With this section, you will be able to:
 Describe how to create and use a staffing plan
 Design a responsibility matrix
 List the four stages of the Tuckman team
development
 Describe various motivational theories
 Describe leadership styles and the most
appropriate to use
 Sequentially list the seven main sources of
project conflicts.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
The following is a list of the responsibilities project managers •
 Negotiate with resource managers for the optimal available resources.
 Confirm availability of resources assigned.
 Create a project team directory.
 Create project job descriptions for team members and other stakeholders.
 Make sure all roles and responsibilities on the project are clearly assigned.
 Understand the team members' needs for training related to their work on the project, and make
sure they get the training.
 Create a formal plan covering such topics as how the team will be involved in the project and what
roles they will perform-a human resource management plan.
 Insert reports of team members' performance into their official company employment record.
 Send out letters of commendation to team members and their bosses.
 Make sure team members' needs are taken care of.
 Create recognition and reward systems-described in the Human Resource Management Plan
section of this chapter.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Project Human Resource Management describes the processes that enable the project manager to
organize and lead the project team. A subset of the project team is the project management team,
which is responsible for leadership activities in each of the five major process groups.
Part of the role of the project manager in managing the project team is to influence the team when
human resource factors may impact the project, and to ensure professional and ethical behavior at all
times when conducting project activities.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Plan Human Resource Management is the process of identifying and documenting project roles, responsibilities,
required skills, reporting relationships, and creating a staffing management plan. The key benefit of this process
is that it establishes project roles and responsibilities, project organization charts, and the staffing management
plan including the timetable for staff acquisition and release
9.1.1 Plan Human Resource Management: Inputs
9.1.1.1 Project Management Plan
The project management plan is used to develop the human resource management plan.
The information used for the development of the human resource management plan includes, but is not limited to:
 The project life cycle and the processes that will be applied to each phase,
 How work will be executed to accomplish the project objectives,
 A change management plan that documents how changes will be monitored and controlled,
 A configuration management plan that documents how configuration management will be performed,
 How integrity of the project baselines will be maintained, Needs and methods of communication among
stakeholders.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
9.1.1.2 Activity Resource Requirements
Used to determine the human resource needs for the project. The preliminary requirements regarding the
required project team members and their competencies are progressively elaborated as part of the Plan Human
Resource Management process.
9.1.2 Plan Human Resource Management: Tools and Techniques
9.1.2.1 Organization Charts and Position Descriptions
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
The objective is to define roles and responsibilities of
each member in the project team
This can be by documenting the required roles in
different forms like:
Hierarchical, matrix and Text oriented
a hierarchical format may be used to represent high-level roles, while
a text-based format may be better suited to document the detailed responsibilities.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Hierarchical-type charts.
The traditional organization chart structure can be used to show positions and relationships in a graphical, top-
down format.
OBS:
Organization Breakdown structure ,it’s arranged according to an organization existing departments ,units ,or team
with the project activities
RBS
IT is a chart that shows the various resources necessary for a given project. A resource breakdown structure
tends to contain tangible resources, such as personnel, machinery, and raw materials required to accomplish
project activities .
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
B-Matrix –Based Chart:
A responsibility assignment matrix RAM is used to
illustrate connections between work package and
project team members
RACI :
A type of responsibility assignment matrix that
defines role assignments more clearly than the
previous type where
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Tools : Networking
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Interaction of individuals with
each other in organization,
industry ..etc
Interactions like meeting, events,
informal conversation ,formal
corresponding
The way of interaction impact the
effectiveness of working
performance
Interaction could be formal or
informal
9.1.2.3 Organizational Theory
 Organizational theory provides information regarding the way in which people, teams, and organizational
units behave.
 Effective use of common themes identified in organizational theory can shorten the amount of time,
cost, and effort needed to create the Plan Human Resource Management process outputs and improve
planning efficiency.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Output : Human Resources Plan
It provides guidance on all information on how human resources should be defined, staffed, managed
,controlled .It can include the following
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Some of the components of the human resource management plan are:
 Roles and responsibilities (WE ALREADY DISSCUSED IT BEFORE )
 Project organization charts (WE ALREADY DISSCUSED IT BEFORE )
 Staffing management plan
1-Roles and responsibilities
The roles and responsibilities grid is
a critical tool for the project manager.
It can identify activities , documents,
and other deliverables along with the
person accountable for those activities,
documents or deliverables.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
3- Staffing management plan
For a small project requiring few resources and a quick turnaround, the staffing management plan may
simply be a single page that lists who's going to work on the project.
For large complex projects requiring large teams numbering into hundreds of people, staffing management
plan is required to track the following:
 All needed resources for the project
 When the resources for the project are needed, available, and their anticipated duration on the
 project
 Any gaps such as needed skill sets or levels of expertise required for the project
 When resources roll off the project
 Any potential training needs
The Staffing Management Plan contains:
 The Resource Histogram: Shows what resources will be needed and at what times in the project
 Staffing Release Plan: Establishes method and timing for releasing resources
The Resource histogram is used to visually chart where resources are needed on the project and the
hours needed from each resource on a daily/weekly/monthly basis.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
 Training Needs (if expecting team members will not have required skills)
 Compliance with HR rules and governmental regulations
 Safety policies and procedures
 Recognition & reward systems :
• Say (Thank You)
• Member of the month prize / performance prize
• Recommend him/her for raises
• Parties, events, and celebrations
• Training courses (paid)
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
NOTE
Human resources can be divided into administrative and behavioral management topics.
Most of the answers to human resource questions should come from your everyday
knowledge and work experience. Though you will see a lot of different topics described
in this chapter, these concepts do not amount to a lot of questions on the exam. To study,
read this chapter two or three times and simply make a list of the gaps in your knowledge
as you read. After a couple of passes through this chapter, you will likely remember the
information well enough for the high-level questions on the exam.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
2nd PROCESS
Acquire Project Team
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Confirmation of Human resource availability and obtaining
