Project Name: xxx
RA Ref No.: xxx
RA compilation Date: Review date:
Date:
Compiled by:
Reviewed by:
Approved by:
Overall Task Details
Storage of substances classified under CoSHH on project sites, such as paints and associated thinners and cleaners, protective coatings, additives, adhesives and sealants, chemical sprays, fuels and oils, etc. Relevant Applicable MAS:
• 00939 – Storage of Substances Hazardous to Health Additional Training required:
NOC’s Required for task:
RISK SCORE CALCULATOR
Use the Risk Score Calculator to Determine the Level of Risk of each Hazard
What would be the
CONSEQUENCE
of an occurrence be? What is the LIKELIHOOD of an occurrence? Hierarchy of Controls
Frequent/Almost certain (5)
Continuous or will happen frequently Often (4)
6 to 12 times a year Likely (3)
1 to 5 times a year Possible (2)
Once every 5 years Rarely (1)
Less than once every 5 years Can the hazard be Eliminated or removed from the work place?
Catastrophic (5)
Multiple Fatalities High 25 High 20 High 15 Medium 10 Medium 5 Can the product or process be substituted for a less hazardous alternative?
Serious (4)
Class 1 single fatality High 20 High 16 High 12 Medium 8 Low 4 Can the hazard be engineered away with guards or barriers?
Moderate (3)
Class2 (AWI or LTI) or Class 1 Permanently disabling effects High 15 High 12 Medium 9 Medium 6 Low 3 Can Administration Controls be adopted
I.e. procedures, job rotation etc.
Minor (2)
Medical attention needed, no work restrictions. MTI Medium10 Medium 8 Medium 6 Low 4 Low 2 Can Personal Protective Equipment & Clothing be worn to safe guard against hazards?
Insignificant (1)
FAI Medium10 Medium 4 Low 3 Low 2 Low 1
No Specific Task Step
(In sequence of works) Hazard Details Consequence/Risk Initial Risk Rating Control Measures Residual Risks Additional Control Measures RR
L C RR
1 PRIOR TO / AT SITE DELIVERY • Hazardous substances • Poor or incorrect substance storage due to lack of manufacturer’s specification; 3 3 9 MED i. Store operatives to ensure a Hazard Data Sheet is supplied ideally prior to substance delivery, if not supplied when delivered to site; Documentation unavailable for review Substance quarantined until evidence provided Low
2 Storage • Storage of Substance potentially hazardous to worker health or to the environment; • Possible inhalation, absorption of hazardous fumes, vapor and substances hazardous to health;
• Build-up of flammable vapor in confined area;
• Fire;
• Inadequate cooling and ventilation of storage resulting in ill health or combustion;
• Inadequate signage and substance identification;
• Poor controls over distribution of substances/chemicals;
• Excessive quantities issued to work areas;
3 4 12 HIGH i. HLG Workplaces storing hazardous substances/chemicals, using hazardous materials and/or generating hazardous waste shall have a hazardous materials management system;
ii. A plan of the store showing locations of the hazardous materials / wastes
2 Fire Risk Assessment Template Risk Assessment Templates
1. Site set up of temporary offices and cabins
Incl. Fire risk assessment;
2. Use of Portable gas heating or cutting equipment.
(all areas)
3. Electrical equipment (portable and fixed installation)
4. Smoking prevention, controls and arrangements within the Project
5. Hot Works activity controls
(Grinding, Welding, Cutting etc.)
6. Waste disposal: Combustible materials controlled and disposed of correctly.
(E.g. paper, cardboard plastics or wood.)
7. Storage of Flammable Gas within the project
(Acetylene, propane, butane, LPG etc.)
8. Flammable or highly flammable materials or substances on site and point of use.
(e.g. solvents, paints, adhesives, aerosols etc.)
9. Steps to reduce the potential sources of oxygen to a fire.
10. Any operations (or proposed) that may affect the Fire risk assessment
11. Clear access to electrical components and equipment.
12. Suspended ceilings within temporary buildings
(Offices, cabins etc.)
13. Alterations to structure and installations designed to prevent fire spread
14. Arson Prevention
(including security)
15. Smoke/heat detectors installed in high risk areas
16. Fire call points (break glass) installation.
17. Audible/visual fire alarms.
20 use of suspended access cradles and platforms (temporary works) risk asses...Dwarika Bhushan Sharma
20 Use of Suspended Access cradles and Platforms (Temporary Works) Risk Assessment Templates
Cradle checks on arrival to site
PRIOR TO USE • Use of Access equipment • Failure due to use of un-certificated plant;
Pre-use checks of suspended access cradle or platform • Work at Height; • Collapse of cradle through damage or failure of equipment;
• Falling materials;
Cradle operation ; • Work at Height; • Fall from height;
• Material fall from height;
• Machine malfunction at height;
• Workers trapped at height;
15 Formwork (Temporary Works) Risk Assessment Templates
Access to work areas by personnel and plant.
Material delivery to work area;
Formwork installation
(Classified as Temporary Structures)
Housekeeping when erecting formwork
Dismantling of form-work
Maintenance of Formwork
Worker exposure to direct sun whist working on formwork
(as applicable)
16 Scaffolding (Temporary Works) Risk Assessment Templates
Access to work areas by personnel and plant.
Scaffold Material delivery to work area;
Scaffold design and erection standards
(Classified as Temporary Structure)
Scaffold erection
(Classified as Temporary Structure)
Dismantling of scaffold
Maintenance of Scaffold
Worker exposure to direct sun whist working on scaffold
(as applicable)
Overhead crane, crane safety, lifting operation, EHS, Safety, Testing of Crane, Commissioning of Cranes,
for soft copy please email me at dawoodibrar@hotmail.com
PRIOR TO / AT SITE DELIVERY • Hazardous substances
Storage • Storage of Substance potentially hazardous to worker health or to the environment;
Use of substances and chemicals on site • Use of Substances potentially hazardous to worker health or the environment;
Emergency procedures • Action to be taken in an emergency
Disposal of waste skips • Disposal of out of date substances;
• Disposal of used/empty containers;
13 Initial Project Site Office Set-up Risk Assessment Templates
Working adjacent to public areas
Vehicles/Plant Equipment movements
Groundworks / excavations
Excavation in site area
Trial trenches, septic tank excavation etc.
Works at Height
(Office cabin set-up)
Use of Ladders and stepladders
Mobile Crane operation
(Cabin/unit placing)
Temporary electrics - offices
Site generators – offices and site
2 Fire Risk Assessment Template Risk Assessment Templates
1. Site set up of temporary offices and cabins
Incl. Fire risk assessment;
2. Use of Portable gas heating or cutting equipment.
(all areas)
3. Electrical equipment (portable and fixed installation)
4. Smoking prevention, controls and arrangements within the Project
5. Hot Works activity controls
(Grinding, Welding, Cutting etc.)
6. Waste disposal: Combustible materials controlled and disposed of correctly.
(E.g. paper, cardboard plastics or wood.)
7. Storage of Flammable Gas within the project
(Acetylene, propane, butane, LPG etc.)
8. Flammable or highly flammable materials or substances on site and point of use.
(e.g. solvents, paints, adhesives, aerosols etc.)
9. Steps to reduce the potential sources of oxygen to a fire.
10. Any operations (or proposed) that may affect the Fire risk assessment
11. Clear access to electrical components and equipment.
12. Suspended ceilings within temporary buildings
(Offices, cabins etc.)
