© 2011 Pearson
1 - 1
1 Operations and
Productivity
PowerPoint presentation to accompanyPowerPoint presentation to accompany
Heizer and RenderHeizer and Render
Operations Management, 10eOperations Management, 10e
Principles of Operations Management, 8ePrinciples of Operations Management, 8e
PowerPoint slides by Jeff Heyl
© 2011 Pearson
1 - 2
OutlineOutline
 Global Company Profile: Hard Rock
Cafe
 What Is Operations Management?
 Organizing to Produce Goods and
Services
 Why Study OM?
 What Operations Managers Do
© 2011 Pearson
1 - 3
Outline - ContinuedOutline - Continued
 The Heritage of Operations
Management
 Operations in the Service Sector
 Differences between Goods and
Services
 Growth of Services
 Service Pay
 Exciting New Trends in Operations
Management
© 2011 Pearson
1 - 4
Outline - ContinuedOutline - Continued
 The Productivity Challenge
 Productivity Measurement
 Productivity Variables
 Productivity and the Service Sector
 Ethics and Social Responsibility
© 2011 Pearson
1 - 5
Learning ObjectivesLearning Objectives
When you complete this chapterWhen you complete this chapter
you should be able to:you should be able to:
1. Define operations management
2. Explain the distinction between
goods and services
3. Explain the difference between
production and productivity
© 2011 Pearson
1 - 6
Learning ObjectivesLearning Objectives
When you complete this chapterWhen you complete this chapter
you should be able to:you should be able to:
4. Compute single-factor
productivity
5. Compute multifactor productivity
6. Identify the critical variables in
enhancing productivity
© 2011 Pearson
1 - 7
The Hard Rock CafeThe Hard Rock Cafe
 First opened in 1971
 Now – 129 restaurants in over 40 countries
 Rock music memorabilia
 Creates value in the form of good food
and entertainment
 3,500+
custom meals per day in Orlando
 How does an item get on the menu?
 Role of the Operations Manager
© 2011 Pearson
1 - 8
What Is OperationsWhat Is Operations
Management?Management?
ProductionProduction is the creation of
goods and services
Operations management (OM)Operations management (OM)
is the set of activities that
create value in the form of
goods and services by
transforming inputs into
outputs
© 2011 Pearson
1 - 9
Organizing to ProduceOrganizing to Produce
Goods and ServicesGoods and Services
 Essential functions:
1.1. MarketingMarketing – generates demand
2.2. Production/operationsProduction/operations – creates
the product
3.3. Finance/accountingFinance/accounting – tracks how
well the organization is doing,
pays bills, collects the money
© 2011 Pearson
1 - 10
Organizational ChartsOrganizational Charts
Operations
Teller
Scheduling
Check Clearing
Collection
Transaction
processing
Facilities
design/layout
Vault operations
Maintenance
Security
Finance
Investments
Security
Real estate
Accounting
Auditing
Marketing
Loans
Commercial
Industrial
Financial
Personal
Mortgage
Trust Department
Commercial Bank
Figure 1.1(A)
© 2011 Pearson
1 - 11
Organizational ChartsOrganizational Charts
Operations
Ground support
equipment
Maintenance
Ground Operations
Facility
maintenance
Catering
Flight Operations
Crew scheduling
Flying
Communications
Dispatching
Management science
Finance/
accounting
Accounting
Payables
Receivables
General Ledger
Finance
Cash control
International
exchange
Airline
Figure 1.1(B)
Marketing
Traffic
administration
Reservations
Schedules
Tariffs (pricing)
Sales
Advertising
© 2011 Pearson
1 - 12
Marketing
Sales
promotion
Advertising
Sales
Market
research
Organizational ChartsOrganizational Charts
Operations
Facilities
Construction; maintenance
Production and inventory control
Scheduling; materials control
Quality assurance and control
Supply-chain management
Manufacturing
Tooling; fabrication; assembly
Design
Product development and design
Detailed product specifications
Industrial engineering
Efficient use of machines, space,
and personnel
Process analysis
Development and installation of
production tools and equipment
Finance/
accounting
Disbursements/
credits
Receivables
Payables
General ledger
Funds Management
Money market
International
exchange
Capital requirements
Stock issue
Bond issue
and recall
Manufacturing
Figure 1.1(C)
© 2011 Pearson
1 - 13
Why Study OM?Why Study OM?
1. OM is one of three major functions of
any organization, we want to study
how people organize themselves for
productive enterprise
2. We want (and need) to know how
goods and services are produced
3. We want to understand what
operations managers do
4. OM is such a costly part of an
organization
© 2011 Pearson
1 - 14
Options for IncreasingOptions for Increasing
ContributionContribution
Table 1.1
Sales $100,000 $150,000 $100,000 $100,000
Cost of Goods – 80,000 – 120,000 – 80,000 – 64,000
Gross Margin 20,000 30,000 20,000 36,000
Finance Costs – 6,000 – 6,000 – 3,000 – 6,000
Subtotal 14,000 24,000 17,000 30,000
Taxes at 25% – 3,500 – 6,000 – 4,250 – 7,500
Contribution $ 10,500 $ 18,000 $ 12,750 $ 22,500
Finance/
Marketing Accounting OM
Option Option Option
Increase Reduce Reduce
Sales Finance Production
Current Revenue 50% Costs 50% Costs 20%
© 2011 Pearson
1 - 15
What OperationsWhat Operations
Managers DoManagers Do
 Planning
 Organizing
 Staffing
 Leading
 Controlling
Basic Management FunctionsBasic Management Functions
© 2011 Pearson
1 - 16
Ten Critical DecisionsTen Critical Decisions
Ten Decision Areas Chapter(s)
1. Design of goods and services 5
2. Managing quality 6, Supplement 6
3. Process and capacity 7, Supplement 7
design
4. Location strategy 8
5. Layout strategy 9
6. Human resources and 10
job design
7. Supply-chain 11, Supplement 11
management
8. Inventory, MRP, JIT 12, 14, 16
9. Scheduling 13, 15
10. Maintenance 17 Table 1.2
© 2011 Pearson
1 - 17
The Critical DecisionsThe Critical Decisions
1. Design of goods and services
 What good or service should we
offer?
 How should we design these
products and services?
2. Managing quality
 How do we define quality?
 Who is responsible for quality?
Table 1.2 (cont.)
© 2011 Pearson
1 - 18
The Critical DecisionsThe Critical Decisions
3. Process and capacity design
 What process and what capacity will
these products require?
 What equipment and technology is
necessary for these processes?
4. Location strategy
 Where should we put the facility?
