BUILDING PROCESS
Notes 
• The following project schedule is from actual 
project. It was performed August 2014 in North- 
East Zambia, very rural area close to Tanzanian 
border 
• Crew for 14 on-site days consisted 
– 1 Master Engineer / Chief Supervisor (EHS) 
– 1 Project Manager / Supervisor (EHZ) 
– 2 Master Builders (EHZ) 
– 3 Bricklayers 
– 10-15 Workers (depending on day and tasks) 
– 4 women to carry water and gather grass 
– 2 women for support functions
About tools and methods 
• No construction equipment was used 
• The Earth House Crew provided all hand-held 
tools 
• Even gravel was crushed in place using 
small sledges
Rough Timeline 
Week 1 Week 2 Week 3 Week 4 Week 5 
Area cleaning 
Trenches for 
strip foundation 
Interlocking 
brick mfg 
Adobe brick mfg 
Strip foundation 
Interlock & adobe curing 
Steel pre-cut 
Week 6 Week 7 Week 8 Week 9 Week 10 
Procurement 
and pre-staging 
Logistics 
On Site work and delivery
Preparatory work 
• 2 days - area cleaning and baselines for 
strip foundation 
• 1 day to cast and few days to cure
Adobe and clay works 
• 3 days to create 
interlocking bricks for 
plinth 
• 5 days to create 
adobe bricks for in-filling 
• 2-3 weeks to cure the 
bricks
Steel preparation 
and logistics 
• Earth House Systems™ frames are 
manufactured in Lusaka 
• Roof and span structure is subcontracted 
• 4 days (two men) - structural steel cutting 
and tension rod manufacturing 
• All material and tools are pre-staged in 
warehouse and loaded to a single, 7 ton 
truck
Site Day 1 
• Set up work site, perimeter and occupational 
safety 
• Double-check strip foundation dimensions and 
lay up baselines
Site Day 2 
• Create plinth from 
interlocking bricks 
• Start frame assembly
Site Day 3 
• Detail, plaster and finish plinth 
• Continue frame assembly
Site Day 4 
• Cast and finish concrete slab 
• Finish frame assembly
Site Day 5 
• Lay up assembly plates 
• Start steel works
Site Day 6 
• Preparations for clay 
works 
• Finish steel works
Site Day 7 
• Clay works 
starting from the 
lower frames
Site Day 8 
• Finish in filling with 
adobe bricks, 
shaving and 
smoothing of walls 
• First coat 
plastering, lower 
frames 
• Start roof assembly
Site Day 9 
• Attach heavy-duty 
expanded wire to 
exterior walls 
• First coat 
plastering, interior 
walls, upper frames 
• First coat 
plastering, exterior 
walls
Site Day 10 
• Second coat, 
exterior plastering 
• Finishing exterior 
plastering 
• Electrical work 
preparations
Site Day 11 
• Second coat, interior plastering 
• Finishing, interior plastering
Site Day 12 
• Limewashing inside 
and outside 
• Electrical assembly
Site Day 13 
• Door and panel 
mounting 
• Limewash inside 
and outside 
• Cement floor 
casting
Site Day 14 
• Final detailing 
• Handover to customer

More Related Content

What's hot

Affordable Housing 10 days lcm unit
Affordable Housing   10 days lcm unitAffordable Housing   10 days lcm unit
Affordable Housing 10 days lcm unit
John Masanda, ACIM
 
Portfolio_Hyunjong Choi
Portfolio_Hyunjong ChoiPortfolio_Hyunjong Choi
Portfolio_Hyunjong ChoiHyunjong Choi
 
ITS Building Project - progress update 5
ITS Building Project - progress update 5ITS Building Project - progress update 5
ITS Building Project - progress update 5
Institute for Transport Studies (ITS)
 
Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and ProcessWilden How
 
Building Construction process
Building Construction processBuilding Construction process
Building Construction process
Joanne Yunn Tze
 
Airport Boulevard Railroad Grade Separation Project
Airport Boulevard Railroad Grade Separation ProjectAirport Boulevard Railroad Grade Separation Project
Airport Boulevard Railroad Grade Separation Project
American Society of Civil Engineers, Orange County Branch
 
How We Built The St. Bernard Branch Library From the Ground Up
How We Built The St. Bernard Branch Library From the Ground UpHow We Built The St. Bernard Branch Library From the Ground Up
How We Built The St. Bernard Branch Library From the Ground Up
Public Library of Cincinnati and Hamilton County
 
Chris Tom Labourer resume
Chris Tom Labourer resume Chris Tom Labourer resume
Chris Tom Labourer resume Chris Tom
 
Brochure ozr 2 rev1
Brochure ozr 2 rev1Brochure ozr 2 rev1
Brochure ozr 2 rev1
hamidahafifi
 
Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report
I'mMiss Lily
 
Company Brochure
Company BrochureCompany Brochure
Company BrochureErin Saiki
 
PRESENTATION ON THE INTERNSHIP
 PRESENTATION ON THE INTERNSHIP PRESENTATION ON THE INTERNSHIP
PRESENTATION ON THE INTERNSHIP
SufiyanAhmedJeddy
 
Ahli Bank Head Office Building - TimeLine
Ahli Bank Head Office Building - TimeLineAhli Bank Head Office Building - TimeLine
Ahli Bank Head Office Building - TimeLine
Anuj Ramdas
 
Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015
Joyce HweeMin
 
Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)Hammam El Meseiry
 
Assembling Powerbilt Building
Assembling Powerbilt BuildingAssembling Powerbilt Building
Assembling Powerbilt Building
powerbilt
 

What's hot (20)

Affordable Housing 10 days lcm unit
Affordable Housing   10 days lcm unitAffordable Housing   10 days lcm unit
Affordable Housing 10 days lcm unit
 
TOMS RESUME
TOMS RESUMETOMS RESUME
TOMS RESUME
 
Portfolio_Hyunjong Choi
Portfolio_Hyunjong ChoiPortfolio_Hyunjong Choi
Portfolio_Hyunjong Choi
 
ITS Building Project - progress update 5
ITS Building Project - progress update 5ITS Building Project - progress update 5
ITS Building Project - progress update 5
 
Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and Process
 
Building Construction process
Building Construction processBuilding Construction process
Building Construction process
 
Airport Boulevard Railroad Grade Separation Project
Airport Boulevard Railroad Grade Separation ProjectAirport Boulevard Railroad Grade Separation Project
Airport Boulevard Railroad Grade Separation Project
 
How We Built The St. Bernard Branch Library From the Ground Up
How We Built The St. Bernard Branch Library From the Ground UpHow We Built The St. Bernard Branch Library From the Ground Up
How We Built The St. Bernard Branch Library From the Ground Up
 
Chris Tom Labourer resume
Chris Tom Labourer resume Chris Tom Labourer resume
Chris Tom Labourer resume
 
Payne Elementary School SIT Meeting (June 2, 2016)
Payne Elementary School SIT Meeting (June 2, 2016)Payne Elementary School SIT Meeting (June 2, 2016)
Payne Elementary School SIT Meeting (June 2, 2016)
 
Paul OBrien CV
Paul OBrien CVPaul OBrien CV
Paul OBrien CV
 
Brochure ozr 2 rev1
Brochure ozr 2 rev1Brochure ozr 2 rev1
Brochure ozr 2 rev1
 
Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report
 
Company Brochure
Company BrochureCompany Brochure
Company Brochure
 
PRESENTATION ON THE INTERNSHIP
 PRESENTATION ON THE INTERNSHIP PRESENTATION ON THE INTERNSHIP
PRESENTATION ON THE INTERNSHIP
 
Exercise
ExerciseExercise
Exercise
 
Ahli Bank Head Office Building - TimeLine
Ahli Bank Head Office Building - TimeLineAhli Bank Head Office Building - TimeLine
Ahli Bank Head Office Building - TimeLine
 
Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015
 
Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)Environment friendly building_material_technologies_for_low_cost_housing (1)
Environment friendly building_material_technologies_for_low_cost_housing (1)
 
Assembling Powerbilt Building
Assembling Powerbilt BuildingAssembling Powerbilt Building
Assembling Powerbilt Building
 

Similar to Earth House Field Building Process

K.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionK.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionascemiami-dade
 
Ferrouscementhouse 2
Ferrouscementhouse 2Ferrouscementhouse 2
Ferrouscementhouse 2
poreddy jeevanreddy
 
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
ALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTIONALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTION
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
Rajesh Kolli
 
Building maintenance
Building maintenance Building maintenance
Building maintenance
Janki Patel
 
siddhant .construction field visit.pptx
siddhant .construction field visit.pptxsiddhant .construction field visit.pptx
siddhant .construction field visit.pptx
SiddhantAshokSuryawa
 
2022-07-13.pptx
2022-07-13.pptx2022-07-13.pptx
2022-07-13.pptx
AshrafulHaqueTushar1
 
lecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptxlecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptx
BossGold
 
Factory built substation case study
Factory built substation case studyFactory built substation case study
Factory built substation case study
DIS-TRAN Packaged Substations
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyMike Bisland
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphbhlksd
 
Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020
Crosstown TO
 
Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017
Crosstown TO
 
Construction of Primary School slides-1.pptx
Construction of Primary School slides-1.pptxConstruction of Primary School slides-1.pptx
Construction of Primary School slides-1.pptx
SardarMuhammadHashir
 
