CONSTRUCTED LANDSCAPE [ARC 3343]
PROJECT 2 - LANDSCAPE PROJECT
REPORT COMPILATION
Group Member : Khairul Jefri (0318414)
Joshua Yim (0317945)
Khor Hao Xiang (0318065)
Khor Yen Min (0318149)
Nge Jia Chen (0317738)
Wong Zhen Fai (0317890)
Intake : FNBE0214
Lecturer : Mr. Fariz Hilmi
CONTEXT
TITLE PAGE
 Introduction
 Site Analysis
 Concept
 Master Plan
 Planting Plan
 Costing
 Construction Details
 Maintenance Plan
3
4 - 5
6 - 7
8
9
10 - 12
13 - 14
15 - 16
Introduction
The selected site is located at Block E, Level 7’s balcony. Originally, in this
site there is nothing but an empty balcony with little to no aesthetic value. However,
this site has raw potential as it contains a beautiful view of the; surrounding campus,
greenery along the roads and car parks and view of the town. This site is supposed
to be an appropriate location for students or staff members to take a break and visit
the balcony for leisure time but due to the nature of the unused location, there is
nothing there but a simple balcony. Therefore, not many people would bother to
travel all the way up to the 7th
floor to use the balcony.
View from Block E, Level 7’s balcony
Block E, Level 7’s balcony
Site Analysis
After analysing the site , we found out that the strength of wind is cooling enough to
cool the entire site. The wind comes in two directions which makes the site cooling.
Due to the roof existing at the site, it has created enough shade from the sunlight at
various directions and time. This has made the site a more suitable and comfortable
place to rest and leisure at all time.
Sun Orientation
Wind Orientation
Furthermore, students often face stress in studies and prefer to have a walk or find a
relaxing place to have a short gateway to release some stress. Followed by this
activity of the student, this site is needed for students who need to take a break from
work because it has a beautiful view of the surrounding campus, greenery along the
roads and view of the town. It is a suitable place for students to take a break in the
site. Besides that, classes and labs are located next to the site. Thus it is easier for
students to go there.
Concept
The concept for this project is to create another new green space in the campus
which is transforming the simple balcony into a fresh and relaxing green area.
Besides creating a new green space, we intend to abandon the usage of usual-
looking mainstream gardens and replace it with modernism and originality.
Collaborating with the design we made up, the concept of this project can be called
as MOR-DEN ELEVATED (Modern garden that is elevated) due to the elevated
slope on the planning site.
The purpose of this project is to fully utilise the open spaces around the campus
which is making use of the simple and empty balcony and transforming it into a
modern green space. With the implementation of the concept, users can visit the
balcony to take a rest and relax by lingering around, enjoying the scenery and
experiencing fresh air. Moreover, students can also observe the Sun rise and set in
the morning and evening, and stargazing during the night at the balcony.
Master Plan
LOCATION PLAN
SELECTED SITE
Jasminum Sambac
Zoysia Artificial Grass Cedar Wood Walkway
Solar Walkway
Light
Ligustrum
Jonandrum
White Gravel
Solar Lamp Post
Concrete
Planter Box
Planting Plan
KEY COMMON NAME BOTANICAL NAME QUANTITY
1 Jasmine Shrub Jasminum Sambac 106
2 Lollipop Tree Ligustrum Jonandrum 1
3 Zoysia Artificial Grass - 27
HORIZONTAL LAYER OF PLANTS
1
2
3
Construction Details
i. CONSTRUCTION DETAIL FOR BROADWALK
(SCALE 1:10)
ii. CONSTRUCTION DETAIL FOR THE SLOPE
(SCALE 1:20)
Maintenance Plan
Lingustrum Jonandrum
- This plant requires regular watering three times a week. Feel
the soil and make sure it is damp to the touch, not sodden and
not tinder dry. This type of watering needs little and often,
rather than large quantities of water in one go.
Jasminum Sambac
- This plant likes full sun to partial shade. It
requires average watering. Watering is not
required if the soil is moist.
Zoysia Artificial Grass
- Every year, weed killer or special herbicide treatment
will be used to prevent weeds or moss. Any vegetation
can then be conveniently pulled out or swept off the turf.

