SlideShare a Scribd company logo
1 of 16
Download to read offline
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: LOCATION PLAN
EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: NOV 2016
SCALE: 1:2500 @ A3
DRAWN:
CHECKED: TC
EB
108001_1 P1PLANNING
N
0 150m 250m100m 200m50m 50m
1:2500
E L E V T I O N
V
ANDERSONST
Tap Lane Car Park
Posts
GRANT STREET
BROW
N
STREET
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: SITE PLAN
EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: NOV 2016
SCALE: 1:500 @ A3
DRAWN:
CHECKED: TC
EB
108001_2 P1PLANNING
N
010m 10m 20m 30m 40m 50m
1:500
E L E V T I O N
V
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: GROUND FLOOR PLAN
E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: DEC 2016
SCALE: 1:100 @ A3
DRAWN:
CHECKED: TC
EB
108001_3 P1PLANNING
V
02m 2m 4m 6m 8m 10m
1:100
N
A
A
1 MWH Gym Area
2 Hallway
3 Exit to Grant Street
4 Stairs to Office Space
5 Lift to Office Space
6 Reception Area
7 Accessible WC
8 Extension Gym Area
9 Male Changing Room
10 Female Changing Room
11 Plant Room
12 Exit to Brown Street
1
8
2
3
4
5
7
6
9
106
7
12
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: FIRST FLOOR PLAN
E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: DEC 2016
SCALE: 1:100 @ A3
DRAWN:
CHECKED: TC
EB
108001_4 P1PLANNING
V
02m 2m 4m 6m 8m 10m
1:100
N
1 Office Space
2 Kitchenette Area
3 Stairs to Gym Area
4 Lift to Gym Area
4 Lobby
1
2
3
4 5
Light Switch (1100mm above FFL)
LV Recessed Light (motion sensor activation for changing
rooms)
Twin 13amp flush socket outlet unit (450mm above FFL)
Twin 13amp flush socket outlet unit (high level - 150mm
above worktop)
Mechanical extract fan - 15L/sec
Electric unit & meter
Smoke alarm installed in accordance with BS 5446-1: 2000
& wired via permanent & protected circuit & interconnected
to any other smoke alarm or optical fire alarm within the
building - minimum distance to light fixture & walls to be
300mm.
Optical fire detector installed & tested to BS 5839-1: 2002
& wired via permanent & protected circuit & interconnected
to any other smoke or optical fire alarm within the building -
minimum distance to light fixture & walls to be 300mm.
Carbon monoxide detectors should comply with BS EN
50291-1: 2010 & be powered by a battery designed to
operate for the working life of the detector & incorporate a
warning device to alert users when its working life is due to
expire. Hard wired main operated carbon monoxide
detectors complying with BS EN 50291-1: 2010 (Type A)
with fixed wiring (not plug in types) may be used as an
alternative, provide they are fitted with a sensor failure
warning device.
British Telecom outlet (450mm above FFL)
Television point (450mm above FFL)
All electric installations to be
designed, installed and tested in
accordance with BS 7671: 2008.
A minimum of 50% of the fixed light fittings
and lamps to be installed must be of low
energy type designation.
LEGEND
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: ELECTRIC + FIRE PLAN
E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: DEC 2016
SCALE: 1:100 @ A3
DRAWN:
CHECKED: TC
EB
108001_5 P1PLANNING
V
02m 2m 4m 6m 8m 10m
1:100
N
Electric supply in
450mm diameter polydrop inspection chamber
(max. depth 900mm) Class C CI Cover
100mm diameter rainwater pipe with access pipe
(access hatch at the top of every bend at base of
soil stacks and rainwater pipes)
Rodding eye terminal
110mm uPVC drains laid to minimum fall 1:60
LEGEND
RWPRWP
RWP
RWPRWP RWP RWP
SVP
SVP
SVP SVP
SVP
SVP
IC
RE
RE
RE
IC
IC
RWP
Foul water drainage
Surface water
drainage
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: WATER SUPPLY + DRAINAGE PLAN
E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: DEC 2016
SCALE: 1:100 @ A3
DRAWN:
CHECKED: TC
EB
108001_6 P1PLANNING
V
02m 2m 4m 6m 8m 10m
1:100
N
Water supply in
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: GRANT STREET ELEVATION
E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: DEC 2016
SCALE: 1:50 @ A3
DRAWN:
CHECKED: TC
EB
108001_7 P1PLANNING
V
0 1m 2m 3m 4m 5m1m
1:50
Ground Level
0
First Floor
3750
Ridge Height
8780
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: BROWN STREET ELEVATION
E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: DEC 2016
SCALE: 1:50 @ A3
DRAWN:
CHECKED: TC
EB
108001_8 P1PLANNING
V
0 1m 2m 3m 4m 5m1m
1:50
Ground Level
0
Ridge Height
6268
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: MWH SECTION DETAILS
E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: NOV 2016
SCALE: 1:10/1:50 @ A3
DRAWN:
CHECKED: TC
EB
108001_9 P1PLANNING
0 1m 2m 3m 4m 5m1m
1:50
V
MWH Roof (1:10)
6mm Slate Roof Tiles
25mm C24 Timber Battens
25mm C24 Counter Battens
- Visqueen FB Vapour Barrier
---------
50mm Celotex FR5000 Insulation (0.21W/m²K)
60mm Rockwool Sound Insulation
100mm SuperFOIL SF60 (0.13W/m²K) with service cavity
---------
2x12.5mm Plasterboard with scrim tape (for 60mins. fire protection)
MWH Ground Floor (1:10)
20mm Floor Finish
50mm Concrete Screed
100mm Concrete Slab using 50% GGBS