 On what criteria should we base the
location decision?
Table 1.2 (cont.)
© 2011 Pearson
1 - 19
The Critical DecisionsThe Critical Decisions
5. Layout strategy
 How should we arrange the facility?
 How large must the facility be to meet
our plan?
6. Human resources and job design
 How do we provide a reasonable
work environment?
 How much can we expect our
employees to produce?
Table 1.2 (cont.)
© 2011 Pearson
1 - 20
The Critical DecisionsThe Critical Decisions
7. Supply-chain management
 Should we make or buy this
component?
 Who should be our suppliers and how
can we integrate them into our strategy?
8. Inventory, material requirements
planning, and JIT
 How much inventory of each item
should we have?
 When do we re-order?
Table 1.2 (cont.)
© 2011 Pearson
1 - 21
The Critical DecisionsThe Critical Decisions
9. Intermediate and short–term
scheduling
 Are we better off keeping people on
the payroll during slowdowns?
 Which jobs do we perform next?
10.Maintenance
 How do we build reliability into our
processes?
 Who is responsible for maintenance?
Table 1.2 (cont.)
© 2011 Pearson
1 - 22
Where are the OM Jobs?Where are the OM Jobs?
 Technology/methods
 Facilities/space utilization
 Strategic issues
 Response time
 People/team development
 Customer service
 Quality
 Cost reduction
 Inventory reduction
 Productivity improvement
© 2011 Pearson
1 - 23
OpportunitiesOpportunities
Figure 1.2
© 2011 Pearson
1 - 24
CertificationsCertifications
 APICS, the American Production and
Inventory Control Society
 American Society of Quality (ASQ)
 Institute for Supply Management (ISM)
 Project Management Institute (PMI)
 Council of Supply Chain Management
Professionals
 Charter Institute of Purchasing and
Supply (CIPS)
© 2011 Pearson
1 - 25
Significant Events in OMSignificant Events in OM
Figure 1.3
© 2011 Pearson
1 - 26
The Heritage of OMThe Heritage of OM
 Division of labor (Adam Smith 1776;
Charles Babbage 1852)
 Standardized parts (Whitney 1800)
 Scientific Management (Taylor 1881)
 Coordinated assembly line (Ford/
Sorenson 1913)
 Gantt charts (Gantt 1916)
 Motion study (Frank and Lillian Gilbreth
1922)
 Quality control (Shewhart 1924; Deming
1950)
© 2011 Pearson
1 - 27
The Heritage of OMThe Heritage of OM
 Computer (Atanasoff 1938)
 CPM/PERT (DuPont 1957, Navy 1958)
 Material requirements planning (Orlicky
1960)
 Computer aided design (CAD 1970)
 Flexible manufacturing system (FMS 1975)
 Baldrige Quality Awards (1980)
 Computer integrated manufacturing (1990)
 Globalization (1992)
 Internet (1995)
© 2011 Pearson
1 - 28
Eli WhitneyEli Whitney
 Born 1765; died 1825
 In 1798, received government
contract to make 10,000 muskets
 Showed that machine tools could
make standardized parts to exact
specifications
 Musket parts could be used in any
musket
© 2011 Pearson
1 - 29
Frederick W. TaylorFrederick W. Taylor
 Born 1856; died 1915
 Known as ‘father of scientific
management’
 In 1881, as chief engineer for
Midvale Steel, studied how tasks
were done
 Began first motion and time studies
 Created efficiency principles
© 2011 Pearson
1 - 30
Taylor’s PrinciplesTaylor’s Principles
 Matching employees to right job
 Providing the proper training
 Providing proper work methods and
tools
 Establishing legitimate incentives for
work to be accomplished
Management Should TakeManagement Should Take
More Responsibility for:More Responsibility for:
© 2011 Pearson
1 - 31
Frank & Lillian GilbrethFrank & Lillian Gilbreth
 Frank (1868-1924); Lillian (1878-1972)
 Husband-and-wife engineering team
 Further developed work
measurement methods
 Applied efficiency methods to their
home and 12 children!
 Book & Movie: “Cheaper by the
Dozen,” “Bells on Their Toes”
© 2011 Pearson
1 - 32
 Born 1863; died 1947
 In 1903, created Ford Motor
Company
 In 1913, first used moving assembly
line to make Model T
Unfinished product moved by
conveyor past work station
 Paid workers very well for 1911
($5/day!)
Henry FordHenry Ford
© 2011 Pearson
1 - 33
W. Edwards DemingW. Edwards Deming
 Born 1900; died 1993
 Engineer and physicist
 Credited with teaching Japan quality
control methods in post-WW2
 Used statistics to analyze process
 His methods involve workers in
decisions
© 2011 Pearson
1 - 34
Contributions FromContributions From
 Human factors
 Industrial engineering
 Management science
 Biological science
 Physical sciences
 Information technology
© 2011 Pearson
1 - 35
New Challenges in OMNew Challenges in OM
 Global focus
 Just-in-time
 Supply-chain
partnering
 Rapid product
development,
alliances
 Mass
customization
 Empowered
employees, teams
ToToFromFrom
 Local or national focus
 Batch shipments
 Low bid purchasing
 Lengthy product
development
 Standard products
 Job specialization
© 2011 Pearson
1 - 36
Characteristics of GoodsCharacteristics of Goods
 Tangible product
 Consistent product
definition
 Production usually
separate from
consumption
 Can be inventoried
 Low customer
interaction
© 2011 Pearson
1 - 37
Characteristics of ServiceCharacteristics of Service
 Intangible product
 Produced and
consumed at same time
 Often unique
 High customer
interaction
 Inconsistent product
definition
 Often knowledge-based
 Frequently dispersed
© 2011 Pearson
1 - 38
Industry and Services asIndustry and Services as
Percentage of GDPPercentage of GDP
Services Manufacturing
Australia
Canada
China
CzechRep
France
Germany
HongKong
Japan
Mexico
RussianFed
SouthAfrica
Spain
UK
US
90 −
80 −
70 −
60 −
50 −
40 −
30 −
20 −
10 −
0 −
© 2011 Pearson
1 - 39
Goods and ServicesGoods and Services
Automobile
Computer
Installed carpeting
Fast-food meal
Restaurant meal/auto repair
Hospital care
Advertising agency/
investment management
Consulting service/
teaching
Counseling
Percent of Product that is a Good Percent of Product that is a Service
100% 75 50 25 0 25 50 75 100%
| | | | | | | | |
© 2011 Pearson
1 - 40
120 –
100 –
80 –
60 –
40 –
20 –
0 –
| | | | | | |
1950 1970 1990 2010 (est)
1960 1980 2000
Employment(millions)
Manufacturing and ServiceManufacturing and Service
EmploymentEmployment
Figure 1.4 (A)
Manufacturing
ServiceService
© 2011 Pearson
1 - 41
Manufacturing EmploymentManufacturing Employment
and Productionand Production
Figure 1.4 (B)
40 –
30 –
20 –
10 –
0 – | | | | | | |
1950 1970 1990 2010 (est)
1960 1980 2000
– 150150
– 125125
– 100100
– 7575
– 5050
– 2525
– 00
Employment(millions)
Index:1997=100Index:1997=100
Manufacturing
employment
(left scale)
IndustrialIndustrial
productionproduction
(right scale)(right scale)
© 2011 Pearson
1 - 42
Development of theDevelopment of the
Service EconomyService Economy
Figure 1.4 (C)
United States
Canada
France
Italy
Britain
Japan
W. Germany
1970 2010 (est)
| | | | |
40 50 60 70 80
Percent
© 2011 Pearson
1 - 43
Organizations in Each SectorOrganizations in Each Sector
Service SectorService Sector ExampleExample
% of all% of all
JobsJobs
Education,
Legal, Medical,
other
San Diego Zoo, Arnold
Palmer Hospital
25.8
Trade (retail,
wholesale)
Walgreen’s, Wal-Mart,
Nordstrom’s
14.9
Utilities,
Transportation
Pacific Gas & Electric,
American Airlines
5.2
Professional and
Business
Services
Snelling and Snelling, Waste
Management, Inc.
