This document outlines the syllabus for a Strength of Materials course taught at Visvesvaraya Technological University. The course is a 3rd semester undergraduate class in Civil Engineering. It covers 5 modules: simple stresses and strains, compound stresses, shear force and bending moment in beams, torsion in circular shafts, and bending and shear stresses in beams. The course aims to teach students how to evaluate the strength of structural elements and materials. It will cover internal forces, failure concepts, torsion analysis, and beam design. Assessment includes class participation, exams, and a focus on applying concepts to solve engineering problems.