- Underfloor Heating System attached to insulation board
150mm Celotex CL5000 Underfloor Insulation Board (0.21 W/m²K)
- Visqueen Ecomembrane DPM
50mm Ecosand Binding
- Hardcore to Structural Engineer's specifications
MWH Wall (1:10)
20mm Render (Not in view)
600mm Stone
- Visqueen Ecomembrane DPM
50mm Celotex RS5000 Insulation Board (0.20 W/m²K) between timber studs @ 600mm centres
60mm Rockwool Sound Insulation between timber studs @ 600mm centres
100mm SuperFOIL SF60 (0.13W/m²K) with service cavity between 50mm timber studs @ 600mm centres
2x12.5mm Plasterboard with scrim tape (for 60mins. fire protection)
MWH Intermediate Floor (1:10)
2x12.5mm Plasterboard with scrim tape (for 60mins. fire protection)
70mm Timber Batten placed with 50mm Rockwool Sound Insulation
253mm Pasquill Posi-Joist®
placed with 50mm Celotex FI5000 Insulation (0.21W/m²K)
2x12.5mm Plasterboard with scrim tape (for 60mins. fire protection)
Posi-Joist®
attached to I-Beam for stability + bolted to stonewall
0 1000mm800mm600mm400mm200mm200mm
1:10
MWH Critical Section (1:50)
A DEC 2016 EDIT VALLEY GUTTER BETWEEN MWH & EXTENSION
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: EXTENSION SECTION DETAILS
E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: NOV 2016
SCALE: 1:10/1:50 @ A3
DRAWN:
CHECKED: TC
EB
108001_10 P1PLANNING
0 1m 2m 3m 4m 5m1m
1:50
V
Extension Roof (1:10)
50mm Corrugated Aluminium Sheeting
- Vapour Barrier
25mm C24 Timber Battens
25mm C24 Counter Battens
50mm Celotex RS5000 Insulation Board (0.21 W/m²K)
150mm Walltite®
CL100 Insulation (0.13 W/m²K)
160mm IPE 160
60mm Rockwool®
Sound Insulation Slab
2x12.5mm Plasterboard (for 60mins. fire protection)
Extension Wall (1:10)
- Zinc Gutter
10mm Corrugated Aluminium Sheeting
- Vapour Barrier
25mm C24 Timber Battens
25mm C24 Counter Battens
Visqueen Ecomembrane DPM
15mm OSB Sheathing
50mm Celotex RS5000 Insulation Board (0.20 W/m2K)
between timber studs @ 600mm centres
60mm Rockwool Sound Insulation between timber studs
@ 600mm centres
100mm SuperFOIL SF60 (0.13W/m²K) with service cavity
between 50mm timber studs @ 600mm centres
2x12.5mm Plasterboard (for 60mins. fire protection)
Extension Floor (1:10)
20mm Floor Finish
50mm Concrete Screed
100mm Steel Reinforced Concrete Slab using 50% GGBS
150mm Celotex CL5000 Underfloor Insulation Board (0.21 W/m²K)
- Visqueen Ecomembrane DPM
50mm Ecosand Binding
- Hardcore to Structural Engineer's specifications
0 1000mm800mm600mm400mm200mm200mm
1:10
Extension Critical Section (1:50)
A DEC 2016 EDIT VALLEY GUTTER BETWEEN MWH & EXTENSION
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: OPENING DETAILS
E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: NOV 2016
SCALE: 1:5 @ A3
DRAWN:
CHECKED: TC
EB
108001_11 P1PLANNING
V
0 500mm100mm 200mm 300mm 400mm100mm
1:5
MWH Sash Windows (1:5)
B-B : Window Jamb
A-A : Head + Cill
A
B B
MWH Front Door (1:5)
B-B : Door Jamb
A-A : Head + Cill
A
A
B B
Extension Casement Windows (1:5)
Extension Roof Windows - Velux®
(1:5)
REVISIONS: DATE: DESCRIPTION:
DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL
TITLE: THERMAL BRIDGING + AIR TIGHTNESS
E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA
REV:DATE: NOV 2016
SCALE: 1:100 @ A3
DRAWN:
CHECKED: TC
EB
108001_12 P1PLANNING
V
Thermal Bridging
Junctions and connections within a building envelope can typically provide a
route for heat loss, which must be reduced, or if possible, eliminated. The
diagram opposite illustrates common areas in a building where thermal bridging
may occur. Careful design and implementation is required to ensure that these
particular areas do not create unnecessary heat loss paths.
The proposed design aims to reduce thermal bridging in the building. The
insulation is added in response to avoid any penetration from external weather
and prevent heat loss internally. It is important to focus in extending the
insulation around the MWH in the roof, walls, and floor to prevent any heat loss
from the building.
Air Tightness
A high level of air tightness within the building reduces the heating demand and
prevents moisture-laden air from entering the fabric. Achieving air tightness can
be achieved by using airtight membranes/barriers within the building elements
such as a vapour barrier layer. Where layers could be interrupted, like windows,
propriety tape can be attached to the barrier layer ensuring that around
openings continue to be air tight.
Ensuring the building envelope is air tight to reduce the risk of structural
damage, careful design and installation of components such as windows and
doors is imperative. It is aimed to not allow air to flow randomly through walls of
the envelope. This is important because changing temperatures of air flow is not
sufficient to provide consistently air quality for both the occupant and the
building itself. Poor acoustic insulation and heat loss are further disadvantages.
A new ventilation system and acoustic insulation is added to the
extension/sports hall.
02m 2m 4m 6m 8m 10m
1:100
Merkinch Welfare Hall Technical Details
Merkinch Welfare Hall Technical Details