13. Alterations to structure and installations designed to prevent fire spread
14. Arson Prevention
(including security)
15. Smoke/heat detectors installed in high risk areas
16. Fire call points (break glass) installation.
17. Audible/visual fire alarms.
20 use of suspended access cradles and platforms (temporary works) risk asses...Dwarika Bhushan Sharma
20 Use of Suspended Access cradles and Platforms (Temporary Works) Risk Assessment Templates
Cradle checks on arrival to site
PRIOR TO USE • Use of Access equipment • Failure due to use of un-certificated plant;
Pre-use checks of suspended access cradle or platform • Work at Height; • Collapse of cradle through damage or failure of equipment;
• Falling materials;
Cradle operation ; • Work at Height; • Fall from height;
• Material fall from height;
• Machine malfunction at height;
• Workers trapped at height;
15 Formwork (Temporary Works) Risk Assessment Templates
Access to work areas by personnel and plant.
Material delivery to work area;
Formwork installation
(Classified as Temporary Structures)
Housekeeping when erecting formwork
Dismantling of form-work
Maintenance of Formwork
Worker exposure to direct sun whist working on formwork
(as applicable)
16 Scaffolding (Temporary Works) Risk Assessment Templates
Access to work areas by personnel and plant.
Scaffold Material delivery to work area;
Scaffold design and erection standards
(Classified as Temporary Structure)
Scaffold erection
(Classified as Temporary Structure)
Dismantling of scaffold
Maintenance of Scaffold
Worker exposure to direct sun whist working on scaffold
(as applicable)
Overhead crane, crane safety, lifting operation, EHS, Safety, Testing of Crane, Commissioning of Cranes,
for soft copy please email me at dawoodibrar@hotmail.com
PRIOR TO / AT SITE DELIVERY • Hazardous substances
Storage • Storage of Substance potentially hazardous to worker health or to the environment;
Use of substances and chemicals on site • Use of Substances potentially hazardous to worker health or the environment;
Emergency procedures • Action to be taken in an emergency
Disposal of waste skips • Disposal of out of date substances;
• Disposal of used/empty containers;
13 Initial Project Site Office Set-up Risk Assessment Templates
Working adjacent to public areas
Vehicles/Plant Equipment movements
Groundworks / excavations
Excavation in site area
Trial trenches, septic tank excavation etc.
Works at Height
(Office cabin set-up)
Use of Ladders and stepladders
Mobile Crane operation
(Cabin/unit placing)
Temporary electrics - offices
Site generators – offices and site
Project Information :
Project Name:
Month : Date :
Sl. No Type of Permit Permit No. Initiator/ Originator Contact No. Of Originator Company Name Issue Time Permit Expiry Close out Time
1
2
3
4
5
6
7
8
9
10
Remarks:
Recorded By: Signature:
Reviewed By HSE Manager / Incharge : Signature:
8 Lifting Operations with mobile crane Risk Assessment Templates
Crane checks on arrival to site
PRIOR TO USE
Access of crane to work areas
Siting and setting up of crane
Lifting of equipment and material
(Mobile crane Operator)
Crane supervision
Crane Maintenance
(revised 06-06-2018)
Project Fire Risk Assessment Report
(Quarterly) By: App: Project Relevant legislation:
• Federal Law No. 8 – Chapter 5 Article 92 ;
• DM Code of Construction Practice – Chapter 5;
• Regulation NO. 5 2009 Railways in the Emirate of Dubai (RED);
• Railway Protection Code of Practice (RWPCOP);
• UAE Fire and Life Safety Code of Practice – Chapter 12 (FLSCOP);
• Abu Dhabi Occupational Safety and Health Center – Code of Practise (OSHAD – CoP)
Issued: Rev.
Area: Assessment Date:
Next Assessment date:
Report compiled by:
Designation:
ASSESSMENT CRITERIA FIRE AND EMERGENCY CONTROL MEASURES AND LEGAL REQUIREMENTS RELEVANT LEGISLATION IMPLEMENTED PROJECT CONTROLS FOR COMPLIANCE COMMENTS FROM LAST FIRE ASSESSMENT
1. Site set up of temporary offices and cabins
Incl. Fire risk assessment; • Fire risk assessment undertaken on site set up and maintained/amended as project progresses;
• A copy of the fire risk assessment is maintained by HSE personnel;
• Separation distances between buildings under construction and construction-related structures, such as temporary offices, trailers, sheds, and other facilities for the storage of tools and materials having combustible construction or contents;
• No offices to be erected within the 70m Metro Protection Zone; FLSCOP Chapter 12 Table 12.1
RWPCOP
Section 4.6.1
DM Chapter 5.4
OSHAD CoP 8.0 & 43.0 •
2. Use of Portable gas heating or cutting equipment.
(all areas) • Ensure equipment is used in accordance with MAS and adequately maintained;
• Ensure suitable extraction is in place in confined areas and equipment is suitably maintained, extractors regularly maintained/cleaned;
• Ensure suitable fire- fighting equipment available nearby;
• Ensure use of Hot Works and Permits to Work as per section 5 and OSHAD CoP 21.0 and CoP 28.0;
• Ensure flashback arrestors fitted, hoses and connections sound and leak proof (as per inspection regime);
• Gas cylinder storage detailed in Section 7 and OSHAD CoP 49.0; FLSCOP Chapter 12 Section 7
DM Chapters 5, 15
OSHAD CoP 21.0, 28.0 & 49.0 •
3. Electrical equipment (portable and fixed installation)
• Portable electrical equipment to be tested every 6 months. Test stickers on appliances for date of last testing;
• Ensure fixed/temporary installations are checked by a competent person monthly and that this check is recorded and registered;
• Ensure that socket/DB outlets are not overloaded and connections are correct to standards;
• Correct rated fuses and breakers to be installed;
• DB’s to be waterproof and mounted on metal frames if on site;
• All site supply cables to be armoured;
• Install overhead cable frames where practicable in congested areas;
• Damaged equipment and cords shall be removed from service and quarantined until repaired or destroyed;
• Temporary lights shall not be suspended by their electrical cords unless such cords and lights have been designed for that purpose; FLSCOP Chapter 12 Section 14
DM Chapters 5.6, 16 & 17
O
Establishing exclusion zones • Personnel in area • Unauthorized access to test area;
• Workers struck by flying materials;
• Worker struck by High pressure water release;
Signage to test area • Personnel in area • Unauthorized access to test area;
• Inadequate signage to test area;
Pressure testing • High pressure to pipework; • Uncontrolled Stored Energy release;
• Rupture/failure in Pipe lines during testing;
• Valve/connection failure;
• Instrument failure resulting in system over-pressurization;
• End caps/plugs ejecting under high pressure;
• Weld/seal/fitting failure, flying objects;
• High pressure water/air injection.
Emergency procedures • High pressure to pipework; • Emergency procedures not briefed to task workers;
• Poor response in the event of an emergency;
Re-testing in the event of failure • Re-testing with high pressure • Injury due to uncontrolled testing;
• Worker injury due to working on pressurized system;
• Injury due to failure to ensure adequate pre-checks undertaken;
Concrete Pump checks on arrival to site
PRIOR TO SITE ACCESS
Formwork for columns
Scaffolding to formwork
Access of mobile pump and delivery trucks to work areas
Siting and setting up of concrete pump
Pumping concrete
(Pump Operator)
18 Laying blockwork with access scaffolding Risk Assessment Templates
Vehicles/Plant Equipment movements for block delivery
Hi-Abs, forklifts etc.