More Related Content

What's hot

ICI final project
ICI final projectICI final project
ICI final projectMarco Leong
 
A Framework for campus planning - Case Study - India
A  Framework  for  campus  planning - Case Study - IndiaA  Framework  for  campus  planning - Case Study - India
A Framework for campus planning - Case Study - IndiaShubh Cheema
 
FNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTFNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTLucasssong
 
ICI Final Project.docx
ICI Final Project.docxICI Final Project.docx
ICI Final Project.docxFoo Zhi Fung
 
Case study climatology (india habitat centre & peda)
Case study  climatology (india habitat centre & peda)Case study  climatology (india habitat centre & peda)
Case study climatology (india habitat centre & peda)Chandan kumar
 
Community Renewal Diagrams And Design Analysis
Community Renewal Diagrams And Design AnalysisCommunity Renewal Diagrams And Design Analysis
Community Renewal Diagrams And Design AnalysisKim Mitchell
 
ICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolioICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolioJonathan Lim
 
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006Ana elviravelezlorenzocastro jardinbotanicomedellin_2006
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006Facto estudio
 
Landscape in housing projects
Landscape in housing projectsLandscape in housing projects
Landscape in housing projectsDhanya Pravin
 
Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)Christopher Fortin
 

What's hot (17)

Landscape
LandscapeLandscape
Landscape
 
ICI final project
ICI final projectICI final project
ICI final project
 
A Framework for campus planning - Case Study - India
A  Framework  for  campus  planning - Case Study - IndiaA  Framework  for  campus  planning - Case Study - India
A Framework for campus planning - Case Study - India
 
Wall house
Wall houseWall house
Wall house
 
FNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTFNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECT
 
ICI Final Project.docx
ICI Final Project.docxICI Final Project.docx
ICI Final Project.docx
 
Architecture Design Portfolio 2020
Architecture Design Portfolio 2020Architecture Design Portfolio 2020
Architecture Design Portfolio 2020
 
Case study climatology (india habitat centre & peda)
Case study  climatology (india habitat centre & peda)Case study  climatology (india habitat centre & peda)
Case study climatology (india habitat centre & peda)
 
Community Renewal Diagrams And Design Analysis
Community Renewal Diagrams And Design AnalysisCommunity Renewal Diagrams And Design Analysis
Community Renewal Diagrams And Design Analysis
 
Icip3 project brief
Icip3 project briefIcip3 project brief
Icip3 project brief
 
ICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolioICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolio
 
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006Ana elviravelezlorenzocastro jardinbotanicomedellin_2006
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006
 
InternationalOct
InternationalOctInternationalOct
InternationalOct
 
Auroville Architecture
Auroville ArchitectureAuroville Architecture
Auroville Architecture
 
Landscape in housing projects
Landscape in housing projectsLandscape in housing projects
Landscape in housing projects
 
CONSCIOUS URBANISM
CONSCIOUS  URBANISMCONSCIOUS  URBANISM
CONSCIOUS URBANISM
 
Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)
 

Viewers also liked

โครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารโครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารIzezjk
 
Enbe report
Enbe reportEnbe report
Enbe reportj3frin30
 
individual booklet
individual bookletindividual booklet
individual bookletj3frin30
 
บริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ตบริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ตIzezjk
 
Executing Strategy in the Midst of the "Perfect Storm"
Executing Strategy in the Midst of the "Perfect Storm"Executing Strategy in the Midst of the "Perfect Storm"
Executing Strategy in the Midst of the "Perfect Storm"GlobalStrategyTribe
 
Task two and three
Task two and threeTask two and three
Task two and threeprabhdeep_k
 
Ici proposal
Ici proposalIci proposal
Ici proposalj3frin30
 
Slide bkap 1 m rm100 2014
Slide bkap 1 m rm100 2014Slide bkap 1 m rm100 2014
Slide bkap 1 m rm100 2014hizan2304
 
โครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารโครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารIzezjk
 
Introduction to drawing
Introduction to drawingIntroduction to drawing
Introduction to drawingj3frin30
 
