HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
HRM is rapidly being
recognized as an important
factor in improving the
chances of the project success
(in terms of productivity).
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
Human resources is one of the most
crucial elements of construction
productivity.
Some researchers believe that HRM
is a marginal variable for project
success!
Some other believe it is crucial factor
for project success.
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
Some of the critical factors for construction
productivity improvement are:
 Project mission;
 Project manager’s effectiveness;
 Project schedule;
 Client involvement;
 Technical issues;
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
 Project monitoring;
 Communication and feedback;
 Trouble shooting;
 Personnel recruitment method;
 Personnel training;
 Personal motivational issue;
 Management support at all time.
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
 Helpdesk divides productivity factors into:
Pre-construction Activities (1)
 Client brief
 Project objectives
 Specification
 Design/build-ability
 Contractual arrangement
 Planning
 Scheduling
 Estimating
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
Site /Project & Manager Characteristics
(2 &3)
Experience/capability
Leadership style
Authority/influence
Goal commitment
Involvement
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
Management System (4)
Planning
Communication
Controlling
Co-ordinating
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
Resource Management(5)
 Labour selection
 Labour control
 Material selection
 Material handling
 Plant
 Waste on site
 Delay and Disruption on site
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
Labour Characteristics (6)
Subcontracting labour
Direct labour
Motivating Factors (7)
Hygiene Factors
(Process model productivity on site)
• Organisational Factors
• Contract management
• Finance
• Etc
The correlation co-efficient and the chi-square test.
Linear regression method &“Factor Analysis” of the SPSS package
Pre-construction
Activities (1)
D1. Client brief
D2. Project objectives
D3. Specification
D4. Design/build-ability
D5. Contractual
arrangement
D6. Planning
D7. Scheduling
D8. Estimating
Site/Project
Manager
(2 &3)
Characteristics
D9. Experience/capability
D10. Leadership style
D11. Authority/influence
D12. Goal commitment
D13. Involvement
Labour (6)
Characteristics
D39. Subcontracting
Labour
D40. Direct labour
Management (4)
System
D18. Planning
D19. Communication
D20. Controlling
D21. Co-ordinating
Resource (5)
Management
D22. Labour selection
D23. Labour control
D24. Material selection
D25. Material handling
D26. Plant
D27. D31. Waste on site
D32. D38. Delay and
Disruption on site
Motivating
Factors (7)
D41-D46
Hygiene
Factors
D47-D55
P
R
O
D
U
C
T
I
V
I
T
Y
Project
Performance
• Time
• Cost
• Quality
• Safety
Job
SatisfactionEffort Rewards
Ability and Skill of worker
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
Historically, projects are managed
as technical system.
There is a shift towards behavioural
system.
Project managers effectiveness is
related to project goals.
 (Time-Cost-Quality).
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
The concept of gaol model
This concept suggest that
effectiveness is related to project
goal.
Project effectiveness and efficiency
brings project success.
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
Project success
 From project manger’s point of
view.
 Client point of view.
 The end user’s point of view.
 Should be based on achieving
project’s objectives.
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
 These are KPIs.
 The most successful organizations
mange their human resources
differently.
 Less productive organization not
have a sound HR policy.
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
In the past project success was defined as:
 The level of satisfaction expressed by at
least one of the three main players. They
are:
1. Sponsor’s view
2. Project manager’s view
3. Sponsor as project manager’s view
 Today customers view is also considered
to be very important.
*
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
 Productivity helpdesk derived productivity
model.
 Including the Freeman and Beale model can
improve the productivity on site and at the
head office.
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
 Project manger should devote a
significant amount of time in managing
human resources.
 Regular training for workforce will
increase the level of productivity.
 Major project failures are related to
manpower.
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
HR failure is related to factors such as:
1. Training;
2. Non qualified staff;
3. Management experience;
4. Shortage of skilled workers;
5. Lack of multi trade workforce.
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
 Project manager’s training is
considered to be one of the most
important influential factor.
 project manager must be a team
builder.
 They must be able to form/create
an effective team.
HUMAN RESOURCE MANAGEMENT-
PROJECT SUCCESS
 To motivate their team
successfully.
 The key project success/high
productivity can be achieved by
having:
1. well qualified
2. motivated personnel.
Between hard and soft HRM
 During the recession 2008, organizations
have tended to shed labour as part of a
survival strategy.
 More skilled workers are kept for a longer
period of time.
 Domestic and global competition, shifted the
desired outcomes in the management of
employment relationship (people oriented) to
task oriented.
Between hard and soft HRM
 There are two broad approaches towards
HRM.
 ‘soft’
 ‘hard’ HRM
 The ‘soft’ approach to HRM is particularly
associated with the Harvard school.
 The ‘soft’ approach describes that employees
are the greatest asset.
 Hence they are the key to organizational
success.
 It is the workforce themselves who are
adding value to the organization.
Between hard and soft HRM
 A well looked after workforce are more
committed.
 Also, more creative than ignored workforce.
 Human resource should be managed carefully
and professionally.
 Reliable and good workforce should receive
appropriate training and development.
 Good workers should be rewarded to reflect their
value.
Between hard and soft HRM
 The ‘hard; approach is associated with
Michigan school.
 The ‘hard’ approach puts the main emphasis
on strategic business objectives.
 It handles its human resources like any other
factors of production.
 In ‘hard’ approach the main motive is to make
workforce work harder.
 It must be used as flexibly as possible.
Between hard and soft HRM
The world ‘people’ is substituted
for ‘employee’ in the ‘hard’
approach.
The ‘hard’ approach is historically
associated with scientific
management.
‘soft’ approach and ‘hard’
approach are not contradictory.
Between hard and soft HRM
They both want high productivity.
their emphasis are not the same.
British researchers view has been
characterized by scepticism about
the coherence of ‘soft’ and ‘hard’
approach.
Between hard and soft HRM
Limited development of
managers and workforce is
harmful to the construction
industry.
This industry is interesting in term
of HRM as each project has
different contracting arrangement.
Between hard and soft HRM
Projects carry uncertainty in a
constant changing environment.
There is less scope for improving
HRM.
Or innovative work methods.
Larger companies take HRM and
innovation seriously.
Between hard and soft HRM
The economic pressure often
determine HRM strategies.
Smaller construction firms with
irregular flow of work do not have
HRM policy.
They have experienced significant
pressure over the past two years.
Between hard and soft HRM
Reduced the core workforce and
adopted a more Felixable
approach in working arrangement.
The growth in self-employment
during booms had a significant
increase and has started to decline
in 2008 during the recent
recession.

