SlideShare a Scribd company logo
1 of 14
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 1
Introduction to Construction Industry
FINAL PROJECT
FNBE February 2014 Intake
Group Member: Ong Jia Hui (0317752)
Khairul Jefri (0318237)
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 2
Content
1.0. Introduction 3
2.0. Site Analysis 4 - 5
3.0. Types of Development 6 - 7
4.0. Concept and Suggestion 8 - 10
5.0. Rationale 11
6.0.Benefits 12
7.0.Evaluation 13
8.0. Needs of the Project to the Client and Community 14
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 3
1.0. Introduction
The selected site is a balcony located at Block C, Level 6 of Taylor’s University Lakeside
Campus. Our 20m x 6.8m site is located at the east of the campus, with its balcony facing the
west. Located on top of the library, the selected site is fully bare and the floor is covered with
concrete pavement. The site actually provides a good and beautiful view of the campus as one
can see the full view of the campus from there. However, due to the nature of the unused
location, this site is left unattended and the space considered wasted.
This 20m x 6.8m is selected as it is not properly used and developed, yet contains raw potential.
Hence, as a group, we propose to transform this balcony into a rest area where everyone can
come and chill, rest, and relax.
Floor Plan
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 4
2.0. Site Analysis
The selected site which is located on top of the library experiences many elements. The site
records an average temperature of 26 ºC (lowest) to 33 ºC (highest). The precipitation level of
the site is 20%, with humidity of 89%.
In terms of wind orientation, the site records an average wind speed of 3km/h (lowest) to
11km/h (highest). After further analysis, we found out that the strength of the wind is cooling
enough to cool the entire site. The wind comes from two directions which makes the site
cooling.
Wind Orientation
The site comes with very small crowd of people as only classrooms and stairs are near to it.
The people coming over to the site are mostly those that are trying to get a break from studying
in the classroom or the library (the library is located just below the site). Hence it is quite a
quiet place. However, as it is just a bare concrete space, the people seeking for a resting spot
has nowhere to sit and relax.
Also, the site provides a good view of the surrounding of the campus as it is located on quite a
high level above ground, being on Level 6 of the building.
View from the site (Block C, Level 6 Balcony)
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 5
The sun orientation is from east to west of the site. Even with the help of the wind, the site still
experiences scorching heat as it is in contact with direct sunlight especially during its peak,
which is 12pm, where the sun sits right above the chosen site.
Sun Orientation
The main problem of the selected site is:
I. The lack of roofs or shades
As an open-air area, this has caused the people that are trying to rest and take a
break to be exposed to the heat of the sunlight, and possibly rain.
II. The lack of seats and resting spots
The people coming here are looking for a place to rest. With the lack of seats, they
can only stand, which will lead to a pair of tired legs.
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 6
3.0. Types of Development
There are various types of development in the construction industry. Here are some to begin
with:
I. On-site Upgrading
Slum upgrading is a way of improving the basic services and physical environment
in existing communities, while preserving their social structures, character and
location. Generally, upgrading indicates the improvement of the houses, roads,
lanes, and open spaces without changing the plot sizes or layout.
.
II. On-site Reblocking
Reblocking is a more systematic way of improving the physical condition and
infrastructure in existing communities by making some adjustments to the layout of
the roads and houses to install roads, walkways, drains and sewers. Usually, some
houses and lanes have to be moved and re-aligned and reconstructed to improve
access and enable drainage lines, water supply systems when communities opt for
reblocking.
III. On-site Reconstruction
Existing communities are totally demolished and rebuilt on the same land in this
upgrading strategy. Although the reconstruction option involves making
considerable physical changes within the community and requires some adaptations
to a new environment, the strategy allows people to continue living in the same
place and to remain close to their places of work and vital support systems.
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 7
IV. Land Sharing
Land-sharing is a housing and settlement improvement strategy which allows both
the land-owner and the community people living on that land to benefit. The
community is given, sold or leased one portion for reconstructing their housing, and
the rest of the land is returned to the land-owner to develop.
The people may end up with less area than they had before, and the land-owner may
get back less-than-all of his land, but the trade-off is that the poor will no longer be
squatters but the legal owners or tenants of their land. And the landlord finally gets
to develop the land.
Despite all the types of development, our proposed project is categorized under the “on-site
upgrading” category as our project improves the physical environment and basic services in
the existing community by adding on roofs and walls to shelter the people and napping area
and facilities to provide people with comfortable sleeping spots – all while preserving the
current location.
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 8
4.0. Concept & Suggestion
The idea of this concept is to mainly solve the problem which exists at the site. This concept is
to provide a comfortable rest area where people can relax and rest comfortably as they take a
break from the hustle and bustle of life.
To solve the problems at site, the concept is to have a place with:
I. Seats (Bean Bag Chair)
The bean bags serve as a comfortable seat where people can sit and relax and take
a short break.
Bean Bag Chair
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 9
II. A place to rest or nap (Metronap Sleep Pod, Capsule)
With the Metronap Sleep Pod and Capsule, people, students and staffs alike can
catch a power nap in order to boost their energy level before resuming to their
business.
Metronap Sleep Pod
Capsule
III. Shades (Roof made from Wood-Fiber Insulation Board)
To provide shade and shelter for the people from the harsh sun and rain.
Wood-Fiber Insulation Board
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 10
IV. Walls (Tinted Glass Wall)
Tinted glass wall is an ideal choice as it shields the people inside from the sunlight