The National Eco House Oman
The National Eco House OmanThe National Eco House Oman
The National Eco House Oman
MECandPMV
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Fairfax County
 

Similar to Earth House Field Building Process (20)

K.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionK.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progression
 
Client Presentation
Client PresentationClient Presentation
Client Presentation
 
Ferrouscementhouse 2
Ferrouscementhouse 2Ferrouscementhouse 2
Ferrouscementhouse 2
 
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
ALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTIONALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTION
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
 
Building maintenance
Building maintenance Building maintenance
Building maintenance
 
siddhant .construction field visit.pptx
siddhant .construction field visit.pptxsiddhant .construction field visit.pptx
siddhant .construction field visit.pptx
 
Ryan Arendse
Ryan ArendseRyan Arendse
Ryan Arendse
 
2022-07-13.pptx
2022-07-13.pptx2022-07-13.pptx
2022-07-13.pptx
 
lecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptxlecture 5 - Technical Specifications and MM.pptx
lecture 5 - Technical Specifications and MM.pptx
 
Factory built substation case study
Factory built substation case studyFactory built substation case study
Factory built substation case study
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
 
Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020
 
Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017
 
Construction of Primary School slides-1.pptx
Construction of Primary School slides-1.pptxConstruction of Primary School slides-1.pptx
Construction of Primary School slides-1.pptx
 
The National Eco House Oman
The National Eco House OmanThe National Eco House Oman
The National Eco House Oman
 
Steel buildings
Steel buildings  Steel buildings
Steel buildings
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
Benjamin Weiser Resume
Benjamin Weiser ResumeBenjamin Weiser Resume
Benjamin Weiser Resume
 

Recently uploaded

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 

Recently uploaded (20)

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 

Earth House Field Building Process

  • 2. Notes • The following project schedule is from actual project. It was performed August 2014 in North- East Zambia, very rural area close to Tanzanian border • Crew for 14 on-site days consisted – 1 Master Engineer / Chief Supervisor (EHS) – 1 Project Manager / Supervisor (EHZ) – 2 Master Builders (EHZ) – 3 Bricklayers – 10-15 Workers (depending on day and tasks) – 4 women to carry water and gather grass – 2 women for support functions
  • 3. About tools and methods • No construction equipment was used • The Earth House Crew provided all hand-held tools • Even gravel was crushed in place using small sledges
  • 4. Rough Timeline Week 1 Week 2 Week 3 Week 4 Week 5 Area cleaning Trenches for strip foundation Interlocking brick mfg Adobe brick mfg Strip foundation Interlock & adobe curing Steel pre-cut Week 6 Week 7 Week 8 Week 9 Week 10 Procurement and pre-staging Logistics On Site work and delivery
  • 5. Preparatory work • 2 days - area cleaning and baselines for strip foundation • 1 day to cast and few days to cure
  • 6. Adobe and clay works • 3 days to create interlocking bricks for plinth • 5 days to create adobe bricks for in-filling • 2-3 weeks to cure the bricks
  • 7. Steel preparation and logistics • Earth House Systems™ frames are manufactured in Lusaka • Roof and span structure is subcontracted • 4 days (two men) - structural steel cutting and tension rod manufacturing • All material and tools are pre-staged in warehouse and loaded to a single, 7 ton truck
  • 8. Site Day 1 • Set up work site, perimeter and occupational safety • Double-check strip foundation dimensions and lay up baselines
  • 9. Site Day 2 • Create plinth from interlocking bricks • Start frame assembly
  • 10. Site Day 3 • Detail, plaster and finish plinth • Continue frame assembly
  • 11. Site Day 4 • Cast and finish concrete slab • Finish frame assembly
  • 12. Site Day 5 • Lay up assembly plates • Start steel works
  • 13. Site Day 6 • Preparations for clay works • Finish steel works
  • 14. Site Day 7 • Clay works starting from the lower frames
  • 15. Site Day 8 • Finish in filling with adobe bricks, shaving and smoothing of walls • First coat plastering, lower frames • Start roof assembly
  • 16. Site Day 9 • Attach heavy-duty expanded wire to exterior walls • First coat plastering, interior walls, upper frames • First coat plastering, exterior walls
  • 17. Site Day 10 • Second coat, exterior plastering • Finishing exterior plastering • Electrical work preparations
  • 18. Site Day 11 • Second coat, interior plastering • Finishing, interior plastering
  • 19. Site Day 12 • Limewashing inside and outside • Electrical assembly
  • 20. Site Day 13 • Door and panel mounting • Limewash inside and outside • Cement floor casting
  • 21. Site Day 14 • Final detailing • Handover to customer