SlideShare a Scribd company logo
1 of 4
Download to read offline
ACCOUNTING POLICIES
                   1.   GRANTS-IN-AID

                        1.1 Grants-in-aid received from the Central Government or other authorities towards capital expenditure as well
                            as consumers’ contribution to capital works are treated initially as Capital reserve and subsequently adjusted
                             as income in the same proportion as the depreciation written off on the assets acquired out of the grants.

                        1.2 Where the ownership of the assets acquired out of the grants vests with the government, the grants are
                            adjusted in the carrying cost of such assets.

                   2.   FIXED ASSETS

                        2.1 Fixed Assets are shown at historical cost.

                        2.2 Intangible assets are recorded at their cost of acquisition.

                        2.3 Capital expenditure on assets not owned by the Company is reflected as a distinct item in Capital Work-in-
                            Progress till the period of completion and thereafter in the Fixed Assets.

                        2.4 Deposits, payments/liabilities made provisionally towards compensation, rehabilitation and other expenses
                            relatable to land in possession are treated as cost of land.

                        2.5 In the case of commissioned assets, where final settlement of bills with contractors is yet to be effected,
                            capitalisation is done on provisional basis subject to necessary adjustment in the year of final settlement.

                        2.6 Assets and systems common to more than one generating unit are capitalised on the basis of engineering
                            estimates/assessments.

                   3.   CAPITAL WORK-IN-PROGRESS

                        3.1 In respect of supply-cum-erection contracts, the value of supplies received at site and accepted is treated as
                            Capital Work-in-Progress.

                        3.2 Incidental Expenditure during Construction (net) including corporate office expenses (allocated to the projects
                            pro-rata to the annual capital expenditure) for the year, is apportioned to Capital Work-in-Progress on the basis
                            of accretions thereto.

                        3.3 Deposit work/cost plus contracts are accounted for on the basis of statements of account received from the
                            contractors.

                        3.4 Claims for price variation/exchange rate variation in case of contracts are accounted for on acceptance.

                   4.   FOREIGN CURRENCY TRANSACTIONS

                        4.1 Foreign currency transactions are initially recorded at the rates of exchange ruling at the date of transaction.

                        4.2 At the balance sheet date, foreign currency monetary items are reported using the closing rate. Non-monetary
                            items denominated in foreign currency are reported at the exchange rate ruling at the date of transaction.

                        4.3 Exchange differences in respect of loans/deposits/liabilities relating to Fixed Assets/Capital Work-in-Progress,
                            arising out of transactions entered prior to 01.04.2004, are adjusted in the carrying cost of related items.
                             Exchange differences to the extent regarded as an adjustment to interest costs for the loans contracted on or
                             after 1.04.2000 are treated as borrowing costs.

       82    29th Annual Report




82_122-FINAL.pmd                   82                                                       8/13/2005, 1:42 AM
4.4 Exchange differences in respect of loans/deposits/liabilities relating to Fixed Assets/Capital Work-in-Progress
                   acquired from a country outside India, arising out of transactions entered on or after 01.04.2004, are adjusted
                   in the carrying cost of related items.

             4.5 Other exchange differences are recognized as income or expense in the period in which they arise.

      5.     BORROWING COSTS

                   Borrowing costs attributable to the fixed assets during their construction/renovation and modernisation are
                   capitalised. Such borrowing costs are apportioned on the average balance of Capital Work-in-Progress for the
                   year. Other borrowing costs are recognised as an expense in the period in which they are incurred.

      6.     INVESTMENTS

             6.1 Current Investments are valued at lower of cost and fair value.

             6.2 Long term investments are carried at cost. Provision is made for diminution, other than temporary, in the value
                   of such investments.

      7.     INVENTORIES

             7.1 Inventories, other than scrap, are valued at cost, on weighted average basis. Stores-in-transit are valued at
                 cost.

             7.2 Steel scrap is valued at realizable value. Other scrap is considered at nil value and accounted for on realization.

             7.3 Losses towards unserviceable and obsolete stores and spares identified on review of inventories are provided
                 for in the accounts.

      8.     PROFIT AND LOSS ACCOUNT

             8.1 INCOME RECOGNITION

                   8.1.1 Sale of energy is accounted for based on tariff rates approved by the Central Electricity Regulatory
                         Commission. In case of power stations where the tariff rates are yet to be approved /agreed with
                         beneficiaries, provisional rates are adopted.

                   8.1.2 The incentives/disincentives are accounted for based on the norms notified/approved by the Central
                         Electricity Regulatory Commission or agreements with the beneficiaries. In cases of power stations
                         where the same have not been notified/approved/agreed with beneficiaries, incentives/disincentives
                         are accounted for on provisional basis.

