SlideShare a Scribd company logo
Partnership
for
Performance
•Two manufacturing sites
•Liverpool
•Denholm Rees & O’Donnell
•Stoke-on-Trent
•C E Edwards Engineering
Our UK Operations
“Working Together for
Success.”
Group History
• Denholm Rees & O’Donnell established 1931 as a
precision engineering company
• Historical manufacturing partnerships with Blue
chip OEM’s since 1965
• Supplier to the Valve & Pump industry since
1970’s
• Global supplier to the Oil & Gas industry since
early 1980’s
• Acquired C E Edwards Ltd in 1995 as part of
Denholms strategic growth plan
“Working Together for
Success.”
Recent History
• 2001 - New Senior Management Team
• 2002 – New business strategies introduced
• 2003 – Invested into World Class Manufacturing
through Cranfield University
• 2004 – Identified the need to reinvest in plant &
equipment within the group to stay ahead of market
competition
• 2005 - New management control system ‘M1’
purchased and installed
• To date our investments in both plant & equipment
have totalled over €10m across both sites and are
planned to continue into the future
“Working Together for
Success.”
How has this been achieved?
• Management integrated across the whole
business
• Best working practices introduced between sites
• Cellular Manufacturing Concepts
• Open book philosophy with all staff
• Bonus and Profit sharing at all levels
• Commitment to continuous improvement through
staff development
• Empowerment of complete workforce
“Working Together for
Success.”
What has this achieved?
• Consolidated focus of business goals
• Improved communication
• Increased capacity
• Standardisation of systems, processes and
equipment
• Improved efficiencies & costs
• Improved Customer satisfaction throughout
• Staff culture change
“Working Together for
Success.”
Where are we going?
• Developing Existing and new Partner relationships
to satisfy all needs
• Identifying and Developing New Markets Together
• More regular Client Interface
• Developing Long Term Agreements (LTA’s) as a
positive partnership
• Continuous improvement in cost reduction, quality
and delivery to the benefit of all
• Continuing to Invest in new plant and equipment
to completely satisfy clients future requirements
• Table: 1600mm x 2000mm – 20T
• X – 5000mm
• Y – 2000mm
• Z – 800mm
• W – 1500mm
• B – 360 ° in 0.001 increments
• U – 125mm
• Spindle Ø125mm
Sacem MSMG-125
Horizontal Boring and Milling
6 Axis CNC- Heidenhain TNC
430 Control
Sacem MSMG-125 Horizontal Boring / Milling
6 Axis CNC - Heidenhain TNC 430 Control
40 International Taper Angle Head
Head Size = 99 mm
Bore Size = 100 mm (4”) Bore
50 International Taper Angle Head
Head Size = 149 mm
Bore Size = 150 mm (6”) Bore
Pump Shaft Cell
• Pump Shaft manufacturing for over 40 years
• €3m investment since 2005
• Complete CNC Production solutions
• Special and Conventional solutions
• State of the art quality inspection procedures
• Preferred Supplier to the Industry
• NDT Partnerships with local suppliers
2 x Doosan Puma
700LY Turning Centres
Max Ø = Ø850mm
Length =3200mm
2 x Doosan Puma 3100XLY
Turning Centres
Max Ø = Ø420mm
Length =2000mm
• Full milling capabilities
• Shorter Lead times
• ISO 50 Power Tooling
• Less operations
Turning centre benefits
Pump shaft precision turn & keyway
manufacture in single operation
ROBBI - 3620 CNC
Grinding Machine
Max Ø = Ø355
Length = 2000mm
Conventional Machinery
Examples of
Pump Shafts
Latest inspection technology
Some examples of other products
we have manufactured
Volute Cases
Impellers
Split & Solid Bearing Housings
Machined from Solid
“Working Together for
Success.”
Single Volute Cases
Inner Cases
More conventional machined pump parts
Quality is our game
CMM Inspection of large components
How do we meet your
requirements ?
• Proven Infrastructure
• ECi M1 ERP Software
ECi M1 is a complete enterprise resource planning (ERP)
system that provides total automation of financials,
inventory, production, sales/quoting, and production
planning. The software is designed for small to midsized
firms who manufacture via repetitive, make-to-stock,
make-to-order, engineer-to-order processes.
We have worked closely with M1 over the past 8 years to
develop our own tailor made package which best suits
both ourselves and our customers needs
The system can allow for linking directly to your host to
allow a clear view of your current orders.
Engineering Capacity
• We have an excellent engineering department with many years
experience
• We have long established disciplines in our Quality System
which has driven our team to ensure that all aspects of the job
are well detailed at the planning stage and consideration is
given to both the tooling and inspection requirements of the
component
• All parts undergo an extensive contract review before the part
is released for manufacture, our engineers will communicate
with your own engineers to ensure the best practices are
worked to and any known traits are handed over from your
own experience
• Our M1 system allows for us to initiate and record any
engineering change requests which may occur through quality
issues or possible design change to help reduce manufacturing
costs for the future
Change request screen shot
M1 Shop Load Explorer
Shop loading & Scheduling
• Our M1 system allows us real time visibility of what capacity
we have in any department
M1 Scheduling Screen
Shop loading & Scheduling
• M1 further allows us to drill down to each machine and see
is loading
Job Analysis Screen
• Individual jobs can hen be broken down further to
allow for individual processes to be monitored
Stock Holding
• We can review your components to see what the most
economical batch sizes are for manufacture
• We look to see whether parts may be best part
manufactured thus allowing them to be modified into
more than one component
• Based on our findings we can make provision for holding
these parts on stock at our expense
• This can not only reduce cost and lead time but will allow
for quick delivery of spares items for aftermarket sales
Quality
• Denholm’s currently holds ISO 9001:2015 certification
and works to controlled documents and procedures within
that system
• To support that we have a dedicated inspection team of
highly skilled Quality Engineers
• They are equipped with the latest forms of inspection
equipment and gauges
• We currently have a large CMM with a 3.5m table which
will allow us measure your shafts in one position, as a
back up to that we also have Faro gauges which are
portable and may be taken to the job for checking
features on or around the component whilst at or on the
machine thus reducing the need to take large components
out of the machine to inspect critical features
Partnership for performance
Thank you for your attention

