TABLE OF CONTENTS
NO. TOPIC PAGE
1. INTRODUCTION
2. INTRODUCTION TO OUR SITE
3. LOCATION AND SITE PLAN
4. SITE ANALYSIS AND OBSERVATION
5. CONCEPT
6. SKETCH PLAN
7. PERSPECTIVE SKETCH
8. MASTER PLAN
9. BENEFITS OF PROPOSAL SITE
10. CONCLUSION
INTRODUCTION
In this ICI final project, we must find a
partner to form a group of two.We were given a
task, to find a site with the size in between
30x30m(900m²) to 30x40m(1200m²). We were
required to initiate and propose small
construction at the chosen site.
The site should serve one of the following
purposes:
1. Recreation area
2. Commercial area
3. Industrial area
4. Agricultural area
5. Tourism area
6. Residential area
INTRODUCTION TO OUR SITE
After we had our discussion together, we
decided to propose this site as a recreation
area. That is Pocket Park.
We had selected an empty land nearby
Taylor’s University Lakeside as our 30x40meter
site.
LOCATION PLAN
This is our location plan. Located near
the Taylor’s University Lakeside and
Senza Residence(Bottom-cannot be seen
here)
SITE PLAN
The red rectangular shape at left side of
Jalan Taylors is our site.
SITE ANALYSIS
SITE ANALYSIS
SUNLIGHT
In our site, the sunlight come from the east to
west our site. During the sunny day, it will be
very hot because there aren’t any trees.
CIRCULATION
There are many cars passing our site, because
there are two busy street beside our site.
WEATHER
The weather of the site is not so good since
there’s no trees around that area.It’ll be
quite stuffy. When it’s raining, soil erosion
will occurs because the site doesn’t have any
trees and grasses to grab on the soil.
WIND
There will be less wind in our site because
there is a building blocking the wind that blow
to our site.
OBSERVATION
There are a few roadways near the site.
Since there are roads, it would be a lot of
cars passing by. The air will be polluted
easily and also the noise pollution cannot be
avoided.
There is a building behind the site, it’s
blocking the air flowing from behind. Only the
wind from east can flow to the site.
There are no plants can be seen around the
site. The air at the site is not fresh and
polluted. Also, the air around there has a
strong stale smell after raining. This kind of
condition is not suitable for living.
SKETCH PLAN
This is our original sketch plan. But after
this we decided to change some construction
over here. You can see it in the Master Plan.
PERSPECTIVE SKETCH
- This is the entrance to the park from the
Taylor’s University.
- From the entrance, you can see the
beautiful fountain
- The trees give the whole atmosphere the
relaxation feeling.
- Benches are provided which allows the
people to sit down when they’re tired of
walking.
MASTER PLAN
This is the
master plan
of our
proposal.
ENTRANCE
Top left:
From the car park Bottom:
Top right: From Senza
From Taylor’s University Residence
BENEFITS AND FACILITIES OF PROPOSAL SITE
Our proposal site is a pocket park. This
park is open to public. Anyone can come
especially for the residents from Senza
Residence, PJS 7 and the students from Taylor’s
University.
BENCH
By adding a wooden
bench, it maximizes the
use of space. More
people can be fitted
into the selected area
and it also provides
more seats for people.
By doing so, more people can enjoy the nice
scenery as well as having a place to hang out
with friends. Students can do reading there or
just sit there and rest.
STALL
When you are hungry
or thirsty, you can
go to the stall and
have some food or
drinks.
OPEN SPACE
There will be
a large greenly
area. That you
can read your
books, do some
activities, and
enjoy your time
picnic with your
family.
FOUNTAIN
Everyone live in an increasingly stressful
world…the sound of water flowing from a water
fountain has a magically relaxing effect.
Everyone can imagine themselves at the ocean,
or by a babbling brook, and everyone may start
to unwind when you were in our pocket park.
FISH POND
You can walk around the fish pond and the
fish there are colourful and there have many
different kind of fishes in the pond. You can
also feed them with bread or fish food that
sell in the stall.
GAZEBO
The gazebo is near
by the stall, so
that you can have
your meals in there.
And when you are
tired, you can also
rest over there.
CONCEPT
After the site analysis, we came out with
our concept. Our concept is “Love the Earth”.
This concept is to allow the residents and the
students to be closed to the nature. This park
acts as the green lung of the busy city. Also,
it has the rabbit farm area which inspired the
Langkawi Oriental Village. Anyone can go there
to have a look and experience the fun of
feeding the rabbits.
PROJECT REQUIREMENT
 The types of park should be compliment with
the surrounding area which include
residential area(Senza) and educational
area(Taylor’s University).
 Our concept is to allow the nearby
residents and students to relax from the
hectic life. They can relax after the long
week of working and studying or after a
long day.
 The designs of the park of the hawker
centre is to keep to the obligation of laws
and codes of practice set by the
authorities:
I.Uniform Building By-laws;
II.Town & Country Planning Act;
III.Department of Occupational Safety and
Health (JKKP)
IV.Suruhanjaya Tenaga Malaysia (TNB);
V.Syarikat Bekalan Air Selangor
SdnBhd(SYABAS);
VI.Majlis Perbandaraan Subang Jaya (MPSJ)
ARCHITECTURAL REQUIREMENT
The selection and proposal of construction:
- Fountain
- Rabbit farm
- Hawker stands
The utilities
- Lots of trees
- Benches (sitting area)
- Gazebo (BBQ area)
CONCLUSION
In conclusion, we realized that building a
recreation area is not an easy task even it is
at an empty space. We have to think of a lot of
ideas and have to compliment with the
surrounding area. Besides, we also need to do a
lot of research in order to avoid any problems
afterwards. We do hope that this recreational
area can help the students to release their
stress.