More Related Content

What's hot

Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions SA
 
Project human resource management
Project human resource managementProject human resource management
Project human resource managementJahangeer Shams
 
project human resources management
project human resources managementproject human resources management
project human resources managementMohamed , PMP
 
Pmbok 4th edition chapter 2 - Project Life cycle and Organization
Pmbok 4th edition   chapter 2 - Project Life cycle and OrganizationPmbok 4th edition   chapter 2 - Project Life cycle and Organization
Pmbok 4th edition chapter 2 - Project Life cycle and OrganizationAhmad Maharma, PMP,RMP
 
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...GlobalSkillup
 
Introduction to-project-management-dabc
Introduction to-project-management-dabcIntroduction to-project-management-dabc
Introduction to-project-management-dabcChandrasekhar Reddy
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 
Introduction to Project Management - PMP Workgroup
Introduction to Project Management - PMP WorkgroupIntroduction to Project Management - PMP Workgroup
Introduction to Project Management - PMP WorkgroupTùng Trần Thanh
 
Project planning , Productivity metrics,Cost estimation - COCOMO & COCOMO II,...
Project planning , Productivity metrics,Cost estimation - COCOMO & COCOMO II,...Project planning , Productivity metrics,Cost estimation - COCOMO & COCOMO II,...
Project planning , Productivity metrics,Cost estimation - COCOMO & COCOMO II,...nimmik4u
 
