This document summarizes an undergraduate final year project presentation on induction motor drives for an electric car. A team of four electrical engineering students from the University of Engineering and Technology Lahore presented their work. They proposed designing a PWM inverter using IGBTs to power a three-phase induction motor for an electric car and implementing semi-autonomous control via Bluetooth. The team conducted simulations of various PWM techniques in MATLAB and designed inverter components. Their future work involves building a prototype and implementing mobile control of the car's motion and direction.