More Related Content

Viewers also liked

B2B Informatie over het Logo spel van Koninklijke Jumbo
B2B Informatie over het Logo spel van Koninklijke JumboB2B Informatie over het Logo spel van Koninklijke Jumbo
B2B Informatie over het Logo spel van Koninklijke JumboMascha Rood
 
Lápiz casero con linterna
Lápiz casero con linternaLápiz casero con linterna
Lápiz casero con linternaLaura Botina
 
La biotecnologia
La biotecnologiaLa biotecnologia
La biotecnologiaCardona-15
 
Li list date cume
Li   list date cumeLi   list date cume
Li list date cumeDon Shea
 
Resumen de la excursión
Resumen de la excursiónResumen de la excursión
Resumen de la excursiónvictorserranov
 
Proyecto lamparas en guadua
Proyecto lamparas  en guaduaProyecto lamparas  en guadua
Proyecto lamparas en guaduaMiltonGonzalezM
 
Mi Primera Presentacion De Primavera
Mi Primera Presentacion De PrimaveraMi Primera Presentacion De Primavera
Mi Primera Presentacion De Primaveranoctuida
 

Viewers also liked (16)

B2B Informatie over het Logo spel van Koninklijke Jumbo
B2B Informatie over het Logo spel van Koninklijke JumboB2B Informatie over het Logo spel van Koninklijke Jumbo
B2B Informatie over het Logo spel van Koninklijke Jumbo
 