                   8.1.3 Advance against depreciation, forming part of tariff to facilitate repayment of loans, is reduced from
                          sales and considered as deferred revenue to be included in sales in subsequent years.

                   8.1.4 The surcharge on late payment/overdue sundry debtors for sale of energy is recognized when no
                         significant uncertainty as to measurability or collectability exists.

                   8.1.5 Interest/surcharge recoverable on advances to suppliers as well as warranty claims/liquidated damages
                         are not treated accrued due to uncertainty of realisation/acceptance and are therefore accounted for
                         on receipt/acceptances.

                   8.1.6.1 Income from Consultancy service is accounted for on the basis of actual progress/technical assessment
                           of work executed, in line with the terms of respective consultancy contracts.

                                                                                                                     29th Annual Report 8 3




82_122-FINAL.pmd                  83                                                        8/13/2005, 1:42 AM
8.1.6.2 Claims for reimbursement of expenditure are recognized as other income, as per the terms of Consultancy
                                  service contracts.

                           8.1.7 Scrap other than steel scrap is accounted for in the accounts as and when sold.

                           8.1.8 Insurance claims for loss of profit are accounted for in the year of acceptance. Other insurance claims
                                 are accounted for based on certainty of realisation.

                      8.2 EXPENDITURE

                           8.2.1 Depreciation is charged on straight line method at the rates specified in Schedule XIV of the Companies
                                 Act, 1956 except for the following assets in respect of which depreciation is charged at the rates
                                 mentioned below:

                                       a) Kutcha Roads                                                                     47.50 %

                                       b) Enabling works

                                          -   residential buildings including their internal electrification                6.33 %

                                          -   non-residential buildings including their internal electrification,          19.00 %
                                              water supply, sewerage & drainage works, railway sidings,
                                              aerodromes, helipads and airstrips

                           8.2.2 Depreciation on additions to/deductions from fixed assets during the year is charged on pro-rata basis
                                 from/up to the month in which the asset is available for use/disposal.

                           8.2.3 Assets costing up to Rs.5000/- are fully depreciated in the year of capitalization.

                           8.2.4 Cost of Computer software recognized as intangible assets is amortised on straight line method over a
                                 period of legal right to use or 3 years, whichever is earlier.

                           8.2.5 Where the cost of depreciable assets has undergone a change during the year due to increase/
                                  decrease in long term liabilities on account of exchange fluctuation, price adjustment, change in
                                  duties or similar factors, the unamortised balance of such asset is depreciated prospectively over the
                                  residual life determined on the basis of the rate of depreciation.

                           8.2.6 Machinery spares which can be used only in connection with an item of fixed asset and whose use is
                                  expected to be irregular are capitalised and depreciated over the residual useful life of the related
                                  plant and machinery.

                           8.2.7 Capital expenditure referred to in Para 2.3 is amortised over a period of 4 years from the year in which
                                 the first unit of project concerned comes into commercial operation and thereafter from the year in
                                  which the relevant asset becomes available for use. However, such expenditure for community
                                  development in case of stations fully under operation is charged off to revenue.

                           8.2.8 Leasehold buildings are amortised over the lease period or 30 years, whichever is lower. Leasehold
                                 land and buildings, whose lease period is yet to be finalised, are amortised over a period of 30 years.

                           8.2.9.1 Expenses on training, recruitment and ex-gratia payments under Voluntary Retirement Scheme are
                                   charged to revenue in the year of incurrence.



       84    29th Annual Report




82_122-FINAL.pmd                  84                                                          8/13/2005, 1:42 AM
8.2.9.2 Research and development expenses, other than fixed assets, are charged to revenue in the year of
                          incurrence.

                   8.2.9.3 Preliminary expenses on account of new projects incurred prior to approval of feasibility report are
                           charged to revenue in the year of incurrence.

                   8.2.10 Expenditure on Leave Travel Concession to employees is recognized in the year of availment due to
                          uncertainties in accrual.

                   8.2.11 Expenses common to operation and construction activities are allocated to Profit and Loss Account
                          and Incidental Expenditure during Construction in proportion of sales to annual capital outlay in the
                          case of Corporate Office and sales to accretion to Capital Work-in-Progress in the case of projects.

                   8.2.12 Net pre-commissioning income/expenditure is adjusted directly in the cost of related assets and systems.

                   8.2.13 Prepaid expenses and prior period expenses/income of items of Rs.100,000/- and below are charged
                          to natural heads of accounts.