Project management frame work part 1
Project management frame work part 1Project management frame work part 1
Project management frame work part 1Mohamed , PMP
 
The Project Management Professional (PMP) - Is it For You?
The Project Management Professional (PMP) - Is it For You?The Project Management Professional (PMP) - Is it For You?
The Project Management Professional (PMP) - Is it For You?Carla Fair-Wright
 
Standard org chart & role descriptions
Standard org chart & role descriptionsStandard org chart & role descriptions
Standard org chart & role descriptionsJeffa62
 

What's hot (19)

Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for Executives
 
Session 14 4th edition PMP
Session  14 4th edition PMPSession  14 4th edition PMP
Session 14 4th edition PMP
 
Project human resource management
Project human resource managementProject human resource management
Project human resource management
 
Project Resource Management
Project Resource ManagementProject Resource Management
Project Resource Management
 
project human resources management
project human resources managementproject human resources management
project human resources management
 
Project management
Project managementProject management
Project management
 
Pmbok 4th edition chapter 2 - Project Life cycle and Organization
Pmbok 4th edition   chapter 2 - Project Life cycle and OrganizationPmbok 4th edition   chapter 2 - Project Life cycle and Organization
Pmbok 4th edition chapter 2 - Project Life cycle and Organization
 
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
 
Introduction to-project-management-dabc
Introduction to-project-management-dabcIntroduction to-project-management-dabc
Introduction to-project-management-dabc
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Project Planning and Management
Project Planning and ManagementProject Planning and Management
Project Planning and Management
 
Introduction to Project Management - PMP Workgroup
Introduction to Project Management - PMP WorkgroupIntroduction to Project Management - PMP Workgroup
Introduction to Project Management - PMP Workgroup
 
Project planning , Productivity metrics,Cost estimation - COCOMO & COCOMO II,...
Project planning , Productivity metrics,Cost estimation - COCOMO & COCOMO II,...Project planning , Productivity metrics,Cost estimation - COCOMO & COCOMO II,...
Project planning , Productivity metrics,Cost estimation - COCOMO & COCOMO II,...
 
Chap09 project human resource management
Chap09 project human resource managementChap09 project human resource management
Chap09 project human resource management
 
Project Human Resource Management
Project Human Resource ManagementProject Human Resource Management
Project Human Resource Management
 
Project management frame work part 1
Project management frame work part 1Project management frame work part 1
Project management frame work part 1
 
The Project Management Professional (PMP) - Is it For You?
The Project Management Professional (PMP) - Is it For You?The Project Management Professional (PMP) - Is it For You?
The Project Management Professional (PMP) - Is it For You?
 
Bpp 3213 lecture 1
Bpp 3213 lecture 1Bpp 3213 lecture 1
Bpp 3213 lecture 1
 
Standard org chart & role descriptions
Standard org chart & role descriptionsStandard org chart & role descriptions
Standard org chart & role descriptions
 

Viewers also liked

Viewers also liked (7)

Humanresources
Humanresources Humanresources
Humanresources
 
Human resource back ground
Human resource back groundHuman resource back ground
Human resource back ground
 
Importance of hrm
Importance of hrmImportance of hrm
Importance of hrm
 
ORGANISATION STRUCTURE
ORGANISATION STRUCTUREORGANISATION STRUCTURE
ORGANISATION STRUCTURE
 
Importance of hrm
Importance of hrmImportance of hrm
Importance of hrm
 
Differences between Human Resources and Human Capital
Differences between Human Resources and Human CapitalDifferences between Human Resources and Human Capital
Differences between Human Resources and Human Capital
 
Human Resource Management
Human Resource ManagementHuman Resource Management
Human Resource Management
 

Similar to 033 Human Resource Management

Mercer NYCDOE Project Home Run White Paper
Mercer NYCDOE Project Home Run White PaperMercer NYCDOE Project Home Run White Paper
Mercer NYCDOE Project Home Run White PaperMichael J Esposito
 