10.7
Table 1.3
© 2011 Pearson
1 - 44
Organizations in Each SectorOrganizations in Each Sector
Service SectorService Sector ExampleExample
% of all% of all
JobsJobs
Finance,
Information,
Real Estate
Citicorp, American Express,
Prudential, Aetna
9.6
Food, Lodging,
Entertainment
Olive Garden, Motel 6, Walt
Disney
8.5
Public
Administration
U.S., State of Alabama, Cook
County
4.6
Total 78.8
Table 1.3
© 2011 Pearson
1 - 45
Organizations in Each SectorOrganizations in Each Sector
Other SectorsOther Sectors ExampleExample
% of all% of all
JobsJobs
Manufacturing
Sector
General Electric, Ford,
U.S. Steel, Intel
11.2
Construction
Sector
Bechtel, McDermott 8.1
Agriculture
Sector
King Ranch 1.4
Mining Sector Homestake Mining 0.5
Total 21.2
Table 1.3
© 2011 Pearson
1 - 46
Changing ChallengesChanging Challenges
Traditional
Approach
Reasons for
Change
Current
Challenge
Ethics and
regulations
not at the
forefront
Public concern over
pollution, corruption,
child labor, etc.
High ethical and
social
responsibility;
increased legal
and professional
standards
Local or
national
focus
Growth of reliable, low
cost communication
and transportation
Global focus,
international
collaboration
Lengthy
product
development
Shorter life cycles;
growth of global
communication; CAD,
Internet
Rapid product
development;
design
collaboration
Figure 1.5
© 2011 Pearson
1 - 47
Changing ChallengesChanging Challenges
Traditional
Approach
Reasons for
Change
Current
Challenge
Low cost
production,
with little
concern for
environment;
free
resources
(air, water)
ignored
Public sensitivity to
environment; ISO 14000
standard; increasing
disposal costs
Environmentally
sensitive
production; green
manufacturing;
sustainability
Low-cost
standardized
products
Rise of consumerism;
increased affluence;
individualism
Mass
customization
Figure 1.5
© 2011 Pearson
1 - 48
Changing ChallengesChanging Challenges
Traditional
Approach
Reasons for
Change
Current
Challenge
Emphasis on
specialized,
often manual
tasks
Recognition of the
employee's total
contribution; knowledge
society
Empowered
employees;
enriched jobs
“In-house”
production;
low-bid
purchasing
Rapid technological
change; increasing
competitive forces
Supply-chain
partnering; joint
ventures, alliances
Large lot
production
Shorter product life
cycles; increasing need
to reduce inventory
Just-In-Time
performance;
lean; continuous
improvement
Figure 1.5
© 2011 Pearson
1 - 49
New Trends in OMNew Trends in OM
 Ethics
 Global focus
 Environmentally sensitive production
 Rapid product development
 Environmentally sensitive production
 Mass customization
 Empowered employees
 Supply-chain partnering
 Just-in-time performance
© 2011 Pearson
1 - 50
Productivity ChallengeProductivity Challenge
Productivity is the ratio of outputs (goods
and services) divided by the inputs
(resources such as labor and capital)
The objective is to improve productivity!The objective is to improve productivity!
Important Note!
Production is a measure of output
only and not a measure of efficiency
© 2011 Pearson
1 - 51
Feedback loop
Outputs
Goods
and
services
Transformation
The U.S. economic system
transforms inputs to outputs
at about an annual 2.5%
increase in productivity per
year. The productivity
increase is the result of a
mix of capital (38% of 2.5%),
labor (10% of 2.5%), and
management (52% of 2.5%).
The Economic SystemThe Economic System
Inputs
Labor,
capital,
management
Figure 1.6
© 2011 Pearson
1 - 52
Improving Productivity atImproving Productivity at
StarbucksStarbucks
A team of 10 analystsA team of 10 analysts
continually look for wayscontinually look for ways
to shave time. Someto shave time. Some
improvements:improvements:
Stop requiring signatures
on credit card purchases
under $25
Saved 8 seconds
per transaction
Change the size of the ice
scoop
Saved 14 seconds
per drink
New espresso machines Saved 12 seconds
per shot
© 2011 Pearson
1 - 53
Improving Productivity atImproving Productivity at
StarbucksStarbucks
A team of 10 analystsA team of 10 analysts
continually look for wayscontinually look for ways
to shave time. Someto shave time. Some
improvements:improvements:
Stop requiring signatures
on credit card purchases
under $25
Saved 8 seconds
per transaction
Change the size of the ice
scoop
Saved 14 seconds
per drink
New espresso machines Saved 12 seconds
per shot
Operations improvements have
helped Starbucks increase yearly
revenue per outlet by $200,000 to
$940,000 in six years.
Productivity has improved by 27%,
or about 4.5% per year.
