MeasuringWork Progress
Brief description of the project
Several methods for measuring work progress are suggested.
Five of these methods are as follows :
Calculating or Estimating the percent complete for .
Activity Project
1. Units Completed
2. Cost or Time Ratio
3. Start – Finish
4. Supervisor’s Opinion
5. Incremental Milestones
This method works well for activities with Small, Identical, Repetitive components, of easily measured production of easily
measured ,when each piece requires approximately the same level of effort.
1- Units Completed
Work Progress =
Units completed
Total units
For example, in an activity involving installing 5000 concrete blocks, 2000 have
been installed.
Percent complete =
2000
5000
*100 = 40 %
40%
• Laying bricks or CMUs (concrete masonry units),
• Excavating,
• Fishing electric wire, Installing tile or carpet, …..
For example, a project supervision activity scheduled for 10 months with a budget of SAR 200,000. After 2 months if SAR 38,000
is already spent, what is the percent complete ?
Cost Ratio =
Cost to Date
Total Budget Time Ratio =
Time Elapsed
Total Duration
Activities that Uniform throughout the project,
Long duration tasks or that are continuous during the life of a project,
which are estimated and budgeted on bulk allocations of money and workhours rather than on the basis of production.
• Project Management,
• Quality Assurance,
• Contract Administration,
• Project Controls ,
• Safety Inspection
Percent complete =
2
10
*100 = 20 %
Percent complete =
38,000
220,000
*100 = 17 % 17COST RATIO
20TIME RATIO
2- COST OR TIME RATIO:
Examples : Planning activities, flushing ,cleaning, testing
3- Start – Finish :
Have not started yet 0%
Started but not yet finished
(an arbitrary amount)
40% or 50%
Finished 100 %
Small activities or with no or a short
duration.
Where no intermediate milestones can
be defined
The effort/time required is very
difficult to estimate.
This method relies totally on the foreman or superintendent’s judgment.
Because it does not require actual measurements, it is considered the quickest
method.
Examples : Dewatering, Temporary construction, Landscaping
4- Supervisor’s opinion:
Used only for relatively minor tasks and where developing a more objective status
is not feasible.
used when no other method can be suitably
Be careful not to overuse this method.
The task is segmented into subtasks and each is assigned an increment of progress
“weight” for the entire task. Completing a subtask is the achievement task. of a
milestone.
Each subtasks assigned a ‘‘weight’’ that is approximately equal to its percentage share
of effort in the total task .
The milestone percentage is normally based. on the number of workhours required
5- Incremental Milestones:
Suitable for large and complex or multistage activities.
By Júlio Reis - Own work, CC BY-SA 3.0,https://commons.wikimedia.org/w/index.php?curid=934562
Roman milestone XXIX on Via Romana XVIII – the road linking the Iberian cities of Bracara Augusta and Asturica
Augusta
Milestones
http://www.dsw-photo.com/Travel/Road-Trip-To-Saudi-Arabia-Qata
Milestones
KANBAN BOARD
REFERENCE
Mubarak, Saleh. “Construction Project Scheduling and Control, Second Edition,”
21.03.2018 ARDC session #3  measuring work Progress

More Related Content

What's hot

What's hot (20)

Monitoring the control
Monitoring the control Monitoring the control
Monitoring the control
 
Day 2 Revision
Day 2 RevisionDay 2 Revision
Day 2 Revision
 
PERT
PERTPERT
PERT
 
05 critical path analysis
05 critical path analysis05 critical path analysis
05 critical path analysis
 
Free float and total float - PMP/CAPM from PMI
Free float and total float - PMP/CAPM from PMIFree float and total float - PMP/CAPM from PMI
Free float and total float - PMP/CAPM from PMI
 
Fopm evm
Fopm   evmFopm   evm
Fopm evm
 
P&msp2010 10 project-control
P&msp2010 10 project-controlP&msp2010 10 project-control
P&msp2010 10 project-control
 
High Level Overview Of Using The Earned Value On A T24 Project
High Level Overview Of Using The Earned Value On A T24 ProjectHigh Level Overview Of Using The Earned Value On A T24 Project
High Level Overview Of Using The Earned Value On A T24 Project
 
Network scheduling
Network scheduling Network scheduling
Network scheduling
 
Three-point estimation technique for software development
Three-point estimation technique for software developmentThree-point estimation technique for software development
Three-point estimation technique for software development
 
079 Network Programming
079 Network Programming079 Network Programming
079 Network Programming
 
CPM NETWORK
CPM NETWORKCPM NETWORK
CPM NETWORK
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysis
 
Metric System and Dimensional Analysis
Metric System and Dimensional AnalysisMetric System and Dimensional Analysis
Metric System and Dimensional Analysis
 