Humanside of project management
Humanside of project managementHumanside of project management
Humanside of project managementDMR Panda
 
analysis of interconnection between concurrent engineering and human resource...
analysis of interconnection between concurrent engineering and human resource...analysis of interconnection between concurrent engineering and human resource...
analysis of interconnection between concurrent engineering and human resource...INFOGAIN PUBLICATION
 
1 b. introduction to project management
1 b. introduction to project management1 b. introduction to project management
1 b. introduction to project managementDr.R. SELVAM
 
Fast future the Future of HR Whitepaper
Fast future   the Future of HR WhitepaperFast future   the Future of HR Whitepaper
Fast future the Future of HR WhitepaperRohit Talwar
 
TRENDS AND ISSUES in HUMAN RESOURCE MANAGEMENT
TRENDS AND ISSUES in HUMAN RESOURCE MANAGEMENTTRENDS AND ISSUES in HUMAN RESOURCE MANAGEMENT
TRENDS AND ISSUES in HUMAN RESOURCE MANAGEMENTJasmin Comoda
 
Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3Chetan Pandharinath Padme
 
Project report-on-hrm-2-converted
Project report-on-hrm-2-convertedProject report-on-hrm-2-converted
Project report-on-hrm-2-convertedVishalRaj155
 
Agile methodologies in_project_management
Agile methodologies in_project_managementAgile methodologies in_project_management
Agile methodologies in_project_managementPravin Asar
 
Project Management vs Change Management - PMI Madrid.pdf
Project Management vs Change Management - PMI Madrid.pdfProject Management vs Change Management - PMI Madrid.pdf
Project Management vs Change Management - PMI Madrid.pdfJesús Vázquez González
 
Knowledge areas of project management processes
Knowledge areas of project management processesKnowledge areas of project management processes
Knowledge areas of project management processesDavide Pierleoni
 
STRATEGIC INITIATIVES Aligning Business & HR Objectives With a.docx
STRATEGIC INITIATIVES Aligning Business & HR Objectives With a.docxSTRATEGIC INITIATIVES Aligning Business & HR Objectives With a.docx
STRATEGIC INITIATIVES Aligning Business & HR Objectives With a.docxflorriezhamphrey3065
 
Transition & Change Management Presentation
Transition & Change Management PresentationTransition & Change Management Presentation
Transition & Change Management PresentationAlex Ragan - MBA, PMP
 

Similar to 033 Human Resource Management (20)

Mercer NYCDOE Project Home Run White Paper
Mercer NYCDOE Project Home Run White PaperMercer NYCDOE Project Home Run White Paper
Mercer NYCDOE Project Home Run White Paper
 
Humanside of project management
Humanside of project managementHumanside of project management
Humanside of project management
 
CCP_SEC5_ Project Management
CCP_SEC5_ Project ManagementCCP_SEC5_ Project Management
CCP_SEC5_ Project Management
 
The Future Of HR
The Future Of HR  The Future Of HR
The Future Of HR
 
Mhr 16
Mhr 16Mhr 16
Mhr 16
 
analysis of interconnection between concurrent engineering and human resource...
analysis of interconnection between concurrent engineering and human resource...analysis of interconnection between concurrent engineering and human resource...
analysis of interconnection between concurrent engineering and human resource...
 
Modern Capacity Planning
Modern Capacity PlanningModern Capacity Planning
Modern Capacity Planning
 
Hr in projects
Hr in projectsHr in projects
Hr in projects
 
1 b. introduction to project management
1 b. introduction to project management1 b. introduction to project management
1 b. introduction to project management
 
Fast future the Future of HR Whitepaper
Fast future   the Future of HR WhitepaperFast future   the Future of HR Whitepaper
Fast future the Future of HR Whitepaper
 
Change and project_management
Change and project_managementChange and project_management
Change and project_management
 
TRENDS AND ISSUES in HUMAN RESOURCE MANAGEMENT
TRENDS AND ISSUES in HUMAN RESOURCE MANAGEMENTTRENDS AND ISSUES in HUMAN RESOURCE MANAGEMENT
TRENDS AND ISSUES in HUMAN RESOURCE MANAGEMENT
 
Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3
 
Project report-on-hrm-2-converted
Project report-on-hrm-2-convertedProject report-on-hrm-2-converted
Project report-on-hrm-2-converted
 
Agile methodologies in_project_management
Agile methodologies in_project_managementAgile methodologies in_project_management
Agile methodologies in_project_management
 
Project Management vs Change Management - PMI Madrid.pdf
Project Management vs Change Management - PMI Madrid.pdfProject Management vs Change Management - PMI Madrid.pdf
Project Management vs Change Management - PMI Madrid.pdf
 
Knowledge areas of project management processes
Knowledge areas of project management processesKnowledge areas of project management processes
Knowledge areas of project management processes
 
STRATEGIC INITIATIVES Aligning Business & HR Objectives With a.docx
STRATEGIC INITIATIVES Aligning Business & HR Objectives With a.docxSTRATEGIC INITIATIVES Aligning Business & HR Objectives With a.docx
STRATEGIC INITIATIVES Aligning Business & HR Objectives With a.docx
 
Transition & Change Management Presentation
Transition & Change Management PresentationTransition & Change Management Presentation
Transition & Change Management Presentation
 
Adecco Vietnam - Reshaping HR Strategy in Next Stage 2014 - 2016
Adecco Vietnam - Reshaping HR Strategy in Next Stage 2014 - 2016Adecco Vietnam - Reshaping HR Strategy in Next Stage 2014 - 2016
Adecco Vietnam - Reshaping HR Strategy in Next Stage 2014 - 2016
 

More from Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrunDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-writeDr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projectsDr Fereidoun Dejahang
 

More from Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Recently uploaded

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 

Recently uploaded (20)