                   8.2.14 Carpet coal is charged off to coal consumption. However, during pre-commissioning period, carpet
                          coal is retained in inventories and charged off to consumption in the first year of commercial operation.
                          Windage and handling losses of coal as per norms are included in cost of coal.

      9.     RETIREMENT BENEFITS

             9.1 The liability for retirement benefits of employees in respect of Provident Fund and Gratuity, which is ascertained
                 annually on actuarial valuation at the year end, are accrued and funded separately.

             9.2 The liabilities for leave encashment and post retirement medical benefits to employees are accounted for on
                 accrual basis based on actuarial valuation at the year end.

      10. FINANCE LEASES

             10.1 Assets taken on lease are capitalized at fair value or net present value of the minimum lease payments,
                  whichever is lower.

             10.2 Depreciation on the assets taken on lease is charged at the rate applicable to similar type of fixed assets as per
                  Accounting Policy 8.2.1. If the leased assets are returnable to the lessor on the expiry of the lease period,
                  depreciation is charged over its useful life or lease period, whichever is shorter.

             10.3 Lease payments made are apportioned between the finance charges and reduction of the outstanding
                  liability in respect of assets taken on lease.




                                                                                                                         29th Annual Report 8 5




82_122-FINAL.pmd                   85                                                         8/13/2005, 1:42 AM

More Related Content

What's hot

Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Divyanshu Dayal
 
Vitiating Elements in the Formation of a Contract: Mistake and frustration
Vitiating Elements in the Formation of a Contract: Mistake and frustrationVitiating Elements in the Formation of a Contract: Mistake and frustration
Vitiating Elements in the Formation of a Contract: Mistake and frustrationPreeti Sikder
 
PPA - Unit 8 - Auditing Standards and Procedures
PPA - Unit 8 - Auditing Standards and ProceduresPPA - Unit 8 - Auditing Standards and Procedures
PPA - Unit 8 - Auditing Standards and ProceduresAjay Nazarene
 
Breach of contract
Breach of contractBreach of contract
Breach of contractRam Yadav
 
Training fidic moustafa ismail 2017 _ lec 4
Training fidic moustafa ismail  2017 _  lec 4Training fidic moustafa ismail  2017 _  lec 4
Training fidic moustafa ismail 2017 _ lec 4Moustafa Ismail Abu Dief
 
Internal Audit of Manufacturing Companies
Internal Audit of Manufacturing CompaniesInternal Audit of Manufacturing Companies
Internal Audit of Manufacturing Companiesvikas_k
 
Wills In The Indian Perspective
Wills In The Indian PerspectiveWills In The Indian Perspective
Wills In The Indian PerspectiveVijay Dalmia
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16Arvind Solanki
 
Types of contract
Types of contractTypes of contract
Types of contractSweetp999
 

What's hot (20)

Fidic Form of Contract.
Fidic Form of Contract.Fidic Form of Contract.
Fidic Form of Contract.
 
Knowledge sharing session On Bank Audit
Knowledge sharing session On Bank AuditKnowledge sharing session On Bank Audit
Knowledge sharing session On Bank Audit
 
Bailment unit 15
Bailment   unit 15Bailment   unit 15
Bailment unit 15
 
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
 
Vitiating Elements in the Formation of a Contract: Mistake and frustration
Vitiating Elements in the Formation of a Contract: Mistake and frustrationVitiating Elements in the Formation of a Contract: Mistake and frustration
Vitiating Elements in the Formation of a Contract: Mistake and frustration
 
13. report
13. report13. report
13. report
 
Fidic
FidicFidic
Fidic
 
Construction contracts
Construction contractsConstruction contracts
Construction contracts
 
Contracts
ContractsContracts
Contracts
 
PPA - Unit 8 - Auditing Standards and Procedures
PPA - Unit 8 - Auditing Standards and ProceduresPPA - Unit 8 - Auditing Standards and Procedures
PPA - Unit 8 - Auditing Standards and Procedures
 
Contract management sys
Contract management sysContract management sys
Contract management sys
 
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
 
Breach of contract
Breach of contractBreach of contract
Breach of contract
 
Training fidic moustafa ismail 2017 _ lec 4
Training fidic moustafa ismail  2017 _  lec 4Training fidic moustafa ismail  2017 _  lec 4
Training fidic moustafa ismail 2017 _ lec 4
 
Construction claims
Construction claimsConstruction claims
Construction claims
 
Internal Audit of Manufacturing Companies
Internal Audit of Manufacturing CompaniesInternal Audit of Manufacturing Companies
Internal Audit of Manufacturing Companies
 
Capex audit checklist
Capex audit checklistCapex audit checklist
Capex audit checklist
 
Wills In The Indian Perspective
Wills In The Indian PerspectiveWills In The Indian Perspective
Wills In The Indian Perspective
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
 
