Abstract: Quality systems-5S and Kaizen
that focus on adding value and
eliminating waste, as well as creating a
more sustainable and vibrant economy,
culture, and world.
5S for
Construction-
[For Study]
Compiled by Karikalan M
5S For Construction
1 | P a g e
http://www.copyrighted.com/
Registration date: November 11, 2016 - 08:31 AM
Copyright number: 5QTC-W3P9-FXNV-EZTJ
Study Report
-Page Blank-
5S Quality tool Used to eliminate waste that results from improper organization of work
area.
5S For Construction
2 | P a g e
Sr.No. 5S Related Action
1 Sort
Determine what is to be kept in the open and what in the
shed
Allocate area for each type of construction equipment and
machinery
Allocate area for electrical tools
Allocate area for hand tools
Allocate area for construction material/equipment to be
used/installed in the project
Allocate area for hazardous, inflammable material
Allocate area for chemicals, paints
Allocate area for spare parts for maintenance
Kaizen Quality tool Used for continually eliminating waste from manufacturing processes
by combining the collective talent of the company.
Sr.No. 5S Related Action
5S For Construction
3 | P a g e
2 Set in Order
 Keep/arrange equipment in such a way that their
maneuvering/movement shall be easy
 Vehicles to be parked in the yard in such a way
that frequently used vehicles are parked near the
gate
 Frequently used equipment/machinery to be
located near the workplace
 Set boundaries for different type of equipment
and machinery
 Identify and arrange tools for easy access
 Identify and store material/equipment per
relevant division/section of contract documents
 Identify and store materials in accordance with
their usage per construction schedule
 Determine items that need special conditions
 Mark/tag the items/materials
 Display route map and location
 Put the materials in sequence per their use
 Frequently used consumables to be kept near
workplace
 Label on the drawer with list of contents
 Keep shuttering materials in one place
Kaizen Quality tool Used for continually eliminating waste from manufacturing processes
by combining the collective talent of the company.
Sr.No. 5S Related Action
5S For Construction
4 | P a g e
3 Shine  Clean site on daily basis by removing:
 cut pieces of reinforced bars
 cut pieces of plywood
 left-out concrete
 cut pieces of pipes
 cut pieces of cables and wires
 used welding rods
 clean equipment and vehicles
 check electrical tools after return by the
technician
 attend to breakdown report
Kaizen Quality tool Used for continually eliminating waste from manufacturing processes
by combining the collective talent of the company.
5S For Construction
5 | P a g e
Sr.No. 5S Related Action
4 Standardize
Standardize the store by allocating separate areas for
material used by different divisions/sections
Standardize areas for long lead items
Determine a regular schedule for cleaning the workplace
Make available standard tool kit/box for a group of
technicians
Inform every one of their responsibilities and related
areas where the things are to be placed and will be
available
Standardize the store for consumable items
Inform suppliers/vendors in advance the place for
delivery of material
Kaizen Quality tool Used for continually eliminating waste from manufacturing processes
by combining the collective talent of the company.
5S For Construction
6 | P a g e
Sr.No. 5S Related Action
5 Sustain
Follow the system until the end of the project
Kaizen Quality tool Used for continually eliminating waste from manufacturing processes
by combining the collective talent of the company.
Source: Abdul Razzak Rumane. (2010). Quality Management in Construction Projects.

5S for Construction [For Study]

  • 1.
    Abstract: Quality systems-5Sand Kaizen that focus on adding value and eliminating waste, as well as creating a more sustainable and vibrant economy, culture, and world. 5S for Construction- [For Study] Compiled by Karikalan M
  • 2.
    5S For Construction 1| P a g e http://www.copyrighted.com/ Registration date: November 11, 2016 - 08:31 AM Copyright number: 5QTC-W3P9-FXNV-EZTJ Study Report -Page Blank- 5S Quality tool Used to eliminate waste that results from improper organization of work area.
  • 3.
    5S For Construction 2| P a g e Sr.No. 5S Related Action 1 Sort Determine what is to be kept in the open and what in the shed Allocate area for each type of construction equipment and machinery Allocate area for electrical tools Allocate area for hand tools Allocate area for construction material/equipment to be used/installed in the project Allocate area for hazardous, inflammable material Allocate area for chemicals, paints Allocate area for spare parts for maintenance Kaizen Quality tool Used for continually eliminating waste from manufacturing processes by combining the collective talent of the company. Sr.No. 5S Related Action
  • 4.
    5S For Construction 3| P a g e 2 Set in Order  Keep/arrange equipment in such a way that their maneuvering/movement shall be easy  Vehicles to be parked in the yard in such a way that frequently used vehicles are parked near the gate  Frequently used equipment/machinery to be located near the workplace  Set boundaries for different type of equipment and machinery  Identify and arrange tools for easy access  Identify and store material/equipment per relevant division/section of contract documents  Identify and store materials in accordance with their usage per construction schedule  Determine items that need special conditions  Mark/tag the items/materials  Display route map and location  Put the materials in sequence per their use  Frequently used consumables to be kept near workplace  Label on the drawer with list of contents  Keep shuttering materials in one place Kaizen Quality tool Used for continually eliminating waste from manufacturing processes by combining the collective talent of the company. Sr.No. 5S Related Action
  • 5.
    5S For Construction 4| P a g e 3 Shine  Clean site on daily basis by removing:  cut pieces of reinforced bars  cut pieces of plywood  left-out concrete  cut pieces of pipes  cut pieces of cables and wires  used welding rods  clean equipment and vehicles  check electrical tools after return by the technician  attend to breakdown report Kaizen Quality tool Used for continually eliminating waste from manufacturing processes by combining the collective talent of the company.
  • 6.
    5S For Construction 5| P a g e Sr.No. 5S Related Action 4 Standardize Standardize the store by allocating separate areas for material used by different divisions/sections Standardize areas for long lead items Determine a regular schedule for cleaning the workplace Make available standard tool kit/box for a group of technicians Inform every one of their responsibilities and related areas where the things are to be placed and will be available Standardize the store for consumable items Inform suppliers/vendors in advance the place for delivery of material Kaizen Quality tool Used for continually eliminating waste from manufacturing processes by combining the collective talent of the company.
  • 7.
    5S For Construction 6| P a g e Sr.No. 5S Related Action 5 Sustain Follow the system until the end of the project Kaizen Quality tool Used for continually eliminating waste from manufacturing processes by combining the collective talent of the company. Source: Abdul Razzak Rumane. (2010). Quality Management in Construction Projects.