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

033 Human Resource Management

  • 2. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS HRM is rapidly being recognized as an important factor in improving the chances of the project success (in terms of productivity).
  • 3. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS Human resources is one of the most crucial elements of construction productivity. Some researchers believe that HRM is a marginal variable for project success! Some other believe it is crucial factor for project success.
  • 4. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS Some of the critical factors for construction productivity improvement are:  Project mission;  Project manager’s effectiveness;  Project schedule;  Client involvement;  Technical issues;
  • 5. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS  Project monitoring;  Communication and feedback;  Trouble shooting;  Personnel recruitment method;  Personnel training;  Personal motivational issue;  Management support at all time.
  • 6. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS  Helpdesk divides productivity factors into: Pre-construction Activities (1)  Client brief  Project objectives  Specification  Design/build-ability  Contractual arrangement  Planning  Scheduling  Estimating
  • 7. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS Site /Project & Manager Characteristics (2 &3) Experience/capability Leadership style Authority/influence Goal commitment Involvement
  • 8. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS Management System (4) Planning Communication Controlling Co-ordinating
  • 9. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS Resource Management(5)  Labour selection  Labour control  Material selection  Material handling  Plant  Waste on site  Delay and Disruption on site
  • 10. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS Labour Characteristics (6) Subcontracting labour Direct labour Motivating Factors (7) Hygiene Factors
  • 11. (Process model productivity on site) • Organisational Factors • Contract management • Finance • Etc The correlation co-efficient and the chi-square test. Linear regression method &“Factor Analysis” of the SPSS package Pre-construction Activities (1) D1. Client brief D2. Project objectives D3. Specification D4. Design/build-ability D5. Contractual arrangement D6. Planning D7. Scheduling D8. Estimating Site/Project Manager (2 &3) Characteristics D9. Experience/capability D10. Leadership style D11. Authority/influence D12. Goal commitment D13. Involvement Labour (6) Characteristics D39. Subcontracting Labour D40. Direct labour Management (4) System D18. Planning D19. Communication D20. Controlling D21. Co-ordinating Resource (5) Management D22. Labour selection D23. Labour control D24. Material selection D25. Material handling D26. Plant D27. D31. Waste on site D32. D38. Delay and Disruption on site Motivating Factors (7) D41-D46 Hygiene Factors D47-D55 P R O D U C T I V I T Y Project Performance • Time • Cost • Quality • Safety Job SatisfactionEffort Rewards Ability and Skill of worker
  • 12. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS Historically, projects are managed as technical system. There is a shift towards behavioural system. Project managers effectiveness is related to project goals.  (Time-Cost-Quality).
  • 13. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS The concept of gaol model This concept suggest that effectiveness is related to project goal. Project effectiveness and efficiency brings project success.
  • 14. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS Project success  From project manger’s point of view.  Client point of view.  The end user’s point of view.  Should be based on achieving project’s objectives.
  • 15. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS  These are KPIs.  The most successful organizations mange their human resources differently.  Less productive organization not have a sound HR policy.
  • 16. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS In the past project success was defined as:  The level of satisfaction expressed by at least one of the three main players. They are: 1. Sponsor’s view 2. Project manager’s view 3. Sponsor as project manager’s view  Today customers view is also considered to be very important.
  • 17. *
  • 18. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS  Productivity helpdesk derived productivity model.  Including the Freeman and Beale model can improve the productivity on site and at the head office.
  • 19. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS  Project manger should devote a significant amount of time in managing human resources.  Regular training for workforce will increase the level of productivity.  Major project failures are related to manpower.
  • 20. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS HR failure is related to factors such as: 1. Training; 2. Non qualified staff; 3. Management experience; 4. Shortage of skilled workers; 5. Lack of multi trade workforce.
  • 21. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS  Project manager’s training is considered to be one of the most important influential factor.  project manager must be a team builder.  They must be able to form/create an effective team.
  • 22. HUMAN RESOURCE MANAGEMENT- PROJECT SUCCESS  To motivate their team successfully.  The key project success/high productivity can be achieved by having: 1. well qualified 2. motivated personnel.
  • 23.
  • 24. Between hard and soft HRM  During the recession 2008, organizations have tended to shed labour as part of a survival strategy.  More skilled workers are kept for a longer period of time.  Domestic and global competition, shifted the desired outcomes in the management of employment relationship (people oriented) to task oriented.
  • 25. Between hard and soft HRM  There are two broad approaches towards HRM.  ‘soft’  ‘hard’ HRM  The ‘soft’ approach to HRM is particularly associated with the Harvard school.  The ‘soft’ approach describes that employees are the greatest asset.  Hence they are the key to organizational success.  It is the workforce themselves who are adding value to the organization.
  • 26. Between hard and soft HRM  A well looked after workforce are more committed.  Also, more creative than ignored workforce.  Human resource should be managed carefully and professionally.  Reliable and good workforce should receive appropriate training and development.  Good workers should be rewarded to reflect their value.
  • 27. Between hard and soft HRM  The ‘hard; approach is associated with Michigan school.  The ‘hard’ approach puts the main emphasis on strategic business objectives.  It handles its human resources like any other factors of production.  In ‘hard’ approach the main motive is to make workforce work harder.  It must be used as flexibly as possible.
  • 28. Between hard and soft HRM The world ‘people’ is substituted for ‘employee’ in the ‘hard’ approach. The ‘hard’ approach is historically associated with scientific management. ‘soft’ approach and ‘hard’ approach are not contradictory.
  • 29. Between hard and soft HRM They both want high productivity. their emphasis are not the same. British researchers view has been characterized by scepticism about the coherence of ‘soft’ and ‘hard’ approach.
  • 30. Between hard and soft HRM Limited development of managers and workforce is harmful to the construction industry. This industry is interesting in term of HRM as each project has different contracting arrangement.
  • 31. Between hard and soft HRM Projects carry uncertainty in a constant changing environment. There is less scope for improving HRM. Or innovative work methods. Larger companies take HRM and innovation seriously.
  • 32. Between hard and soft HRM The economic pressure often determine HRM strategies. Smaller construction firms with irregular flow of work do not have HRM policy. They have experienced significant pressure over the past two years.
  • 33. Between hard and soft HRM Reduced the core workforce and adopted a more Felixable approach in working arrangement. The growth in self-employment during booms had a significant increase and has started to decline in 2008 during the recent recession.