Types of contract
Types of contractTypes of contract
Types of contract
 

Viewers also liked

Ksou need result june july exam session
Ksou need result june july exam sessionKsou need result june july exam session
Ksou need result june july exam sessionedudivya
 
Accountingconcepts
AccountingconceptsAccountingconcepts
Accountingconceptsvenkatesh y
 
A study on_working_capital_management_at Export
A study on_working_capital_management_at ExportA study on_working_capital_management_at Export
A study on_working_capital_management_at ExportAnkur Mittal
 
Madam Tussauds Museum
Madam Tussauds MuseumMadam Tussauds Museum
Madam Tussauds Museumvenkatesh y
 
Approaches to deal with global warming
Approaches to deal with global warmingApproaches to deal with global warming
Approaches to deal with global warmingKishore Raveendran
 
Managing brands for competitive advantages
Managing brands for  competitive  advantagesManaging brands for  competitive  advantages
Managing brands for competitive advantagesGc university faisalabad
 
Essential Skills Team Leader1
Essential Skills Team Leader1Essential Skills Team Leader1
Essential Skills Team Leader1Sumant Palwankar
 
Undestanding cash flow statement
Undestanding cash flow statementUndestanding cash flow statement
Undestanding cash flow statementRS P
 
Crafting Of Service Environment
Crafting Of Service EnvironmentCrafting Of Service Environment
Crafting Of Service EnvironmentKishore Raveendran
 
The Latest In Design & Technology
The Latest In Design & TechnologyThe Latest In Design & Technology
The Latest In Design & Technologyvenkatesh y
 
Ksou examination datesheet jan 201
Ksou examination datesheet jan 201Ksou examination datesheet jan 201
Ksou examination datesheet jan 201edudivya
 
know about accounting (venkat reddy)
know about accounting (venkat reddy)know about accounting (venkat reddy)
know about accounting (venkat reddy)Raavi Venkat Reddy
 

Viewers also liked (20)

As 4
As 4As 4
As 4
 
Ksou need result june july exam session
Ksou need result june july exam sessionKsou need result june july exam session
Ksou need result june july exam session
 
Swine Flu Info
Swine Flu InfoSwine Flu Info
Swine Flu Info
 
Accountingconcepts
AccountingconceptsAccountingconcepts
Accountingconcepts
 
A study on_working_capital_management_at Export
A study on_working_capital_management_at ExportA study on_working_capital_management_at Export
A study on_working_capital_management_at Export
 
Madam Tussauds Museum
Madam Tussauds MuseumMadam Tussauds Museum
Madam Tussauds Museum
 
Approaches to deal with global warming
Approaches to deal with global warmingApproaches to deal with global warming
Approaches to deal with global warming
 
Managing brands for competitive advantages
Managing brands for  competitive  advantagesManaging brands for  competitive  advantages
Managing brands for competitive advantages
 
Mutual funds
Mutual fundsMutual funds
Mutual funds
 
World Wide Web (WWW)
World Wide Web (WWW)World Wide Web (WWW)
World Wide Web (WWW)
 
Marketing
MarketingMarketing
Marketing
 
Essential Skills Team Leader1
Essential Skills Team Leader1Essential Skills Team Leader1
Essential Skills Team Leader1
 
Undestanding cash flow statement
Undestanding cash flow statementUndestanding cash flow statement
Undestanding cash flow statement
 
Shares
SharesShares
Shares
 
F Ds
F DsF Ds
F Ds
 
Attitude
AttitudeAttitude
Attitude
 
Crafting Of Service Environment
Crafting Of Service EnvironmentCrafting Of Service Environment
Crafting Of Service Environment
 
The Latest In Design & Technology
The Latest In Design & TechnologyThe Latest In Design & Technology
The Latest In Design & Technology
 
Ksou examination datesheet jan 201
Ksou examination datesheet jan 201Ksou examination datesheet jan 201
Ksou examination datesheet jan 201
 
know about accounting (venkat reddy)
know about accounting (venkat reddy)know about accounting (venkat reddy)
know about accounting (venkat reddy)
 

Similar to Accounting Policies05

Ind AS 23 - Borrowing Costs
Ind AS 23 - Borrowing CostsInd AS 23 - Borrowing Costs
Ind AS 23 - Borrowing CostsRaman Khanna
 
Indian accounting standards IFRS
Indian accounting standards IFRSIndian accounting standards IFRS
Indian accounting standards IFRSShashank Shukla
 
anheuser-busch 2004AR_Notes
anheuser-busch 2004AR_Notesanheuser-busch 2004AR_Notes
anheuser-busch 2004AR_Notesfinance15
 
Ind AS 23 Barrowing cost
Ind AS 23 Barrowing costInd AS 23 Barrowing cost
Ind AS 23 Barrowing costsathishpalankar
 
Vietnam Accounting Standards - VAS 03 Tangible Fixed Assets
Vietnam Accounting Standards - VAS 03 Tangible Fixed AssetsVietnam Accounting Standards - VAS 03 Tangible Fixed Assets
Vietnam Accounting Standards - VAS 03 Tangible Fixed AssetsAC&C Consulting Co., Ltd.
 