the team necessary to complete project assignments.
How acquire team is during execution process
group??
A-Remember that we are talking on Mega projects
B-This is mean that a part of project team can be acquire
when it’s necessary in the time required ,like next year,
after two years according to project schedule
C-Project Team does not mean people who plan, but it
includes contractos,sub contractors ,suppliers..etc
D- Finaly Actual people who will be doing some of the
work may not be selected shortly before the work begin
Acquire Project Team = Acquire Final project Team
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Acquire Project Team is the process of confirming human resource availability and obtaining the team necessary
to complete project activities. The key benefit of this process consists of outlining and guiding the team selection
and responsibility assignment to obtain a successful team.
Acquisition:
Resources from outside can be acquired to complete certain work package
Example: Sub Contractors ,Consultant, Technical Expert….etc.
Pre-assignment:
 When project team members are selected in advance they are considered pre-assigned
If the project is dependent upon the expertise of particular persons ,or if some staff assignments
are defined within the project charter
Multi-Criteria Decision Analysis
the multi-criteria decision analysis is used to help rate or score potential team members. The criteria are
weighted based on the relative importance of the criteria. Typical selection criteria include but are not
limited to the following:
• Availability • Cost
• Experience • Ability
• Knowledge • Skills
• Attitude • International factors
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Negotiation:
Negotiation one of the important factors that can be used by the PM
or the project team member to acquire team from functional managers
or another working project
 Know the needs of the project and its priority within the organization.
 Be able to express how the resource's manager will benefit from assisting
the project manager.
 Understand that the resource's manager has his or her own work to do and that the
individual may not gain benefits from supporting the project.
 Do not ask for the best resources if the project does not need them.
 Be able to prove, by using project management tools such as the network diagram and project
schedule, why the project requires the stated quantity and quality of resources.
 Use the negotiation as an opportunity to discover what the resource's manager will need from the
project manager in order to manage his or her own resources.
Work with the resource's manager to deal with situations as they arise.
 Build a relationship so the project manager can call on the expertise of the resource's manager later in the
project if necessary.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Types of Teams
 Dedicated Most of the team members work full-time and exclusively on the project
Dedicated teams are most common in projectized organizations.
 Part-time Team members and the project manager spend a portion of their time working on the project.
Part-time teams are most often seen in functional and matrix organizations.
 Partnership In cases where several organizations undertake a project, the teams are likely to
consist of people from each of the participating organizations, plus the project manager from the
organization taking the lead on the project. Such teams may offer advantages such as cost savings,
but they can also be difficult to manage.
 Virtual
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Virtual Teams:
Team members with little or no time spent meeting face to face.
Advantages:
1. Use special expertise even if the expert is not in the same area
2. Incorporate employees who work from home
3. Include people with mobility limitations or disabilities
4. Work in projects that would have been ignored due to travel expenses
Disadvantage:
1. Possibility for misunderstanding
2. Difficulties of sharing knowledge and experience between members
3. Cost of applying communication technology
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Halo Effect
The "halo effect" is something to be aware of when dealing with team
members. There can be a tendency to rate team members high or low on all factors
due to the impression of a high or low rating on some specific factor. This can mean,
"You are a great programmer. Therefore, we will make you a project manager and
expect you to be great at that as well
Output:
1-Project Staff Assignments:
The project is staffed when appropriate people have been assigned using mentioned techniques.
 Document this assignment in Project Team Directory
 Send memos to team members
 Insert name in organization chart
2-Resources Calendar :
Document the time periods that each project team can work on the project
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
The Process of improving the
competencies, team interaction,
and overall team environment to
enhance project performance:
A-Encourage Team working
B-Establish and maintain trust
between all project team
C-Motivate project team
D-Provide training for project
team if need it
E-Place team member in same
location ( Co-location )
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Interpersonal Skills: (Soft Skills)
Interpersonal skills are the life skills we use every day to communicate and interact with other people, individually
and in groups . Interpersonal skills include not only how we communicate with others, but also our confidence and
our ability to listen and understand. Problem solving, decision making and personal stress management are also
considered interpersonal skills
Ex: Communication skills, emotional intelligence, conflict resolution, negotiation, influence, creativity, and team
building. Encourage team, communicate honestly, establish and maintain trust.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Training:
It includes all activities to enhance the competencies of the project team members ,
it can be formal or informal
Team-Building Activities can play a major role in team development. Such activities help form the project team
into a cohesive group working for the best interests of the project, to enhance project performance.
Make sure you know:
• It is the project manager's job to guide, manage, and improve the interactions of team members.
• The project manager should improve trust and cohesiveness among the team members.
• The project manager should incorporate team-building activities into all project activities.
• Team building requires a concerted effort and continued attention throughout the life of the project.
• WBS creation is a team-building tool.
• Team building should start early in the life of the project.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
• Forming People are brought together as a team.
• Storming There are disagreements as people learn to work together.
• Norming In the norming phase, team members begin to work together and adjust their work habits and
behaviors to support the team. The team learns to trust each other..
• Performing Teams that reach the performing stage function as a well-organized unit. They are
interdependent and work through issues smoothly and effectively.
• Adjourning The project ends, and the team is disbanded.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Co-Location:
Placing the active team members in the same location (war room) to enhance their ability to perform as a team.
War room is a central location for project coordination usually with WBS, networks, schedule, … etc. posted on
the wall
Ground Rules (Tight Matrix):
What behavior is acceptable and what is not acceptable for example:
• How should team member resolve conflicts with others
• Who is authorized to give direction to contractors
• Acceptable behavior during meetings
Setting ground rules can help eliminate conflicts or problems with the team during
the project because everyone knows what is expected of them. And if team
members have input into creating the ground rules, they're more likely to follow
them. Ground rules are especially important when the team is managed virtually.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Recognition and Rewards
the project manager appraises performance and gives out recognition and
rewards that are appropriate for each team member, as defined in
the human resource management plan.
increase the performance of project team, specially when the reward given
to an individual satisfies a need which is valued by that individual
Team Performance Assessment