Access Scaffolding, Working platforms for high level block laying
Loading out blocks in work area and mixing mortar
Laying blockwork
Disposal of concrete – as per LEED requirements
Worker exposure to direct sun whist working on scaffolding
(as applicable)
Our VISION - Health, Safety & Environment
General site safety rules, Personal behavior and conduct.
Duty of Care – Employer Responsibilities , Employee obligation
Signs
Personal Protective Equipments ( P.P.E.)
Smoking Regulation, Traffic rules, Site Access & Security
Welfare & First Aid Facilities.
Reporting Incidents
Emergency Procedure - In case of accidents, FIRE
Safety Inspections. Safety Monitoring Meeting.
Safety Trainings
Safety Motivation - Safety Incentive Scheme, Disciplinary Action.
Workplace Hazard & Solutions (Housekeeping, Working at height, FIRE etc)
Slips, Trips, Bumps & Falls
Slips, trips and falls are among the highest causes of injury and incidents at workplace. A slip or fall will happen when there is not enough traction between the footwear and the walking surface. Slips often result in serious injuries and injuries to arms, wrists, backs and head are the most common. Most slip, trip and fall incidents are preventable with general precautions and safety measures.
Things to watch out for:
Watch out for low scaffoldings to avoid bumping into it.
Watch out for protruding rebar and pipes and other material.
When entering a darker area such as basements or lift shaft opening, approach with caution and allow time for eyes to adjust to the illumination difference.
Other Precautions:
Don’t walk with your hands in your pockets.
Don’t talk on the phone, take notes or other distractions while walking.
Don’t block stairways or aisles.
Always store items safely to avoid trip hazards.
Keep all entrances, exits and pedestrian walkways free and clear.
Maintain good housekeeping.
When exiting vehicles/buses use extra caution and use 3 point of contact holding onto vehicle door until you have firm footing.
21 Confined Space Working Risk Assessment Templates
Planned confined space work in areas where live services may be present including:
• Water;
• Sewerage;
• Gas;
PRIOR TO ENTRY
Confined space working –
• Deep excavations;
• Tanks;
• Vessels;
• Manholes;
• NDRC pits;
• Bridge decks;
• Pipework;
• Sewerage;
• Lift shafts;
• Ducting;
• Etc.
Planned excavation for NDRC pit in areas where live services may be present including:
• Electrical;
• Water;
• Sewerage;
• Gas;
• Telecoms;
PRIOR TO WORKS
Use of Excavator for excavating NDRC Pit and backfilling
Excavation open in site area
Confined space working – deep excavation for NDRC
NDRC – Thrust boring operation
Pipe electric welding inside pit
HDPE Welding inside pit
Maintenance of NDRC Excavation
Worker exposure to direct sun
(as applicable)
What is Permit to work system?
What are the requirements of permit to work?
Different types of permit to work system such electrical, hot and cold work etc.
Project Information :
Project Name:
Month : Date :
Sl. No Type of Permit Permit No. Initiator/ Originator Contact No. Of Originator Company Name Issue Time Permit Expiry Close out Time
1
2
3
4
5
6
7
8
9
10
Remarks:
Recorded By: Signature:
Reviewed By HSE Manager / Incharge : Signature:
8 Lifting Operations with mobile crane Risk Assessment Templates
Crane checks on arrival to site
PRIOR TO USE
Access of crane to work areas
Siting and setting up of crane
Lifting of equipment and material
(Mobile crane Operator)
Crane supervision
Crane Maintenance
(revised 06-06-2018)
Project Fire Risk Assessment Report
(Quarterly) By: App: Project Relevant legislation:
• Federal Law No. 8 – Chapter 5 Article 92 ;
• DM Code of Construction Practice – Chapter 5;
• Regulation NO. 5 2009 Railways in the Emirate of Dubai (RED);
• Railway Protection Code of Practice (RWPCOP);
• UAE Fire and Life Safety Code of Practice – Chapter 12 (FLSCOP);
• Abu Dhabi Occupational Safety and Health Center – Code of Practise (OSHAD – CoP)
Issued: Rev.
Area: Assessment Date:
Next Assessment date:
Report compiled by:
Designation:
ASSESSMENT CRITERIA FIRE AND EMERGENCY CONTROL MEASURES AND LEGAL REQUIREMENTS RELEVANT LEGISLATION IMPLEMENTED PROJECT CONTROLS FOR COMPLIANCE COMMENTS FROM LAST FIRE ASSESSMENT
1. Site set up of temporary offices and cabins
Incl. Fire risk assessment; • Fire risk assessment undertaken on site set up and maintained/amended as project progresses;
• A copy of the fire risk assessment is maintained by HSE personnel;
• Separation distances between buildings under construction and construction-related structures, such as temporary offices, trailers, sheds, and other facilities for the storage of tools and materials having combustible construction or contents;
• No offices to be erected within the 70m Metro Protection Zone; FLSCOP Chapter 12 Table 12.1
RWPCOP
Section 4.6.1
DM Chapter 5.4
OSHAD CoP 8.0 & 43.0 •
2. Use of Portable gas heating or cutting equipment.
(all areas) • Ensure equipment is used in accordance with MAS and adequately maintained;
• Ensure suitable extraction is in place in confined areas and equipment is suitably maintained, extractors regularly maintained/cleaned;
• Ensure suitable fire- fighting equipment available nearby;
• Ensure use of Hot Works and Permits to Work as per section 5 and OSHAD CoP 21.0 and CoP 28.0;
• Ensure flashback arrestors fitted, hoses and connections sound and leak proof (as per inspection regime);
• Gas cylinder storage detailed in Section 7 and OSHAD CoP 49.0; FLSCOP Chapter 12 Section 7
DM Chapters 5, 15
OSHAD CoP 21.0, 28.0 & 49.0 •
3. Electrical equipment (portable and fixed installation)
• Portable electrical equipment to be tested every 6 months. Test stickers on appliances for date of last testing;
• Ensure fixed/temporary installations are checked by a competent person monthly and that this check is recorded and registered;
• Ensure that socket/DB outlets are not overloaded and connections are correct to standards;
• Correct rated fuses and breakers to be installed;
• DB’s to be waterproof and mounted on metal frames if on site;
• All site supply cables to be armoured;
• Install overhead cable frames where practicable in congested areas;
• Damaged equipment and cords shall be removed from service and quarantined until repaired or destroyed;
• Temporary lights shall not be suspended by their electrical cords unless such cords and lights have been designed for that purpose; FLSCOP Chapter 12 Section 14
DM Chapters 5.6, 16 & 17
O
Establishing exclusion zones • Personnel in area • Unauthorized access to test area;
• Workers struck by flying materials;
• Worker struck by High pressure water release;
Signage to test area • Personnel in area • Unauthorized access to test area;
• Inadequate signage to test area;
Pressure testing • High pressure to pipework; • Uncontrolled Stored Energy release;
• Rupture/failure in Pipe lines during testing;
• Valve/connection failure;
• Instrument failure resulting in system over-pressurization;
• End caps/plugs ejecting under high pressure;
• Weld/seal/fitting failure, flying objects;
• High pressure water/air injection.