Vietnam Accounting Standards - VAS 16 Borrowing Costs
Vietnam Accounting Standards - VAS 16 Borrowing CostsVietnam Accounting Standards - VAS 16 Borrowing Costs
Vietnam Accounting Standards - VAS 16 Borrowing CostsAC&C Consulting Co., Ltd.
 
Bba ii cost and management accounting u 3.3 contract costing
Bba ii cost and management accounting u 3.3 contract costingBba ii cost and management accounting u 3.3 contract costing
Bba ii cost and management accounting u 3.3 contract costingRai University
 
29205rtpfinalmay2013 1
29205rtpfinalmay2013 129205rtpfinalmay2013 1
29205rtpfinalmay2013 1homeankushin
 
Vietnam Accounting Standards - VAS 05 Investment Property
Vietnam Accounting Standards - VAS 05 Investment PropertyVietnam Accounting Standards - VAS 05 Investment Property
Vietnam Accounting Standards - VAS 05 Investment PropertyAC&C Consulting Co., Ltd.
 
Construction Economics 1s.pptx
Construction Economics 1s.pptxConstruction Economics 1s.pptx
Construction Economics 1s.pptxEsubalewWondwosen
 
Valuation of fixed assets
Valuation of fixed assetsValuation of fixed assets
Valuation of fixed assetsKapil Chhabra
 
Borrowing cost
Borrowing cost Borrowing cost
Borrowing cost Sundar B N
 
IAS 23 2018 Edition International Accounting Standard 23 Borrowing Costs
IAS 23 2018 Edition International Accounting Standard 23  Borrowing CostsIAS 23 2018 Edition International Accounting Standard 23  Borrowing Costs
IAS 23 2018 Edition International Accounting Standard 23 Borrowing CostsSazzad Hossain, ITP, MBA, CSCA™
 
RERA- Certification and issues in Alteration
RERA- Certification and issues in AlterationRERA- Certification and issues in Alteration
RERA- Certification and issues in Alterationsandesh mundra
 
IAS 16: Property, Plant and Equipment
IAS 16: Property, Plant and EquipmentIAS 16: Property, Plant and Equipment
IAS 16: Property, Plant and EquipmentRS P
 

Similar to Accounting Policies05 (20)

Chaptee1
Chaptee1Chaptee1
Chaptee1
 
Ind AS 23 - Borrowing Costs
Ind AS 23 - Borrowing CostsInd AS 23 - Borrowing Costs
Ind AS 23 - Borrowing Costs
 
Indian accounting standards IFRS
Indian accounting standards IFRSIndian accounting standards IFRS
Indian accounting standards IFRS
 
anheuser-busch 2004AR_Notes
anheuser-busch 2004AR_Notesanheuser-busch 2004AR_Notes
anheuser-busch 2004AR_Notes
 
Ind AS 23 Barrowing cost
Ind AS 23 Barrowing costInd AS 23 Barrowing cost
Ind AS 23 Barrowing cost
 
Vietnam Accounting Standards - VAS 03 Tangible Fixed Assets
Vietnam Accounting Standards - VAS 03 Tangible Fixed AssetsVietnam Accounting Standards - VAS 03 Tangible Fixed Assets
Vietnam Accounting Standards - VAS 03 Tangible Fixed Assets
 
Ind AS 23 borrowing cost
Ind AS 23   borrowing costInd AS 23   borrowing cost
Ind AS 23 borrowing cost
 
Vietnam Accounting Standards - VAS 16 Borrowing Costs
Vietnam Accounting Standards - VAS 16 Borrowing CostsVietnam Accounting Standards - VAS 16 Borrowing Costs
Vietnam Accounting Standards - VAS 16 Borrowing Costs
 
Bba ii cost and management accounting u 3.3 contract costing
Bba ii cost and management accounting u 3.3 contract costingBba ii cost and management accounting u 3.3 contract costing
Bba ii cost and management accounting u 3.3 contract costing
 
29205rtpfinalmay2013 1
29205rtpfinalmay2013 129205rtpfinalmay2013 1
29205rtpfinalmay2013 1
 