© 2011 Pearson
1 - 54
 Measure of process improvement
 Represents output relative to input
 Only through productivity increases
can our standard of living improve
ProductivityProductivity
Productivity =
Units produced
Input used
© 2011 Pearson
1 - 55
Productivity CalculationsProductivity Calculations
Productivity =
Units produced
Labor-hours used
= = 4 units/labor-hour
1,000
250
Labor ProductivityLabor Productivity
One resource input  single-factor productivity
© 2011 Pearson
1 - 56
Multi-Factor ProductivityMulti-Factor Productivity
Output
Labor + Material + Energy
+ Capital + Miscellaneous
Productivity =
 Also known as total factor productivity
 Output and inputs are often expressed
in dollars
Multiple resource inputs  multi-factor productivity
© 2011 Pearson
1 - 57
Collins Title ProductivityCollins Title Productivity
Staff of 4 works 8 hrs/day 8 titles/day
Payroll cost = $640/day Overhead = $400/day
Old System:Old System:
=
Old labor
productivity
8 titles/day
32 labor-hrs
© 2011 Pearson
1 - 58
Collins Title ProductivityCollins Title Productivity
Staff of 4 works 8 hrs/day 8 titles/day
Payroll cost = $640/day Overhead = $400/day
Old System:Old System:
8 titles/day
32 labor-hrs
=
Old labor
productivity = .25 titles/labor-hr
© 2011 Pearson
1 - 59
Collins Title ProductivityCollins Title Productivity
Staff of 4 works 8 hrs/day 8 titles/day
Payroll cost = $640/day Overhead = $400/day
Old System:Old System:
14 titles/day Overhead = $800/day
New System:New System:
8 titles/day
32 labor-hrs
=
Old labor
productivity
=
New labor
productivity
= .25 titles/labor-hr
14 titles/day14 titles/day
32 labor-hrs32 labor-hrs
© 2011 Pearson
1 - 60
Collins Title ProductivityCollins Title Productivity
Staff of 4 works 8 hrs/day 8 titles/day
Payroll cost = $640/day Overhead = $400/day
Old System:Old System:
14 titles/day Overhead = $800/day
New System:New System:
8 titles/day
32 labor-hrs
=
Old labor
productivity = .25 titles/labor-hr
14 titles/day
32 labor-hrs
=
New labor
productivity
= .4375 titles/labor-hr
© 2011 Pearson
1 - 61
Collins Title ProductivityCollins Title Productivity
Staff of 4 works 8 hrs/day 8 titles/day
Payroll cost = $640/day Overhead = $400/day
Old System:Old System:
14 titles/day Overhead = $800/day
New System:New System:
=
Old multifactor
productivity
8 titles/day
$640 + 400
© 2011 Pearson
1 - 62
Collins Title ProductivityCollins Title Productivity
Staff of 4 works 8 hrs/day 8 titles/day
Payroll cost = $640/day Overhead = $400/day
Old System:Old System:
14 titles/day Overhead = $800/day
New System:New System:
8 titles/day
$640 + 400
=
Old multifactor
productivity
= .0077 titles/dollar
© 2011 Pearson
1 - 63
Collins Title ProductivityCollins Title Productivity
Staff of 4 works 8 hrs/day 8 titles/day
Payroll cost = $640/day Overhead = $400/day
Old System:Old System:
14 titles/day Overhead = $800/day
New System:New System:
8 titles/day
$640 + 400
=
Old multifactor
productivity
=
New multifactor
productivity
= .0077 titles/dollar
14 titles/day14 titles/day
$640 + 800$640 + 800
© 2011 Pearson
1 - 64
Collins Title ProductivityCollins Title Productivity
Staff of 4 works 8 hrs/day 8 titles/day
Payroll cost = $640/day Overhead = $400/day
Old System:Old System:
14 titles/day Overhead = $800/day
New System:New System:
8 titles/day
$640 + 400
14 titles/day
$640 + 800
=
Old multifactor
productivity
=
New multifactor
productivity
= .0077 titles/dollar
= .0097 titles/dollar
© 2011 Pearson
1 - 65
Measurement ProblemsMeasurement Problems
1.1. QualityQuality may change while the
quantity of inputs and outputs
remains constant
2.2. External elementsExternal elements may cause an
increase or decrease in
productivity
 Precise unitsPrecise units of measure may be
lacking
© 2011 Pearson
1 - 66
Productivity VariablesProductivity Variables
1.1. LaborLabor - contributes
about 10% of the
annual increase
2.2. CapitalCapital - contributes
about 38% of the
annual increase
3.3. ManagementManagement -
contributes about
52% of the annual
increase
© 2011 Pearson
1 - 67
Key Variables for ImprovedKey Variables for Improved
Labor ProductivityLabor Productivity
1. Basic education appropriate for the
labor force
2. Diet of the labor force
3. Social overhead that makes labor
available
 Challenge is in maintaining and
enhancing skills in the midst of rapidly
changing technology and knowledge
© 2011 Pearson
1 - 68
Labor SkillsLabor Skills
About half of the 17-year-olds in the U.S. cannotAbout half of the 17-year-olds in the U.S. cannot
correctly answer questions of this typecorrectly answer questions of this type
Figure 1.7
© 2011 Pearson
1 - 69
Investment and ProductivityInvestment and Productivity
10
8
6
4
2
0
Percentincreaseinproductivity
Percentage investment
10 15 20 25 30 35
© 2011 Pearson
1 - 70
Service ProductivityService Productivity
1. Typically labor intensive
2. Frequently focused on unique
individual attributes or desires
3. Often an intellectual task performed by
professionals
4. Often difficult to mechanize
5. Often difficult to evaluate for quality
© 2011 Pearson
1 - 71
Productivity at Taco BellProductivity at Taco Bell
Improvements:
 Revised the menu
 Designed meals for easy preparation
 Shifted some preparation to suppliers
 Efficient layout and automation
 Training and employee empowerment
 New water and energy saving grills
© 2011 Pearson
1 - 72
Productivity at Taco BellProductivity at Taco Bell
Improvements:
 Revised the menu
 Designed meals for easy preparation
 Shifted some preparation to suppliers
 Efficient layout and automation
 Training and employee empowerment
 New water and energy saving grills
Results:
 Preparation time cut to 8 seconds
 Management span of control increased
from 5 to 30
 In-store labor cut by 15 hours/day
 Stores handle twice the volume with half
the labor
 Conserve 300 million gallons of water andConserve 300 million gallons of water and
200 million KwH of electricity each year200 million KwH of electricity each year
saving $17 million annuallysaving $17 million annually
© 2011 Pearson
1 - 73
Ethics andEthics and
Social ResponsibilitySocial Responsibility
Challenges facingChallenges facing
operations managers:operations managers:
 Developing and producing safe,
quality products
 Maintaining a clean environment
 Providing a safe workplace
 Honoring stakeholder commitments
© 2011 Pearson
1 - 74
All rights reserved. No part of this publication may be reproduced, stored in a retrieval
system, or transmitted, in any form or by any means, electronic, mechanical, photocopying,
recording, or otherwise, without the prior written permission of the publisher.