Emergency procedures • High pressure to pipework; • Emergency procedures not briefed to task workers;
• Poor response in the event of an emergency;
Re-testing in the event of failure • Re-testing with high pressure • Injury due to uncontrolled testing;
• Worker injury due to working on pressurized system;
• Injury due to failure to ensure adequate pre-checks undertaken;
Concrete Pump checks on arrival to site
PRIOR TO SITE ACCESS
Formwork for columns
Scaffolding to formwork
Access of mobile pump and delivery trucks to work areas
Siting and setting up of concrete pump
Pumping concrete
(Pump Operator)
18 Laying blockwork with access scaffolding Risk Assessment Templates
Vehicles/Plant Equipment movements for block delivery
Hi-Abs, forklifts etc.
Access Scaffolding, Working platforms for high level block laying
Loading out blocks in work area and mixing mortar
Laying blockwork
Disposal of concrete – as per LEED requirements
Worker exposure to direct sun whist working on scaffolding
(as applicable)
Our VISION - Health, Safety & Environment
General site safety rules, Personal behavior and conduct.
Duty of Care – Employer Responsibilities , Employee obligation
Signs
Personal Protective Equipments ( P.P.E.)
Smoking Regulation, Traffic rules, Site Access & Security
Welfare & First Aid Facilities.
Reporting Incidents
Emergency Procedure - In case of accidents, FIRE
Safety Inspections. Safety Monitoring Meeting.
Safety Trainings
Safety Motivation - Safety Incentive Scheme, Disciplinary Action.
Workplace Hazard & Solutions (Housekeeping, Working at height, FIRE etc)
Slips, Trips, Bumps & Falls
Slips, trips and falls are among the highest causes of injury and incidents at workplace. A slip or fall will happen when there is not enough traction between the footwear and the walking surface. Slips often result in serious injuries and injuries to arms, wrists, backs and head are the most common. Most slip, trip and fall incidents are preventable with general precautions and safety measures.
Things to watch out for:
Watch out for low scaffoldings to avoid bumping into it.
Watch out for protruding rebar and pipes and other material.
When entering a darker area such as basements or lift shaft opening, approach with caution and allow time for eyes to adjust to the illumination difference.
Other Precautions:
Don’t walk with your hands in your pockets.
Don’t talk on the phone, take notes or other distractions while walking.
Don’t block stairways or aisles.
Always store items safely to avoid trip hazards.
Keep all entrances, exits and pedestrian walkways free and clear.
Maintain good housekeeping.
When exiting vehicles/buses use extra caution and use 3 point of contact holding onto vehicle door until you have firm footing.
21 Confined Space Working Risk Assessment Templates
Planned confined space work in areas where live services may be present including:
• Water;
• Sewerage;
• Gas;
PRIOR TO ENTRY
Confined space working –
• Deep excavations;
• Tanks;
• Vessels;
• Manholes;
• NDRC pits;
• Bridge decks;
• Pipework;
• Sewerage;
• Lift shafts;
• Ducting;
• Etc.
Planned excavation for NDRC pit in areas where live services may be present including:
• Electrical;
• Water;
• Sewerage;
• Gas;
• Telecoms;
PRIOR TO WORKS
Use of Excavator for excavating NDRC Pit and backfilling
Excavation open in site area
Confined space working – deep excavation for NDRC
NDRC – Thrust boring operation
Pipe electric welding inside pit
HDPE Welding inside pit
Maintenance of NDRC Excavation
Worker exposure to direct sun
(as applicable)
What is Permit to work system?
What are the requirements of permit to work?
Different types of permit to work system such electrical, hot and cold work etc.
RISK SCORE CALCULATOR
Use the Risk Score Calculator to Determine the Level of Risk of each Hazard
What would be the
CONSEQUENCE
of an occurrence be? What is the LIKELIHOOD of an occurrence? Hierarchy of Controls
Frequent/Almost certain (5)
Continuous or will happen frequently Often (4)
6 to 12 times a year Likely (3)
1 to 5 times a year Possible (2)
Once every 5 years Rarely (1)
Less than once every 5 years Can the hazard be Eliminated or removed from the work place?
Catastrophic (5)
Multiple Fatalities High 25 High 20 High 15 Medium 10 Medium 5 Can the product or process be substituted for a less hazardous alternative?
Serious (4)
Class 1 single fatality High 20 High 16 High 12 Medium 8 Low 4 Can the hazard be engineered away with guards or barriers?
Moderate (3)
Class2 (AWI or LTI) or Class 1 Permanently disabling effects High 15 High 12 Medium 9 Medium 6 Low 3 Can Administration Controls be adopted
I.e. procedures, job rotation etc.
Minor (2)
Medical attention needed, no work restrictions. MTI Medium10 Medium 8 Medium 6 Low 4 Low 2 Can Personal Protective Equipment & Clothing be worn to safe guard against hazards?
Insignificant (1)
FAI Medium10 Medium 4 Low 3 Low 2 Low 1
Project Name: xxx
RA Ref No.: xxx
RA compilation Date: Review date:
Date:
Compiled by:
Reviewed by:
Approved by:
Overall Task Details
Working in area designated as a confined space Relevant Applicable MAS:
• 00246 – Excavations;
• 00233 – Lift Shafts Additional Training required:
NOC’s Required for task:
No Specific Task Step
(In sequence of works) Hazard Details Consequence/Risk Initial Risk Rating Control Measures Residual Risks Additional Control Measures RR
P S RR
1 Planned confined space work in areas where live services may be present including:
• Water;
• Sewerage;
• Gas;
PRIOR TO ENTRY • Presence of live underground services;
• Services not in area specified on drawings;
• Presence of unmarked services;
• Risk of asphyxia;
• Risk of explosion due to gas ignition;
• Risk of flooding of confined space;
• Risk of hazardous waste entering confined space due to live sewerage;
• Risk of vehicles / Plant entering confined space; 4 4 20
HIGH i. All existing utility service drawings reviewed for known service details and position;
ii. NOC and Utility provider and HLG permits to be completed, unique number added and recorded in log;
iii. All services clearly communicated to all workers at briefings and TBT’s, signed off and recorded;
iv. Permit/NOC/JSEA/Approved design Drawings copies to be with task supervisor in work area for review;
v. Suitable training undertaken for operatives; LOW
2 Confined space working –
• Deep excavations;
• Tanks;
• Vessels;
• Manholes;
• NDRC pits;
• Bridge decks;
• Pipework;
• Sewerage;
• Lift shafts;
• Ducting;
• Etc. • Workers required to work in confined space; • Excess or lack of oxygen;
• Presence of Toxic gases;
• Ingress of water or other substances;
• Explosion due to build-up of gases;
• Sudden w
Petrolatum, commonly referred to as petroleum jelly, is an oil-based product that is unctuous, translucent, yellowish to amber in colour or white. It is largely used in medicine and pharmacy as a protective dressing and as a substitute for fats in ointments and cosmetics. It hardly has any flavour or smell. Furthermore, it is used in several polishes and lubricating greases.
Elchemy is the leading petroleum jelly supplier, and exporter, offering high-quality and innovative chemical products to a wide range of industries. For more details, visit our website now!
https://www.elchemy.com/
Website: https://www.scottishwindowtinting.com/salt-lake-city/
Scottish Window Tinting Salt Lake City.