Vietnam Accounting Standards - VAS 05 Investment Property
Vietnam Accounting Standards - VAS 05 Investment PropertyVietnam Accounting Standards - VAS 05 Investment Property
Vietnam Accounting Standards - VAS 05 Investment Property
 
Construction Economics 1s.pptx
Construction Economics 1s.pptxConstruction Economics 1s.pptx
Construction Economics 1s.pptx
 
Valuation of fixed assets
Valuation of fixed assetsValuation of fixed assets
Valuation of fixed assets
 
13 chapter7
13 chapter713 chapter7
13 chapter7
 
The financing agreement and general conditions
The financing agreement and general conditionsThe financing agreement and general conditions
The financing agreement and general conditions
 
Airtel info.
Airtel info.Airtel info.
Airtel info.
 
Borrowing cost
Borrowing cost Borrowing cost
Borrowing cost
 
IAS 23 2018 Edition International Accounting Standard 23 Borrowing Costs
IAS 23 2018 Edition International Accounting Standard 23  Borrowing CostsIAS 23 2018 Edition International Accounting Standard 23  Borrowing Costs
IAS 23 2018 Edition International Accounting Standard 23 Borrowing Costs
 
RERA- Certification and issues in Alteration
RERA- Certification and issues in AlterationRERA- Certification and issues in Alteration
RERA- Certification and issues in Alteration
 
IAS 16: Property, Plant and Equipment
IAS 16: Property, Plant and EquipmentIAS 16: Property, Plant and Equipment
IAS 16: Property, Plant and Equipment
 

More from venkatesh y

Freight Prepaid Terms
Freight Prepaid TermsFreight Prepaid Terms
Freight Prepaid Termsvenkatesh y
 
Lesson On Excise Duty
Lesson On Excise DutyLesson On Excise Duty
Lesson On Excise Dutyvenkatesh y
 
Accounting Concepts
Accounting ConceptsAccounting Concepts
Accounting Conceptsvenkatesh y
 
Recommended Daily Allowance Chart For Vitamins
Recommended Daily Allowance Chart For VitaminsRecommended Daily Allowance Chart For Vitamins
Recommended Daily Allowance Chart For Vitaminsvenkatesh y
 
Presentation On C Form
Presentation On C FormPresentation On C Form
Presentation On C Formvenkatesh y
 
Variance Analysis
Variance AnalysisVariance Analysis
Variance Analysisvenkatesh y
 
2002 0918 Internet History And Growth
2002 0918 Internet History And Growth2002 0918 Internet History And Growth
2002 0918 Internet History And Growthvenkatesh y
 
Famous Ma Presentations
Famous Ma PresentationsFamous Ma Presentations
Famous Ma Presentationsvenkatesh y
 

More from venkatesh y (16)

Shree Ganesh
Shree GaneshShree Ganesh
Shree Ganesh
 
Freight Prepaid Terms
Freight Prepaid TermsFreight Prepaid Terms
Freight Prepaid Terms
 
Lesson On Excise Duty
Lesson On Excise DutyLesson On Excise Duty
Lesson On Excise Duty
 
Accounting Concepts
Accounting ConceptsAccounting Concepts
Accounting Concepts
 
3 Fbt
3 Fbt3 Fbt
3 Fbt
 
Tds
TdsTds
Tds
 
Recommended Daily Allowance Chart For Vitamins
Recommended Daily Allowance Chart For VitaminsRecommended Daily Allowance Chart For Vitamins
Recommended Daily Allowance Chart For Vitamins
 
Forex India
Forex IndiaForex India
Forex India
 
India
IndiaIndia
India
 
Presentation On C Form
Presentation On C FormPresentation On C Form
Presentation On C Form
 
Variance Analysis
Variance AnalysisVariance Analysis
Variance Analysis
 
Wage Theories
Wage TheoriesWage Theories
Wage Theories
 
VAT IN INDIA
VAT IN INDIAVAT IN INDIA
VAT IN INDIA
 
Mantra
MantraMantra
Mantra
 
2002 0918 Internet History And Growth
2002 0918 Internet History And Growth2002 0918 Internet History And Growth
2002 0918 Internet History And Growth
 
Famous Ma Presentations
Famous Ma PresentationsFamous Ma Presentations
Famous Ma Presentations
 

Recently uploaded

DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 

Recently uploaded (20)

DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 

Accounting Policies05

  • 1. ACCOUNTING POLICIES 1. GRANTS-IN-AID 1.1 Grants-in-aid received from the Central Government or other authorities towards capital expenditure as well as consumers’ contribution to capital works are treated initially as Capital reserve and subsequently adjusted as income in the same proportion as the depreciation written off on the assets acquired out of the grants. 1.2 Where the ownership of the assets acquired out of the grants vests with the government, the grants are adjusted in the carrying cost of such assets. 2. FIXED ASSETS 2.1 Fixed Assets are shown at historical cost. 2.2 Intangible assets are recorded at their cost of acquisition. 2.3 Capital expenditure on assets not owned by the Company is reflected as a distinct item in Capital Work-in- Progress till the period of completion and thereafter in the Fixed Assets. 2.4 Deposits, payments/liabilities made provisionally towards compensation, rehabilitation and other expenses relatable to land in possession are treated as cost of land. 2.5 In the case of commissioned assets, where final settlement of bills with contractors is yet to be effected, capitalisation is done on provisional basis subject to necessary adjustment in the year of final settlement. 2.6 Assets and systems common to more than one generating unit are capitalised on the basis of engineering estimates/assessments. 3. CAPITAL WORK-IN-PROGRESS 3.1 In respect of supply-cum-erection contracts, the value of supplies received at site and accepted is treated as Capital Work-in-Progress. 3.2 Incidental Expenditure during Construction (net) including corporate office expenses (allocated to the projects pro-rata to the annual capital expenditure) for the year, is apportioned to Capital Work-in-Progress on the basis of accretions thereto. 3.3 Deposit work/cost plus contracts are accounted for on the basis of statements of account received from the contractors. 3.4 Claims for price variation/exchange rate variation in case of contracts are accounted for on acceptance. 4. FOREIGN CURRENCY TRANSACTIONS 4.1 Foreign currency transactions are initially recorded at the rates of exchange ruling at the date of transaction. 4.2 At the balance sheet date, foreign currency monetary items are reported using the closing rate. Non-monetary items denominated in foreign currency are reported at the exchange rate ruling at the date of transaction. 4.3 Exchange differences in respect of loans/deposits/liabilities relating to Fixed Assets/Capital Work-in-Progress, arising out of transactions entered prior to 01.04.2004, are adjusted in the carrying cost of related items. Exchange differences to the extent regarded as an adjustment to interest costs for the loans contracted on or after 1.04.2000 are treated as borrowing costs. 82 29th Annual Report 82_122-FINAL.pmd 82 8/13/2005, 1:42 AM
  • 2. 4.4 Exchange differences in respect of loans/deposits/liabilities relating to Fixed Assets/Capital Work-in-Progress acquired from a country outside India, arising out of transactions entered on or after 01.04.2004, are adjusted in the carrying cost of related items. 4.5 Other exchange differences are recognized as income or expense in the period in which they arise. 5. BORROWING COSTS Borrowing costs attributable to the fixed assets during their construction/renovation and modernisation are capitalised. Such borrowing costs are apportioned on the average balance of Capital Work-in-Progress for the year. Other borrowing costs are recognised as an expense in the period in which they are incurred. 6. INVESTMENTS 6.1 Current Investments are valued at lower of cost and fair value. 6.2 Long term investments are carried at cost. Provision is made for diminution, other than temporary, in the value of such investments. 7. INVENTORIES 7.1 Inventories, other than scrap, are valued at cost, on weighted average basis. Stores-in-transit are valued at cost. 7.2 Steel scrap is valued at realizable value. Other scrap is considered at nil value and accounted for on realization. 7.3 Losses towards unserviceable and obsolete stores and spares identified on review of inventories are provided for in the accounts. 8. PROFIT AND LOSS ACCOUNT 8.1 INCOME RECOGNITION 8.1.1 Sale of energy is accounted for based on tariff rates approved by the Central Electricity Regulatory Commission. In case of power stations where the tariff rates are yet to be approved /agreed with beneficiaries, provisional rates are adopted. 8.1.2 The incentives/disincentives are accounted for based on the norms notified/approved by the Central Electricity Regulatory Commission or agreements with the beneficiaries. In cases of power stations where the same have not been notified/approved/agreed with beneficiaries, incentives/disincentives are accounted for on provisional basis. 8.1.3 Advance against depreciation, forming part of tariff to facilitate repayment of loans, is reduced from sales and considered as deferred revenue to be included in sales in subsequent years. 8.1.4 The surcharge on late payment/overdue sundry debtors for sale of energy is recognized when no significant uncertainty as to measurability or collectability exists. 8.1.5 Interest/surcharge recoverable on advances to suppliers as well as warranty claims/liquidated damages are not treated accrued due to uncertainty of realisation/acceptance and are therefore accounted for on receipt/acceptances. 8.1.6.1 Income from Consultancy service is accounted for on the basis of actual progress/technical assessment of work executed, in line with the terms of respective consultancy contracts. 29th Annual Report 8 3 82_122-FINAL.pmd 83 8/13/2005, 1:42 AM