in order to not disturb them from their naps, yet still enables them to have a good
view of the surrounding campus from the inside.
Tinted Glass
The juice bar acts as a bonus refreshment for the people, be it those who just woke up from
their naps or those just seeking to have a sip of water to quench their thirst. Having a juice bar
placed there is an optimal choice as students are most likely to get themselves a glass of water
or juice to proceed with their studies.
Juice Bar
The bean bag chair is placed in the middle open area, where it is wide, so people can just drag
the bean bag chair to wherever they intend to sit, be it near or far away from the front view.
The juice bar is faced to the front so people can enjoy the beautiful scenery of the campus while
sipping away.
The Metronap Sleep Pod is placed on both sides of the site to reduce the waste of space. As the
upper part of the pod took the shape of a cocoon, it shields away the unwanted sunlight. Hence,
it is acceptable to place it near the glass walls.
The capsule is placed furthest away from the front to shy them away from the sunlight,
providing the user a better napping experience.
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 11
5.0. Rationale
The reason behind the concept and suggestion of placement of the bean bag chair, Metronap
Sleep Pod, Capsule, roof (made from wood-fiber insulation board) and tinted glass walls are
as follows:
I. Bean Bag Chair
A bean bag chair is very comfortable and it fits to a person’s form as they sit in it.
Many people use the bean bag chair to sit in while they read a book or surf the net.
These chairs are filled with very light weight foam, they are very easy to move from
one place to another. It is very convenient to have it in a university’s rest area as
one can simply pick it up and move it when they want to sit with their friends.
II. Metronap Sleep Pod
The pod’s upholstery breathes and remains cool. It is durable and resistant. It
inclines forward to allow for easy entry, and then reclines to allow for optimal
positioning. The slight elevation of the feet promote blood circulation while the
elevation of the knee takes pressure off one’s lower back.
The spherical shape of the pod’s upper body provides a semi-private acoustical and
visual environment. The cocoon feel of the upper dome nurtures without overly
enclosing. It also blocks away unwanted lights and enhance sleeping.
III. Capsule
While the Metronap Sleep Pod is are meant for those that are seeking temporary
naps, the Capsule is built for those that are staying over at the campus due to many
reasons.
This capsule is space efficiency, providing the users with just enough room to serve
their function and providing a place to sleep.
IV. Roof (made from Wood-Fiber Insulation Board)
The rood will be constructed using wood-fiber insulation board as wood is a
sustainable raw material with not very energy intensive processing and it is
ecologically sound. The wood-fiber insulation board also increases living comfort.
The thermal capacity of wood is much higher than that of mineral fiber or plastic
foam, as a result, they protect much better against summer heat.
V. Walls (Tinted Glass Walls)
Tinted glass walls are chosen over typical opaque walls as opaque walls will block
away the beautiful view of the campus where it can be seen from our site. However,
despite it being a glass wall, the tinting is capable of reducing the temperature of
the interior by 15 ºC, and reduce the UV rays entering the interior of the building
by 99%.
Also, the tinting process can mean that you see outside during the day, but prying
eyes are unable to penetrate the insides. Hence, privacy is preserved.
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 12
6.0. Benefits
Having a rest area where people get to take a nap in public during the day time actually comes
with a handful of benefits.
The 20-minute power nap – sometimes called the stage 2 nap – is good for alertness and motor
learning skills. According to research, naps that are longer than 20 minutes help boost memory
and enhance creativity. Slow-wave sleep (napping for approximately 30-60 minutes) is good
for decision-making skills, such as memorizing vocabulary or recalling directions. Getting
rapid eye movement or REM sleep (usually 60-90 minutes of napping) plays a key role in
making new connections in the brain and solving creative problems.
What these and other studies are showing is that naps can restore one’s attention, the quality of
one’s work, while also helping reduce one’s mistakes. It also improve one’s ability to learn.
Moreover, the effects of napping extend a few hours into the day.
Students will definitely be able to perform better on both academic and co-curriculum activities
with the help of power nap. Such facilities will not only benefit the students, but the staffs as
well as they will be able to work more diligently after having boost their energy level.
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 13
7.0. Evaluation
Upon completion of the project, the initially desolate and barren balcony will be transformed
into a comfortable rest area where everyone – staffs and students alike– will be able to come
and have a rest, or even better, a nap. This new rest area which is equipped with various
facilities will reduce the problem of lack of seats and shelter from the sun as it provides many
spots for sitting (and napping) and contains a roof and tinted glass walls all around the area to
shelter the people.
Such project should be encouraged especially in universities, working areas and R&R stations,
where one’s full and adequate attention is needed towards the task at hand.
Introduction to Construction Industry | Final Project
FNBE 022014 | Taylor’s University 14
8.0. Needs of the Project to the Client and Community
Our proposed project – a public rest area with napping spots – allows our client (the students
and staffs of Taylor’s University Lakeside Campus) to recharge their energy level with power
naps, even if they are away from their personal bed. The facilities of our projects are much
needed for the students that are tired from hours of studying, and for the staffs that worked all
day long in the campus. Our project serves as a good platform where our clients can regain and
increase their attentive level before proceeding with their activities. With better attentive level,
the quality of work of our clients will improve as well.
In terms of community, our project will be able to help decrease the rate of car accidents.
Having our proposed project placed at the R&R stations along the highway, the tired and worn
out drivers that had spent hours on the road will be able to catch a nap before hitting the road.
This way, the rate of car accidents on the road will decrease as drivers will be able to pay full
attention when driving instead of dozing off and be a danger to others and oneself.