The project manager completes formal and informal team performance assessments as part of developing the
project team.
These assessments are meant to evaluate and enhance the effectiveness of the team as a whole. They
may include an analysis of how much team members' skills have improved; how well the team is
performing, interacting, and dealing with conflict .
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Team Performance Assessments:
The evaluation of a team’s effectiveness may include indicators such as:
1. Improvement in skills
2. Improvement in competencies
3. Increased team cohesiveness
4. Reduce staff turnover rate
Note: Team performance assessment is done by project manager or by project management team for all team ,
not for individuals.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Exam Tip:
Team performance assessments evaluate the entire team for the project as a whole. It is the primary
output of the Develop Project Team process.
Project performance appraisals are an evaluation of an individual's performance on the project, and is a
tool and technique of the Manage Project Team process
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Issue Log:
A written log documents and helps monitor who is responsible for resolving specific issue by target date
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Observation and conversation:
They are used to stay in touch with the work and attitudes of the project team members
Project Performance Appraisals:
Evaluation of employees’ performance by their supervision.
360-Degree Review is one of the ways to complete appraisal by including the input of coworkers, subordinates,
and supervisors.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
PMP_GATEWAY
Prepared by
Engr. Mohamed Eid , PMP®
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Our thinking •Conflict :It’s not always a bad thing ,it
gives opportunities for improvement
•Conflict can be beneficial as it can shows
defect in certain process
•Conflict is resolved through
openess,identifying the causes, problem
solving by the people involved and their
immediate manager
•The presence of conflict is due to:
 Nature of the project to fulfill many
requirements of different stakeholders
 Limited power of project manager
 Necessity of obtaining resources from
functional managers
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Conflict Management
Example:
Forcing: Do it in this way
Smoothing: Let's calm down and get the job done,
I'm sure we can get to agreement about equipment need it
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Compromising: Let us do a little of what both u suggest
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Withdrawal / Avoid : Let's deal with this issue next week
Confronting: I suggest to make more examination for this equipment's to decide correctly if we will use it
or not.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Causes of Conflict
Schedule , Project Priority, Resources, Technical opinions, Administrative overhead, Cost, Personality
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
NOTE:
 Conflict forces a search for alternative solutions
 Conflict is a team issue
 Conflict resolution focuses on issues, not
personalities
 Openness resolves conflict
 Conflict resolution focuses on the present, not the past
 Sometimes you should use withdraw or forcing as per
situation
 The best approach is collaborating/problem solving , The worst approach is forcing
 Compromise, smoothing and withdrawing can lead to ‘lose-lose’ situations
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
For the project manager, there is a brief listing of interpersonal skills that not only contribute to conflict
resolution scenarios but that help drive to the strengths of the project team members.
Key skills are:
• Leadership - imparting vision and inspiring the team to achieve high performance
• Influencing - particularly important in a matrix environment in which the project manager may
have little direct authority over the team members. In this case, the ability to influence
stakeholders becomes a key component in project success. Effective skills in this area include:
 Interactive listening skills
 Clear articulation of points of view and the ability to be persuasive
 Seeing all sides of the issue from your stakeholders perspectives
 Being a trusted resource - not taking sides when addressing stakeholder issues
• Effective decision-making - Strong negotiation skills to influence the organization for the
success of the project
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Past View vs Current view about conflict after study PMP
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Interpersonal Skills
A. Powers of project manager:
Formal (Legitimate) This power is based on your position. Example: "You need to listen to me
when I tell you to do this work, because I have been put in charge!“
Reward This power stems from giving rewards. Example: "I understand that you want to
participate in the acceptance testing of this project. Because of your performance, I will assign you
as part of that team:‘
Penalty : This power comes from the ability to penalize team members. Example: "If
this does not get done on time, I will remove you from the group .
Expert This power comes from being project management expert.
Referent This power comes from another person liking you, respecting you, or wanting to be like
you. It is the power of charisma and fame
NOTE: The best forms of power are EXPERT and REWARD. Penalty is the worst form. FORMAL, REWARD, and PENALTY are
powers derived from your position in the company. EXPERT power is earned on your own.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
B. Management and Leadership Styles:
 At the beginning of project use directing styles.
 At the project execution use coaching, facilitating, and supporting.
 Directing: Telling others what to do.
 Facilitating: Coordinating the inputs of others.
 Coaching: Helping other achieve their goal.
 Supporting: Providing assistance along the way.
 Autocratic: Manager has power to do what he want.
 Consultative: Manager obtains others’ opinions & act as servant for team
 Consultative- Autocratic: Manager takes input from team members but retains decision-making authority for
him self.
 Consensus: Making decisions base on group agreement.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
 Delegation: Establish goals then give team authority to complete the work.
 Bureaucratic : Following procedures exactly. Appropriate for critical work.
 Charismatic: Energize and encourage team in performing.
 Democratic (Participative): Team own the decision made by group.
 Laissez-Faire: Leave alone/Allow to act. Manager is not directly involved in team work but consult as
necessary.
 Analytical: Manager asks questions to get facts.
 Driver: Constantly giving directions. His attitude drives team to win.
 Influencing: This style emphasizes team work, teambuilding, and team working. These managers work with
their teams to influence project implementation. Influence skills include: persuasive – listening – mutual trust –
consideration of various perspectives.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
 NOTES
 Expectancy Theory: Employees who expect to be rewarded for their
accomplishments remains productive as rewards meet their expectations.
 Perquisites (Perks): Some employees receive special rewards such as
assigned parking space or executive dining.
 Fringe Benefits : Standard benefits formally given to all employees such as
educational benefits, insurance, and profit sharing
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
B- Maslow’s theory hierarchy of need:
To ascend next level you should fulfill levels below.
Starting from the pyramid base :
1. Physiological: Air, water, ... etc.
2. Safety: Security, Stability, ... etc.
3. Social: Like, love, friends, ... etc.
4. Esteem: Attention, respect, ... etc.
5. Self Actualization: Learning, growth, … etc.
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
C- David McClelland's Theory of Needs:
Also Called Acquired Needs Theory
 People need achievement
 People need Affiliation
 People need Power
D- Herzberg’s Theory:
1. Hygiene Factors: Work condition, salary, security, personal life, relationship at work.
2. Motivating Agents: Responsibility, self-actualization, recognition, professional growth.
Poor hygiene factors may destroy motivation but improving them will not improve motivation
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
Prepared by Presented by:
Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®