More Related Content

What's hot (7)

Auroville Architecture
Auroville ArchitectureAuroville Architecture
Auroville Architecture
 
Solar kitchen
Solar kitchenSolar kitchen
Solar kitchen
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
Auroville Student Practicum - Architecture
Auroville Student Practicum - ArchitectureAuroville Student Practicum - Architecture
Auroville Student Practicum - Architecture
 
Auroville Green Practices Summer School - Presentation
Auroville Green Practices Summer School - PresentationAuroville Green Practices Summer School - Presentation
Auroville Green Practices Summer School - Presentation
 
Project ujeli
Project ujeliProject ujeli
Project ujeli
 
Manasarovar Nature Park - submitted for PMs award for Urban Planning and Design
Manasarovar Nature Park - submitted for PMs award for Urban Planning and DesignManasarovar Nature Park - submitted for PMs award for Urban Planning and Design
Manasarovar Nature Park - submitted for PMs award for Urban Planning and Design
 

Viewers also liked

tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdf
tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdftj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdf
tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdfFoo Zhi Fung
 
PLJ Article - Holding Over
PLJ Article - Holding OverPLJ Article - Holding Over
PLJ Article - Holding OverNerissa Hatcher
 
Jake Horaist resume
Jake Horaist resumeJake Horaist resume
Jake Horaist resumeJake Horaist
 
scsi_residentialpropertyreview_2014
scsi_residentialpropertyreview_2014scsi_residentialpropertyreview_2014
scsi_residentialpropertyreview_2014Orla Deasy
 
WHAT DID JOHN SEE IN REVELATION
WHAT DID JOHN SEE IN REVELATIONWHAT DID JOHN SEE IN REVELATION
WHAT DID JOHN SEE IN REVELATIONLavera Wright
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfFoo Zhi Fung
 
structuralengeeniring63-141128233958-conversion-gate02.ppt
structuralengeeniring63-141128233958-conversion-gate02.pptstructuralengeeniring63-141128233958-conversion-gate02.ppt
structuralengeeniring63-141128233958-conversion-gate02.pptFoo Zhi Fung
 
Music magazine plan
Music magazine plan Music magazine plan
Music magazine plan lydiaharding
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
Functions of Money
Functions of MoneyFunctions of Money
Functions of Moneyangelineross
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
Nuffield-Report-Final
Nuffield-Report-FinalNuffield-Report-Final
Nuffield-Report-FinalSafa Hashemi
 
Stewardship brings prosperity !!
Stewardship brings prosperity  !!Stewardship brings prosperity  !!
Stewardship brings prosperity !!Lavera Wright
 