More Related Content

Viewers also liked

Task two and three
Task two and threeTask two and three
Task two and threeprabhdeep_k
 
1. cl report
1. cl report1. cl report
1. cl reportj3frin30
 
Executing Strategy in the Midst of the "Perfect Storm"
Executing Strategy in the Midst of the "Perfect Storm"Executing Strategy in the Midst of the "Perfect Storm"
Executing Strategy in the Midst of the "Perfect Storm"GlobalStrategyTribe
 
โครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารโครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารIzezjk
 
Slide bkap 1 m rm100 2014
Slide bkap 1 m rm100 2014Slide bkap 1 m rm100 2014
Slide bkap 1 m rm100 2014hizan2304
 
Enbe report
Enbe reportEnbe report
Enbe reportj3frin30
 
individual booklet
individual bookletindividual booklet
individual bookletj3frin30
 
บริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ตบริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ตIzezjk
 
โครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารโครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารIzezjk
 
Introduction to drawing
Introduction to drawingIntroduction to drawing
Introduction to drawingj3frin30
 
A Tour through Open Space by the Center for Collaborative Awareness
A Tour through Open Space by the Center for Collaborative AwarenessA Tour through Open Space by the Center for Collaborative Awareness
A Tour through Open Space by the Center for Collaborative Awarenessmaureenkmccarthy
 

Viewers also liked (15)

Task two and three
Task two and threeTask two and three
Task two and three
 
1. cl report
1. cl report1. cl report
1. cl report
 
Executing Strategy in the Midst of the "Perfect Storm"
Executing Strategy in the Midst of the "Perfect Storm"Executing Strategy in the Midst of the "Perfect Storm"
Executing Strategy in the Midst of the "Perfect Storm"
 
โครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารโครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสาร
 
Slide bkap 1 m rm100 2014
Slide bkap 1 m rm100 2014Slide bkap 1 m rm100 2014
Slide bkap 1 m rm100 2014
 
Enbe report
Enbe reportEnbe report
Enbe report
 
individual booklet
individual bookletindividual booklet
individual booklet
 
บริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ตบริการต่างๆบนอินเทอร์เน็ต
บริการต่างๆบนอินเทอร์เน็ต
 
โครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสารโครงงานคอมพิวเตอร์ เกาะแสมสาร
โครงงานคอมพิวเตอร์ เกาะแสมสาร
 
