Parametric Estimation in a Nutshell
© 2017 Planisware
What is Parametric Estimation?
• Parametric Estimation is a method for estimating project cost and
duration / effort, in which the project is modelled (described) using
predefined algorithms
• Parametric Estimation is often perceived as one of the more accurate
and reliable estimation methods, because it uses actual historical data
or industry standards, and credible units to account for the work to be
performed.
© 2017 Planisware 2
PX2
Let’s look
at an example
© 2017 Planisware 3
The project
• Our team must prepare the cost estimates for a small scale
wind farm project. The team leader has opted for using
parametric estimation techniques.
• Specifications for this project include:
– Purchase and installation of 3 commercial grade wind turbines with
an output of 2MW per turbine
– Interconnection with the existing power system and associated
upgrades
© 2017 Planisware 4
Parametric Estimation Process
Step 1 - Identify the equations that model our project
Step 2 – Evaluate the equations
Step 3 – Create (or update) the output
© 2017 Planisware 5
Step 1 – Identify the equations applicable
• First, we need to break down the project into sub-components,
according to our library of equations.
• Our wind farm project is composed of three major components:
© 2017 Planisware 6
1. The project site, which includes:
• Site assessment for the proposed project site
• Land lease
• Permits and associated studies
(archaeological, environmental impact, …)
2. The wind turbines, which include:
• The turbines and their tower
• Installation costs for each turbine
3. Interconnection with the existing
power system, which includes:
• Connectivity to the power system
• System upgrades to mitigate the
impact of this project on the power
system
To simplify this example a bit,
let’s focus now on the three elements in bold
Step 1 – Identify the equations applicable
The Land Lease (a simple equation)
• The windiest spot in the area – and the site earmarked for our
project – carries a lease negotiated at 3,000 USD per MW and
per year.
• The equation for the Land Lease is therefore:
𝐶𝑜𝑠𝑡 𝑜𝑓 𝐿𝑒𝑎𝑠𝑒 = 𝑛𝑏 𝑀𝑊 × 3000 𝑈𝑆𝐷
© 2017 Planisware 7
Step 1 – Identify the equations applicable
Purchase cost of the turbines (equation using a lookup table)
• The price for the wind turbines by the preferred manufacturer
depends on the purchase volume:
• The equation for the cost of the turbines is therefore:
𝐶𝑜𝑠𝑡 𝑜𝑓 𝑇𝑢𝑟𝑏𝑖𝑛𝑒𝑠 = 𝑛𝑏 𝑡𝑢𝑟𝑏𝑖𝑛𝑒𝑠 × 𝐿𝑜𝑜𝑘𝑢𝑝𝑃𝑟𝑖𝑐𝑒(𝑛𝑏 𝑡𝑢𝑟𝑏𝑖𝑛𝑒𝑠)
© 2017 Planisware 8
Nb of units
purchased
Price per turbine
1 3 million USD
2 to 4 2.8 million USD
5 to 9 2.5 million USD
Our project includes the installation
of 3 wind turbines.
Step 1 – Identify the equations applicable
Connectivity to the power system (equation with activation condition)
• The cost of connecting the wind turbines to the power system depends on
whether there is available capacity on the transmission lines near the project
site:
– If there is, then we can build feeder lines from the wind farm to the turbines. The cost is
80,000 USD per mile of feeder line + the cost of one step-up transformer
@ 35,000 USD per turbine.
– If there isn’t, we will have to build transmission lines from scratch, at a cost of
300,000 USD per mile
• The equation for the cost of connectivity is therefore:
– 𝐼𝑓 ∃𝑐𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑡ℎ𝑒𝑛 𝐶𝑜𝑠𝑡 𝑜𝑓 𝑐𝑜𝑛𝑛𝑒𝑐𝑡𝑖𝑣𝑖𝑡𝑦 = 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 × 𝑐𝑜𝑠𝑡 𝑓𝑒𝑒𝑑𝑒𝑟 𝑙𝑖𝑛𝑒𝑠 + 𝑛𝑏 𝑡𝑢𝑟𝑏𝑖𝑛𝑒𝑠 ×
𝑐𝑜𝑠𝑡 𝑠𝑡𝑒𝑝𝑢𝑝 𝑡𝑟𝑎𝑛𝑠𝑓𝑜𝑟𝑚𝑒𝑟
– 𝐼𝑓 ∄𝑐𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑡ℎ𝑒𝑛 𝐶𝑜𝑠𝑡 𝑜𝑓 𝑐𝑜𝑛𝑛𝑒𝑐𝑡𝑖𝑣𝑖𝑡𝑦 = 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 × 𝑐𝑜𝑠𝑡 𝑡𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛 𝑙𝑖𝑛𝑒𝑠
© 2017 Planisware 9
Step 2 – Evaluate the equation
• Once we’ve matched each subcomponent of our project with the right
equation, we need to evaluate them
• Let’s return to our example:
– Cost of the lease: the equation is simple and straightforward:
𝐶𝑜𝑠𝑡 𝑜𝑓 𝐿𝑒𝑎𝑠𝑒 = 𝑛𝑏 𝑀𝑊 × 3000 = 3 × 2 × 3000 = 18,000 𝑈𝑆𝐷 𝑝𝑒𝑟 𝑦𝑒𝑎𝑟
– Cost of the turbines: our project is for 3 turbines, so the lookup function will return
the price for the 2nd bracket (2.8 million USD)
𝐶𝑜𝑠𝑡 𝑜𝑓 𝑡𝑢𝑟𝑏𝑖𝑛𝑒𝑠 = 3 × 2.8 𝑚𝑖𝑙𝑙𝑖𝑜𝑛 = 8.4 𝑚𝑖𝑙𝑙𝑖𝑜𝑛 𝑈𝑆𝐷
– Cost of connectivity: the transmission lines near the site of our project have
sufficient available capacity. Therefore, the first equation is activated:
𝐶𝑜𝑠𝑡 𝑜𝑓 𝑐𝑜𝑛𝑛𝑒𝑐𝑡𝑖𝑣𝑖𝑡𝑦 = 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 × 80,000 + 𝑛𝑏 𝑡𝑢𝑟𝑏𝑖𝑛𝑒𝑠 × 35,000
= 5 × 80,000 + 3 × 35,000 = 505,000 𝑈𝑆𝐷
© 2017 Planisware 10
Step 3 – Create (or update) the output
• Once we’ve evaluated all the equations, we can consolidate
them in a cost plan
• A simple cost plan for
our project could
look like this:
© 2017 Planisware 11
Project Task Estimated Cost
01 - Project Site
… …
B – Land Lease 18,000 USD per year
… …
02 – Wind Turbines
A - Purchase of the Turbines 8.4 million USD
… …
03 - Interconnection
A - Connectivity to the power system 505,000 USD
… …
Considerations for
implementing
Parametric Estimation
© 2017 Planisware 12
When to use Parametric Estimation
• Parametric estimation is particularly useful in the early stages
of a project, as it does not require as much information as
other estimation techniques, and provides more accurate and
reliable estimates.
• Parametric estimation works best for tasks that are:
– Often repeated, with little variability (too much variability means that
a single equation to model the task will be difficult to design)
– With tangible deliverables
• For this reason, it is mainly used in the Life Science,
Engineering and Construction industries.
© 2017 Planisware 13
When to use Parametric Estimation
• Parametric Estimation can be used in conjunction with
Analogous Estimation (which uses actuals from previous
projects to calculate estimates) when historical data is not
available for a specific task
© 2017 Planisware 14
Benefits of Parametric Estimation
• Parametric estimation is believed to be more accurate than
other methods of estimation because the equations are based
on experience that takes into account a larger number of
factors.
• Effort to produce the first set of estimates and keep them up-
to-date is minimal:
– When parametric estimates are generated through a solid software
(usually PPM) solution, a new set of estimates can be generated on-
demand in minutes
– Similarly, the portfolio can be automatically updated via the batch
update mode
© 2017 Planisware 15
Benefits of Parametric Estimation
• Parametric Estimation provides a centralised and standard
definition of how estimates should be produced:
– Because the algorithms used are used across projects, the forecast
“template” will be the same regardless of the type of project (or
template project)
– Likewise, the calculation method will be the same across all projects
of the portfolio
– This means that calculations are easily repeatable, and of the same
level of quality
© 2017 Planisware 16
However…
• Parametric estimation requires a high effort upfront to build the
algorithm. It requires an analysis of each element that
contribute to the forecast, and all possible combinations, so as
to make available the right equations
• By definition, an equation for an activity can only be
determined once there is a large base of experience in that
activity
• If market conditions change, the equations will have to be
updated too
© 2017 Planisware 17
Scoring Parametric Estimation
© 2017 Planisware 18
Criteria Score Comments
Intended Forecast Horizon Medium / Long Too generic for accurate short term forecasting
Accuracy 4
Accuracy improves over time, with algorithm
calibration
Consistency 5 Consistent output for a given set of conditions
Transparency 2 Transparency depends on algorithm complexity
Ease of conducting initial forecast 4 Dependent on number of criteria to define
Ease of running alternative
scenarios
5 Most flexible approach for scenario analysis
Ease of implementation 1
Requires identification of all major criteria and
the magnitude of their impact
Where do the algorithms come from?
• There are two primary sources:
– Historical data, derived from an analysis of past projects, their
drivers, and other contributing factors
– Parametric rates published by specialised organisations
© 2017 Planisware 19
Key success factors
• When starting to build a parametric estimation model:
– Start with the easiest role, in order to get familiar with the process of
analysing the data and building the algorithm
– Set a realistic / achievable accuracy goal
When setting up parametric estimation for a portfolio, aim for
portfolio accuracy, not project accuracy
– Limit the number of drivers per algorithm
© 2017 Planisware 21
To learn more about Estimations and tools to
power them, visit our glossary:
www.planisware.com/glossary/earned-value-
management
© 2014 Planisware 22