More Related Content

What's hot

CIMCO Maintenance brochure CANADA - PRINT
CIMCO Maintenance brochure CANADA - PRINTCIMCO Maintenance brochure CANADA - PRINT
CIMCO Maintenance brochure CANADA - PRINTDrew Perryman
 
Lori Green's Resume
Lori Green's ResumeLori Green's Resume
Lori Green's ResumeLori Green
 
John Ford Resume
John Ford ResumeJohn Ford Resume
John Ford ResumeJohn ford
 
ROI for Warehouse Management System: The Business Case for a WMS
ROI for Warehouse Management System: The Business Case for a WMSROI for Warehouse Management System: The Business Case for a WMS
ROI for Warehouse Management System: The Business Case for a WMS
Net at Work
 
Advoco food case_study
Advoco food case_studyAdvoco food case_study
Advoco food case_study
jcvd12
 
logistics operations manager lean six sigma
logistics operations manager lean six sigmalogistics operations manager lean six sigma
logistics operations manager lean six sigma
Pete Ortega
 
PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)Terry Dixon
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric Reneker
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component Improvement
Lean Teams USA
 
PLG Linkedin Deck
PLG Linkedin DeckPLG Linkedin Deck
PLG Linkedin Deck
jwmattern
 
James thomas May 2016 cv
James thomas May 2016 cvJames thomas May 2016 cv
James thomas May 2016 cvJames Thomas
 

What's hot (19)