This file is from Salt Lake City, Utah. It contains information about window tinting. All information and rights to the material are copyrighted by the company to whom it belongs to. Thank you for viewing. Scottish Window Tinting hopes you enjoy.
Website: https://www.scottishwindowtinting.com/dallas/
Scottish Window Tinting Dallas.
This file is from Dallas, Texas. It contains information about window tinting. All information and rights to the material are copyrighted by the company to whom it belongs to. Thank you for viewing. Scottish Window Tinting hopes you enjoy.
This file is from Salt Lake City, Utah. It contains information about window tinting. All information and rights to the material are copyrighted by the company to whom it belongs to. Thank you for viewing. Salt Lake Window Tinting hopes you enjoy.
Similar to 26 Storage of Substances under CoSHH Risk Assessment Templates.docx (20)
Project Information:
Project Name:
Location: Supervisor :
Company name : Date:
Task Description:
Before work starts, the following must be in place
Induction Supervision Test Certificates Communication in same language Method Statement Risk Assessment Permit To Work Area Lighting
SELECT HAZARDS SELECT CONTROLS
( Tick to identify the controls in place)
Fall from height Training Access Ladder Access Handrail Edge Protection Secure Ladder Adequate Work Platform Guards for Openings Safety Harness Life Lines
Others( Specify)
Manual Handling Training Check Weight Mechanical Aids Access Route Team Lifting Wrong method Right Method
Power tools Training Color code inspection tag Check Cable Wheel guards Safe plug & sockets Cable Protection Proper Scaffold Cable Overhead Rotatory part guards
Scaffold Scaffold Tag Edge Protection Check Overhead works Access Ladder Adequate Work Platform Weather condition Out riggers Ladder 3 feet above platform Safety Harness
SELECT HAZARDS SELECT CONTROLS
( Tick to identify the controls in place)
Risk Assessment
Lifting Plan Tag Lines Lifting points / hooks Banks man Load stability Check Lifting gear Examination /Inspection Sharp edges protected
Lifting operations Weather/ Wind Speed Ground conditions Exclusion zone Communication Loading/ unloading vehicles Spreader Beams Check Ground conditions Check outriggers Others
Fire Fire Extinguisher Fire Hose Fire Exit Assembly point others
Slip/Trip Clean before you go Barricade the waste Waste Management Clean Access Housekeeping Clean liquid spillage Access signs Maintain access/ Egress
PPE
Safety Harness
Safety Helmet Coveralls Hi vis Jacket Safety Shoe Face Shield Ear Protection
Dust mask Respiratory Equipment Life line/ harness anchorage Hand Gloves Goggles/ Glass
Pre start Briefing done by: Signature:
Reviewed By HSE Manager/ In charge: Signature:
1. Project Information:
Project Name: Checklist No.:
Sub-Contractor/Company:
Date:
2. Task Details:
Description of Task:
Location / Area :
Number of Workers:
Task Duration:
Time (from): _______Hrs.
Time (To): __________Hrs.
Date:
3. Prerequisites:
Checks Yes-No-NA Checks Yes-No-NA
Safety induction done. ☐ ☐ ☐
Safety tool box talk done. ☐ ☐ ☐
Method statement/Risk assessment in place. ☐ ☐ ☐
Training on Risk Assessment/ Method Statement done ☐ ☐ ☐
Job Safety Analysis done. ☐ ☐ ☐
3 Month Safety Look Ahead in place ☐ ☐ ☐
Permit to Work obtained ☐ ☐ ☐
Site Supervisor available ☐ ☐ ☐
PPE Available ☐ ☐ ☐
Working area is well lighted ☐ ☐ ☐
Tools and equipment inspected and tagged ☐ ☐ ☐
Unsafe conditions rectified ☐ ☐ ☐
Pre-Start Checks completed ☐ ☐ ☐
Emergency procedures communicated ☐ ☐ ☐
Unauthorized workers are cleared from the area.
☐ ☐ ☐
Other ( Specify): ☐ ☐ ☐
4. Acknowledgement by Sub-Contractor:
☐ Acknowledge that all above precautions/ controls measures have been taken. These have also been fully explained to the operatives, and I consider them competent to do it safely.
Initiator/Originator Name: Designation:
Signature: Date /Time:
Signature: Date /Time
Project Information
Project Name: Store No.
Location: Contact Person:
Company Name: Arabtec Construction LLC. Date:
Sr. Description Yes No N/A Comments
1. Is access to stores are restricted to authorized personnel only?
2. Are there clear spaces around racks and stacks of stored materials and are adequate gangways provided between them?
3. Are stacks and storage kept clear of light fittings and hot surfaces?
4. Are all stocks of flammable liquids kept in purpose-built flammable storage liquid stores?
5. Are storage areas generally cleaned and tidy?
6. Are flammable liquids kept away from all possible sources of ignition?
7. Emergency exit signs are available in right locations
8. Smoke detectors/fire alarm are visible and accessible.
9. Fire extinguishers are available are serviced regularly
10. Are free standing shelves and cupboards secured for stability?
11. Are heavy items stored at a suitable height?
12. Are chemical containers used for storage suitable and clearly labelled?
13. Is there adequate light in the storage area?
14. Are all small loose items secured in appropriate storage?
15. Are warning notices, prohibiting smoking and naked lights prominently displayed?
16. Others if any:
Remarks:
Inspected by: Signature:
Reviewed by Project Manager/HSE Manager Signature:
PROJECT:
LOCATION: DATE:
I (name)_____________________________________would like provide my statement as follows on.
I hereby acknowledge that the above statement are true to the best of my recollection, and that these are my very own written down by m myself s others _________Name and Signature________
Name : ____________________________ Signature: ______________________
Position: _________________________________________Date:_________________
1. Project Information:
Project Name: Click here to enter text.
Report No.: Click here to enter text.
Project Location: Click here to enter text.
Property No.: Click here to enter text.
☐ Fatality ☐ Major Injury ☐ Minor Injury ☐ Property Damage ☐ Environmental ☐ Other
2. Describe the Incident in detail:
Answer who, what, why, where, when & how in this section: (Attach additional pages if required)
3. Incident Root Causes:
Describe direct, indirect & root cause: (Attach additional pages if required)
4. Key Corrections Taken Immediately after the Incident:
Attach additional pages if more space is required:
5. Key Corrective Actions to Prevent Recurrence:
Describe the corrective actions with timeframe: (Attach additional pages if required)
Corporate Office Remarks:
1. Project Information: (To be filled by initiator/originator)
Project Name: Permit No.:
Project Location:
Requesting Contractor/Company
2. Permit Issuance Details: (To be filled by initiator/originator)
THIS PERMIT IS ONLY FOR ONE SHIFT AND NOT EXTENDABLE
Description of Task:
Detail of Surroundings:
Permit Validity:
Time (from): __________Hrs.
Time (To): __________Hrs.