Printed in the United States of America.

360_ch01

  • 1.
    © 2011 Pearson 1- 1 1 Operations and Productivity PowerPoint presentation to accompanyPowerPoint presentation to accompany Heizer and RenderHeizer and Render Operations Management, 10eOperations Management, 10e Principles of Operations Management, 8ePrinciples of Operations Management, 8e PowerPoint slides by Jeff Heyl
  • 2.
    © 2011 Pearson 1- 2 OutlineOutline  Global Company Profile: Hard Rock Cafe  What Is Operations Management?  Organizing to Produce Goods and Services  Why Study OM?  What Operations Managers Do
  • 3.
    © 2011 Pearson 1- 3 Outline - ContinuedOutline - Continued  The Heritage of Operations Management  Operations in the Service Sector  Differences between Goods and Services  Growth of Services  Service Pay  Exciting New Trends in Operations Management
  • 4.
    © 2011 Pearson 1- 4 Outline - ContinuedOutline - Continued  The Productivity Challenge  Productivity Measurement  Productivity Variables  Productivity and the Service Sector  Ethics and Social Responsibility
  • 5.
    © 2011 Pearson 1- 5 Learning ObjectivesLearning Objectives When you complete this chapterWhen you complete this chapter you should be able to:you should be able to: 1. Define operations management 2. Explain the distinction between goods and services 3. Explain the difference between production and productivity
  • 6.
    © 2011 Pearson 1- 6 Learning ObjectivesLearning Objectives When you complete this chapterWhen you complete this chapter you should be able to:you should be able to: 4. Compute single-factor productivity 5. Compute multifactor productivity 6. Identify the critical variables in enhancing productivity
  • 7.
    © 2011 Pearson 1- 7 The Hard Rock CafeThe Hard Rock Cafe  First opened in 1971  Now – 129 restaurants in over 40 countries  Rock music memorabilia  Creates value in the form of good food and entertainment  3,500+ custom meals per day in Orlando  How does an item get on the menu?  Role of the Operations Manager
  • 8.
    © 2011 Pearson 1- 8 What Is OperationsWhat Is Operations Management?Management? ProductionProduction is the creation of goods and services Operations management (OM)Operations management (OM) is the set of activities that create value in the form of goods and services by transforming inputs into outputs
  • 9.
    © 2011 Pearson 1- 9 Organizing to ProduceOrganizing to Produce Goods and ServicesGoods and Services  Essential functions: 1.1. MarketingMarketing – generates demand 2.2. Production/operationsProduction/operations – creates the product 3.3. Finance/accountingFinance/accounting – tracks how well the organization is doing, pays bills, collects the money
  • 10.
    © 2011 Pearson 1- 10 Organizational ChartsOrganizational Charts Operations Teller Scheduling Check Clearing Collection Transaction processing Facilities design/layout Vault operations Maintenance Security Finance Investments Security Real estate Accounting Auditing Marketing Loans Commercial Industrial Financial Personal Mortgage Trust Department Commercial Bank Figure 1.1(A)
  • 11.
    © 2011 Pearson 1- 11 Organizational ChartsOrganizational Charts Operations Ground support equipment Maintenance Ground Operations Facility maintenance Catering Flight Operations Crew scheduling Flying Communications Dispatching Management science Finance/ accounting Accounting Payables Receivables General Ledger Finance Cash control International exchange Airline Figure 1.1(B) Marketing Traffic administration Reservations Schedules Tariffs (pricing) Sales Advertising
  • 12.
    © 2011 Pearson 1- 12 Marketing Sales promotion Advertising Sales Market research Organizational ChartsOrganizational Charts Operations Facilities Construction; maintenance Production and inventory control Scheduling; materials control Quality assurance and control Supply-chain management Manufacturing Tooling; fabrication; assembly Design Product development and design Detailed product specifications Industrial engineering Efficient use of machines, space, and personnel Process analysis Development and installation of production tools and equipment Finance/ accounting Disbursements/ credits Receivables Payables General ledger Funds Management Money market International exchange Capital requirements Stock issue Bond issue and recall Manufacturing Figure 1.1(C)
  • 13.
    © 2011 Pearson 1- 13 Why Study OM?Why Study OM? 1. OM is one of three major functions of any organization, we want to study how people organize themselves for productive enterprise 2. We want (and need) to know how goods and services are produced 3. We want to understand what operations managers do 4. OM is such a costly part of an organization
  • 14.
    © 2011 Pearson 1- 14 Options for IncreasingOptions for Increasing ContributionContribution Table 1.1 Sales $100,000 $150,000 $100,000 $100,000 Cost of Goods – 80,000 – 120,000 – 80,000 – 64,000 Gross Margin 20,000 30,000 20,000 36,000 Finance Costs – 6,000 – 6,000 – 3,000 – 6,000 Subtotal 14,000 24,000 17,000 30,000 Taxes at 25% – 3,500 – 6,000 – 4,250 – 7,500 Contribution $ 10,500 $ 18,000 $ 12,750 $ 22,500 Finance/ Marketing Accounting OM Option Option Option Increase Reduce Reduce Sales Finance Production Current Revenue 50% Costs 50% Costs 20%
  • 15.
    © 2011 Pearson 1- 15 What OperationsWhat Operations Managers DoManagers Do  Planning  Organizing  Staffing  Leading  Controlling Basic Management FunctionsBasic Management Functions
  • 16.
    © 2011 Pearson 1- 16 Ten Critical DecisionsTen Critical Decisions Ten Decision Areas Chapter(s) 1. Design of goods and services 5 2. Managing quality 6, Supplement 6 3. Process and capacity 7, Supplement 7 design 4. Location strategy 8 5. Layout strategy 9 6. Human resources and 10 job design 7. Supply-chain 11, Supplement 11 management 8. Inventory, MRP, JIT 12, 14, 16 9. Scheduling 13, 15 10. Maintenance 17 Table 1.2
  • 17.
    © 2011 Pearson 1- 17 The Critical DecisionsThe Critical Decisions 1. Design of goods and services  What good or service should we offer?  How should we design these products and services? 2. Managing quality  How do we define quality?  Who is responsible for quality? Table 1.2 (cont.)
  • 18.