More Related Content

What's hot

Operation Research (Simplex Method)
Operation Research (Simplex Method)Operation Research (Simplex Method)
Operation Research (Simplex Method)Shivani Gautam
 
Earned value management for Beginners
Earned value management for Beginners Earned value management for Beginners
Earned value management for Beginners Shenin Hassan
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementHayat Denzi
 
fdocuments.in_branch-and-bound-design-and-analysis-of-alogorithm.ppt
fdocuments.in_branch-and-bound-design-and-analysis-of-alogorithm.pptfdocuments.in_branch-and-bound-design-and-analysis-of-alogorithm.ppt
fdocuments.in_branch-and-bound-design-and-analysis-of-alogorithm.pptKartikGupta711
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueChris Carson
 
Network analysis lecture
Network analysis lectureNetwork analysis lecture
Network analysis lectureSara-Jayne Terp
 
Vogel's Approximation Method
Vogel's Approximation MethodVogel's Approximation Method
Vogel's Approximation MethodUsharaniRavikumar
 
Software Project Scheduling Diagrams
Software Project Scheduling DiagramsSoftware Project Scheduling Diagrams
Software Project Scheduling DiagramsSaqib Raza
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisAsif Sultan Razu
 
Cpm n pert lecture 1
Cpm n pert lecture 1Cpm n pert lecture 1
Cpm n pert lecture 1adeelmunir158
 
Operation research ppt chapter two mitku
Operation research ppt   chapter two mitkuOperation research ppt   chapter two mitku
Operation research ppt chapter two mitkumitku assefa
 