CV of Barbra Mae Rana
CV of Barbra Mae RanaCV of Barbra Mae Rana
CV of Barbra Mae Rana
 
Lápiz casero con linterna
Lápiz casero con linternaLápiz casero con linterna
Lápiz casero con linterna
 
Wire-Spec
Wire-SpecWire-Spec
Wire-Spec
 
ultra naukri global
ultra naukri globalultra naukri global
ultra naukri global
 
ultra naukri global
ultra naukri globalultra naukri global
ultra naukri global
 
La biotecnologia
La biotecnologiaLa biotecnologia
La biotecnologia
 
Li list date cume
Li   list date cumeLi   list date cume
Li list date cume
 
La biotecnologia
La biotecnologiaLa biotecnologia
La biotecnologia
 
Thesis Book
Thesis BookThesis Book
Thesis Book
 
Resumen de la excursión
Resumen de la excursiónResumen de la excursión
Resumen de la excursión
 
Glosario palabras
Glosario palabras Glosario palabras
Glosario palabras
 
Bottle Box Columbia
Bottle Box ColumbiaBottle Box Columbia
Bottle Box Columbia
 
Draft 3
Draft 3Draft 3
Draft 3
 
Proyecto lamparas en guadua
Proyecto lamparas  en guaduaProyecto lamparas  en guadua
Proyecto lamparas en guadua
 
Mi Primera Presentacion De Primavera
Mi Primera Presentacion De PrimaveraMi Primera Presentacion De Primavera
Mi Primera Presentacion De Primavera
 

Similar to Merkinch Welfare Hall Technical Details

Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2Tej Raj Upreti
 
NJI Portfolio Short
NJI Portfolio ShortNJI Portfolio Short
NJI Portfolio ShortNick Ivill
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignKathleenFaithMamuad
 
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENT
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENTCOS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENT
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENTAtang Maphela
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush LodgeGrant Hepburn
 
Application in deep vertical groundbeds of linear flexible anodes
Application in deep vertical groundbeds of linear flexible anodesApplication in deep vertical groundbeds of linear flexible anodes
Application in deep vertical groundbeds of linear flexible anodesSimone Tremolada
 
ICI Final Project - BQ
ICI Final Project - BQICI Final Project - BQ
ICI Final Project - BQPang Shuen
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Projectcharliewynn_3
 
Catalogue MCCB Fuji - Beeteco.com
Catalogue MCCB Fuji - Beeteco.comCatalogue MCCB Fuji - Beeteco.com
Catalogue MCCB Fuji - Beeteco.comBeeteco
 
Cast resin dry type transformer
Cast resin dry type transformerCast resin dry type transformer
Cast resin dry type transformerJoeChueng
 
Cast resin dry type transformer/dry transformer
Cast resin dry type transformer/dry transformerCast resin dry type transformer/dry transformer
Cast resin dry type transformer/dry transformerJestem Zhou
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 

Similar to Merkinch Welfare Hall Technical Details (20)

Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 
Insulators 3-5
Insulators 3-5Insulators 3-5
Insulators 3-5
 
NJI Portfolio Short
NJI Portfolio ShortNJI Portfolio Short
NJI Portfolio Short
 
Leisure Centre.
Leisure Centre.Leisure Centre.
Leisure Centre.
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENT
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENTCOS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENT
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENT
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush Lodge
 
Application in deep vertical groundbeds of linear flexible anodes
Application in deep vertical groundbeds of linear flexible anodesApplication in deep vertical groundbeds of linear flexible anodes
Application in deep vertical groundbeds of linear flexible anodes
 
ICI Final Project - BQ
ICI Final Project - BQICI Final Project - BQ
ICI Final Project - BQ
 
Pearce avenue
Pearce avenuePearce avenue
Pearce avenue
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Project
 
List of EN1317 Compliant RRS January 2015
List of EN1317 Compliant RRS January 2015 List of EN1317 Compliant RRS January 2015
List of EN1317 Compliant RRS January 2015
 
Catalogue MCCB Fuji - Beeteco.com
Catalogue MCCB Fuji - Beeteco.comCatalogue MCCB Fuji - Beeteco.com
Catalogue MCCB Fuji - Beeteco.com
 