Ici
IciIci
Ici
 
Ants
AntsAnts
Ants
 
Introduction to drawing
Introduction to drawingIntroduction to drawing
Introduction to drawing
 
Employee motivation 1
Employee motivation  1Employee motivation  1
Employee motivation 1
 
Smart goal
Smart goalSmart goal
Smart goal
 
A Tour through Open Space by the Center for Collaborative Awareness
A Tour through Open Space by the Center for Collaborative AwarenessA Tour through Open Space by the Center for Collaborative Awareness
A Tour through Open Space by the Center for Collaborative Awareness
 

Similar to Ici proposal

Ici report revised (2)
Ici report revised (2)Ici report revised (2)
Ici report revised (2)Darren Loong
 
Ici final group
Ici final groupIci final group
Ici final groupKailyn Lee
 
Friday ici submission (2)
Friday ici submission (2)Friday ici submission (2)
Friday ici submission (2)Amy_wlh
 
ICI Project 3: The project Brief Report
ICI Project 3: The project Brief ReportICI Project 3: The project Brief Report
ICI Project 3: The project Brief ReportShze Hwa Lee
 
Ici project 3 - the project brief
Ici project 3 - the project briefIci project 3 - the project brief
Ici project 3 - the project briefirynnakwon
 
FNBE 0414 ICI Project 3 Proposal Report
FNBE 0414 ICI Project 3 Proposal ReportFNBE 0414 ICI Project 3 Proposal Report
FNBE 0414 ICI Project 3 Proposal ReportTan Jaden
 
Introduction to construction industry
Introduction to construction industryIntroduction to construction industry
Introduction to construction industryHwei Ying Saw
 
the project brief
the project briefthe project brief
the project briefJoyce Wee
 
FNBE0214_ICI_Final Project_Report
FNBE0214_ICI_Final Project_ReportFNBE0214_ICI_Final Project_Report
FNBE0214_ICI_Final Project_ReportWinnie Ang
 
FNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportFNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportWinnie Ang
 

Similar to Ici proposal (20)

Ici report revised (2)
Ici report revised (2)Ici report revised (2)
Ici report revised (2)
 
Ici report (1)
Ici report (1)Ici report (1)
Ici report (1)
 
Ici final group
Ici final groupIci final group
Ici final group
 
Proposal
ProposalProposal
Proposal
 
Ici report
Ici reportIci report
Ici report
 
Friday ici submission (2)
Friday ici submission (2)Friday ici submission (2)
Friday ici submission (2)
 
ICI Project 3: The project Brief Report
ICI Project 3: The project Brief ReportICI Project 3: The project Brief Report
ICI Project 3: The project Brief Report
 
Ici project 3 - the project brief
Ici project 3 - the project briefIci project 3 - the project brief
Ici project 3 - the project brief
 
FNBE 0414 ICI Project 3 Proposal Report
FNBE 0414 ICI Project 3 Proposal ReportFNBE 0414 ICI Project 3 Proposal Report
FNBE 0414 ICI Project 3 Proposal Report
 
Introduction to construction industry
Introduction to construction industryIntroduction to construction industry
Introduction to construction industry
 
Project 3.docx
Project 3.docxProject 3.docx
Project 3.docx
 
the project brief
the project briefthe project brief
the project brief
 
Ici
IciIci
Ici
 
FNBE0214_ICI_Final Project_Report
FNBE0214_ICI_Final Project_ReportFNBE0214_ICI_Final Project_Report
FNBE0214_ICI_Final Project_Report
 
Cl report
Cl reportCl report
Cl report
 
CL Report
CL ReportCL Report
CL Report
 
FNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportFNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_Report
 
N.Lindemer-Project Highlights
N.Lindemer-Project HighlightsN.Lindemer-Project Highlights
N.Lindemer-Project Highlights
 
ICI Report
ICI ReportICI Report
ICI Report
 
Ici final project
Ici final projectIci final project
Ici final project
 

Recently uploaded

6 Tips for Interpretable Topic Models _ by Nicha Ruchirawat _ Towards Data Sc...
6 Tips for Interpretable Topic Models _ by Nicha Ruchirawat _ Towards Data Sc...6 Tips for Interpretable Topic Models _ by Nicha Ruchirawat _ Towards Data Sc...
6 Tips for Interpretable Topic Models _ by Nicha Ruchirawat _ Towards Data Sc...Dr Arash Najmaei ( Phd., MBA, BSc)
 
Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...Seán Kennedy
 
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...Amil Baba Dawood bangali
 
Networking Case Study prepared by teacher.pptx
Networking Case Study prepared by teacher.pptxNetworking Case Study prepared by teacher.pptx
Networking Case Study prepared by teacher.pptxHimangsuNath
 
Conf42-LLM_Adding Generative AI to Real-Time Streaming Pipelines
Conf42-LLM_Adding Generative AI to Real-Time Streaming PipelinesConf42-LLM_Adding Generative AI to Real-Time Streaming Pipelines
Conf42-LLM_Adding Generative AI to Real-Time Streaming PipelinesTimothy Spann
 
Semantic Shed - Squashing and Squeezing.pptx
Semantic Shed - Squashing and Squeezing.pptxSemantic Shed - Squashing and Squeezing.pptx
Semantic Shed - Squashing and Squeezing.pptxMike Bennett
 
Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)Cathrine Wilhelmsen
 
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...Boston Institute of Analytics
 
modul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptxmodul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptxaleedritatuxx
 
The Power of Data-Driven Storytelling_ Unveiling the Layers of Insight.pptx
The Power of Data-Driven Storytelling_ Unveiling the Layers of Insight.pptxThe Power of Data-Driven Storytelling_ Unveiling the Layers of Insight.pptx
The Power of Data-Driven Storytelling_ Unveiling the Layers of Insight.pptxTasha Penwell
 
Data Analysis Project : Targeting the Right Customers, Presentation on Bank M...
Data Analysis Project : Targeting the Right Customers, Presentation on Bank M...Data Analysis Project : Targeting the Right Customers, Presentation on Bank M...
Data Analysis Project : Targeting the Right Customers, Presentation on Bank M...Boston Institute of Analytics
 
wepik-insightful-infographics-a-data-visualization-overview-20240401133220kwr...
wepik-insightful-infographics-a-data-visualization-overview-20240401133220kwr...wepik-insightful-infographics-a-data-visualization-overview-20240401133220kwr...
wepik-insightful-infographics-a-data-visualization-overview-20240401133220kwr...KarteekMane1
 
Advanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsAdvanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsVICTOR MAESTRE RAMIREZ
 
Principles and Practices of Data Visualization
Principles and Practices of Data VisualizationPrinciples and Practices of Data Visualization
Principles and Practices of Data VisualizationKianJazayeri1
 
Decoding Patterns: Customer Churn Prediction Data Analysis Project
Decoding Patterns: Customer Churn Prediction Data Analysis ProjectDecoding Patterns: Customer Churn Prediction Data Analysis Project
Decoding Patterns: Customer Churn Prediction Data Analysis ProjectBoston Institute of Analytics
 
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...Boston Institute of Analytics
 
FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024
FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024
FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024Susanna-Assunta Sansone
 
SMOTE and K-Fold Cross Validation-Presentation.pptx
SMOTE and K-Fold Cross Validation-Presentation.pptxSMOTE and K-Fold Cross Validation-Presentation.pptx
SMOTE and K-Fold Cross Validation-Presentation.pptxHaritikaChhatwal1
 
Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 217djon017
 

Recently uploaded (20)

6 Tips for Interpretable Topic Models _ by Nicha Ruchirawat _ Towards Data Sc...
6 Tips for Interpretable Topic Models _ by Nicha Ruchirawat _ Towards Data Sc...6 Tips for Interpretable Topic Models _ by Nicha Ruchirawat _ Towards Data Sc...
6 Tips for Interpretable Topic Models _ by Nicha Ruchirawat _ Towards Data Sc...
 
Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...Student Profile Sample report on improving academic performance by uniting gr...
Student Profile Sample report on improving academic performance by uniting gr...
 
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
 
Networking Case Study prepared by teacher.pptx
Networking Case Study prepared by teacher.pptxNetworking Case Study prepared by teacher.pptx
Networking Case Study prepared by teacher.pptx
 
Conf42-LLM_Adding Generative AI to Real-Time Streaming Pipelines
Conf42-LLM_Adding Generative AI to Real-Time Streaming PipelinesConf42-LLM_Adding Generative AI to Real-Time Streaming Pipelines
Conf42-LLM_Adding Generative AI to Real-Time Streaming Pipelines
 
Semantic Shed - Squashing and Squeezing.pptx
Semantic Shed - Squashing and Squeezing.pptxSemantic Shed - Squashing and Squeezing.pptx
Semantic Shed - Squashing and Squeezing.pptx
 
Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)
 
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...
Decoding the Heart: Student Presentation on Heart Attack Prediction with Data...
 
modul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptxmodul pembelajaran robotic Workshop _ by Slidesgo.pptx
modul pembelajaran robotic Workshop _ by Slidesgo.pptx
 
The Power of Data-Driven Storytelling_ Unveiling the Layers of Insight.pptx
The Power of Data-Driven Storytelling_ Unveiling the Layers of Insight.pptxThe Power of Data-Driven Storytelling_ Unveiling the Layers of Insight.pptx
The Power of Data-Driven Storytelling_ Unveiling the Layers of Insight.pptx
 
Insurance Churn Prediction Data Analysis Project
Insurance Churn Prediction Data Analysis ProjectInsurance Churn Prediction Data Analysis Project
Insurance Churn Prediction Data Analysis Project
 
Data Analysis Project : Targeting the Right Customers, Presentation on Bank M...
Data Analysis Project : Targeting the Right Customers, Presentation on Bank M...Data Analysis Project : Targeting the Right Customers, Presentation on Bank M...
Data Analysis Project : Targeting the Right Customers, Presentation on Bank M...
 
wepik-insightful-infographics-a-data-visualization-overview-20240401133220kwr...
wepik-insightful-infographics-a-data-visualization-overview-20240401133220kwr...wepik-insightful-infographics-a-data-visualization-overview-20240401133220kwr...
wepik-insightful-infographics-a-data-visualization-overview-20240401133220kwr...
 
Advanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsAdvanced Machine Learning for Business Professionals
Advanced Machine Learning for Business Professionals
 
Principles and Practices of Data Visualization
Principles and Practices of Data VisualizationPrinciples and Practices of Data Visualization
Principles and Practices of Data Visualization
 
Decoding Patterns: Customer Churn Prediction Data Analysis Project
Decoding Patterns: Customer Churn Prediction Data Analysis ProjectDecoding Patterns: Customer Churn Prediction Data Analysis Project
Decoding Patterns: Customer Churn Prediction Data Analysis Project
 
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...
Data Analysis Project Presentation: Unveiling Your Ideal Customer, Bank Custo...
 
FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024
FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024
FAIR, FAIRsharing, FAIR Cookbook and ELIXIR - Sansone SA - Boston 2024
 
SMOTE and K-Fold Cross Validation-Presentation.pptx
SMOTE and K-Fold Cross Validation-Presentation.pptxSMOTE and K-Fold Cross Validation-Presentation.pptx
SMOTE and K-Fold Cross Validation-Presentation.pptx
 
Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2
 

Ici proposal

  • 1. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 1 Introduction to Construction Industry FINAL PROJECT FNBE February 2014 Intake Group Member: Ong Jia Hui (0317752) Khairul Jefri (0318237)
  • 2. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 2 Content 1.0. Introduction 3 2.0. Site Analysis 4 - 5 3.0. Types of Development 6 - 7 4.0. Concept and Suggestion 8 - 10 5.0. Rationale 11 6.0.Benefits 12 7.0.Evaluation 13 8.0. Needs of the Project to the Client and Community 14
  • 3. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 3 1.0. Introduction The selected site is a balcony located at Block C, Level 6 of Taylor’s University Lakeside Campus. Our 20m x 6.8m site is located at the east of the campus, with its balcony facing the west. Located on top of the library, the selected site is fully bare and the floor is covered with concrete pavement. The site actually provides a good and beautiful view of the campus as one can see the full view of the campus from there. However, due to the nature of the unused location, this site is left unattended and the space considered wasted. This 20m x 6.8m is selected as it is not properly used and developed, yet contains raw potential. Hence, as a group, we propose to transform this balcony into a rest area where everyone can come and chill, rest, and relax. Floor Plan
  • 4. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 4 2.0. Site Analysis The selected site which is located on top of the library experiences many elements. The site records an average temperature of 26 ºC (lowest) to 33 ºC (highest). The precipitation level of the site is 20%, with humidity of 89%. In terms of wind orientation, the site records an average wind speed of 3km/h (lowest) to 11km/h (highest). After further analysis, we found out that the strength of the wind is cooling enough to cool the entire site. The wind comes from two directions which makes the site cooling. Wind Orientation The site comes with very small crowd of people as only classrooms and stairs are near to it. The people coming over to the site are mostly those that are trying to get a break from studying in the classroom or the library (the library is located just below the site). Hence it is quite a quiet place. However, as it is just a bare concrete space, the people seeking for a resting spot has nowhere to sit and relax. Also, the site provides a good view of the surrounding of the campus as it is located on quite a high level above ground, being on Level 6 of the building. View from the site (Block C, Level 6 Balcony)
  • 5. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 5 The sun orientation is from east to west of the site. Even with the help of the wind, the site still experiences scorching heat as it is in contact with direct sunlight especially during its peak, which is 12pm, where the sun sits right above the chosen site. Sun Orientation The main problem of the selected site is: I. The lack of roofs or shades As an open-air area, this has caused the people that are trying to rest and take a break to be exposed to the heat of the sunlight, and possibly rain. II. The lack of seats and resting spots The people coming here are looking for a place to rest. With the lack of seats, they can only stand, which will lead to a pair of tired legs.
  • 6. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 6 3.0. Types of Development There are various types of development in the construction industry. Here are some to begin with: I. On-site Upgrading Slum upgrading is a way of improving the basic services and physical environment in existing communities, while preserving their social structures, character and location. Generally, upgrading indicates the improvement of the houses, roads, lanes, and open spaces without changing the plot sizes or layout. . II. On-site Reblocking Reblocking is a more systematic way of improving the physical condition and infrastructure in existing communities by making some adjustments to the layout of the roads and houses to install roads, walkways, drains and sewers. Usually, some houses and lanes have to be moved and re-aligned and reconstructed to improve access and enable drainage lines, water supply systems when communities opt for reblocking. III. On-site Reconstruction Existing communities are totally demolished and rebuilt on the same land in this upgrading strategy. Although the reconstruction option involves making considerable physical changes within the community and requires some adaptations to a new environment, the strategy allows people to continue living in the same place and to remain close to their places of work and vital support systems.
  • 7. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 7 IV. Land Sharing Land-sharing is a housing and settlement improvement strategy which allows both the land-owner and the community people living on that land to benefit. The community is given, sold or leased one portion for reconstructing their housing, and the rest of the land is returned to the land-owner to develop. The people may end up with less area than they had before, and the land-owner may get back less-than-all of his land, but the trade-off is that the poor will no longer be squatters but the legal owners or tenants of their land. And the landlord finally gets to develop the land. Despite all the types of development, our proposed project is categorized under the “on-site upgrading” category as our project improves the physical environment and basic services in the existing community by adding on roofs and walls to shelter the people and napping area and facilities to provide people with comfortable sleeping spots – all while preserving the current location.
  • 8. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 8 4.0. Concept & Suggestion The idea of this concept is to mainly solve the problem which exists at the site. This concept is to provide a comfortable rest area where people can relax and rest comfortably as they take a break from the hustle and bustle of life. To solve the problems at site, the concept is to have a place with: I. Seats (Bean Bag Chair) The bean bags serve as a comfortable seat where people can sit and relax and take a short break. Bean Bag Chair
  • 9. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 9 II. A place to rest or nap (Metronap Sleep Pod, Capsule) With the Metronap Sleep Pod and Capsule, people, students and staffs alike can catch a power nap in order to boost their energy level before resuming to their business. Metronap Sleep Pod Capsule III. Shades (Roof made from Wood-Fiber Insulation Board) To provide shade and shelter for the people from the harsh sun and rain. Wood-Fiber Insulation Board
