Pre-Production
Jack Bevens
Style sheet
I researched all these from the internet. I collected some different fonts because all these
match my film. I chose the top one because this font looks more careless and not as neat
which goes with my genre as it is unpredictable. I collected some images that match my
storylines.
Actor/actress names
My name.
Brief figures about my film.
Layout 1
Front Cover
Layout 2
Back Cover
Brief describe about my films.
Actors, director, writer and
producer name.
Release date
Subtitle are allow.
Some strong languages.
Layout 3 Poster
May 2017
A Jack Bevens Film
You can hide but you can’t escape!
Creepy, Unpredictable and Nightmare
Story Boards
1
2 3 4
Story Boards
5 6 7
8 9 10
Props & Locations
Props/Costume needed Locations needed
Fake blood Park
Knife Bridge
Phone Field
Bench
handbags
Wood stick
Contingency Planning
Potential Issue Solution
I like my film start to finish in one week (start
next week).
If person who is acting is busy or ill. I will move
different scene.
I choice that rooms for we will playing and
filming it
I need to ask for permission that rooms. Or if
my house I will allow to using rooms.
I like people on background while I filming it. I must ask to people for permission. If they
don’t like then I will remove people on
background.
My film will be delaying next week or so. if any actors unavailable or didn’t turning up I
will recast them.
USB breaks. Back up in other places.
Camera battery dies. Charger.
Health and Safety
Potential Issue How will the issue be
avoided?
Problem with the lights because it had wires. It
had a heat. It may be easy fall over and bang
someone’s head.
I must full responsibility check with lights to
makes sure safe before someone may will
happen accident.
Problem with the camera because use operator
camera and person need walk back.
Need other person guide behind the camera
and makes sure check on the back is clear.
Problem with computer overheating. Move pcs every hour.
problem with straining eyes, headaches. Take regular breaks, turn screen brightness
down.
Tripping over tripods. Must watch out with tripods or take them off.
Stress take the break and stick to deadlines
Schedule
Day Plan of Action Resources Required
Day 1  Invite the people who is like to be acting  Actor/actress.
Day 2  Meeting talk about my ideas.  Rooms.
Day 3  People practise with script.  Script.
Day 4  Start filming.  Camera and lights.
Day 5  Continue filming.  Camera and lights.
Day 6  Editing it.  Premier.
Day 7  Continue editing.  Premier.
Day 8  Finish short film  Save in my file.

5. pre production

  • 1.
  • 2.
    Style sheet I researchedall these from the internet. I collected some different fonts because all these match my film. I chose the top one because this font looks more careless and not as neat which goes with my genre as it is unpredictable. I collected some images that match my storylines.
  • 3.
    Actor/actress names My name. Brieffigures about my film. Layout 1 Front Cover
  • 4.
    Layout 2 Back Cover Briefdescribe about my films. Actors, director, writer and producer name. Release date Subtitle are allow. Some strong languages.
  • 5.
    Layout 3 Poster May2017 A Jack Bevens Film You can hide but you can’t escape! Creepy, Unpredictable and Nightmare
  • 6.
  • 7.
  • 8.
    Props & Locations Props/Costumeneeded Locations needed Fake blood Park Knife Bridge Phone Field Bench handbags Wood stick
  • 9.
    Contingency Planning Potential IssueSolution I like my film start to finish in one week (start next week). If person who is acting is busy or ill. I will move different scene. I choice that rooms for we will playing and filming it I need to ask for permission that rooms. Or if my house I will allow to using rooms. I like people on background while I filming it. I must ask to people for permission. If they don’t like then I will remove people on background. My film will be delaying next week or so. if any actors unavailable or didn’t turning up I will recast them. USB breaks. Back up in other places. Camera battery dies. Charger.
  • 10.
    Health and Safety PotentialIssue How will the issue be avoided? Problem with the lights because it had wires. It had a heat. It may be easy fall over and bang someone’s head. I must full responsibility check with lights to makes sure safe before someone may will happen accident. Problem with the camera because use operator camera and person need walk back. Need other person guide behind the camera and makes sure check on the back is clear. Problem with computer overheating. Move pcs every hour. problem with straining eyes, headaches. Take regular breaks, turn screen brightness down. Tripping over tripods. Must watch out with tripods or take them off. Stress take the break and stick to deadlines
  • 11.
    Schedule Day Plan ofAction Resources Required Day 1  Invite the people who is like to be acting  Actor/actress. Day 2  Meeting talk about my ideas.  Rooms. Day 3  People practise with script.  Script. Day 4  Start filming.  Camera and lights. Day 5  Continue filming.  Camera and lights. Day 6  Editing it.  Premier. Day 7  Continue editing.  Premier. Day 8  Finish short film  Save in my file.

Editor's Notes

  • #3 Explore colours, fonts and image styles similar to what you want to produce. Discuss all three elements in relation to why you chose them and where you may use them in your project. Go over as many pages as you need to
  • #4 Mock up of a potential design using the co Dvd cover layout lours and fonts established in your style sheet and sourced images
  • #5 Mock up of a potential design using the co Dvd cover layout lours and fonts established in your style sheet and sourced images
  • #6 Mock up of a potential design using the colours and fonts established in your style sheet and sourced images A different idea for a layout or a film poster idea I tought back of dvd cover
  • #7 Number the shots?