Lesson in fs cpm,cpa
Lesson in fs cpm,cpaLesson in fs cpm,cpa
Lesson in fs cpm,cpa
 
Critical path method & pert
Critical path method & pertCritical path method & pert
Critical path method & pert
 
Project Scheduling
Project Scheduling Project Scheduling
Project Scheduling
 
Software engineering 11 project scheduling
Software engineering 11 project schedulingSoftware engineering 11 project scheduling
Software engineering 11 project scheduling
 
PMBok Processes with CCPM Best Practices
PMBok Processes with CCPM Best PracticesPMBok Processes with CCPM Best Practices
PMBok Processes with CCPM Best Practices
 
Chapter 07
Chapter 07Chapter 07
Chapter 07
 

Similar to 21.03.2018 ARDC session #3 measuring work Progress

Project Tracking & SPC
Project Tracking & SPCProject Tracking & SPC
Project Tracking & SPCMeghaj Mallick
 
Chap05_Project Monitoring and Control.pdf
Chap05_Project Monitoring and Control.pdfChap05_Project Monitoring and Control.pdf
Chap05_Project Monitoring and Control.pdfVarunSubramanyam
 
CCM821S _ Contract Management _ 8. Monitoring Project Performance.pptx
CCM821S _ Contract Management _ 8. Monitoring Project Performance.pptxCCM821S _ Contract Management _ 8. Monitoring Project Performance.pptx
CCM821S _ Contract Management _ 8. Monitoring Project Performance.pptxMariaNambahu
 
Quantitative analysis for business decision- Program Evaluation and Review Te...
Quantitative analysis for business decision- Program Evaluation and Review Te...Quantitative analysis for business decision- Program Evaluation and Review Te...
Quantitative analysis for business decision- Program Evaluation and Review Te...Chandra Shekar Immani
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and consPragnendra Rahevar
 
Chapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptxChapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptxssusercf695b
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800PRIYANSHU KUMAR
 
PMP preparation and PMI Framework
PMP preparation and PMI FrameworkPMP preparation and PMI Framework
PMP preparation and PMI FrameworkUzma Khan
 
Features and Techniques of controlling.pptx
Features and Techniques of controlling.pptxFeatures and Techniques of controlling.pptx
Features and Techniques of controlling.pptxNishabagad
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagementDhamo daran
 
Glen Ballard Last Planner Lean Construction Institute
Glen Ballard Last Planner Lean Construction InstituteGlen Ballard Last Planner Lean Construction Institute
Glen Ballard Last Planner Lean Construction InstituteYefersonCcoyllulle1
 
Mba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aRai University
 
Traditional Management System.ppt
Traditional Management System.pptTraditional Management System.ppt
Traditional Management System.pptUtkarshDwivedi74
 
Project-Planning
Project-PlanningProject-Planning
Project-PlanningRon Drew
 
Project-Time-Line.pdf
Project-Time-Line.pdfProject-Time-Line.pdf
Project-Time-Line.pdfNabeel Ahmad
 

Similar to 21.03.2018 ARDC session #3 measuring work Progress (20)

Project Tracking & SPC
Project Tracking & SPCProject Tracking & SPC
Project Tracking & SPC
 
Chap05_Project Monitoring and Control.pdf
Chap05_Project Monitoring and Control.pdfChap05_Project Monitoring and Control.pdf
Chap05_Project Monitoring and Control.pdf
 
CCM821S _ Contract Management _ 8. Monitoring Project Performance.pptx
CCM821S _ Contract Management _ 8. Monitoring Project Performance.pptxCCM821S _ Contract Management _ 8. Monitoring Project Performance.pptx
CCM821S _ Contract Management _ 8. Monitoring Project Performance.pptx
 
Pmp time chapter 6
Pmp time chapter 6Pmp time chapter 6
Pmp time chapter 6
 
Quantitative analysis for business decision- Program Evaluation and Review Te...
Quantitative analysis for business decision- Program Evaluation and Review Te...Quantitative analysis for business decision- Program Evaluation and Review Te...
Quantitative analysis for business decision- Program Evaluation and Review Te...
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and cons
 
Chapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptxChapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptx
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
PMP preparation and PMI Framework
PMP preparation and PMI FrameworkPMP preparation and PMI Framework
PMP preparation and PMI Framework
 
Features and Techniques of controlling.pptx
Features and Techniques of controlling.pptxFeatures and Techniques of controlling.pptx
Features and Techniques of controlling.pptx
 
Performing against the wall - SPI after completion
Performing against the wall - SPI after completionPerforming against the wall - SPI after completion
Performing against the wall - SPI after completion
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagement
 
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSISPROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
 