Lect-6&7: Network Diagrams, PERT and CPM
Lect-6&7: Network Diagrams, PERT and CPMLect-6&7: Network Diagrams, PERT and CPM
Lect-6&7: Network Diagrams, PERT and CPMMubashir Ali
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost ManagementBhuWan Khadka
 
Unit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pertUnit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pertDagnaygebawGoshme
 
Mb 106 quantitative techniques 5
Mb 106 quantitative techniques 5Mb 106 quantitative techniques 5
Mb 106 quantitative techniques 5KrishnaRoy45
 
Simplex Method
Simplex MethodSimplex Method
Simplex MethodSachin MK
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Akaresh Jose Kaviyil JY
 

What's hot (20)

Operation Research (Simplex Method)
Operation Research (Simplex Method)Operation Research (Simplex Method)
Operation Research (Simplex Method)
 
Earned value management for Beginners
Earned value management for Beginners Earned value management for Beginners
Earned value management for Beginners
 
Pmp procurement chapter 12
Pmp procurement chapter 12Pmp procurement chapter 12
Pmp procurement chapter 12
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
fdocuments.in_branch-and-bound-design-and-analysis-of-alogorithm.ppt
fdocuments.in_branch-and-bound-design-and-analysis-of-alogorithm.pptfdocuments.in_branch-and-bound-design-and-analysis-of-alogorithm.ppt
fdocuments.in_branch-and-bound-design-and-analysis-of-alogorithm.ppt
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned Value
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Network analysis lecture
Network analysis lectureNetwork analysis lecture
Network analysis lecture
 
Vogel's Approximation Method
Vogel's Approximation MethodVogel's Approximation Method
Vogel's Approximation Method
 
Software Project Scheduling Diagrams
Software Project Scheduling DiagramsSoftware Project Scheduling Diagrams
Software Project Scheduling Diagrams
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
 
Cpm n pert lecture 1
Cpm n pert lecture 1Cpm n pert lecture 1
Cpm n pert lecture 1
 
Operation research ppt chapter two mitku
Operation research ppt   chapter two mitkuOperation research ppt   chapter two mitku
Operation research ppt chapter two mitku
 
Lect-6&7: Network Diagrams, PERT and CPM
Lect-6&7: Network Diagrams, PERT and CPMLect-6&7: Network Diagrams, PERT and CPM
Lect-6&7: Network Diagrams, PERT and CPM
 
Network Techniques
Network TechniquesNetwork Techniques
Network Techniques
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
Unit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pertUnit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pert
 
Mb 106 quantitative techniques 5
Mb 106 quantitative techniques 5Mb 106 quantitative techniques 5
Mb 106 quantitative techniques 5
 
Simplex Method
Simplex MethodSimplex Method
Simplex Method
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )
 

Similar to Parametric Estimation in a nutshell

Using PySpark to Scale Markov Decision Problems for Policy Exploration
Using PySpark to Scale Markov Decision Problems for Policy ExplorationUsing PySpark to Scale Markov Decision Problems for Policy Exploration
Using PySpark to Scale Markov Decision Problems for Policy ExplorationDatabricks
 
How to optimise renewables & energy storage
How to optimise renewables & energy storageHow to optimise renewables & energy storage
How to optimise renewables & energy storageIain Beveridge
 
INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...
 INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI... INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...
INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...IAEME Publication
 
(Presentation) Cis utilization of earned value management for monitoring prod...
(Presentation) Cis utilization of earned value management for monitoring prod...(Presentation) Cis utilization of earned value management for monitoring prod...
(Presentation) Cis utilization of earned value management for monitoring prod...Скоробогатов Дмитрий
 
7.project costmanagement
7.project costmanagement7.project costmanagement
7.project costmanagementNiranjana K.R.
 