Cast resin dry type transformer
Cast resin dry type transformerCast resin dry type transformer
Cast resin dry type transformer
 
Cast resin dry type transformer/dry transformer
Cast resin dry type transformer/dry transformerCast resin dry type transformer/dry transformer
Cast resin dry type transformer/dry transformer
 
Architecture Portfolio
Architecture PortfolioArchitecture Portfolio
Architecture Portfolio
 
Final catalogue
Final catalogueFinal catalogue
Final catalogue
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
06 - MCCB & ACB - Fuji Electric
06 - MCCB & ACB - Fuji Electric06 - MCCB & ACB - Fuji Electric
06 - MCCB & ACB - Fuji Electric
 

Recently uploaded

Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...ZurliaSoop
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...gajnagarg
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证eeanqy
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789CristineGraceAcuyan
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxbalqisyamutia
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxNikhil Raut
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证eeanqy
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样awasv46j
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyIsadora Agency
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahimamgadibrahim92
 
Eye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docxEye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docxMdBokhtiyarHossainNi
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证ehyxf
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...nirzagarg
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKMarekMitek1
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxbalqisyamutia
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...instagramfab782445
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecturesaipriyacoool
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement 210303105569
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationZenSeloveres
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipNitya salvi
 

Recently uploaded (20)

Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptx
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 
Eye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docxEye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docx
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptx
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecture
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
 