Date:
3. Control Measures: (To be filled by initiator/originator and verified by Evaluator)
Checks Yes-No-NA Checks Yes-No-NA
Method statement & Risk assessment developed, approved & communicated? ☐ ☐ ☐
Availability of rescue procedure and equipment? ☐ ☐ ☐
Operatives are trained and competent? ☐ ☐ ☐
Workplace appropriately illuminated ☐ ☐ ☐
Any high risk activity associated that requires PTW (i.e. hot work, CSE)? ☐ ☐ ☐
Forced ventilation provided? ☐ ☐ ☐
Are all necessary Permit approved and displayed at work location? ☐ ☐ ☐
Means of communication available? (Mobile, radio etc.) ☐ ☐ ☐
Safe access / Working Platform provided? ☐ ☐ ☐
Mandatory/specific good condition PPEs are available ☐ ☐ ☐
Availability of barricades/protection to prevent unauthorized or accidental entry? ☐ ☐ ☐
Life Line provided? ☐ ☐ ☐
Warning signs posted? ☐ ☐ ☐
Fall Protection equipment (e.g. full body harness) available? ☐ ☐ ☐
Availability of Fall protection arrangement? ☐ ☐ ☐
Other(s): ☐ ☐ ☐
Adequate Lighting provided? ☐ ☐ ☐
☐ ☐ ☐
4. Acknowledgement by Initiator and Evaluator:
☐ Acknowledge that all above precautions have been taken. These have also been fully explained to the operatives, and I consider them competent to do it safely.
Initiator/Originator Name: Designation:
Signature: Time:
☐ Acknowledge that I have checked above control measures and consider the work area safe to carry out the activity
Evaluator (HSE Team): Designation:
Signature: Time
Comments (if any):
5. Authorization (PM/CM):
Name: Designation:
Signature: Time:
6. Completion/Cancelation of Permit:
☐ Acknowledge that the area have been restored to a safe and orderly condition.
Initiator Signature: Time:
☐ Acknowledge that I have checked the area and been restored to a safe and orderly condition.
Evaluator Signature: Time:
1. Project Information: (To be filled by initiator/originator)
Project Name: Permit No.:
Project Location:
Requesting Contractor/Company
2. Permit Issuance Details: (To be filled by initiator/originator)
THIS PERMIT IS ONLY FOR ONE SHIFT AND NOT EXTENDABLE
Description of Task:
Location / Area :
Panel No : Voltage:
Permit Validity:
Time (from): _______Hrs.
Time (To): __________Hrs.
Date:
3. Prerequisites: (To be filled by initiator/originator and verified by Evaluator)
No: Checks Yes-No-NA Checks Yes-No-NA
ENERGIZATION (“Power On”) ISOLATION (“Power Off”)
1. Safety tool box briefing done. ☐ ☐ ☐
Method statement/Risk assessment in place. ☐ ☐ ☐
2. Authorized personnel / operators available. ☐ ☐ ☐
Authorized personnel / operators available. ☐ ☐ ☐
3. Method statement/Risk assessment in place. ☐ ☐ ☐
Adjacent live areas protected. ☐ ☐ ☐
4. Safety Barriers in place and safety signage Displayed. ☐ ☐ ☐
PPE available, high voltage rubber gloves, Safety goggles and floor mat. ☐ ☐ ☐
5. Working area is well lighted. ☐ ☐ ☐
Isolation/Lock-out in place. ☐ ☐ ☐
6. Electrical instruments are available for any Purpose. ☐ ☐ ☐
Electrical circuits “proved” by calibrated Instrument and found out to be no power. ☐ ☐ ☐
7. Correct PPE available, high voltage rubber Gloves, safety goggles and floor mat. ☐ ☐ ☐
Unauthorized workers are cleared from the Area. ☐ ☐ ☐
8. Approved WIR for installation, testing and Termination are attached to the permit. ☐ ☐ ☐
Standby operatives in the event of contact With live circuits. ☐ ☐ ☐
9. Emergency light (Flashlight) available. ☐ ☐ ☐
Emergency light (Flashlight) available. ☐ ☐ ☐
10. Is live work absolutely necessary? ☐ ☐ ☐
Emergency response plan available ☐ ☐ ☐
11. Unauthorized workers are cleared from the area.
☐ ☐ ☐
Other ( Specify): ☒ ☐ ☐
12. Power cable route from panel board to plant & equipment has been checked ☐ ☐ ☐
13 Emergency response plan available ☐ ☐ ☐
14 Other ( Specify): ☐ ☐ ☐
4. Acknowledgement by Initiator and Evaluator:
☐ Acknowledge that all above precautions have been taken. These have also been fully explained to the operatives, and I consider them competent to do it safely.
Initiator/Originator Name: Designation:
Signature: Date /Time:
☐ Acknowledge that I have checked above control measures and consider the work area safe to carry out the activity
Evaluator (HSE Team): Designation:
Signature: Date /Time
Comments (if any):
5. Authorization (PM/CM):
Name: Designation:
Signature: Date /Time:
6. Completion/Cancelation of Permit:
☐ Acknowledge that the area have been restored to a safe and orderly condition.
Initiator Signature: Time:
☐ Acknowledge that I have checked the area and been restored to a safe and orderly condition.
Evaluator Signature: Time:
Project Information
Project Name:
Date: Location:
Sr. Equipment type / Name Registration No & Exp Date Company Name
Operator Name / Mb. No Operator Third party competency certificate expiry date Operator License expiry date Equipment & Plant 3rd Party Inspection Certificate expiry date SWL / Capacity Signalman /Rigger name & TPC Exp Comment
1
2
3
4
5
6
7
8
9
10.
Remarks:
Inspected By: Signature:
Reviewed By HSE Manager / In charge: Signature:
Accommodation Name: Date :
Accommodation Location: Time :
SN Description Yes NO N/A Observation Control
Measures Due Date
ACCESS AND EGRESS
1 Is there segregation between vehicles/ pedestrians
2 Is entry to inside camp restricted to workforce only? How is this controlled
3 Is the entrance well lit
4 Is the entrance free from water pooling
GENERAL HOUSEKEEPING
1 Are there adequate dustbins available? Are they covered
2 Is garbage disposed of on a regular basis?
3 Are toilets wash areas cleaned regular?
4 Is there adequate water for toilet and bath
5 Are water tanks kept covered at all times
6 Is soap and hand towels available?
7 Is bathroom area cleaned on a regular basis and kept dry and non-slippery
8 Is the water tank cleaned on a regular basis
9 Is the laundry area electrical & connections/ wires are in good condition.
10 Is the laundry area kept clean and dry
11 Is the tumble dryer filters cleaned frequently to prevent overheating
SEPTIC TANKS
1 Is the camp on main drainage?
2 If not are septic tanks provided?
3 Are septic tanks fitted with overflow alarm if not how are they prevented from overflowing
4 If septic tank in ground is it in a membrane?
5 If above ground is it protected from being hit by vehicular traffic?
FOOD PREPARATION AREA
1 Is the area kept clean and tidy
2 Are food preparation areas cleaned and free from cracks
3 Are signs for "No smoking" being posted
4 Food waste storage area is cleaned, odour free. Flies area controlled
5 Floor drains are provided in sink area
6 All refrigerators and freezers are working at correct temperatures Refrigerators 1c0 to 4c0
Freezers -14c0 to -18c0
7 Are there temp gauges fitted?
8 Are these temperatures recorded?
9 The Dining and Kitchen areas have an overall clean, tidy and well maintained appearance
10 LPG cylinders are of good conditions (free of damages)
11 Is storage of LPG satisfactory under shed & outside kitchens with no flammable materials nearby
12 Are Piping not perished
13 Are firefighting equipment provided in kitchen area?
LIVING QUARTERS
1 Are Ventilation working well
2 Is lighting suitable
3 Are Emergency numbers being posted in each room
4 Are emergency procedures posted in each room
5 Are Electrical sockets in good condition not damaged & no bare wires are placed in sockets
6 Are sockets overloaded
7 ELCB is provided checks carried out and recorded by
INCIDENT INVESTIGATION REPORT
(To be submitted to the HSEQ Corporate Office within 7 days of incident.)