    © 2011 Pearson 1- 18 The Critical DecisionsThe Critical Decisions 3. Process and capacity design  What process and what capacity will these products require?  What equipment and technology is necessary for these processes? 4. Location strategy  Where should we put the facility?  On what criteria should we base the location decision? Table 1.2 (cont.)
  • 19.
    © 2011 Pearson 1- 19 The Critical DecisionsThe Critical Decisions 5. Layout strategy  How should we arrange the facility?  How large must the facility be to meet our plan? 6. Human resources and job design  How do we provide a reasonable work environment?  How much can we expect our employees to produce? Table 1.2 (cont.)
  • 20.
    © 2011 Pearson 1- 20 The Critical DecisionsThe Critical Decisions 7. Supply-chain management  Should we make or buy this component?  Who should be our suppliers and how can we integrate them into our strategy? 8. Inventory, material requirements planning, and JIT  How much inventory of each item should we have?  When do we re-order? Table 1.2 (cont.)
  • 21.
    © 2011 Pearson 1- 21 The Critical DecisionsThe Critical Decisions 9. Intermediate and short–term scheduling  Are we better off keeping people on the payroll during slowdowns?  Which jobs do we perform next? 10.Maintenance  How do we build reliability into our processes?  Who is responsible for maintenance? Table 1.2 (cont.)
  • 22.
    © 2011 Pearson 1- 22 Where are the OM Jobs?Where are the OM Jobs?  Technology/methods  Facilities/space utilization  Strategic issues  Response time  People/team development  Customer service  Quality  Cost reduction  Inventory reduction  Productivity improvement
  • 23.
    © 2011 Pearson 1- 23 OpportunitiesOpportunities Figure 1.2
  • 24.
    © 2011 Pearson 1- 24 CertificationsCertifications  APICS, the American Production and Inventory Control Society  American Society of Quality (ASQ)  Institute for Supply Management (ISM)  Project Management Institute (PMI)  Council of Supply Chain Management Professionals  Charter Institute of Purchasing and Supply (CIPS)
  • 25.
    © 2011 Pearson 1- 25 Significant Events in OMSignificant Events in OM Figure 1.3
  • 26.
    © 2011 Pearson 1- 26 The Heritage of OMThe Heritage of OM  Division of labor (Adam Smith 1776; Charles Babbage 1852)  Standardized parts (Whitney 1800)  Scientific Management (Taylor 1881)  Coordinated assembly line (Ford/ Sorenson 1913)  Gantt charts (Gantt 1916)  Motion study (Frank and Lillian Gilbreth 1922)  Quality control (Shewhart 1924; Deming 1950)
  • 27.
    © 2011 Pearson 1- 27 The Heritage of OMThe Heritage of OM  Computer (Atanasoff 1938)  CPM/PERT (DuPont 1957, Navy 1958)  Material requirements planning (Orlicky 1960)  Computer aided design (CAD 1970)  Flexible manufacturing system (FMS 1975)  Baldrige Quality Awards (1980)  Computer integrated manufacturing (1990)  Globalization (1992)  Internet (1995)
  • 28.
    © 2011 Pearson 1- 28 Eli WhitneyEli Whitney  Born 1765; died 1825  In 1798, received government contract to make 10,000 muskets  Showed that machine tools could make standardized parts to exact specifications  Musket parts could be used in any musket
  • 29.
    © 2011 Pearson 1- 29 Frederick W. TaylorFrederick W. Taylor  Born 1856; died 1915  Known as ‘father of scientific management’  In 1881, as chief engineer for Midvale Steel, studied how tasks were done  Began first motion and time studies  Created efficiency principles
  • 30.
    © 2011 Pearson 1- 30 Taylor’s PrinciplesTaylor’s Principles  Matching employees to right job  Providing the proper training  Providing proper work methods and tools  Establishing legitimate incentives for work to be accomplished Management Should TakeManagement Should Take More Responsibility for:More Responsibility for:
  • 31.
    © 2011 Pearson 1- 31 Frank & Lillian GilbrethFrank & Lillian Gilbreth  Frank (1868-1924); Lillian (1878-1972)  Husband-and-wife engineering team  Further developed work measurement methods  Applied efficiency methods to their home and 12 children!  Book & Movie: “Cheaper by the Dozen,” “Bells on Their Toes”
  • 32.
    © 2011 Pearson 1- 32  Born 1863; died 1947  In 1903, created Ford Motor Company  In 1913, first used moving assembly line to make Model T Unfinished product moved by conveyor past work station  Paid workers very well for 1911 ($5/day!) Henry FordHenry Ford
  • 33.
    © 2011 Pearson 1- 33 W. Edwards DemingW. Edwards Deming  Born 1900; died 1993  Engineer and physicist  Credited with teaching Japan quality control methods in post-WW2  Used statistics to analyze process  His methods involve workers in decisions
  • 34.
    © 2011 Pearson 1- 34 Contributions FromContributions From  Human factors  Industrial engineering  Management science  Biological science  Physical sciences  Information technology
  • 35.
    © 2011 Pearson 1- 35 New Challenges in OMNew Challenges in OM  Global focus  Just-in-time  Supply-chain partnering  Rapid product development, alliances  Mass customization  Empowered employees, teams ToToFromFrom  Local or national focus  Batch shipments  Low bid purchasing  Lengthy product development  Standard products  Job specialization
  • 36.
    © 2011 Pearson 1- 36 Characteristics of GoodsCharacteristics of Goods  Tangible product  Consistent product definition  Production usually separate from consumption  Can be inventoried  Low customer interaction
  • 37.
    © 2011 Pearson 1- 37 Characteristics of ServiceCharacteristics of Service  Intangible product  Produced and consumed at same time  Often unique  High customer interaction  Inconsistent product definition  Often knowledge-based  Frequently dispersed
  • 38.
    © 2011 Pearson 1- 38 Industry and Services asIndustry and Services as Percentage of GDPPercentage of GDP Services Manufacturing Australia Canada China CzechRep France Germany HongKong Japan Mexico RussianFed SouthAfrica Spain UK US 90 − 80 − 70 − 60 − 50 − 40 − 30 − 20 − 10 − 0 −
  • 39.
    © 2011 Pearson 1- 39 Goods and ServicesGoods and Services Automobile Computer Installed carpeting Fast-food meal Restaurant meal/auto repair Hospital care Advertising agency/ investment management Consulting service/ teaching Counseling Percent of Product that is a Good Percent of Product that is a Service 100% 75 50 25 0 25 50 75 100% | | | | | | | | |
  • 40.