Bill Resume
Bill ResumeBill Resume
Bill Resume
 
CIMCO Maintenance brochure CANADA - PRINT
CIMCO Maintenance brochure CANADA - PRINTCIMCO Maintenance brochure CANADA - PRINT
CIMCO Maintenance brochure CANADA - PRINT
 
RESUME -Angela Perrotta 07-2016
RESUME -Angela Perrotta 07-2016RESUME -Angela Perrotta 07-2016
RESUME -Angela Perrotta 07-2016
 
vimlesh kc - Copy
vimlesh kc - Copyvimlesh kc - Copy
vimlesh kc - Copy
 
Juan's Resume
Juan's ResumeJuan's Resume
Juan's Resume
 
Lori Green's Resume
Lori Green's ResumeLori Green's Resume
Lori Green's Resume
 
John Ford Resume
John Ford ResumeJohn Ford Resume
John Ford Resume
 
Resume
ResumeResume
Resume
 
ROI for Warehouse Management System: The Business Case for a WMS
ROI for Warehouse Management System: The Business Case for a WMSROI for Warehouse Management System: The Business Case for a WMS
ROI for Warehouse Management System: The Business Case for a WMS
 
Advoco food case_study
Advoco food case_studyAdvoco food case_study
Advoco food case_study
 
Resume_ Girish
Resume_ GirishResume_ Girish
Resume_ Girish
 
Resume
ResumeResume
Resume
 
logistics operations manager lean six sigma
logistics operations manager lean six sigmalogistics operations manager lean six sigma
logistics operations manager lean six sigma
 
PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)PropertyFacility Manager 3 word (4)
PropertyFacility Manager 3 word (4)
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1
 
Den Resume 040116
Den Resume 040116Den Resume 040116
Den Resume 040116
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component Improvement
 
PLG Linkedin Deck
PLG Linkedin DeckPLG Linkedin Deck
PLG Linkedin Deck
 
James thomas May 2016 cv
James thomas May 2016 cvJames thomas May 2016 cv
James thomas May 2016 cv
 

Similar to A History of Denholm Rees & O'Donnell

Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for PerformanceDenholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
BSAMARKETING
 
Finpower Aircon LLC
Finpower  Aircon LLCFinpower  Aircon LLC
Finpower Aircon LLC
Jayesh Mohan
 
Trillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre CapabilitiesTrillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre Capabilities
Matthew Hewett
 
Dynalec company profile_11_mar19
Dynalec company profile_11_mar19Dynalec company profile_11_mar19
Dynalec company profile_11_mar19
Shirish Kulkarni
 
Operation management
Operation managementOperation management
Operation managementMamta Karanji
 
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEERRESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEERAlok Saxena
 
CM Presentation 02
CM Presentation 02CM Presentation 02
CM Presentation 02Paul Gambon
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.
Pramod Patil
 
Mike humphreys cv profile
Mike humphreys cv profileMike humphreys cv profile
Mike humphreys cv profile
Michael Humphreys
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Roger Boyette
 
David Crane - CV
David Crane - CVDavid Crane - CV
David Crane - CVDavid Crane
 
Company presentation-Tec-Shine
Company presentation-Tec-ShineCompany presentation-Tec-Shine
Company presentation-Tec-ShineAlisa Chen
 
Zeppelin -Company Profile
Zeppelin -Company ProfileZeppelin -Company Profile
Zeppelin -Company ProfileHardik Patel
 

Similar to A History of Denholm Rees & O'Donnell (20)

Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for PerformanceDenholm Rees & O'Donnell + C E Edwards - Partnership for Performance
Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
 
VTL Group Overview
VTL Group OverviewVTL Group Overview
VTL Group Overview
 
Finpower Aircon LLC
Finpower  Aircon LLCFinpower  Aircon LLC
Finpower Aircon LLC
 
Trillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre CapabilitiesTrillium Flow Technologies: Alloa Service Centre Capabilities
Trillium Flow Technologies: Alloa Service Centre Capabilities
 
ses_12_page_brochure
ses_12_page_brochureses_12_page_brochure
ses_12_page_brochure
 