Merkinch Welfare Hall Technical Details

  • 1.
  • 2.
  • 3. REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: LOCATION PLAN EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: NOV 2016 SCALE: 1:2500 @ A3 DRAWN: CHECKED: TC EB 108001_1 P1PLANNING N 0 150m 250m100m 200m50m 50m 1:2500 E L E V T I O N V
  • 4. ANDERSONST Tap Lane Car Park Posts GRANT STREET BROW N STREET REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: SITE PLAN EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: NOV 2016 SCALE: 1:500 @ A3 DRAWN: CHECKED: TC EB 108001_2 P1PLANNING N 010m 10m 20m 30m 40m 50m 1:500 E L E V T I O N V
  • 5. REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: GROUND FLOOR PLAN E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: DEC 2016 SCALE: 1:100 @ A3 DRAWN: CHECKED: TC EB 108001_3 P1PLANNING V 02m 2m 4m 6m 8m 10m 1:100 N A A 1 MWH Gym Area 2 Hallway 3 Exit to Grant Street 4 Stairs to Office Space 5 Lift to Office Space 6 Reception Area 7 Accessible WC 8 Extension Gym Area 9 Male Changing Room 10 Female Changing Room 11 Plant Room 12 Exit to Brown Street 1 8 2 3 4 5 7 6 9 106 7 12
  • 6. REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: FIRST FLOOR PLAN E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: DEC 2016 SCALE: 1:100 @ A3 DRAWN: CHECKED: TC EB 108001_4 P1PLANNING V 02m 2m 4m 6m 8m 10m 1:100 N 1 Office Space 2 Kitchenette Area 3 Stairs to Gym Area 4 Lift to Gym Area 4 Lobby 1 2 3 4 5
  • 7. Light Switch (1100mm above FFL) LV Recessed Light (motion sensor activation for changing rooms) Twin 13amp flush socket outlet unit (450mm above FFL) Twin 13amp flush socket outlet unit (high level - 150mm above worktop) Mechanical extract fan - 15L/sec Electric unit & meter Smoke alarm installed in accordance with BS 5446-1: 2000 & wired via permanent & protected circuit & interconnected to any other smoke alarm or optical fire alarm within the building - minimum distance to light fixture & walls to be 300mm. Optical fire detector installed & tested to BS 5839-1: 2002 & wired via permanent & protected circuit & interconnected to any other smoke or optical fire alarm within the building - minimum distance to light fixture & walls to be 300mm. Carbon monoxide detectors should comply with BS EN 50291-1: 2010 & be powered by a battery designed to operate for the working life of the detector & incorporate a warning device to alert users when its working life is due to expire. Hard wired main operated carbon monoxide detectors complying with BS EN 50291-1: 2010 (Type A) with fixed wiring (not plug in types) may be used as an alternative, provide they are fitted with a sensor failure warning device. British Telecom outlet (450mm above FFL) Television point (450mm above FFL) All electric installations to be designed, installed and tested in accordance with BS 7671: 2008. A minimum of 50% of the fixed light fittings and lamps to be installed must be of low energy type designation. LEGEND REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: ELECTRIC + FIRE PLAN E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: DEC 2016 SCALE: 1:100 @ A3 DRAWN: CHECKED: TC EB 108001_5 P1PLANNING V 02m 2m 4m 6m 8m 10m 1:100 N Electric supply in
  • 8. 450mm diameter polydrop inspection chamber (max. depth 900mm) Class C CI Cover 100mm diameter rainwater pipe with access pipe (access hatch at the top of every bend at base of soil stacks and rainwater pipes) Rodding eye terminal 110mm uPVC drains laid to minimum fall 1:60 LEGEND RWPRWP RWP RWPRWP RWP RWP SVP SVP SVP SVP SVP SVP IC RE RE RE IC IC RWP Foul water drainage Surface water drainage REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: WATER SUPPLY + DRAINAGE PLAN E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: DEC 2016 SCALE: 1:100 @ A3 DRAWN: CHECKED: TC EB 108001_6 P1PLANNING V 02m 2m 4m 6m 8m 10m 1:100 N Water supply in
  • 9. REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: GRANT STREET ELEVATION E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: DEC 2016 SCALE: 1:50 @ A3 DRAWN: CHECKED: TC EB 108001_7 P1PLANNING V 0 1m 2m 3m 4m 5m1m 1:50 Ground Level 0 First Floor 3750 Ridge Height 8780
  • 10. REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: BROWN STREET ELEVATION E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: DEC 2016 SCALE: 1:50 @ A3 DRAWN: CHECKED: TC EB 108001_8 P1PLANNING V 0 1m 2m 3m 4m 5m1m 1:50 Ground Level 0 Ridge Height 6268