    © 2011 Pearson 1- 40 120 – 100 – 80 – 60 – 40 – 20 – 0 – | | | | | | | 1950 1970 1990 2010 (est) 1960 1980 2000 Employment(millions) Manufacturing and ServiceManufacturing and Service EmploymentEmployment Figure 1.4 (A) Manufacturing ServiceService
  • 41.
    © 2011 Pearson 1- 41 Manufacturing EmploymentManufacturing Employment and Productionand Production Figure 1.4 (B) 40 – 30 – 20 – 10 – 0 – | | | | | | | 1950 1970 1990 2010 (est) 1960 1980 2000 – 150150 – 125125 – 100100 – 7575 – 5050 – 2525 – 00 Employment(millions) Index:1997=100Index:1997=100 Manufacturing employment (left scale) IndustrialIndustrial productionproduction (right scale)(right scale)
  • 42.
    © 2011 Pearson 1- 42 Development of theDevelopment of the Service EconomyService Economy Figure 1.4 (C) United States Canada France Italy Britain Japan W. Germany 1970 2010 (est) | | | | | 40 50 60 70 80 Percent
  • 43.
    © 2011 Pearson 1- 43 Organizations in Each SectorOrganizations in Each Sector Service SectorService Sector ExampleExample % of all% of all JobsJobs Education, Legal, Medical, other San Diego Zoo, Arnold Palmer Hospital 25.8 Trade (retail, wholesale) Walgreen’s, Wal-Mart, Nordstrom’s 14.9 Utilities, Transportation Pacific Gas & Electric, American Airlines 5.2 Professional and Business Services Snelling and Snelling, Waste Management, Inc. 10.7 Table 1.3
  • 44.
    © 2011 Pearson 1- 44 Organizations in Each SectorOrganizations in Each Sector Service SectorService Sector ExampleExample % of all% of all JobsJobs Finance, Information, Real Estate Citicorp, American Express, Prudential, Aetna 9.6 Food, Lodging, Entertainment Olive Garden, Motel 6, Walt Disney 8.5 Public Administration U.S., State of Alabama, Cook County 4.6 Total 78.8 Table 1.3
  • 45.
    © 2011 Pearson 1- 45 Organizations in Each SectorOrganizations in Each Sector Other SectorsOther Sectors ExampleExample % of all% of all JobsJobs Manufacturing Sector General Electric, Ford, U.S. Steel, Intel 11.2 Construction Sector Bechtel, McDermott 8.1 Agriculture Sector King Ranch 1.4 Mining Sector Homestake Mining 0.5 Total 21.2 Table 1.3
  • 46.
    © 2011 Pearson 1- 46 Changing ChallengesChanging Challenges Traditional Approach Reasons for Change Current Challenge Ethics and regulations not at the forefront Public concern over pollution, corruption, child labor, etc. High ethical and social responsibility; increased legal and professional standards Local or national focus Growth of reliable, low cost communication and transportation Global focus, international collaboration Lengthy product development Shorter life cycles; growth of global communication; CAD, Internet Rapid product development; design collaboration Figure 1.5
  • 47.
    © 2011 Pearson 1- 47 Changing ChallengesChanging Challenges Traditional Approach Reasons for Change Current Challenge Low cost production, with little concern for environment; free resources (air, water) ignored Public sensitivity to environment; ISO 14000 standard; increasing disposal costs Environmentally sensitive production; green manufacturing; sustainability Low-cost standardized products Rise of consumerism; increased affluence; individualism Mass customization Figure 1.5
  • 48.
    © 2011 Pearson 1- 48 Changing ChallengesChanging Challenges Traditional Approach Reasons for Change Current Challenge Emphasis on specialized, often manual tasks Recognition of the employee's total contribution; knowledge society Empowered employees; enriched jobs “In-house” production; low-bid purchasing Rapid technological change; increasing competitive forces Supply-chain partnering; joint ventures, alliances Large lot production Shorter product life cycles; increasing need to reduce inventory Just-In-Time performance; lean; continuous improvement Figure 1.5
  • 49.
    © 2011 Pearson 1- 49 New Trends in OMNew Trends in OM  Ethics  Global focus  Environmentally sensitive production  Rapid product development  Environmentally sensitive production  Mass customization  Empowered employees  Supply-chain partnering  Just-in-time performance
  • 50.
    © 2011 Pearson 1- 50 Productivity ChallengeProductivity Challenge Productivity is the ratio of outputs (goods and services) divided by the inputs (resources such as labor and capital) The objective is to improve productivity!The objective is to improve productivity! Important Note! Production is a measure of output only and not a measure of efficiency
  • 51.
    © 2011 Pearson 1- 51 Feedback loop Outputs Goods and services Transformation The U.S. economic system transforms inputs to outputs at about an annual 2.5% increase in productivity per year. The productivity increase is the result of a mix of capital (38% of 2.5%), labor (10% of 2.5%), and management (52% of 2.5%). The Economic SystemThe Economic System Inputs Labor, capital, management Figure 1.6
  • 52.
    © 2011 Pearson 1- 52 Improving Productivity atImproving Productivity at StarbucksStarbucks A team of 10 analystsA team of 10 analysts continually look for wayscontinually look for ways to shave time. Someto shave time. Some improvements:improvements: Stop requiring signatures on credit card purchases under $25 Saved 8 seconds per transaction Change the size of the ice scoop Saved 14 seconds per drink New espresso machines Saved 12 seconds per shot
  • 53.
    © 2011 Pearson 1- 53 Improving Productivity atImproving Productivity at StarbucksStarbucks A team of 10 analystsA team of 10 analysts continually look for wayscontinually look for ways to shave time. Someto shave time. Some improvements:improvements: Stop requiring signatures on credit card purchases under $25 Saved 8 seconds per transaction Change the size of the ice scoop Saved 14 seconds per drink New espresso machines Saved 12 seconds per shot Operations improvements have helped Starbucks increase yearly revenue per outlet by $200,000 to $940,000 in six years. Productivity has improved by 27%, or about 4.5% per year.
  • 54.
    © 2011 Pearson 1- 54  Measure of process improvement  Represents output relative to input  Only through productivity increases can our standard of living improve ProductivityProductivity Productivity = Units produced Input used
  • 55.
    © 2011 Pearson 1- 55 Productivity CalculationsProductivity Calculations Productivity = Units produced Labor-hours used = = 4 units/labor-hour 1,000 250 Labor ProductivityLabor Productivity One resource input  single-factor productivity
  • 56.