1. Project Information:
Project Name: Click here to enter text.
Report No.: Click here to enter text.
Project Location: Click here to enter text.
Property No.: Click here to enter text.
☐ Fatality ☐ Major Incident ☐ Minor Incident
2. Describe the Incident in detail:
Answer who, what, why, where, when & how in this section: (Attach additional pages if required)
Click here to enter text.
☐ Photos Attached
3. Incident Root Causes:
Describe direct, indirect & root cause: (Attach additional pages if required)
Click here to enter text.
4. Key Corrective Actions to Prevent Recurrence:
Describe the corrective actions with timeframe: (Attach additional pages if required)
Click here to enter text.
5. Key Corrections Taken Immediately after the Incident:
Attach additional pages if more space is required:
Click here to enter text.
6. Witnesses:
I declare that I witnessed the incident and the information provided above is true, correct and complete.
No. Name Designation Signature Date
1. Click here to enter text.
Click here to enter text.
Click here to enter text.
2. Click here to enter text.
Click here to enter text.
Click here to enter text.
7. Incident Information:
Initial Incident Report No.: Click here to enter text.
Date Reported: Click here to enter text.
Date of Incident: Click here to enter text.
Time of Incident: Click here to enter text.
Type of Incident: ☐ Near Miss
☐ Major Environmental Incident
☐ Serious Dangerous Occurrence
☐ Equipment / Property Damage
☐ Medical Treatment Case (MTC)
☐ Restricted Work Case (RWC)
☐ Lost Workday Case (LWC)
☐ Serious Occupational Illness/Disease
☐ Class 1 Injuries
☐ Permanent Partial Disability (PPD)
☐ Permanent Total Disability (PTD)
☐ Fatality (F)
Recordkeeping: ☐ Reportable ☐ Recordable
Incident Location on Site: Click here to enter text.
Applicable Reports: ☐ Police
☐ Medical
☐ Other (Specify)
Click here to enter text.
Attached: ☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
8. Injured Person’s Personal Details:
In case of an incident with more than one injured person, complete the information for each person using separate forms.
Name: Click here to enter text.
Occupation: Click here to enter text.
Company: Click here to enter text.
MB / Oracle No.: Click here to enter text.
Nationality: Click here to enter text.
Date of Birth: Click here to enter text.
Passport Number: Click here to enter text.
Length of Service: Click here to enter text.
Gender: ☐ Male ☐ Female
Labour Card No.: Click here to enter text.
9. Incident Causes Details: To be supported with factual evidence
Immediate Cause
(Unsafe Acts) ☐ Failure to secure
☐ Failure to warn
☐ Removing / Defeating Safety Devices
☐
HSE INDUCTION
(Workers)
Name: _________________________________ Trade: ____________________________
M.B. No./Company Name : ________________
Date of Joining: __________________________
SL. N SUBJECT ON INDUCTION PREVIOUS SAFETY EXPOSURE FURTHER SAFETY TRAINING NEED ANALYSIS
1. Introduction Safety Requirements
2. Working Safety is of Primary Importance
3. General Safety Rules
4. Basic Safety Requirements
5. House Keeping
6. Health, Hygiene & Welfare Facilities
7. Fire Extinguisher / Fire Fighting
8. Emergency Procedure
9. Safety Violations & Penalty
10. Safety Award
11. Manual Handling
Induction Given By: Name: ___________________________
Designation: ___________________________
1st Warning 0 Ref. No. ______________
2nd Warning 0
3rd Warning 0
4th Warning 0 Date: ________________
Employee’s Name : ______________________________________ M.B No. : __________
Occupation : _____________________________________________________________________
Location / Project Site: _____________________________________________________________________
You have committed the following HSE violation/s:
………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………….….
The employee is hereby warned that if the violation is repeated further disciplinary action can be
taken as per the company Code of Conduct.
ORIGINATOR APPROVED BY (MANAGER IN CHARGE / ARABTEC HSEQ & ORG. RISK Manager)
Name: _______________________________ Name: _____________________________
Designation: _______________________________ Designation: _____________________________
Signature:
_______________________________ Signature:
_____________________________
Employee Acknowledgement:
I the undersigned have received this Safety warning letter / disciplinary notice and I admit that I have understood the contents.
0 Received on: ………………………….. (Date) Signature: ………………………………..…..
Project Information
Project Name: Porta Cabin No:
Location: Contact Person:
Company Name: Date :
Sr. Description Yes No N/A Comments
1. Emergency exit signs are available in right locations
2. Fire alarms and fire extinguishers are visible and accessible.
3. Fire doors (e.g. in stairways) are kept closed unless equipped with automatic closing device
4. Fire extinguishers are serviced regularly
5. Corridors and stairways are kept free of obstruction
6. Fire escape/ evacuation plan available and posted
7. First aid box available
8. Floor surfaces are kept dry and free of slip hazards
9. Electrical cords and plugs are in good condition with proper Grounding
10. Kitchen equipment checked
11. Fire blanket available in the pantry
12. Heat detector available in the pantry
13. Toilets floor clean and dry
14. Are staff trained to use Fire Extinguishers
15. Hand wash/ soap solution available in the toilet
16. Civil Defense or Authority approval
17. Others if any:
Remarks:
Inspected By: Signature:
Reviewed By HSE Manager / In charge : Signature:
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
26 Storage of Substances under CoSHH Risk Assessment Templates.docx
1. HEALTH SAFETY AND ENVIRONMENT Author: Approved:
RISK ASSESSMENT: ACT/HSE/RA 001 STORAGE OF SUBSTANCES UNDER COSHH
Issued: Rev. Date:
Revision: 0
Page 1 of 2 HSEQ -Rev-01(Jan-2023)
No
Specific Task Step
(In sequence of
works)
Hazard Details Consequence/Risk
Initial Risk
Rating Control Measures Residual Risks
Additional Control
Measures
RR
L C RR
1 PRIOR TO / AT SITE
DELIVERY
Hazardous
substances
Poor or incorrect substance storage
due to lack of manufacturer’s
specification;
3 3
9
MED
i. Store operatives to ensure a Hazard Data Sheet is supplied ideally prior to
substance delivery, if not supplied when delivered to site;
Documentation
unavailable for
review
Substance quarantined until
evidence provided
Low
2 Storage
Storage of Substance
potentially hazardous
to worker health or to
the environment;
Possible inhalation, absorption of
hazardous fumes, vapor and
substances hazardous to health;
Build-up of flammable vapor in
confined area;
Fire;
Inadequate cooling and ventilation of
storage resulting in ill health or
combustion;
Inadequate signage and substance
identification;
Poor controls over distribution of
substances/chemicals;
Excessive quantities issued to work
areas;
3 4
12
HIGH
i. HLG Workplaces storing hazardous substances/chemicals, using
hazardous materials and/or generating hazardous waste shall have a
hazardous materials management system;
ii. A plan of the store showing locations of the hazardous materials / wastes
stored shall be available, with suitable warning signage clearly displayed
in multi-language inside and outside;
iii. Smoking prohibited in and around chemical stores, clear prohibition
signage to be displayed;
iv. Location of emergency spill kits and fire-fighting equipment, and access
and escape routes shall be displayed. These shall be checked routinely
with records kept for review;
v. Appropriate storage compatibility risk assessments undertaken and
MSDS available for review. The assessment / MSDS shall cover all
activities, products and services to identify all hazardous materials that
are present, stored or being handled at the worksite and the risks
associated with them;
vi. MSDS records shall be indexed to allow fast access to emergency
treatment if required, available for review;
vii. All substances and chemicals clearly marked and segregated;
viii. Limitations on quantities of the materials / wastes stored shall be adhered
to as per MSDS and site requirements;
ix. Storage conditions implemented, including adequate ventilation and
extraction in stores. Stores to be locked to prevent unauthorized removal
of contents, with signage indicating key holders;
x. Only enough hazardous substance sufficient for the shift shall be issued
to workers, to prevent uncontrolled storage in work areas. Workers
instructed to return unused chemicals to the stores;
xi. Drums to be stored on wooden pallets, no substances to be stored directly
on the floor;
xii. PPE to be available, rubber gloves, masks, glasses etc., as required by
the MSDS;
Spillage
Prevent spill entering
waterways, drains etc.