Energy efficient computing & computational services
Energy efficient computing & computational services Energy efficient computing & computational services
Energy efficient computing & computational services David Wallom
 
7 cost managmenet
7 cost managmenet7 cost managmenet
7 cost managmenetAla Ibrahim
 
Time Cost Trade Off
Time Cost Trade OffTime Cost Trade Off
Time Cost Trade Offssuserfe1b72
 
Introduction to Earned Value Management
Introduction to Earned Value ManagementIntroduction to Earned Value Management
Introduction to Earned Value ManagementUnanet
 
Effect of Temporal Collaboration Network, Maintenance Activity, and Experienc...
Effect of Temporal Collaboration Network, Maintenance Activity, and Experienc...Effect of Temporal Collaboration Network, Maintenance Activity, and Experienc...
Effect of Temporal Collaboration Network, Maintenance Activity, and Experienc...ESEM 2014
 
Capital Cost Expenditure Estimating .ppt
Capital Cost Expenditure Estimating .pptCapital Cost Expenditure Estimating .ppt
Capital Cost Expenditure Estimating .pptArvinThamsir1
 
Day1 1620-1705-maple-pranabendubhattacharyya-131008043643-phpapp02
Day1 1620-1705-maple-pranabendubhattacharyya-131008043643-phpapp02Day1 1620-1705-maple-pranabendubhattacharyya-131008043643-phpapp02
Day1 1620-1705-maple-pranabendubhattacharyya-131008043643-phpapp02PMI_IREP_TP
 
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
Day 1   1620 - 1705 - maple - pranabendu bhattacharyyaDay 1   1620 - 1705 - maple - pranabendu bhattacharyya
Day 1 1620 - 1705 - maple - pranabendu bhattacharyyaPMI2011
 
06 -Estimates, QS_CE, Mar 2021.pdf
06 -Estimates, QS_CE, Mar 2021.pdf06 -Estimates, QS_CE, Mar 2021.pdf
06 -Estimates, QS_CE, Mar 2021.pdfJunaidMughal34
 

Similar to Parametric Estimation in a nutshell (20)

Using PySpark to Scale Markov Decision Problems for Policy Exploration
Using PySpark to Scale Markov Decision Problems for Policy ExplorationUsing PySpark to Scale Markov Decision Problems for Policy Exploration
Using PySpark to Scale Markov Decision Problems for Policy Exploration
 
Sitech
SitechSitech
Sitech
 
How to optimise renewables & energy storage
How to optimise renewables & energy storageHow to optimise renewables & energy storage
How to optimise renewables & energy storage
 
2014 PV Reliability, Operations & Maintenance Workshop: An O&M Perspective
2014 PV Reliability, Operations & Maintenance Workshop: An O&M Perspective2014 PV Reliability, Operations & Maintenance Workshop: An O&M Perspective
2014 PV Reliability, Operations & Maintenance Workshop: An O&M Perspective
 
INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...
 INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI... INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...
INSTANCE BASED MULTI CRITERIA DECISION MODEL FOR CLOUD SERVICE SELECTION USI...
 
(Presentation) Cis utilization of earned value management for monitoring prod...
(Presentation) Cis utilization of earned value management for monitoring prod...(Presentation) Cis utilization of earned value management for monitoring prod...
(Presentation) Cis utilization of earned value management for monitoring prod...
 
Load forecasting
Load forecastingLoad forecasting
Load forecasting
 
7.project costmanagement
7.project costmanagement7.project costmanagement
7.project costmanagement
 
Energy efficient computing & computational services
Energy efficient computing & computational services Energy efficient computing & computational services
Energy efficient computing & computational services
 
Costing
CostingCosting
Costing
 
7 cost managmenet
7 cost managmenet7 cost managmenet
7 cost managmenet
 
Time Cost Trade Off
Time Cost Trade OffTime Cost Trade Off
Time Cost Trade Off
 
Introduction to Earned Value Management
Introduction to Earned Value ManagementIntroduction to Earned Value Management
Introduction to Earned Value Management
 
Effect of Temporal Collaboration Network, Maintenance Activity, and Experienc...
Effect of Temporal Collaboration Network, Maintenance Activity, and Experienc...Effect of Temporal Collaboration Network, Maintenance Activity, and Experienc...
Effect of Temporal Collaboration Network, Maintenance Activity, and Experienc...
 