    © 2011 Pearson 1- 56 Multi-Factor ProductivityMulti-Factor Productivity Output Labor + Material + Energy + Capital + Miscellaneous Productivity =  Also known as total factor productivity  Output and inputs are often expressed in dollars Multiple resource inputs  multi-factor productivity
  • 57.
    © 2011 Pearson 1- 57 Collins Title ProductivityCollins Title Productivity Staff of 4 works 8 hrs/day 8 titles/day Payroll cost = $640/day Overhead = $400/day Old System:Old System: = Old labor productivity 8 titles/day 32 labor-hrs
  • 58.
    © 2011 Pearson 1- 58 Collins Title ProductivityCollins Title Productivity Staff of 4 works 8 hrs/day 8 titles/day Payroll cost = $640/day Overhead = $400/day Old System:Old System: 8 titles/day 32 labor-hrs = Old labor productivity = .25 titles/labor-hr
  • 59.
    © 2011 Pearson 1- 59 Collins Title ProductivityCollins Title Productivity Staff of 4 works 8 hrs/day 8 titles/day Payroll cost = $640/day Overhead = $400/day Old System:Old System: 14 titles/day Overhead = $800/day New System:New System: 8 titles/day 32 labor-hrs = Old labor productivity = New labor productivity = .25 titles/labor-hr 14 titles/day14 titles/day 32 labor-hrs32 labor-hrs
  • 60.
    © 2011 Pearson 1- 60 Collins Title ProductivityCollins Title Productivity Staff of 4 works 8 hrs/day 8 titles/day Payroll cost = $640/day Overhead = $400/day Old System:Old System: 14 titles/day Overhead = $800/day New System:New System: 8 titles/day 32 labor-hrs = Old labor productivity = .25 titles/labor-hr 14 titles/day 32 labor-hrs = New labor productivity = .4375 titles/labor-hr
  • 61.
    © 2011 Pearson 1- 61 Collins Title ProductivityCollins Title Productivity Staff of 4 works 8 hrs/day 8 titles/day Payroll cost = $640/day Overhead = $400/day Old System:Old System: 14 titles/day Overhead = $800/day New System:New System: = Old multifactor productivity 8 titles/day $640 + 400
  • 62.
    © 2011 Pearson 1- 62 Collins Title ProductivityCollins Title Productivity Staff of 4 works 8 hrs/day 8 titles/day Payroll cost = $640/day Overhead = $400/day Old System:Old System: 14 titles/day Overhead = $800/day New System:New System: 8 titles/day $640 + 400 = Old multifactor productivity = .0077 titles/dollar
  • 63.
    © 2011 Pearson 1- 63 Collins Title ProductivityCollins Title Productivity Staff of 4 works 8 hrs/day 8 titles/day Payroll cost = $640/day Overhead = $400/day Old System:Old System: 14 titles/day Overhead = $800/day New System:New System: 8 titles/day $640 + 400 = Old multifactor productivity = New multifactor productivity = .0077 titles/dollar 14 titles/day14 titles/day $640 + 800$640 + 800
  • 64.
    © 2011 Pearson 1- 64 Collins Title ProductivityCollins Title Productivity Staff of 4 works 8 hrs/day 8 titles/day Payroll cost = $640/day Overhead = $400/day Old System:Old System: 14 titles/day Overhead = $800/day New System:New System: 8 titles/day $640 + 400 14 titles/day $640 + 800 = Old multifactor productivity = New multifactor productivity = .0077 titles/dollar = .0097 titles/dollar
  • 65.
    © 2011 Pearson 1- 65 Measurement ProblemsMeasurement Problems 1.1. QualityQuality may change while the quantity of inputs and outputs remains constant 2.2. External elementsExternal elements may cause an increase or decrease in productivity  Precise unitsPrecise units of measure may be lacking
  • 66.
    © 2011 Pearson 1- 66 Productivity VariablesProductivity Variables 1.1. LaborLabor - contributes about 10% of the annual increase 2.2. CapitalCapital - contributes about 38% of the annual increase 3.3. ManagementManagement - contributes about 52% of the annual increase
  • 67.
    © 2011 Pearson 1- 67 Key Variables for ImprovedKey Variables for Improved Labor ProductivityLabor Productivity 1. Basic education appropriate for the labor force 2. Diet of the labor force 3. Social overhead that makes labor available  Challenge is in maintaining and enhancing skills in the midst of rapidly changing technology and knowledge
  • 68.
    © 2011 Pearson 1- 68 Labor SkillsLabor Skills About half of the 17-year-olds in the U.S. cannotAbout half of the 17-year-olds in the U.S. cannot correctly answer questions of this typecorrectly answer questions of this type Figure 1.7
  • 69.
    © 2011 Pearson 1- 69 Investment and ProductivityInvestment and Productivity 10 8 6 4 2 0 Percentincreaseinproductivity Percentage investment 10 15 20 25 30 35
  • 70.
    © 2011 Pearson 1- 70 Service ProductivityService Productivity 1. Typically labor intensive 2. Frequently focused on unique individual attributes or desires 3. Often an intellectual task performed by professionals 4. Often difficult to mechanize 5. Often difficult to evaluate for quality
  • 71.
    © 2011 Pearson 1- 71 Productivity at Taco BellProductivity at Taco Bell Improvements:  Revised the menu  Designed meals for easy preparation  Shifted some preparation to suppliers  Efficient layout and automation  Training and employee empowerment  New water and energy saving grills
  • 72.
    © 2011 Pearson 1- 72 Productivity at Taco BellProductivity at Taco Bell Improvements:  Revised the menu  Designed meals for easy preparation  Shifted some preparation to suppliers  Efficient layout and automation  Training and employee empowerment  New water and energy saving grills Results:  Preparation time cut to 8 seconds  Management span of control increased from 5 to 30  In-store labor cut by 15 hours/day  Stores handle twice the volume with half the labor  Conserve 300 million gallons of water andConserve 300 million gallons of water and 200 million KwH of electricity each year200 million KwH of electricity each year saving $17 million annuallysaving $17 million annually
  • 73.
    © 2011 Pearson 1- 73 Ethics andEthics and Social ResponsibilitySocial Responsibility Challenges facingChallenges facing operations managers:operations managers:  Developing and producing safe, quality products  Maintaining a clean environment  Providing a safe workplace  Honoring stakeholder commitments
  • 74.
    © 2011 Pearson 1- 74 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. Printed in the United States of America.

Editor's Notes

  • #20 Using this and subsequent slides, you might go through in more detail the decisions of Operations Management. While greater detail is provided by these slides than the earlier one, you may still decide to have the students contribute examples from their own experience.