More Related Content

What's hot

Project management Panagiotis Dimitrios .Pilichos
Project management Panagiotis Dimitrios .PilichosProject management Panagiotis Dimitrios .Pilichos
Project management Panagiotis Dimitrios .PilichosPanosPilichos
 
Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions SA
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsAnand Bobade
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1Craig Brown
 
2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1reddvise
 
Prince2 resources e-book 1
Prince2 resources e-book 1Prince2 resources e-book 1
Prince2 resources e-book 1Knowledge Train
 
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre..."Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...SN Panigrahi, PMP
 
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project PlanningSDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project PlanningOpenLearningLab
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMOTURKI , PMP
 
Agile project management framework
Agile project management frameworkAgile project management framework
Agile project management frameworkstefanhenry
 
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaOnline PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaGlobalSkillup
 
Standard org chart & role descriptions
Standard org chart & role descriptionsStandard org chart & role descriptions
Standard org chart & role descriptionsJeffa62
 
Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Logitrain: New Zealand
 
Introduction of software project management
Introduction of software project managementIntroduction of software project management
Introduction of software project managementREHMAT ULLAH
 

What's hot (20)

Project management Panagiotis Dimitrios .Pilichos
Project management Panagiotis Dimitrios .PilichosProject management Panagiotis Dimitrios .Pilichos
Project management Panagiotis Dimitrios .Pilichos
 
Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for Executives
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
Project management
Project managementProject management
Project management
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management details
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1
 
Prince2 resources e-book 1
Prince2 resources e-book 1Prince2 resources e-book 1
Prince2 resources e-book 1
 
PMO-Framework
PMO-FrameworkPMO-Framework
PMO-Framework
 
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre..."Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
 
033 Human Resource Management
033 Human Resource Management033 Human Resource Management
033 Human Resource Management
 
Project managemen concept
Project managemen conceptProject managemen concept
Project managemen concept
 
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project PlanningSDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMO
 
Agile project management framework
Agile project management frameworkAgile project management framework
Agile project management framework
 
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaOnline PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
 
Standard org chart & role descriptions
Standard org chart & role descriptionsStandard org chart & role descriptions
Standard org chart & role descriptions
 
1 project management framework
1  project management framework1  project management framework
1 project management framework
 
Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)
 
Introduction of software project management
Introduction of software project managementIntroduction of software project management
Introduction of software project management
 

Viewers also liked

project Scope management
project Scope management project Scope management
project Scope management Mohamed , PMP
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementAnand Bobade
 
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...GlobalSkillup
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2ejlp12
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1Anand Bobade
 
Presentación websites
Presentación websitesPresentación websites
Presentación websitesnadiapacheco03
 
Teaching English
Teaching EnglishTeaching English
Teaching EnglishSimonShares
 
про посилення роботи школи
про посилення роботи школи про посилення роботи школи
про посилення роботи школи Сергій Якуба
 
D184d0bed180d0bcd0b0d182d183d0b2d0b0d0bdd0bdd18f d181d0b8d0bcd0b2d0bed0bbid0b2
D184d0bed180d0bcd0b0d182d183d0b2d0b0d0bdd0bdd18f d181d0b8d0bcd0b2d0bed0bbid0b2D184d0bed180d0bcd0b0d182d183d0b2d0b0d0bdd0bdd18f d181d0b8d0bcd0b2d0bed0bbid0b2
D184d0bed180d0bcd0b0d182d183d0b2d0b0d0bdd0bdd18f d181d0b8d0bcd0b2d0bed0bbid0b2Сергій Якуба
 

Viewers also liked (17)

project Scope management
project Scope management project Scope management
project Scope management
 
05 human resources management
05 human resources management05 human resources management
05 human resources management
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource management
 
Certificate (Mohamed Eid)
Certificate (Mohamed Eid)Certificate (Mohamed Eid)
Certificate (Mohamed Eid)
 
09 project human resources management pmbok 5th
09 project human resources management pmbok 5th09 project human resources management pmbok 5th
09 project human resources management pmbok 5th
 
PMP Preparation - 08 Quality Management
PMP Preparation - 08 Quality ManagementPMP Preparation - 08 Quality Management
PMP Preparation - 08 Quality Management
 
PMP Preparation - 06 Time Management
PMP Preparation - 06 Time ManagementPMP Preparation - 06 Time Management
PMP Preparation - 06 Time Management
 
PMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time managementPMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time management
 
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
 
Presentación websites
Presentación websitesPresentación websites
Presentación websites
 
Election
ElectionElection
Election
 
Teaching English
Teaching EnglishTeaching English
Teaching English
 
6 клас 3 урок 2
6 клас 3 урок 26 клас 3 урок 2
6 клас 3 урок 2
 
про посилення роботи школи
про посилення роботи школи про посилення роботи школи
про посилення роботи школи
 
D184d0bed180d0bcd0b0d182d183d0b2d0b0d0bdd0bdd18f d181d0b8d0bcd0b2d0bed0bbid0b2
D184d0bed180d0bcd0b0d182d183d0b2d0b0d0bdd0bdd18f d181d0b8d0bcd0b2d0bed0bbid0b2D184d0bed180d0bcd0b0d182d183d0b2d0b0d0bdd0bdd18f d181d0b8d0bcd0b2d0bed0bbid0b2
D184d0bed180d0bcd0b0d182d183d0b2d0b0d0bdd0bdd18f d181d0b8d0bcd0b2d0bed0bbid0b2
 

Similar to project human resources management

Pm0013 – managing human resources in projects
Pm0013 – managing human resources in projectsPm0013 – managing human resources in projects
Pm0013 – managing human resources in projectssmumbahelp
 
Project Management Office (Anna Maria Felici)
Project Management Office (Anna Maria Felici)Project Management Office (Anna Maria Felici)
Project Management Office (Anna Maria Felici)GPMS
 
PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10Muzette Charles, PMP
 
Humanside of project management
Humanside of project managementHumanside of project management
Humanside of project managementDMR Panda
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPTbletindia
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project ManagementMahesh Bendigeri
 
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES            .docxRunning head RECRUITMENT AND INTERVIEWING PROCESSES            .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docxcharisellington63520
 
MANAGEMENT TRAINEE PROGRAM-HR
MANAGEMENT TRAINEE PROGRAM-HRMANAGEMENT TRAINEE PROGRAM-HR
MANAGEMENT TRAINEE PROGRAM-HRSwati Iyer
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course reviewAsa Chan
 
Survey: Problems Related to Human in Software Projects
Survey: Problems Related to Human in Software ProjectsSurvey: Problems Related to Human in Software Projects
Survey: Problems Related to Human in Software ProjectsIOSR Journals
 
1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docx1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docxaulasnilda
 
Project Human Resource Management.pptx
Project Human Resource Management.pptxProject Human Resource Management.pptx
Project Human Resource Management.pptxIkram192675
 

Similar to project human resources management (20)

W frec04
W frec04W frec04
W frec04
 
Ben Mkt 347 Week 4
Ben Mkt 347 Week 4Ben Mkt 347 Week 4
Ben Mkt 347 Week 4
 
Pm0013 – managing human resources in projects
Pm0013 – managing human resources in projectsPm0013 – managing human resources in projects
Pm0013 – managing human resources in projects
 
PMP Preparation - 09 Human Resource Management
PMP Preparation - 09 Human Resource ManagementPMP Preparation - 09 Human Resource Management
PMP Preparation - 09 Human Resource Management
 
Project Management Office (Anna Maria Felici)
Project Management Office (Anna Maria Felici)Project Management Office (Anna Maria Felici)
Project Management Office (Anna Maria Felici)
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
 
PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10
 
Hr in projects
Hr in projectsHr in projects
Hr in projects
 
Humanside of project management
Humanside of project managementHumanside of project management
Humanside of project management
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
 
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES            .docxRunning head RECRUITMENT AND INTERVIEWING PROCESSES            .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docx
 
Session 14 4th edition PMP
Session  14 4th edition PMPSession  14 4th edition PMP
Session 14 4th edition PMP
 
MANAGEMENT TRAINEE PROGRAM-HR
MANAGEMENT TRAINEE PROGRAM-HRMANAGEMENT TRAINEE PROGRAM-HR
MANAGEMENT TRAINEE PROGRAM-HR
 
Project Management.pdf
Project Management.pdfProject Management.pdf
Project Management.pdf
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
 
Survey: Problems Related to Human in Software Projects
Survey: Problems Related to Human in Software ProjectsSurvey: Problems Related to Human in Software Projects
Survey: Problems Related to Human in Software Projects
 
1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docx1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docx
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Project Human Resource Management.pptx
Project Human Resource Management.pptxProject Human Resource Management.pptx
Project Human Resource Management.pptx
 

Recently uploaded

Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxsqpmdrvczh
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 

Recently uploaded (20)

Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 

project human resources management

  • 1. Project Human Resource Management Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 2. Project Human Resource Management Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 3. Project Human Resource Management With this section, you will be able to:  Describe how to create and use a staffing plan  Design a responsibility matrix  List the four stages of the Tuckman team development  Describe various motivational theories  Describe leadership styles and the most appropriate to use  Sequentially list the seven main sources of project conflicts. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 4. The following is a list of the responsibilities project managers •  Negotiate with resource managers for the optimal available resources.  Confirm availability of resources assigned.  Create a project team directory.  Create project job descriptions for team members and other stakeholders.  Make sure all roles and responsibilities on the project are clearly assigned.  Understand the team members' needs for training related to their work on the project, and make sure they get the training.  Create a formal plan covering such topics as how the team will be involved in the project and what roles they will perform-a human resource management plan.  Insert reports of team members' performance into their official company employment record.  Send out letters of commendation to team members and their bosses.  Make sure team members' needs are taken care of.  Create recognition and reward systems-described in the Human Resource Management Plan section of this chapter. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 5. Project Human Resource Management describes the processes that enable the project manager to organize and lead the project team. A subset of the project team is the project management team, which is responsible for leadership activities in each of the five major process groups. Part of the role of the project manager in managing the project team is to influence the team when human resource factors may impact the project, and to ensure professional and ethical behavior at all times when conducting project activities. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 6. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 7. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP® Plan Human Resource Management is the process of identifying and documenting project roles, responsibilities, required skills, reporting relationships, and creating a staffing management plan. The key benefit of this process is that it establishes project roles and responsibilities, project organization charts, and the staffing management plan including the timetable for staff acquisition and release
  • 8. 9.1.1 Plan Human Resource Management: Inputs 9.1.1.1 Project Management Plan The project management plan is used to develop the human resource management plan. The information used for the development of the human resource management plan includes, but is not limited to:  The project life cycle and the processes that will be applied to each phase,  How work will be executed to accomplish the project objectives,  A change management plan that documents how changes will be monitored and controlled,  A configuration management plan that documents how configuration management will be performed,  How integrity of the project baselines will be maintained, Needs and methods of communication among stakeholders. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 9. 9.1.1.2 Activity Resource Requirements Used to determine the human resource needs for the project. The preliminary requirements regarding the required project team members and their competencies are progressively elaborated as part of the Plan Human Resource Management process. 9.1.2 Plan Human Resource Management: Tools and Techniques 9.1.2.1 Organization Charts and Position Descriptions Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP® The objective is to define roles and responsibilities of each member in the project team This can be by documenting the required roles in different forms like: Hierarchical, matrix and Text oriented
  • 10. a hierarchical format may be used to represent high-level roles, while a text-based format may be better suited to document the detailed responsibilities. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 11. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP® Hierarchical-type charts. The traditional organization chart structure can be used to show positions and relationships in a graphical, top- down format. OBS: Organization Breakdown structure ,it’s arranged according to an organization existing departments ,units ,or team with the project activities
  • 12. RBS IT is a chart that shows the various resources necessary for a given project. A resource breakdown structure tends to contain tangible resources, such as personnel, machinery, and raw materials required to accomplish project activities . Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 13. B-Matrix –Based Chart: A responsibility assignment matrix RAM is used to illustrate connections between work package and project team members RACI : A type of responsibility assignment matrix that defines role assignments more clearly than the previous type where Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 14. Tools : Networking Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP® Interaction of individuals with each other in organization, industry ..etc Interactions like meeting, events, informal conversation ,formal corresponding The way of interaction impact the effectiveness of working performance Interaction could be formal or informal
  • 15. 9.1.2.3 Organizational Theory  Organizational theory provides information regarding the way in which people, teams, and organizational units behave.  Effective use of common themes identified in organizational theory can shorten the amount of time, cost, and effort needed to create the Plan Human Resource Management process outputs and improve planning efficiency. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 16. Output : Human Resources Plan It provides guidance on all information on how human resources should be defined, staffed, managed ,controlled .It can include the following Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 17. Some of the components of the human resource management plan are:  Roles and responsibilities (WE ALREADY DISSCUSED IT BEFORE )  Project organization charts (WE ALREADY DISSCUSED IT BEFORE )  Staffing management plan 1-Roles and responsibilities The roles and responsibilities grid is a critical tool for the project manager. It can identify activities , documents, and other deliverables along with the person accountable for those activities, documents or deliverables. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 18. 3- Staffing management plan For a small project requiring few resources and a quick turnaround, the staffing management plan may simply be a single page that lists who's going to work on the project. For large complex projects requiring large teams numbering into hundreds of people, staffing management plan is required to track the following:  All needed resources for the project  When the resources for the project are needed, available, and their anticipated duration on the  project  Any gaps such as needed skill sets or levels of expertise required for the project  When resources roll off the project  Any potential training needs The Staffing Management Plan contains:  The Resource Histogram: Shows what resources will be needed and at what times in the project  Staffing Release Plan: Establishes method and timing for releasing resources The Resource histogram is used to visually chart where resources are needed on the project and the hours needed from each resource on a daily/weekly/monthly basis. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 19.  Training Needs (if expecting team members will not have required skills)  Compliance with HR rules and governmental regulations  Safety policies and procedures  Recognition & reward systems : • Say (Thank You) • Member of the month prize / performance prize • Recommend him/her for raises • Parties, events, and celebrations • Training courses (paid) Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 20. NOTE Human resources can be divided into administrative and behavioral management topics. Most of the answers to human resource questions should come from your everyday knowledge and work experience. Though you will see a lot of different topics described in this chapter, these concepts do not amount to a lot of questions on the exam. To study, read this chapter two or three times and simply make a list of the gaps in your knowledge as you read. After a couple of passes through this chapter, you will likely remember the information well enough for the high-level questions on the exam. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 21. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 22. 2nd PROCESS Acquire Project Team Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 23. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP® Confirmation of Human resource availability and obtaining the team necessary to complete project assignments. How acquire team is during execution process group?? A-Remember that we are talking on Mega projects B-This is mean that a part of project team can be acquire when it’s necessary in the time required ,like next year, after two years according to project schedule C-Project Team does not mean people who plan, but it includes contractos,sub contractors ,suppliers..etc D- Finaly Actual people who will be doing some of the work may not be selected shortly before the work begin Acquire Project Team = Acquire Final project Team