  • 11. REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: MWH SECTION DETAILS E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: NOV 2016 SCALE: 1:10/1:50 @ A3 DRAWN: CHECKED: TC EB 108001_9 P1PLANNING 0 1m 2m 3m 4m 5m1m 1:50 V MWH Roof (1:10) 6mm Slate Roof Tiles 25mm C24 Timber Battens 25mm C24 Counter Battens - Visqueen FB Vapour Barrier --------- 50mm Celotex FR5000 Insulation (0.21W/m²K) 60mm Rockwool Sound Insulation 100mm SuperFOIL SF60 (0.13W/m²K) with service cavity --------- 2x12.5mm Plasterboard with scrim tape (for 60mins. fire protection) MWH Ground Floor (1:10) 20mm Floor Finish 50mm Concrete Screed 100mm Concrete Slab using 50% GGBS - Underfloor Heating System attached to insulation board 150mm Celotex CL5000 Underfloor Insulation Board (0.21 W/m²K) - Visqueen Ecomembrane DPM 50mm Ecosand Binding - Hardcore to Structural Engineer's specifications MWH Wall (1:10) 20mm Render (Not in view) 600mm Stone - Visqueen Ecomembrane DPM 50mm Celotex RS5000 Insulation Board (0.20 W/m²K) between timber studs @ 600mm centres 60mm Rockwool Sound Insulation between timber studs @ 600mm centres 100mm SuperFOIL SF60 (0.13W/m²K) with service cavity between 50mm timber studs @ 600mm centres 2x12.5mm Plasterboard with scrim tape (for 60mins. fire protection) MWH Intermediate Floor (1:10) 2x12.5mm Plasterboard with scrim tape (for 60mins. fire protection) 70mm Timber Batten placed with 50mm Rockwool Sound Insulation 253mm Pasquill Posi-Joist® placed with 50mm Celotex FI5000 Insulation (0.21W/m²K) 2x12.5mm Plasterboard with scrim tape (for 60mins. fire protection) Posi-Joist® attached to I-Beam for stability + bolted to stonewall 0 1000mm800mm600mm400mm200mm200mm 1:10 MWH Critical Section (1:50) A DEC 2016 EDIT VALLEY GUTTER BETWEEN MWH & EXTENSION
  • 12. REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: EXTENSION SECTION DETAILS E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: NOV 2016 SCALE: 1:10/1:50 @ A3 DRAWN: CHECKED: TC EB 108001_10 P1PLANNING 0 1m 2m 3m 4m 5m1m 1:50 V Extension Roof (1:10) 50mm Corrugated Aluminium Sheeting - Vapour Barrier 25mm C24 Timber Battens 25mm C24 Counter Battens 50mm Celotex RS5000 Insulation Board (0.21 W/m²K) 150mm Walltite® CL100 Insulation (0.13 W/m²K) 160mm IPE 160 60mm Rockwool® Sound Insulation Slab 2x12.5mm Plasterboard (for 60mins. fire protection) Extension Wall (1:10) - Zinc Gutter 10mm Corrugated Aluminium Sheeting - Vapour Barrier 25mm C24 Timber Battens 25mm C24 Counter Battens Visqueen Ecomembrane DPM 15mm OSB Sheathing 50mm Celotex RS5000 Insulation Board (0.20 W/m2K) between timber studs @ 600mm centres 60mm Rockwool Sound Insulation between timber studs @ 600mm centres 100mm SuperFOIL SF60 (0.13W/m²K) with service cavity between 50mm timber studs @ 600mm centres 2x12.5mm Plasterboard (for 60mins. fire protection) Extension Floor (1:10) 20mm Floor Finish 50mm Concrete Screed 100mm Steel Reinforced Concrete Slab using 50% GGBS 150mm Celotex CL5000 Underfloor Insulation Board (0.21 W/m²K) - Visqueen Ecomembrane DPM 50mm Ecosand Binding - Hardcore to Structural Engineer's specifications 0 1000mm800mm600mm400mm200mm200mm 1:10 Extension Critical Section (1:50) A DEC 2016 EDIT VALLEY GUTTER BETWEEN MWH & EXTENSION
  • 13. REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: OPENING DETAILS E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: NOV 2016 SCALE: 1:5 @ A3 DRAWN: CHECKED: TC EB 108001_11 P1PLANNING V 0 500mm100mm 200mm 300mm 400mm100mm 1:5 MWH Sash Windows (1:5) B-B : Window Jamb A-A : Head + Cill A B B MWH Front Door (1:5) B-B : Door Jamb A-A : Head + Cill A A B B Extension Casement Windows (1:5) Extension Roof Windows - Velux® (1:5)
  • 14. REVISIONS: DATE: DESCRIPTION: DRAWING STATUS: PROJECT: MERKINCH WELFARE HALL TITLE: THERMAL BRIDGING + AIR TIGHTNESS E L E V T I O N EDWARD BROWN 15003518 ・UHI INVERNESS ・1 INVERNESS CAMPUS ・INVERNESS ・IV2 5NA REV:DATE: NOV 2016 SCALE: 1:100 @ A3 DRAWN: CHECKED: TC EB 108001_12 P1PLANNING V Thermal Bridging Junctions and connections within a building envelope can typically provide a route for heat loss, which must be reduced, or if possible, eliminated. The diagram opposite illustrates common areas in a building where thermal bridging may occur. Careful design and implementation is required to ensure that these particular areas do not create unnecessary heat loss paths. The proposed design aims to reduce thermal bridging in the building. The insulation is added in response to avoid any penetration from external weather and prevent heat loss internally. It is important to focus in extending the insulation around the MWH in the roof, walls, and floor to prevent any heat loss from the building. Air Tightness A high level of air tightness within the building reduces the heating demand and prevents moisture-laden air from entering the fabric. Achieving air tightness can be achieved by using airtight membranes/barriers within the building elements such as a vapour barrier layer. Where layers could be interrupted, like windows, propriety tape can be attached to the barrier layer ensuring that around openings continue to be air tight. Ensuring the building envelope is air tight to reduce the risk of structural damage, careful design and installation of components such as windows and doors is imperative. It is aimed to not allow air to flow randomly through walls of the envelope. This is important because changing temperatures of air flow is not sufficient to provide consistently air quality for both the occupant and the building itself. Poor acoustic insulation and heat loss are further disadvantages. A new ventilation system and acoustic insulation is added to the extension/sports hall. 02m 2m 4m 6m 8m 10m 1:100