per units $0.30 $0.30 $0.40 Total O/H allocated per unit $0.36 $0.46 $0.40
  • 13. Stages of ABC Stage 1: Allocation to Activities The first step in Activity-Based Costing is to divide the expenses of certain overhead activities to a per-event cost. Stage 2: Allocation to Production The second step in activity-based costing is to allocate the activity cost to each product.
  • 16. CHARACTERISTICS  Activity based: The ABC system is based on activities. Activities consist of different functions that are associated with cost objects.  Activity cost center: This is also called cost pool—the overhead cost is identified to an activity and assigned to each activity cost center.  Use of cost drivers: The causes of occurrence of overheads are called cost drivers. These are used to assign costs to products.  Accumulation of overhead costs: Accumulation of overheads is done on the basis of various activities. A single unit—the entire organization—is not taken into account. No blanket rate is applied.  Traceability: Overhead costs can be traced easily. Hence, cost data are more reliable and accurate. ABC
  • 17.   Identifies Wasteful Products  Improves Business Processes  Activity-based costing provides a more accurate method of product/service costing, leading to more accurate pricing decisions  Enables improved product and customer profitability analysis  It increases understanding of overheads and cost drivers; and makes costly and non-value adding activities more visible, allowing managers to reduce or eliminate them. Advantages
  • 18. Disadvantages •Misinterpretation of Data •Expensive Implementation •Substantial resources required to implement and maintain. •Does not conform to GAAP. Two costing systems may be needed

Editor's Notes

  1. Cost object:A cost object is a tangible input for a product manufactured/Service provided, like labor or material. For example a cloth manufacturing firm requires some amount of predetermined labor and predetermined raw material for any amount of cloth being manufactured.
  2. Unit level cost :For example, fabric and thread are unit-level costs for an apparel manufacturer: if the company wants to double production, it will need twice as much fabric and thread. Facility level cost : . An example is property taxes on the facility, or the salaries of front office personnel such as the receptionist and office managerProduct level cost :An example is the salary of a product manager with responsibility for only one product. The product manager’s salary is a fixed cost to the company for a wide range of production volume levels. However, if the company drops the product entirely, the product manager is no longer needed.  
  3. Stage-1 For example, say that the overall cost of resetting a machine for production during the year was Rs 1 million. You have two products and you had to switch the machine over 100 times. The first stage of allocation would stipulate that the cost of one setting switch is Rs-10,000.Stage-2Using the same example, a uniform batch of each product would be produced after every switch. So after every switch, 1,000 units of Product A or 10,000 units of Product B would be produced. The “switching cost” allocated to a single item of Product A would be Rs-10, while the switching cost for a single item of Product B would be Rs-1.
  4. An ABC system allocates indirect costs based on a product’s cost driver, or the factor that creates the cost. As costs are allocated per product, a picture starts to emerge of which business processes are performing well and which ones need to be improvedThe use of ABC can also add value to the continuous improvement of business processes.The ABC method accounts for costs similar to the way production work is performed, allowing your business to better understand where overhead costs are going. The data can identify wasteful products and unnecessary costs, so that resources can be used productively
  5. Setting up an ABC system can be expensive and time-consuming. As business activities are analyzed, they must be broken down into each activity’s individual components. The entire process can use up valuable resources , ABC does not conform to accounting standards and should not be used for external reporting. Since traditional cost figures tend to be the norm, interpreting ABC data along with regular accounting information can be confusing and lead to bad decision-making.