  • 24. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP® Acquire Project Team is the process of confirming human resource availability and obtaining the team necessary to complete project activities. The key benefit of this process consists of outlining and guiding the team selection and responsibility assignment to obtain a successful team.
  • 25. Acquisition: Resources from outside can be acquired to complete certain work package Example: Sub Contractors ,Consultant, Technical Expert….etc. Pre-assignment:  When project team members are selected in advance they are considered pre-assigned If the project is dependent upon the expertise of particular persons ,or if some staff assignments are defined within the project charter Multi-Criteria Decision Analysis the multi-criteria decision analysis is used to help rate or score potential team members. The criteria are weighted based on the relative importance of the criteria. Typical selection criteria include but are not limited to the following: • Availability • Cost • Experience • Ability • Knowledge • Skills • Attitude • International factors Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 26. Negotiation: Negotiation one of the important factors that can be used by the PM or the project team member to acquire team from functional managers or another working project  Know the needs of the project and its priority within the organization.  Be able to express how the resource's manager will benefit from assisting the project manager.  Understand that the resource's manager has his or her own work to do and that the individual may not gain benefits from supporting the project.  Do not ask for the best resources if the project does not need them.  Be able to prove, by using project management tools such as the network diagram and project schedule, why the project requires the stated quantity and quality of resources.  Use the negotiation as an opportunity to discover what the resource's manager will need from the project manager in order to manage his or her own resources. Work with the resource's manager to deal with situations as they arise.  Build a relationship so the project manager can call on the expertise of the resource's manager later in the project if necessary. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 27. Types of Teams  Dedicated Most of the team members work full-time and exclusively on the project Dedicated teams are most common in projectized organizations.  Part-time Team members and the project manager spend a portion of their time working on the project. Part-time teams are most often seen in functional and matrix organizations.  Partnership In cases where several organizations undertake a project, the teams are likely to consist of people from each of the participating organizations, plus the project manager from the organization taking the lead on the project. Such teams may offer advantages such as cost savings, but they can also be difficult to manage.  Virtual Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 28. Virtual Teams: Team members with little or no time spent meeting face to face. Advantages: 1. Use special expertise even if the expert is not in the same area 2. Incorporate employees who work from home 3. Include people with mobility limitations or disabilities 4. Work in projects that would have been ignored due to travel expenses Disadvantage: 1. Possibility for misunderstanding 2. Difficulties of sharing knowledge and experience between members 3. Cost of applying communication technology Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 29. Halo Effect The "halo effect" is something to be aware of when dealing with team members. There can be a tendency to rate team members high or low on all factors due to the impression of a high or low rating on some specific factor. This can mean, "You are a great programmer. Therefore, we will make you a project manager and expect you to be great at that as well Output: 1-Project Staff Assignments: The project is staffed when appropriate people have been assigned using mentioned techniques.  Document this assignment in Project Team Directory  Send memos to team members  Insert name in organization chart 2-Resources Calendar : Document the time periods that each project team can work on the project Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 30. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 31. . Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP® The Process of improving the competencies, team interaction, and overall team environment to enhance project performance: A-Encourage Team working B-Establish and maintain trust between all project team C-Motivate project team D-Provide training for project team if need it E-Place team member in same location ( Co-location )
  • 32. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 33. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 34. Interpersonal Skills: (Soft Skills) Interpersonal skills are the life skills we use every day to communicate and interact with other people, individually and in groups . Interpersonal skills include not only how we communicate with others, but also our confidence and our ability to listen and understand. Problem solving, decision making and personal stress management are also considered interpersonal skills Ex: Communication skills, emotional intelligence, conflict resolution, negotiation, influence, creativity, and team building. Encourage team, communicate honestly, establish and maintain trust. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 35. Training: It includes all activities to enhance the competencies of the project team members , it can be formal or informal Team-Building Activities can play a major role in team development. Such activities help form the project team into a cohesive group working for the best interests of the project, to enhance project performance. Make sure you know: • It is the project manager's job to guide, manage, and improve the interactions of team members. • The project manager should improve trust and cohesiveness among the team members. • The project manager should incorporate team-building activities into all project activities. • Team building requires a concerted effort and continued attention throughout the life of the project. • WBS creation is a team-building tool. • Team building should start early in the life of the project. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 36. • Forming People are brought together as a team. • Storming There are disagreements as people learn to work together. • Norming In the norming phase, team members begin to work together and adjust their work habits and behaviors to support the team. The team learns to trust each other.. • Performing Teams that reach the performing stage function as a well-organized unit. They are interdependent and work through issues smoothly and effectively. • Adjourning The project ends, and the team is disbanded. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 37. Co-Location: Placing the active team members in the same location (war room) to enhance their ability to perform as a team. War room is a central location for project coordination usually with WBS, networks, schedule, … etc. posted on the wall Ground Rules (Tight Matrix): What behavior is acceptable and what is not acceptable for example: • How should team member resolve conflicts with others • Who is authorized to give direction to contractors • Acceptable behavior during meetings Setting ground rules can help eliminate conflicts or problems with the team during the project because everyone knows what is expected of them. And if team members have input into creating the ground rules, they're more likely to follow them. Ground rules are especially important when the team is managed virtually. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 38. Recognition and Rewards the project manager appraises performance and gives out recognition and rewards that are appropriate for each team member, as defined in the human resource management plan. increase the performance of project team, specially when the reward given to an individual satisfies a need which is valued by that individual Team Performance Assessment The project manager completes formal and informal team performance assessments as part of developing the project team. These assessments are meant to evaluate and enhance the effectiveness of the team as a whole. They may include an analysis of how much team members' skills have improved; how well the team is performing, interacting, and dealing with conflict . Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 39. Team Performance Assessments: The evaluation of a team’s effectiveness may include indicators such as: 1. Improvement in skills 2. Improvement in competencies 3. Increased team cohesiveness 4. Reduce staff turnover rate Note: Team performance assessment is done by project manager or by project management team for all team , not for individuals. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 40. Exam Tip: Team performance assessments evaluate the entire team for the project as a whole. It is the primary output of the Develop Project Team process. Project performance appraisals are an evaluation of an individual's performance on the project, and is a tool and technique of the Manage Project Team process Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 41. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 42. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 43. Issue Log: A written log documents and helps monitor who is responsible for resolving specific issue by target date Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 44. Observation and conversation: They are used to stay in touch with the work and attitudes of the project team members Project Performance Appraisals: Evaluation of employees’ performance by their supervision. 360-Degree Review is one of the ways to complete appraisal by including the input of coworkers, subordinates, and supervisors. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 46. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 47. Our thinking •Conflict :It’s not always a bad thing ,it gives opportunities for improvement •Conflict can be beneficial as it can shows defect in certain process •Conflict is resolved through openess,identifying the causes, problem solving by the people involved and their immediate manager •The presence of conflict is due to:  Nature of the project to fulfill many requirements of different stakeholders  Limited power of project manager  Necessity of obtaining resources from functional managers Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 48. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 49. Conflict Management Example: Forcing: Do it in this way Smoothing: Let's calm down and get the job done, I'm sure we can get to agreement about equipment need it Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 50. Compromising: Let us do a little of what both u suggest Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 51. Withdrawal / Avoid : Let's deal with this issue next week Confronting: I suggest to make more examination for this equipment's to decide correctly if we will use it or not. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 52. Causes of Conflict Schedule , Project Priority, Resources, Technical opinions, Administrative overhead, Cost, Personality Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 53. NOTE:  Conflict forces a search for alternative solutions  Conflict is a team issue  Conflict resolution focuses on issues, not personalities  Openness resolves conflict  Conflict resolution focuses on the present, not the past  Sometimes you should use withdraw or forcing as per situation  The best approach is collaborating/problem solving , The worst approach is forcing  Compromise, smoothing and withdrawing can lead to ‘lose-lose’ situations Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 54. For the project manager, there is a brief listing of interpersonal skills that not only contribute to conflict resolution scenarios but that help drive to the strengths of the project team members. Key skills are: • Leadership - imparting vision and inspiring the team to achieve high performance • Influencing - particularly important in a matrix environment in which the project manager may have little direct authority over the team members. In this case, the ability to influence stakeholders becomes a key component in project success. Effective skills in this area include:  Interactive listening skills  Clear articulation of points of view and the ability to be persuasive  Seeing all sides of the issue from your stakeholders perspectives  Being a trusted resource - not taking sides when addressing stakeholder issues • Effective decision-making - Strong negotiation skills to influence the organization for the success of the project Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 55. Past View vs Current view about conflict after study PMP Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 56. Interpersonal Skills A. Powers of project manager: Formal (Legitimate) This power is based on your position. Example: "You need to listen to me when I tell you to do this work, because I have been put in charge!“ Reward This power stems from giving rewards. Example: "I understand that you want to participate in the acceptance testing of this project. Because of your performance, I will assign you as part of that team:‘ Penalty : This power comes from the ability to penalize team members. Example: "If this does not get done on time, I will remove you from the group . Expert This power comes from being project management expert. Referent This power comes from another person liking you, respecting you, or wanting to be like you. It is the power of charisma and fame NOTE: The best forms of power are EXPERT and REWARD. Penalty is the worst form. FORMAL, REWARD, and PENALTY are powers derived from your position in the company. EXPERT power is earned on your own. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 57. B. Management and Leadership Styles:  At the beginning of project use directing styles.  At the project execution use coaching, facilitating, and supporting.  Directing: Telling others what to do.  Facilitating: Coordinating the inputs of others.  Coaching: Helping other achieve their goal.  Supporting: Providing assistance along the way.  Autocratic: Manager has power to do what he want.  Consultative: Manager obtains others’ opinions & act as servant for team  Consultative- Autocratic: Manager takes input from team members but retains decision-making authority for him self.  Consensus: Making decisions base on group agreement. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 58.  Delegation: Establish goals then give team authority to complete the work.  Bureaucratic : Following procedures exactly. Appropriate for critical work.  Charismatic: Energize and encourage team in performing.  Democratic (Participative): Team own the decision made by group.  Laissez-Faire: Leave alone/Allow to act. Manager is not directly involved in team work but consult as necessary.  Analytical: Manager asks questions to get facts.  Driver: Constantly giving directions. His attitude drives team to win.  Influencing: This style emphasizes team work, teambuilding, and team working. These managers work with their teams to influence project implementation. Influence skills include: persuasive – listening – mutual trust – consideration of various perspectives. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 59. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®  NOTES  Expectancy Theory: Employees who expect to be rewarded for their accomplishments remains productive as rewards meet their expectations.  Perquisites (Perks): Some employees receive special rewards such as assigned parking space or executive dining.  Fringe Benefits : Standard benefits formally given to all employees such as educational benefits, insurance, and profit sharing
  • 60. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 61. B- Maslow’s theory hierarchy of need: To ascend next level you should fulfill levels below. Starting from the pyramid base : 1. Physiological: Air, water, ... etc. 2. Safety: Security, Stability, ... etc. 3. Social: Like, love, friends, ... etc. 4. Esteem: Attention, respect, ... etc. 5. Self Actualization: Learning, growth, … etc. Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®
  • 62. C- David McClelland's Theory of Needs: Also Called Acquired Needs Theory  People need achievement  People need Affiliation  People need Power D- Herzberg’s Theory: 1. Hygiene Factors: Work condition, salary, security, personal life, relationship at work. 2. Motivating Agents: Responsibility, self-actualization, recognition, professional growth. Poor hygiene factors may destroy motivation but improving them will not improve motivation Prepared by Presented by: Engr. Mohamed Eid , PMP® Engr. Tarek Khairy , PMP®