A Tour through Open Space by the Center for Collaborative Awareness
A Tour through Open Space by the Center for Collaborative AwarenessA Tour through Open Space by the Center for Collaborative Awareness
A Tour through Open Space by the Center for Collaborative Awarenessmaureenkmccarthy
 

Viewers also liked (15)

โครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารโครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสาร
 
Enbe report
Enbe reportEnbe report
Enbe report
 
individual booklet
individual bookletindividual booklet
individual booklet
 
บริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ตบริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ต
 
Executing Strategy in the Midst of the "Perfect Storm"
Executing Strategy in the Midst of the "Perfect Storm"Executing Strategy in the Midst of the "Perfect Storm"
Executing Strategy in the Midst of the "Perfect Storm"
 
Task two and three
Task two and threeTask two and three
Task two and three
 
Ici proposal
Ici proposalIci proposal
Ici proposal
 
Ici
IciIci
Ici
 
Slide bkap 1 m rm100 2014
Slide bkap 1 m rm100 2014Slide bkap 1 m rm100 2014
Slide bkap 1 m rm100 2014
 
โครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารโครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสาร
 
Ants
AntsAnts
Ants
 
Introduction to drawing
Introduction to drawingIntroduction to drawing
Introduction to drawing
 
Employee motivation 1
Employee motivation  1Employee motivation  1
Employee motivation 1
 
Smart goal
Smart goalSmart goal
Smart goal
 
A Tour through Open Space by the Center for Collaborative Awareness
A Tour through Open Space by the Center for Collaborative AwarenessA Tour through Open Space by the Center for Collaborative Awareness
A Tour through Open Space by the Center for Collaborative Awareness
 

Similar to 1. cl report

Ici final project 3
Ici final project 3Ici final project 3
Ici final project 3wyinsam
 
CL Final Project: Report
CL Final Project: ReportCL Final Project: Report
CL Final Project: ReportNatalieKi
 
CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project Ryan Kerry Jy
 
Ici final project
Ici final projectIci final project
Ici final projecttfkc1212
 
Introduction to construction industry
Introduction to construction industryIntroduction to construction industry
Introduction to construction industryHwei Ying Saw
 
Ici final group
Ici final groupIci final group
Ici final groupKailyn Lee
 
Ici project brief
Ici project briefIci project brief
Ici project briefJian Leo
 
Theresa thia and group
Theresa thia and groupTheresa thia and group
Theresa thia and groupTheresa Thia
 
the project brief
the project briefthe project brief
the project briefJoyce Wee
 
ICI Final Project
ICI Final ProjectICI Final Project
ICI Final ProjectBolin Loong
 
FNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportFNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportWinnie Ang
 
Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Lwj Welson
 
Foundation in natural and built environment final project for ici
Foundation in natural and built environment final project for iciFoundation in natural and built environment final project for ici
Foundation in natural and built environment final project for iciYong Sy
 

Similar to 1. cl report (20)

Ici
IciIci
Ici
 
Introduction
IntroductionIntroduction
Introduction
 
Ici final project report
Ici final project reportIci final project report
Ici final project report
 
Ici final project 3
Ici final project 3Ici final project 3
Ici final project 3
 
CL Final Project: Report
CL Final Project: ReportCL Final Project: Report
CL Final Project: Report
 
CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project
 
Ici final project
Ici final projectIci final project
Ici final project
 
Introduction to construction industry
Introduction to construction industryIntroduction to construction industry
Introduction to construction industry
 
Ici final group
Ici final groupIci final group
Ici final group
 
Cl
ClCl
Cl
 
Ici project brief
Ici project briefIci project brief
Ici project brief
 
Theresa thia and group
Theresa thia and groupTheresa thia and group
Theresa thia and group
 
CL Report
CL ReportCL Report
CL Report
 
Cl report
Cl reportCl report
Cl report
 
the project brief
the project briefthe project brief
the project brief
 
ICI Final Project
ICI Final ProjectICI Final Project
ICI Final Project
 
FNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportFNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_Report
 
Cl
ClCl
Cl
 
Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)
 
Foundation in natural and built environment final project for ici
Foundation in natural and built environment final project for iciFoundation in natural and built environment final project for ici
Foundation in natural and built environment final project for ici
 