  • 10. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 10 IV. Walls (Tinted Glass Wall) Tinted glass wall is an ideal choice as it shields the people inside from the sunlight in order to not disturb them from their naps, yet still enables them to have a good view of the surrounding campus from the inside. Tinted Glass The juice bar acts as a bonus refreshment for the people, be it those who just woke up from their naps or those just seeking to have a sip of water to quench their thirst. Having a juice bar placed there is an optimal choice as students are most likely to get themselves a glass of water or juice to proceed with their studies. Juice Bar The bean bag chair is placed in the middle open area, where it is wide, so people can just drag the bean bag chair to wherever they intend to sit, be it near or far away from the front view. The juice bar is faced to the front so people can enjoy the beautiful scenery of the campus while sipping away. The Metronap Sleep Pod is placed on both sides of the site to reduce the waste of space. As the upper part of the pod took the shape of a cocoon, it shields away the unwanted sunlight. Hence, it is acceptable to place it near the glass walls. The capsule is placed furthest away from the front to shy them away from the sunlight, providing the user a better napping experience.
  • 11. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 11 5.0. Rationale The reason behind the concept and suggestion of placement of the bean bag chair, Metronap Sleep Pod, Capsule, roof (made from wood-fiber insulation board) and tinted glass walls are as follows: I. Bean Bag Chair A bean bag chair is very comfortable and it fits to a person’s form as they sit in it. Many people use the bean bag chair to sit in while they read a book or surf the net. These chairs are filled with very light weight foam, they are very easy to move from one place to another. It is very convenient to have it in a university’s rest area as one can simply pick it up and move it when they want to sit with their friends. II. Metronap Sleep Pod The pod’s upholstery breathes and remains cool. It is durable and resistant. It inclines forward to allow for easy entry, and then reclines to allow for optimal positioning. The slight elevation of the feet promote blood circulation while the elevation of the knee takes pressure off one’s lower back. The spherical shape of the pod’s upper body provides a semi-private acoustical and visual environment. The cocoon feel of the upper dome nurtures without overly enclosing. It also blocks away unwanted lights and enhance sleeping. III. Capsule While the Metronap Sleep Pod is are meant for those that are seeking temporary naps, the Capsule is built for those that are staying over at the campus due to many reasons. This capsule is space efficiency, providing the users with just enough room to serve their function and providing a place to sleep. IV. Roof (made from Wood-Fiber Insulation Board) The rood will be constructed using wood-fiber insulation board as wood is a sustainable raw material with not very energy intensive processing and it is ecologically sound. The wood-fiber insulation board also increases living comfort. The thermal capacity of wood is much higher than that of mineral fiber or plastic foam, as a result, they protect much better against summer heat. V. Walls (Tinted Glass Walls) Tinted glass walls are chosen over typical opaque walls as opaque walls will block away the beautiful view of the campus where it can be seen from our site. However, despite it being a glass wall, the tinting is capable of reducing the temperature of the interior by 15 ºC, and reduce the UV rays entering the interior of the building by 99%. Also, the tinting process can mean that you see outside during the day, but prying eyes are unable to penetrate the insides. Hence, privacy is preserved.
  • 12. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 12 6.0. Benefits Having a rest area where people get to take a nap in public during the day time actually comes with a handful of benefits. The 20-minute power nap – sometimes called the stage 2 nap – is good for alertness and motor learning skills. According to research, naps that are longer than 20 minutes help boost memory and enhance creativity. Slow-wave sleep (napping for approximately 30-60 minutes) is good for decision-making skills, such as memorizing vocabulary or recalling directions. Getting rapid eye movement or REM sleep (usually 60-90 minutes of napping) plays a key role in making new connections in the brain and solving creative problems. What these and other studies are showing is that naps can restore one’s attention, the quality of one’s work, while also helping reduce one’s mistakes. It also improve one’s ability to learn. Moreover, the effects of napping extend a few hours into the day. Students will definitely be able to perform better on both academic and co-curriculum activities with the help of power nap. Such facilities will not only benefit the students, but the staffs as well as they will be able to work more diligently after having boost their energy level.
  • 13. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 13 7.0. Evaluation Upon completion of the project, the initially desolate and barren balcony will be transformed into a comfortable rest area where everyone – staffs and students alike– will be able to come and have a rest, or even better, a nap. This new rest area which is equipped with various facilities will reduce the problem of lack of seats and shelter from the sun as it provides many spots for sitting (and napping) and contains a roof and tinted glass walls all around the area to shelter the people. Such project should be encouraged especially in universities, working areas and R&R stations, where one’s full and adequate attention is needed towards the task at hand.
  • 14. Introduction to Construction Industry | Final Project FNBE 022014 | Taylor’s University 14 8.0. Needs of the Project to the Client and Community Our proposed project – a public rest area with napping spots – allows our client (the students and staffs of Taylor’s University Lakeside Campus) to recharge their energy level with power naps, even if they are away from their personal bed. The facilities of our projects are much needed for the students that are tired from hours of studying, and for the staffs that worked all day long in the campus. Our project serves as a good platform where our clients can regain and increase their attentive level before proceeding with their activities. With better attentive level, the quality of work of our clients will improve as well. In terms of community, our project will be able to help decrease the rate of car accidents. Having our proposed project placed at the R&R stations along the highway, the tired and worn out drivers that had spent hours on the road will be able to catch a nap before hitting the road. This way, the rate of car accidents on the road will decrease as drivers will be able to pay full attention when driving instead of dozing off and be a danger to others and oneself.