1. A phrasal verb is a verb combined with a preposition or adverb that creates a new meaning different from the original verb.
2. Phrasal verbs can be transitive or intransitive, separable or inseparable. Transitive phrasal verbs can take an object, while intransitive cannot. Separable phrasal verbs place the object between the verb and preposition, while inseparable place the object after the preposition.
3. There are guidelines for using objects with phrasal verbs depending on if the object is a pronoun or noun.