Recently uploaded

Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 

Recently uploaded (20)

E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 

1. cl report

  • 1. CONSTRUCTED LANDSCAPE [ARC 3343] PROJECT 2 - LANDSCAPE PROJECT REPORT COMPILATION Group Member : Khairul Jefri (0318414) Joshua Yim (0317945) Khor Hao Xiang (0318065) Khor Yen Min (0318149) Nge Jia Chen (0317738) Wong Zhen Fai (0317890) Intake : FNBE0214 Lecturer : Mr. Fariz Hilmi
  • 2. CONTEXT TITLE PAGE  Introduction  Site Analysis  Concept  Master Plan  Planting Plan  Costing  Construction Details  Maintenance Plan 3 4 - 5 6 - 7 8 9 10 - 12 13 - 14 15 - 16
  • 3. Introduction The selected site is located at Block E, Level 7’s balcony. Originally, in this site there is nothing but an empty balcony with little to no aesthetic value. However, this site has raw potential as it contains a beautiful view of the; surrounding campus, greenery along the roads and car parks and view of the town. This site is supposed to be an appropriate location for students or staff members to take a break and visit the balcony for leisure time but due to the nature of the unused location, there is nothing there but a simple balcony. Therefore, not many people would bother to travel all the way up to the 7th floor to use the balcony. View from Block E, Level 7’s balcony Block E, Level 7’s balcony
  • 4. Site Analysis After analysing the site , we found out that the strength of wind is cooling enough to cool the entire site. The wind comes in two directions which makes the site cooling. Due to the roof existing at the site, it has created enough shade from the sunlight at various directions and time. This has made the site a more suitable and comfortable place to rest and leisure at all time. Sun Orientation Wind Orientation
  • 5. Furthermore, students often face stress in studies and prefer to have a walk or find a relaxing place to have a short gateway to release some stress. Followed by this activity of the student, this site is needed for students who need to take a break from work because it has a beautiful view of the surrounding campus, greenery along the roads and view of the town. It is a suitable place for students to take a break in the site. Besides that, classes and labs are located next to the site. Thus it is easier for students to go there.
  • 6. Concept The concept for this project is to create another new green space in the campus which is transforming the simple balcony into a fresh and relaxing green area. Besides creating a new green space, we intend to abandon the usage of usual- looking mainstream gardens and replace it with modernism and originality. Collaborating with the design we made up, the concept of this project can be called as MOR-DEN ELEVATED (Modern garden that is elevated) due to the elevated slope on the planning site. The purpose of this project is to fully utilise the open spaces around the campus which is making use of the simple and empty balcony and transforming it into a modern green space. With the implementation of the concept, users can visit the balcony to take a rest and relax by lingering around, enjoying the scenery and experiencing fresh air. Moreover, students can also observe the Sun rise and set in the morning and evening, and stargazing during the night at the balcony.
  • 7. Master Plan LOCATION PLAN SELECTED SITE Jasminum Sambac Zoysia Artificial Grass Cedar Wood Walkway Solar Walkway Light Ligustrum Jonandrum White Gravel Solar Lamp Post Concrete Planter Box
  • 8. Planting Plan KEY COMMON NAME BOTANICAL NAME QUANTITY 1 Jasmine Shrub Jasminum Sambac 106 2 Lollipop Tree Ligustrum Jonandrum 1 3 Zoysia Artificial Grass - 27 HORIZONTAL LAYER OF PLANTS 1 2 3
  • 9. Construction Details i. CONSTRUCTION DETAIL FOR BROADWALK (SCALE 1:10)
  • 10. ii. CONSTRUCTION DETAIL FOR THE SLOPE (SCALE 1:20)
  • 11. Maintenance Plan Lingustrum Jonandrum - This plant requires regular watering three times a week. Feel the soil and make sure it is damp to the touch, not sodden and not tinder dry. This type of watering needs little and often, rather than large quantities of water in one go. Jasminum Sambac - This plant likes full sun to partial shade. It requires average watering. Watering is not required if the soil is moist. Zoysia Artificial Grass - Every year, weed killer or special herbicide treatment will be used to prevent weeds or moss. Any vegetation can then be conveniently pulled out or swept off the turf.