Google glass
Google glassGoogle glass
Google glassBINAJISH
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
Africans: Tracing your root by Anthony claret
Africans: Tracing your root by Anthony claretAfricans: Tracing your root by Anthony claret
Africans: Tracing your root by Anthony claretAnthony-Claret Onwutalobi
 

Viewers also liked (20)

tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdf
tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdftj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdf
tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdf
 
Opi cyber talk for executives
Opi cyber talk for executivesOpi cyber talk for executives
Opi cyber talk for executives
 
PLJ Article - Holding Over
PLJ Article - Holding OverPLJ Article - Holding Over
PLJ Article - Holding Over
 
Jake Horaist resume
Jake Horaist resumeJake Horaist resume
Jake Horaist resume
 
scsi_residentialpropertyreview_2014
scsi_residentialpropertyreview_2014scsi_residentialpropertyreview_2014
scsi_residentialpropertyreview_2014
 
Vinyaidees
Vinyaidees Vinyaidees
Vinyaidees
 
WHAT DID JOHN SEE IN REVELATION
WHAT DID JOHN SEE IN REVELATIONWHAT DID JOHN SEE IN REVELATION
WHAT DID JOHN SEE IN REVELATION
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdf
 
structuralengeeniring63-141128233958-conversion-gate02.ppt
structuralengeeniring63-141128233958-conversion-gate02.pptstructuralengeeniring63-141128233958-conversion-gate02.ppt
structuralengeeniring63-141128233958-conversion-gate02.ppt
 
Music magazine plan
Music magazine plan Music magazine plan
Music magazine plan
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
Functions of Money
Functions of MoneyFunctions of Money
Functions of Money
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
Music magazine
Music magazineMusic magazine
Music magazine
 
Nuffield-Report-Final
Nuffield-Report-FinalNuffield-Report-Final
Nuffield-Report-Final
 
Stewardship brings prosperity !!
Stewardship brings prosperity  !!Stewardship brings prosperity  !!
Stewardship brings prosperity !!
 
Task 2-3
Task 2-3Task 2-3
Task 2-3
 
Google glass
Google glassGoogle glass
Google glass
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
Africans: Tracing your root by Anthony claret
Africans: Tracing your root by Anthony claretAfricans: Tracing your root by Anthony claret
Africans: Tracing your root by Anthony claret
 

Similar to ICI Final Project.docx

Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Lwj Welson
 
ICI Project 3: The project Brief Report
ICI Project 3: The project Brief ReportICI Project 3: The project Brief Report
ICI Project 3: The project Brief ReportShze Hwa Lee
 
Introduction to the construction industry
Introduction to the construction industryIntroduction to the construction industry
Introduction to the construction industryIRFAANYADUN
 
Ici project brief
Ici project briefIci project brief
Ici project briefJian Leo
 
Ici final project
Ici final projectIci final project
Ici final projectTien Yun
 
ICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolioICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolioJonathan Lim
 
ICI Final Project
ICI Final ProjectICI Final Project
ICI Final ProjectBolin Loong
 
Ici final report pdf
Ici final report pdfIci final report pdf
Ici final report pdfsimpsonchin
 
Final project
Final projectFinal project
Final projectKit' Here
 

Similar to ICI Final Project.docx (20)

Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)
 
ICI Project 3: The project Brief Report
ICI Project 3: The project Brief ReportICI Project 3: The project Brief Report
ICI Project 3: The project Brief Report
 
Introduction
IntroductionIntroduction
Introduction
 
Project 3.docx
Project 3.docxProject 3.docx
Project 3.docx
 
Introduction to the construction industry
Introduction to the construction industryIntroduction to the construction industry
Introduction to the construction industry
 
Ici project brief
Ici project briefIci project brief
Ici project brief
 
ICI
ICIICI
ICI
 
Ici
IciIci
Ici
 
Ici final project
Ici final projectIci final project
Ici final project
 
ICI Project 3
ICI Project 3ICI Project 3
ICI Project 3
 
ICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolioICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolio
 
