This document describes the development and validation of a spectrophotometric method for the determination of the antiepileptic drug rufinamide in bulk and pharmaceutical formulations. Rufinamide forms a colored complex with the dye bromocresol green under acidic conditions that can be extracted with chloroform and measured spectrophotometrically. The method was optimized and validated according to ICH guidelines, demonstrating good linearity, precision, accuracy, and sensitivity for quantifying rufinamide concentrations between 10-50 μg/mL. The method was successfully applied to analyze rufinamide levels in commercial tablet formulations, indicating it is suitable for the routine analysis of this drug in quality control testing.