This document outlines the pre-production planning for a short film about a love triangle between Winnie, William, and Jake. It includes a schedule of scenes to be filmed, subtitles, props and locations needed, contingency planning for potential issues, health and safety considerations, and a proposed 8-day production schedule. The film will involve 6 scenes showing Winnie meeting and interacting with William and Jake, before they both confront her about their feelings at the end.