Dynalec company profile_11_mar19
Dynalec company profile_11_mar19Dynalec company profile_11_mar19
Dynalec company profile_11_mar19
 
Renni Consultancy - Introduction
Renni Consultancy - IntroductionRenni Consultancy - Introduction
Renni Consultancy - Introduction
 
Operation management
Operation managementOperation management
Operation management
 
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEERRESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
RESUME - ALOK SAXENA - CNC - ELECTRONICS ENGINEER
 
CM Presentation 02
CM Presentation 02CM Presentation 02
CM Presentation 02
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.
 
Mike humphreys cv profile
Mike humphreys cv profileMike humphreys cv profile
Mike humphreys cv profile
 
Mike Humphreys CV profile
Mike Humphreys CV profileMike Humphreys CV profile
Mike Humphreys CV profile
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416
 
David Crane - CV
David Crane - CVDavid Crane - CV
David Crane - CV
 
Satish.S -Resume.
Satish.S -Resume.Satish.S -Resume.
Satish.S -Resume.
 
Company presentation-Tec-Shine
Company presentation-Tec-ShineCompany presentation-Tec-Shine
Company presentation-Tec-Shine
 
Zeppelin -Company Profile
Zeppelin -Company ProfileZeppelin -Company Profile
Zeppelin -Company Profile
 
Mitchell1 OnDemand5
Mitchell1 OnDemand5Mitchell1 OnDemand5
Mitchell1 OnDemand5
 
Maverick consulting
Maverick consulting Maverick consulting
Maverick consulting
 

Recently uploaded

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
Nettur Technical Training Foundation
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 

Recently uploaded (20)

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdfThe Role of Electrical and Electronics Engineers in IOT Technology.pdf
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 