Glen Ballard Last Planner Lean Construction Institute
Glen Ballard Last Planner Lean Construction InstituteGlen Ballard Last Planner Lean Construction Institute
Glen Ballard Last Planner Lean Construction Institute
 
Mba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management aMba ii pmom_unit-4.1 project management a
Mba ii pmom_unit-4.1 project management a
 
Traditional Management System.ppt
Traditional Management System.pptTraditional Management System.ppt
Traditional Management System.ppt
 
Methodologies of Project Progress Measurement
Methodologies of Project Progress MeasurementMethodologies of Project Progress Measurement
Methodologies of Project Progress Measurement
 
Project-Planning
Project-PlanningProject-Planning
Project-Planning
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project-Time-Line.pdf
Project-Time-Line.pdfProject-Time-Line.pdf
Project-Time-Line.pdf
 

Recently uploaded

Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girladitipandeya
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 

Recently uploaded (20)

Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 

21.03.2018 ARDC session #3 measuring work Progress

  • 1. PROJECT CONTROLS Diaa Khalaf, Civil Engineer, PMP,PMI-RMP Sr. Project Controls Engineer
  • 3. Several methods for measuring work progress are suggested. Five of these methods are as follows : Calculating or Estimating the percent complete for . Activity Project 1. Units Completed 2. Cost or Time Ratio 3. Start – Finish 4. Supervisor’s Opinion 5. Incremental Milestones
  • 4. This method works well for activities with Small, Identical, Repetitive components, of easily measured production of easily measured ,when each piece requires approximately the same level of effort. 1- Units Completed Work Progress = Units completed Total units For example, in an activity involving installing 5000 concrete blocks, 2000 have been installed. Percent complete = 2000 5000 *100 = 40 % 40% • Laying bricks or CMUs (concrete masonry units), • Excavating, • Fishing electric wire, Installing tile or carpet, …..
  • 5. For example, a project supervision activity scheduled for 10 months with a budget of SAR 200,000. After 2 months if SAR 38,000 is already spent, what is the percent complete ? Cost Ratio = Cost to Date Total Budget Time Ratio = Time Elapsed Total Duration Activities that Uniform throughout the project, Long duration tasks or that are continuous during the life of a project, which are estimated and budgeted on bulk allocations of money and workhours rather than on the basis of production. • Project Management, • Quality Assurance, • Contract Administration, • Project Controls , • Safety Inspection Percent complete = 2 10 *100 = 20 % Percent complete = 38,000 220,000 *100 = 17 % 17COST RATIO 20TIME RATIO 2- COST OR TIME RATIO:
  • 6. Examples : Planning activities, flushing ,cleaning, testing 3- Start – Finish : Have not started yet 0% Started but not yet finished (an arbitrary amount) 40% or 50% Finished 100 % Small activities or with no or a short duration. Where no intermediate milestones can be defined The effort/time required is very difficult to estimate.
  • 7. This method relies totally on the foreman or superintendent’s judgment. Because it does not require actual measurements, it is considered the quickest method. Examples : Dewatering, Temporary construction, Landscaping 4- Supervisor’s opinion: Used only for relatively minor tasks and where developing a more objective status is not feasible. used when no other method can be suitably Be careful not to overuse this method.
  • 8. The task is segmented into subtasks and each is assigned an increment of progress “weight” for the entire task. Completing a subtask is the achievement task. of a milestone. Each subtasks assigned a ‘‘weight’’ that is approximately equal to its percentage share of effort in the total task . The milestone percentage is normally based. on the number of workhours required 5- Incremental Milestones: Suitable for large and complex or multistage activities.
  • 9. By Júlio Reis - Own work, CC BY-SA 3.0,https://commons.wikimedia.org/w/index.php?curid=934562 Roman milestone XXIX on Via Romana XVIII – the road linking the Iberian cities of Bracara Augusta and Asturica Augusta Milestones
  • 12. REFERENCE Mubarak, Saleh. “Construction Project Scheduling and Control, Second Edition,”

Editor's Notes

  1. The project manager or superintendent can assign a percent complete to a small, simple activity easier and more objectively than he or she can do so for a large, complex activity. This subject is broad. In this chapter, it is covered only briefly. There are no correct and incorrect methods; there are only more and less suitable methods for the specific type of activity under consideration.
  2. In some cases, errors may arise despite the similarity in units because of the effect of learning curves or differing conditions. As an example of the second case is when a mason is installing block or brick to an 8-ft high wall. The blocks on the high courses take more time than those in lower courses. When the error is small, it is ignored.
  3. Another alternative is the man-hour ratio (actual man-hours consumed divided by total man-hours budgeted). The time ratio method for individual activities is similar to the duration percent complete and baseline duration percent complete methods for calculating the project percent complete. These methods are discussed in the next section
  4. The contractor may use this method to exaggerate the percent complete for early payment.