ICI Final Project
ICI Final ProjectICI Final Project
ICI Final Project
 
Ici final project
Ici final projectIci final project
Ici final project
 
Ici final project
Ici final projectIci final project
Ici final project
 
Ici report
Ici reportIci report
Ici report
 
Project Proposal
Project ProposalProject Proposal
Project Proposal
 
Ici final report pdf
Ici final report pdfIci final report pdf
Ici final report pdf
 
Group
GroupGroup
Group
 
Final project
Final projectFinal project
Final project
 
Final project
Final projectFinal project
Final project
 

More from Foo Zhi Fung

enbefinalprojectproposal-141130045858-conversion-gate01.pdf
enbefinalprojectproposal-141130045858-conversion-gate01.pdfenbefinalprojectproposal-141130045858-conversion-gate01.pdf
enbefinalprojectproposal-141130045858-conversion-gate01.pdfFoo Zhi Fung
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
1Bici - updated (1).pdf
1Bici - updated (1).pdf1Bici - updated (1).pdf
1Bici - updated (1).pdfFoo Zhi Fung
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdfFoo Zhi Fung
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdfFoo Zhi Fung
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfFoo Zhi Fung
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfFoo Zhi Fung
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdfFoo Zhi Fung
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdfFoo Zhi Fung
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdfFoo Zhi Fung
 
Metropolitan park.pdf
Metropolitan park.pdfMetropolitan park.pdf
Metropolitan park.pdfFoo Zhi Fung
 
Metropolitan park.pdf
Metropolitan park.pdfMetropolitan park.pdf
Metropolitan park.pdfFoo Zhi Fung
 
Project 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdfProject 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdfFoo Zhi Fung
 

More from Foo Zhi Fung (20)

Doc4.docx
Doc4.docxDoc4.docx
Doc4.docx
 
enbefinalprojectproposal-141130045858-conversion-gate01.pdf
enbefinalprojectproposal-141130045858-conversion-gate01.pdfenbefinalprojectproposal-141130045858-conversion-gate01.pdf
enbefinalprojectproposal-141130045858-conversion-gate01.pdf
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
1Bici - updated (1).pdf
1Bici - updated (1).pdf1Bici - updated (1).pdf
1Bici - updated (1).pdf
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdf
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdf
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdf
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdf
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdf
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdf
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdf
 
Metropolitan park.pdf
Metropolitan park.pdfMetropolitan park.pdf
Metropolitan park.pdf
 
Metropolitan park.pdf
Metropolitan park.pdfMetropolitan park.pdf
Metropolitan park.pdf
 
Project 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdfProject 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdf
 