A History of Denholm Rees & O'Donnell

  • 2. •Two manufacturing sites •Liverpool •Denholm Rees & O’Donnell •Stoke-on-Trent •C E Edwards Engineering Our UK Operations
  • 3. “Working Together for Success.” Group History • Denholm Rees & O’Donnell established 1931 as a precision engineering company • Historical manufacturing partnerships with Blue chip OEM’s since 1965 • Supplier to the Valve & Pump industry since 1970’s • Global supplier to the Oil & Gas industry since early 1980’s • Acquired C E Edwards Ltd in 1995 as part of Denholms strategic growth plan
  • 4. “Working Together for Success.” Recent History • 2001 - New Senior Management Team • 2002 – New business strategies introduced • 2003 – Invested into World Class Manufacturing through Cranfield University • 2004 – Identified the need to reinvest in plant & equipment within the group to stay ahead of market competition • 2005 - New management control system ‘M1’ purchased and installed • To date our investments in both plant & equipment have totalled over €10m across both sites and are planned to continue into the future
  • 5. “Working Together for Success.” How has this been achieved? • Management integrated across the whole business • Best working practices introduced between sites • Cellular Manufacturing Concepts • Open book philosophy with all staff • Bonus and Profit sharing at all levels • Commitment to continuous improvement through staff development • Empowerment of complete workforce
  • 6. “Working Together for Success.” What has this achieved? • Consolidated focus of business goals • Improved communication • Increased capacity • Standardisation of systems, processes and equipment • Improved efficiencies & costs • Improved Customer satisfaction throughout • Staff culture change
  • 7. “Working Together for Success.” Where are we going? • Developing Existing and new Partner relationships to satisfy all needs • Identifying and Developing New Markets Together • More regular Client Interface • Developing Long Term Agreements (LTA’s) as a positive partnership • Continuous improvement in cost reduction, quality and delivery to the benefit of all • Continuing to Invest in new plant and equipment to completely satisfy clients future requirements
  • 8. • Table: 1600mm x 2000mm – 20T • X – 5000mm • Y – 2000mm • Z – 800mm • W – 1500mm • B – 360 ° in 0.001 increments • U – 125mm • Spindle Ø125mm Sacem MSMG-125 Horizontal Boring and Milling 6 Axis CNC- Heidenhain TNC 430 Control
  • 9. Sacem MSMG-125 Horizontal Boring / Milling 6 Axis CNC - Heidenhain TNC 430 Control
  • 10. 40 International Taper Angle Head Head Size = 99 mm Bore Size = 100 mm (4”) Bore
  • 11. 50 International Taper Angle Head Head Size = 149 mm Bore Size = 150 mm (6”) Bore
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18. Pump Shaft Cell • Pump Shaft manufacturing for over 40 years • €3m investment since 2005 • Complete CNC Production solutions • Special and Conventional solutions • State of the art quality inspection procedures • Preferred Supplier to the Industry • NDT Partnerships with local suppliers
  • 19. 2 x Doosan Puma 700LY Turning Centres Max Ø = Ø850mm Length =3200mm 2 x Doosan Puma 3100XLY Turning Centres Max Ø = Ø420mm Length =2000mm
  • 20. • Full milling capabilities • Shorter Lead times • ISO 50 Power Tooling • Less operations Turning centre benefits
  • 21. Pump shaft precision turn & keyway manufacture in single operation
  • 22. ROBBI - 3620 CNC Grinding Machine Max Ø = Ø355 Length = 2000mm
  • 26. Some examples of other products we have manufactured Volute Cases Impellers
  • 27. Split & Solid Bearing Housings Machined from Solid
  • 28. “Working Together for Success.” Single Volute Cases Inner Cases More conventional machined pump parts
  • 29.
  • 31. CMM Inspection of large components
  • 32.
  • 33. How do we meet your requirements ? • Proven Infrastructure • ECi M1 ERP Software ECi M1 is a complete enterprise resource planning (ERP) system that provides total automation of financials, inventory, production, sales/quoting, and production planning. The software is designed for small to midsized firms who manufacture via repetitive, make-to-stock, make-to-order, engineer-to-order processes. We have worked closely with M1 over the past 8 years to develop our own tailor made package which best suits both ourselves and our customers needs The system can allow for linking directly to your host to allow a clear view of your current orders.
  • 34. Engineering Capacity • We have an excellent engineering department with many years experience • We have long established disciplines in our Quality System which has driven our team to ensure that all aspects of the job are well detailed at the planning stage and consideration is given to both the tooling and inspection requirements of the component • All parts undergo an extensive contract review before the part is released for manufacture, our engineers will communicate with your own engineers to ensure the best practices are worked to and any known traits are handed over from your own experience • Our M1 system allows for us to initiate and record any engineering change requests which may occur through quality issues or possible design change to help reduce manufacturing costs for the future
  • 36. M1 Shop Load Explorer Shop loading & Scheduling • Our M1 system allows us real time visibility of what capacity we have in any department
  • 37. M1 Scheduling Screen Shop loading & Scheduling • M1 further allows us to drill down to each machine and see is loading
  • 38. Job Analysis Screen • Individual jobs can hen be broken down further to allow for individual processes to be monitored
  • 39. Stock Holding • We can review your components to see what the most economical batch sizes are for manufacture • We look to see whether parts may be best part manufactured thus allowing them to be modified into more than one component • Based on our findings we can make provision for holding these parts on stock at our expense • This can not only reduce cost and lead time but will allow for quick delivery of spares items for aftermarket sales
  • 40. Quality • Denholm’s currently holds ISO 9001:2015 certification and works to controlled documents and procedures within that system • To support that we have a dedicated inspection team of highly skilled Quality Engineers • They are equipped with the latest forms of inspection equipment and gauges • We currently have a large CMM with a 3.5m table which will allow us measure your shafts in one position, as a back up to that we also have Faro gauges which are portable and may be taken to the job for checking features on or around the component whilst at or on the machine thus reducing the need to take large components out of the machine to inspect critical features
  • 41. Partnership for performance Thank you for your attention