  • 3. 8.1.6.2 Claims for reimbursement of expenditure are recognized as other income, as per the terms of Consultancy service contracts. 8.1.7 Scrap other than steel scrap is accounted for in the accounts as and when sold. 8.1.8 Insurance claims for loss of profit are accounted for in the year of acceptance. Other insurance claims are accounted for based on certainty of realisation. 8.2 EXPENDITURE 8.2.1 Depreciation is charged on straight line method at the rates specified in Schedule XIV of the Companies Act, 1956 except for the following assets in respect of which depreciation is charged at the rates mentioned below: a) Kutcha Roads 47.50 % b) Enabling works - residential buildings including their internal electrification 6.33 % - non-residential buildings including their internal electrification, 19.00 % water supply, sewerage & drainage works, railway sidings, aerodromes, helipads and airstrips 8.2.2 Depreciation on additions to/deductions from fixed assets during the year is charged on pro-rata basis from/up to the month in which the asset is available for use/disposal. 8.2.3 Assets costing up to Rs.5000/- are fully depreciated in the year of capitalization. 8.2.4 Cost of Computer software recognized as intangible assets is amortised on straight line method over a period of legal right to use or 3 years, whichever is earlier. 8.2.5 Where the cost of depreciable assets has undergone a change during the year due to increase/ decrease in long term liabilities on account of exchange fluctuation, price adjustment, change in duties or similar factors, the unamortised balance of such asset is depreciated prospectively over the residual life determined on the basis of the rate of depreciation. 8.2.6 Machinery spares which can be used only in connection with an item of fixed asset and whose use is expected to be irregular are capitalised and depreciated over the residual useful life of the related plant and machinery. 8.2.7 Capital expenditure referred to in Para 2.3 is amortised over a period of 4 years from the year in which the first unit of project concerned comes into commercial operation and thereafter from the year in which the relevant asset becomes available for use. However, such expenditure for community development in case of stations fully under operation is charged off to revenue. 8.2.8 Leasehold buildings are amortised over the lease period or 30 years, whichever is lower. Leasehold land and buildings, whose lease period is yet to be finalised, are amortised over a period of 30 years. 8.2.9.1 Expenses on training, recruitment and ex-gratia payments under Voluntary Retirement Scheme are charged to revenue in the year of incurrence. 84 29th Annual Report 82_122-FINAL.pmd 84 8/13/2005, 1:42 AM
  • 4. 8.2.9.2 Research and development expenses, other than fixed assets, are charged to revenue in the year of incurrence. 8.2.9.3 Preliminary expenses on account of new projects incurred prior to approval of feasibility report are charged to revenue in the year of incurrence. 8.2.10 Expenditure on Leave Travel Concession to employees is recognized in the year of availment due to uncertainties in accrual. 8.2.11 Expenses common to operation and construction activities are allocated to Profit and Loss Account and Incidental Expenditure during Construction in proportion of sales to annual capital outlay in the case of Corporate Office and sales to accretion to Capital Work-in-Progress in the case of projects. 8.2.12 Net pre-commissioning income/expenditure is adjusted directly in the cost of related assets and systems. 8.2.13 Prepaid expenses and prior period expenses/income of items of Rs.100,000/- and below are charged to natural heads of accounts. 8.2.14 Carpet coal is charged off to coal consumption. However, during pre-commissioning period, carpet coal is retained in inventories and charged off to consumption in the first year of commercial operation. Windage and handling losses of coal as per norms are included in cost of coal. 9. RETIREMENT BENEFITS 9.1 The liability for retirement benefits of employees in respect of Provident Fund and Gratuity, which is ascertained annually on actuarial valuation at the year end, are accrued and funded separately. 9.2 The liabilities for leave encashment and post retirement medical benefits to employees are accounted for on accrual basis based on actuarial valuation at the year end. 10. FINANCE LEASES 10.1 Assets taken on lease are capitalized at fair value or net present value of the minimum lease payments, whichever is lower. 10.2 Depreciation on the assets taken on lease is charged at the rate applicable to similar type of fixed assets as per Accounting Policy 8.2.1. If the leased assets are returnable to the lessor on the expiry of the lease period, depreciation is charged over its useful life or lease period, whichever is shorter. 10.3 Lease payments made are apportioned between the finance charges and reduction of the outstanding liability in respect of assets taken on lease. 29th Annual Report 8 5 82_122-FINAL.pmd 85 8/13/2005, 1:42 AM