Badrinath_Dash
Badrinath_DashBadrinath_Dash
Badrinath_Dash
 
Project cost management
Project cost management Project cost management
Project cost management
 
Capital Cost Expenditure Estimating .ppt
Capital Cost Expenditure Estimating .pptCapital Cost Expenditure Estimating .ppt
Capital Cost Expenditure Estimating .ppt
 
Day1 1620-1705-maple-pranabendubhattacharyya-131008043643-phpapp02
Day1 1620-1705-maple-pranabendubhattacharyya-131008043643-phpapp02Day1 1620-1705-maple-pranabendubhattacharyya-131008043643-phpapp02
Day1 1620-1705-maple-pranabendubhattacharyya-131008043643-phpapp02
 
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
Day 1   1620 - 1705 - maple - pranabendu bhattacharyyaDay 1   1620 - 1705 - maple - pranabendu bhattacharyya
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
 
06 -Estimates, QS_CE, Mar 2021.pdf
06 -Estimates, QS_CE, Mar 2021.pdf06 -Estimates, QS_CE, Mar 2021.pdf
06 -Estimates, QS_CE, Mar 2021.pdf
 

Recently uploaded

Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherPerry Belcher
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCRsoniya singh
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...Khaled Al Awadi
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 

Recently uploaded (20)

Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 

Parametric Estimation in a nutshell

  • 1. Parametric Estimation in a Nutshell © 2017 Planisware
  • 2. What is Parametric Estimation? • Parametric Estimation is a method for estimating project cost and duration / effort, in which the project is modelled (described) using predefined algorithms • Parametric Estimation is often perceived as one of the more accurate and reliable estimation methods, because it uses actual historical data or industry standards, and credible units to account for the work to be performed. © 2017 Planisware 2 PX2
  • 3. Let’s look at an example © 2017 Planisware 3
  • 4. The project • Our team must prepare the cost estimates for a small scale wind farm project. The team leader has opted for using parametric estimation techniques. • Specifications for this project include: – Purchase and installation of 3 commercial grade wind turbines with an output of 2MW per turbine – Interconnection with the existing power system and associated upgrades © 2017 Planisware 4
  • 5. Parametric Estimation Process Step 1 - Identify the equations that model our project Step 2 – Evaluate the equations Step 3 – Create (or update) the output © 2017 Planisware 5
  • 6. Step 1 – Identify the equations applicable • First, we need to break down the project into sub-components, according to our library of equations. • Our wind farm project is composed of three major components: © 2017 Planisware 6 1. The project site, which includes: • Site assessment for the proposed project site • Land lease • Permits and associated studies (archaeological, environmental impact, …) 2. The wind turbines, which include: • The turbines and their tower • Installation costs for each turbine 3. Interconnection with the existing power system, which includes: • Connectivity to the power system • System upgrades to mitigate the impact of this project on the power system To simplify this example a bit, let’s focus now on the three elements in bold
  • 7. Step 1 – Identify the equations applicable The Land Lease (a simple equation) • The windiest spot in the area – and the site earmarked for our project – carries a lease negotiated at 3,000 USD per MW and per year. • The equation for the Land Lease is therefore: 𝐶𝑜𝑠𝑡 𝑜𝑓 𝐿𝑒𝑎𝑠𝑒 = 𝑛𝑏 𝑀𝑊 × 3000 𝑈𝑆𝐷 © 2017 Planisware 7
  • 8. Step 1 – Identify the equations applicable Purchase cost of the turbines (equation using a lookup table) • The price for the wind turbines by the preferred manufacturer depends on the purchase volume: • The equation for the cost of the turbines is therefore: 𝐶𝑜𝑠𝑡 𝑜𝑓 𝑇𝑢𝑟𝑏𝑖𝑛𝑒𝑠 = 𝑛𝑏 𝑡𝑢𝑟𝑏𝑖𝑛𝑒𝑠 × 𝐿𝑜𝑜𝑘𝑢𝑝𝑃𝑟𝑖𝑐𝑒(𝑛𝑏 𝑡𝑢𝑟𝑏𝑖𝑛𝑒𝑠) © 2017 Planisware 8 Nb of units purchased Price per turbine 1 3 million USD 2 to 4 2.8 million USD 5 to 9 2.5 million USD Our project includes the installation of 3 wind turbines.
  • 9. Step 1 – Identify the equations applicable Connectivity to the power system (equation with activation condition) • The cost of connecting the wind turbines to the power system depends on whether there is available capacity on the transmission lines near the project site: – If there is, then we can build feeder lines from the wind farm to the turbines. The cost is 80,000 USD per mile of feeder line + the cost of one step-up transformer @ 35,000 USD per turbine. – If there isn’t, we will have to build transmission lines from scratch, at a cost of 300,000 USD per mile • The equation for the cost of connectivity is therefore: – 𝐼𝑓 ∃𝑐𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑡ℎ𝑒𝑛 𝐶𝑜𝑠𝑡 𝑜𝑓 𝑐𝑜𝑛𝑛𝑒𝑐𝑡𝑖𝑣𝑖𝑡𝑦 = 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 × 𝑐𝑜𝑠𝑡 𝑓𝑒𝑒𝑑𝑒𝑟 𝑙𝑖𝑛𝑒𝑠 + 𝑛𝑏 𝑡𝑢𝑟𝑏𝑖𝑛𝑒𝑠 × 𝑐𝑜𝑠𝑡 𝑠𝑡𝑒𝑝𝑢𝑝 𝑡𝑟𝑎𝑛𝑠𝑓𝑜𝑟𝑚𝑒𝑟 – 𝐼𝑓 ∄𝑐𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑡ℎ𝑒𝑛 𝐶𝑜𝑠𝑡 𝑜𝑓 𝑐𝑜𝑛𝑛𝑒𝑐𝑡𝑖𝑣𝑖𝑡𝑦 = 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 × 𝑐𝑜𝑠𝑡 𝑡𝑟𝑎𝑛𝑠𝑚𝑖𝑠𝑠𝑖𝑜𝑛 𝑙𝑖𝑛𝑒𝑠 © 2017 Planisware 9
  • 10. Step 2 – Evaluate the equation • Once we’ve matched each subcomponent of our project with the right equation, we need to evaluate them • Let’s return to our example: – Cost of the lease: the equation is simple and straightforward: 𝐶𝑜𝑠𝑡 𝑜𝑓 𝐿𝑒𝑎𝑠𝑒 = 𝑛𝑏 𝑀𝑊 × 3000 = 3 × 2 × 3000 = 18,000 𝑈𝑆𝐷 𝑝𝑒𝑟 𝑦𝑒𝑎𝑟 – Cost of the turbines: our project is for 3 turbines, so the lookup function will return the price for the 2nd bracket (2.8 million USD) 𝐶𝑜𝑠𝑡 𝑜𝑓 𝑡𝑢𝑟𝑏𝑖𝑛𝑒𝑠 = 3 × 2.8 𝑚𝑖𝑙𝑙𝑖𝑜𝑛 = 8.4 𝑚𝑖𝑙𝑙𝑖𝑜𝑛 𝑈𝑆𝐷 – Cost of connectivity: the transmission lines near the site of our project have sufficient available capacity. Therefore, the first equation is activated: 𝐶𝑜𝑠𝑡 𝑜𝑓 𝑐𝑜𝑛𝑛𝑒𝑐𝑡𝑖𝑣𝑖𝑡𝑦 = 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 × 80,000 + 𝑛𝑏 𝑡𝑢𝑟𝑏𝑖𝑛𝑒𝑠 × 35,000 = 5 × 80,000 + 3 × 35,000 = 505,000 𝑈𝑆𝐷 © 2017 Planisware 10