ICI Final Project.docx

  • 1. Foundation in Natural and Built Environment AUGUST INTAKE 2014 INTRODUCTION TO CONSTRUCTION INDUSTRY (QSB30105) FINAL PROJECT GROUP MEMBERS 1. ERICA CHIN CHING (0320460) 2. FOO ZHI FUNG(0320226) TUTOR : MISS ANN
  • 2. TABLE OF CONTENTS NO. TOPIC PAGE 1. INTRODUCTION 2. INTRODUCTION TO OUR SITE 3. LOCATION AND SITE PLAN 4. SITE ANALYSIS AND OBSERVATION 5. CONCEPT 6. SKETCH PLAN 7. PERSPECTIVE SKETCH 8. MASTER PLAN 9. BENEFITS OF PROPOSAL SITE 10. CONCLUSION
  • 3. INTRODUCTION In this ICI final project, we must find a partner to form a group of two.We were given a task, to find a site with the size in between 30x30m(900m²) to 30x40m(1200m²). We were required to initiate and propose small construction at the chosen site. The site should serve one of the following purposes: 1. Recreation area 2. Commercial area 3. Industrial area 4. Agricultural area 5. Tourism area 6. Residential area
  • 4. INTRODUCTION TO OUR SITE After we had our discussion together, we decided to propose this site as a recreation area. That is Pocket Park. We had selected an empty land nearby Taylor’s University Lakeside as our 30x40meter site.
  • 5. LOCATION PLAN This is our location plan. Located near the Taylor’s University Lakeside and Senza Residence(Bottom-cannot be seen here)
  • 6. SITE PLAN The red rectangular shape at left side of Jalan Taylors is our site.
  • 8. SITE ANALYSIS SUNLIGHT In our site, the sunlight come from the east to west our site. During the sunny day, it will be very hot because there aren’t any trees. CIRCULATION There are many cars passing our site, because there are two busy street beside our site. WEATHER The weather of the site is not so good since there’s no trees around that area.It’ll be quite stuffy. When it’s raining, soil erosion will occurs because the site doesn’t have any trees and grasses to grab on the soil. WIND There will be less wind in our site because there is a building blocking the wind that blow to our site.
  • 9. OBSERVATION There are a few roadways near the site. Since there are roads, it would be a lot of cars passing by. The air will be polluted easily and also the noise pollution cannot be avoided. There is a building behind the site, it’s blocking the air flowing from behind. Only the wind from east can flow to the site. There are no plants can be seen around the site. The air at the site is not fresh and polluted. Also, the air around there has a strong stale smell after raining. This kind of condition is not suitable for living.
  • 10. SKETCH PLAN This is our original sketch plan. But after this we decided to change some construction over here. You can see it in the Master Plan.
  • 11. PERSPECTIVE SKETCH - This is the entrance to the park from the Taylor’s University. - From the entrance, you can see the beautiful fountain - The trees give the whole atmosphere the relaxation feeling. - Benches are provided which allows the people to sit down when they’re tired of walking.
  • 12. MASTER PLAN This is the master plan of our proposal. ENTRANCE Top left: From the car park Bottom: Top right: From Senza From Taylor’s University Residence
  • 13. BENEFITS AND FACILITIES OF PROPOSAL SITE Our proposal site is a pocket park. This park is open to public. Anyone can come especially for the residents from Senza Residence, PJS 7 and the students from Taylor’s University.
  • 14. BENCH By adding a wooden bench, it maximizes the use of space. More people can be fitted into the selected area and it also provides more seats for people. By doing so, more people can enjoy the nice scenery as well as having a place to hang out with friends. Students can do reading there or just sit there and rest.
  • 15. STALL When you are hungry or thirsty, you can go to the stall and have some food or drinks. OPEN SPACE There will be a large greenly area. That you can read your books, do some activities, and enjoy your time picnic with your family.
  • 16. FOUNTAIN Everyone live in an increasingly stressful world…the sound of water flowing from a water fountain has a magically relaxing effect. Everyone can imagine themselves at the ocean, or by a babbling brook, and everyone may start to unwind when you were in our pocket park.
  • 17. FISH POND You can walk around the fish pond and the fish there are colourful and there have many different kind of fishes in the pond. You can also feed them with bread or fish food that sell in the stall. GAZEBO The gazebo is near by the stall, so that you can have your meals in there. And when you are tired, you can also rest over there.
  • 18. CONCEPT After the site analysis, we came out with our concept. Our concept is “Love the Earth”. This concept is to allow the residents and the students to be closed to the nature. This park acts as the green lung of the busy city. Also, it has the rabbit farm area which inspired the Langkawi Oriental Village. Anyone can go there to have a look and experience the fun of feeding the rabbits. PROJECT REQUIREMENT
  • 19.  The types of park should be compliment with the surrounding area which include residential area(Senza) and educational area(Taylor’s University).  Our concept is to allow the nearby residents and students to relax from the hectic life. They can relax after the long week of working and studying or after a long day.  The designs of the park of the hawker centre is to keep to the obligation of laws and codes of practice set by the authorities: I.Uniform Building By-laws; II.Town & Country Planning Act; III.Department of Occupational Safety and Health (JKKP) IV.Suruhanjaya Tenaga Malaysia (TNB); V.Syarikat Bekalan Air Selangor SdnBhd(SYABAS); VI.Majlis Perbandaraan Subang Jaya (MPSJ)
  • 20. ARCHITECTURAL REQUIREMENT The selection and proposal of construction: - Fountain - Rabbit farm - Hawker stands The utilities - Lots of trees - Benches (sitting area) - Gazebo (BBQ area)
  • 21. CONCLUSION In conclusion, we realized that building a recreation area is not an easy task even it is at an empty space. We have to think of a lot of ideas and have to compliment with the surrounding area. Besides, we also need to do a lot of research in order to avoid any problems afterwards. We do hope that this recreational area can help the students to release their stress.