Ventilate area and clean up as
per MSDS
Low
Project Name: xxx
RA Ref No.: xxx
RA compilation
Date:
Review date:
Date:
Compiled by:
Reviewed by:
Approved by:
Overall Task Details
Storage of substances classified under CoSHH on project sites, such as paints and
associated thinners and cleaners, protective coatings, additives, adhesives and
sealants, chemical sprays, fuels and oils, etc.
Relevant Applicable MAS:
00939 – Storage of Substances Hazardous to Health
Additional Training required: NOC’s Required for task:
RISK SCORE CALCULATOR
Use the Risk Score Calculator to Determine the Level of Risk of each Hazard
What would be the
CONSEQUENCE
of an occurrence be?
What is the LIKELIHOOD of an occurrence? Hierarchy of Controls
Frequent/Almost certain (5)
Continuous or will happen
frequently
Often (4)
6 to 12 times a year
Likely (3)
1 to 5 times a year
Possible (2)
Once every 5 years
Rarely (1)
Less than once every 5
years
Can the hazard be Eliminated or removed
from the work place?
Catastrophic (5)
Multiple Fatalities
High 25 High 20 High 15 Medium 10 Medium 5
Can the product or process be substituted for
a less hazardous alternative?
Serious (4)
Class 1 single fatality
High 20 High 16 High 12 Medium 8 Low 4
Can the hazard be engineered away with
guards or barriers?
Moderate (3)
Class2 (AWI or LTI) or Class 1
Permanently disabling effects
High 15 High 12 Medium 9 Medium 6 Low 3
Can Administration Controls be adopted
I.e. procedures, job rotation etc.
Minor (2)
Medical attention needed, no work
restrictions. MTI
Medium10 Medium 8 Medium 6 Low 4 Low 2 Can Personal Protective Equipment &
Clothing be worn to safe guard against
hazards?
Insignificant (1)
FAI
Medium10 Medium 4 Low 3 Low 2 Low 1
2. HEALTH SAFETY AND ENVIRONMENT Author: Approved:
RISK ASSESSMENT: ACT/HSE/RA 001 STORAGE OF SUBSTANCES UNDER COSHH
Issued: Rev. Date:
Revision: 0
Page 2 of 2 HSEQ -Rev-01(Jan-2023)
No
Specific Task Step
(In sequence of
works)
Hazard Details Consequence/Risk
Initial Risk
Rating Control Measures Residual Risks
Additional Control
Measures
RR
L C RR
3
Use of substances and
chemicals on site
Use of Substances
potentially hazardous
to worker health or
the environment;
Possible inhalation, accidental
ingestion or absorption of hazardous
fumes, vapor and substances
hazardous to health due to lack of
information issued;
Inadequate cooling and ventilation
through use resulting in ill health or
combustion;
Fire or explosion due to build-up of
fumes or vapor;;
Unused substances left in work
areas;
Chemicals entering ground or
waterways;
3 4
12
HIGH
Employees tasked with using hazardous materials must be instructed by
supervision in the following at a minimum:
i. Never use smell, taste or touch as means for material identification;
ii. Always ensure adequate ventilation or extraction in areas where
hazardous fumes can build up, such as glues, cleaners, additives,
sealers, paints, coatings etc.;
iii. Refrain from any practice that is hazardous or incompatible with the
hazardous materials, e.g. welding or use of lighters in areas where
flammable materials are stored;
iv. Avoid mixing of unknown or incompatible materials;
v. Always use compatible and appropriately identified portable containers
for transporting even small quantities of hazardous materials;
vi. NEVER use water or drink bottles or other unmarked containers for
storing chemicals;
vii. Clean, decontaminate or dispose of any used PPE after use;
viii. Always wash hands after handling chemicals before eating or smoking,
to prevent ingestion;
ix. Observe all precautions stated in safety data sheets of the relevant
materials;
x. Never wash out chemical or paint containers allowing wash off to enter
ground or waterways;
xi. Dispose of used containers or contaminated PPE into designated skips
for removal by licensed contractors, do not leave in work areas;
Unmarked
substance on site
Worker overcome
with fumes or
ingestion
Return to stores for quarantine
or identification
Transfer to hospital
immediately with details of
substance concerned
Low
4 Emergency procedures Action to be taken in
an emergency
Possible inhalation, absorption of
hazardous fumes, vapor and
substances hazardous to health due
to lack of emergency training issued;
Environmental issue, spillage to
land, waterways, drainage systems;
Fire;
3 4
12
HIGH
The emergency management plans must identify and ensure provision of the
following, as required.
i. Arrangements for informing employees or other parties to be contacted
in case of emergency;
ii. Emergency response kits, e.g. absorbent materials and PPE;
iii. Arrangements for containment of spilled materials, and for preventing
them from reaching groundwater, sewerage network or storm-water
pipes;
iv. Arrangements for site decontamination, disposal of waste and
contaminated materials;
v. Types and numbers of fire extinguishers, sprinklers, fire hose reels, fire
hydrants, fire pumps and other control measures, inspection and
surveillance requirements;
vi. Reporting protocol for incidents during transport hazardous materials &
entities;
vii. Information available to disclose the ingredients of hazardous materials
on request by emergency responders, licensed medical practitioners
treating exposed patients and enforcement agencies,
Worker overcome
with fumes or
ingestion
Spillage to ground
Spillage to marine
Transfer to hospital
immediately with details of
substance concerned
Spoil removed and treated as
hazardous waste
Floating booms to prevent
spread of chemicals
Low
5 Disposal of waste skips
Disposal of out of
date substances;
Disposal of
used/empty
containers;
Environmental issue, spillage to
land, waterways, drainage systems;
Inadequate environmental controls
of used containers etc.;
3 3
9
MED
i. Expired and waste chemicals and hazardous materials are to be
disposed of through methods or contractors that are approved /
permitted; Low