  • 11. Step 3 – Create (or update) the output • Once we’ve evaluated all the equations, we can consolidate them in a cost plan • A simple cost plan for our project could look like this: © 2017 Planisware 11 Project Task Estimated Cost 01 - Project Site … … B – Land Lease 18,000 USD per year … … 02 – Wind Turbines A - Purchase of the Turbines 8.4 million USD … … 03 - Interconnection A - Connectivity to the power system 505,000 USD … …
  • 13. When to use Parametric Estimation • Parametric estimation is particularly useful in the early stages of a project, as it does not require as much information as other estimation techniques, and provides more accurate and reliable estimates. • Parametric estimation works best for tasks that are: – Often repeated, with little variability (too much variability means that a single equation to model the task will be difficult to design) – With tangible deliverables • For this reason, it is mainly used in the Life Science, Engineering and Construction industries. © 2017 Planisware 13
  • 14. When to use Parametric Estimation • Parametric Estimation can be used in conjunction with Analogous Estimation (which uses actuals from previous projects to calculate estimates) when historical data is not available for a specific task © 2017 Planisware 14
  • 15. Benefits of Parametric Estimation • Parametric estimation is believed to be more accurate than other methods of estimation because the equations are based on experience that takes into account a larger number of factors. • Effort to produce the first set of estimates and keep them up- to-date is minimal: – When parametric estimates are generated through a solid software (usually PPM) solution, a new set of estimates can be generated on- demand in minutes – Similarly, the portfolio can be automatically updated via the batch update mode © 2017 Planisware 15
  • 16. Benefits of Parametric Estimation • Parametric Estimation provides a centralised and standard definition of how estimates should be produced: – Because the algorithms used are used across projects, the forecast “template” will be the same regardless of the type of project (or template project) – Likewise, the calculation method will be the same across all projects of the portfolio – This means that calculations are easily repeatable, and of the same level of quality © 2017 Planisware 16
  • 17. However… • Parametric estimation requires a high effort upfront to build the algorithm. It requires an analysis of each element that contribute to the forecast, and all possible combinations, so as to make available the right equations • By definition, an equation for an activity can only be determined once there is a large base of experience in that activity • If market conditions change, the equations will have to be updated too © 2017 Planisware 17
  • 18. Scoring Parametric Estimation © 2017 Planisware 18 Criteria Score Comments Intended Forecast Horizon Medium / Long Too generic for accurate short term forecasting Accuracy 4 Accuracy improves over time, with algorithm calibration Consistency 5 Consistent output for a given set of conditions Transparency 2 Transparency depends on algorithm complexity Ease of conducting initial forecast 4 Dependent on number of criteria to define Ease of running alternative scenarios 5 Most flexible approach for scenario analysis Ease of implementation 1 Requires identification of all major criteria and the magnitude of their impact
  • 19. Where do the algorithms come from? • There are two primary sources: – Historical data, derived from an analysis of past projects, their drivers, and other contributing factors – Parametric rates published by specialised organisations © 2017 Planisware 19
  • 20. Key success factors • When starting to build a parametric estimation model: – Start with the easiest role, in order to get familiar with the process of analysing the data and building the algorithm – Set a realistic / achievable accuracy goal When setting up parametric estimation for a portfolio, aim for portfolio accuracy, not project accuracy – Limit the number of drivers per algorithm © 2017 Planisware 21
  • 21. To learn more about Estimations and tools to power them, visit our glossary: www.planisware.com/glossary/earned-value- management © 2014 Planisware 22