Jack Bevens is preparing for the pre-production of his short film. He has researched fonts and collected images that match the film's genre and storylines. He has also designed layouts for the film's front and back covers, poster, and storyboards. Props, costumes, and filming locations are identified. Contingency plans are in place to address potential issues like actors being unavailable or rooms not being accessible for filming. Health and safety concerns are considered for equipment and preventing eye strain or injuries. A one-week production schedule is outlined, starting with inviting actors and a planning meeting, followed by rehearsals, filming, and editing to complete the short film.