Aircraft Design
              Aero474
        Dr. Mohammad Tawfik
E-mail: Mohammad.tawfik@gmail.com


                                 Aero474
                          Aircraft Design
Preliminary design




                     Aero474
              Aircraft Design
Problem definition
• Who are the customers?
• How should we assess if the product is viable?
• Can we completely define the problem in terms that will
    be useful to the technical design process?
• What are the new/novel features that we hope to exploit
    to make our design better than the existing
    competition and to build in flexibility to cater for future
    developments?
• What is the best way to tackle the problem and how will
    this be managed?

                                                    Aero474
                                             Aircraft Design
The Customer (Stakeholders)
●   Clients
●   Operators
●   Director
●   Sales Team
●   Environmentalists
●   Politicians
●   etc...
                               Aero474
                        Aircraft Design
Aircraft Viability
 ●   How is the aircraft going to be judged?
A. W. Bishop of British Aerospace observed:

The message is clear – if everyone can agree beforehand on how to measure the effectiveness of the
design, then the designer has a much simpler task. But even if everyone does not agree, the designer
should still quantify his own ideas to give himself a sensible guide.

 ●   Investors ==> Return on investment
 ●   Civil aviation ==> Direct operating cost
 ●   Military ==> Life cycle cost
 ●   etc...

                                                                             Aero474
                                                                      Aircraft Design
Understanding the problem
●   Has the problem been considered as
    broadly as possible?
●   Have you identified all the ‘real’ constraints
    to the solution of the problem?
●   Are all the constraints reasonable?
●   Have you thoroughly examined all the non-
    technical constraints to determine their
    suitability?
                                          Aero474
                                   Aircraft Design
Innovation
●   What are the new technologies and other
    innovations that will be incorporated into
    the design?
●   How will such features provide an
    advantage over existing/competing
    aircraft?
●   How can the risk to the project be
    mitigated?
                                         Aero474
                                  Aircraft Design
Organising the design process
●   Student's Check-list
●   Team-working
●   Managing design meetings
●   Writing technical reports
●   Technical presentation



                                       Aero474
                                Aircraft Design
Student's Check-list
●   Initial Question:
    ●   What is the problem to be addressed?
    ●   What information is available?
    ●   What data on previous and competitor aircraft designs
        can be found?
    ●   Do we need to take into account any specific issues?
    ●   Can you write a complete aircraft operational
        requirement?
    ●   What aircraft concepts might be considered?

                                                   Aero474
                                            Aircraft Design
Technical Tasks
●   Which configuration?
●   Initial sizing
●   Aerodynamic and performance estimates
●   Check validity
●   Generate initial technical drawings
●   Refine initial estimates and conduct parametric study
●   Produce final drawings and perform SWOT analysis
●   Finalize report and presentation
                                                 Aero474
                                          Aircraft Design
Team-working
●   There are many advantages to the team approach to
    design:
●   Teaming brings together the strengths of a diverse group
    of people.
●   Team consensus usually results in a better product.
●   Everyone on the team has a backup person to check his
    work.
●   Sharing the task makes the job easier and more fun.
●   Teaming allows each member to use his or her talents in
    a more focused way.
                                                  Aero474
                                           Aircraft Design
Team-working
●   Teaming also has disadvantages:
●   The success of the team may be limited by its weakest
    members.
●   Some members may tend to procrastinate, delaying the
    work of the entire team.
●   Teaming makes it easier to blame problems on the least
    liked or least productive member of the team.
●   Personalities can get in the way of progress.
●   The most energetic team members usually do more than
    their fair share of the work.
                                                   Aero474
                                            Aircraft Design
Homework #2
●   Read Chapter 11 of the textbook!
●   Prepare a summary of the chapter in the form of a report
    and a presentation on it and the following
●   Prepare a task breakdown and Gantt chart for the project
    work
●   Prepare a document presenting how your meeting will be
    managed (a template for agenda and minutes should be
    developed)
●   Assign Roles including titles and responsibilities of each
    team member

                                                    Aero474
                                             Aircraft Design

02 Preliminary Design 01

  • 1.
    Aircraft Design Aero474 Dr. Mohammad Tawfik E-mail: Mohammad.tawfik@gmail.com Aero474 Aircraft Design
  • 2.
    Preliminary design Aero474 Aircraft Design
  • 3.
    Problem definition • Whoare the customers? • How should we assess if the product is viable? • Can we completely define the problem in terms that will be useful to the technical design process? • What are the new/novel features that we hope to exploit to make our design better than the existing competition and to build in flexibility to cater for future developments? • What is the best way to tackle the problem and how will this be managed? Aero474 Aircraft Design
  • 4.
    The Customer (Stakeholders) ● Clients ● Operators ● Director ● Sales Team ● Environmentalists ● Politicians ● etc... Aero474 Aircraft Design
  • 5.
    Aircraft Viability ● How is the aircraft going to be judged? A. W. Bishop of British Aerospace observed: The message is clear – if everyone can agree beforehand on how to measure the effectiveness of the design, then the designer has a much simpler task. But even if everyone does not agree, the designer should still quantify his own ideas to give himself a sensible guide. ● Investors ==> Return on investment ● Civil aviation ==> Direct operating cost ● Military ==> Life cycle cost ● etc... Aero474 Aircraft Design
  • 6.
    Understanding the problem ● Has the problem been considered as broadly as possible? ● Have you identified all the ‘real’ constraints to the solution of the problem? ● Are all the constraints reasonable? ● Have you thoroughly examined all the non- technical constraints to determine their suitability? Aero474 Aircraft Design
  • 7.
    Innovation ● What are the new technologies and other innovations that will be incorporated into the design? ● How will such features provide an advantage over existing/competing aircraft? ● How can the risk to the project be mitigated? Aero474 Aircraft Design
  • 8.
    Organising the designprocess ● Student's Check-list ● Team-working ● Managing design meetings ● Writing technical reports ● Technical presentation Aero474 Aircraft Design
  • 9.
    Student's Check-list ● Initial Question: ● What is the problem to be addressed? ● What information is available? ● What data on previous and competitor aircraft designs can be found? ● Do we need to take into account any specific issues? ● Can you write a complete aircraft operational requirement? ● What aircraft concepts might be considered? Aero474 Aircraft Design
  • 10.
    Technical Tasks ● Which configuration? ● Initial sizing ● Aerodynamic and performance estimates ● Check validity ● Generate initial technical drawings ● Refine initial estimates and conduct parametric study ● Produce final drawings and perform SWOT analysis ● Finalize report and presentation Aero474 Aircraft Design
  • 11.
    Team-working ● There are many advantages to the team approach to design: ● Teaming brings together the strengths of a diverse group of people. ● Team consensus usually results in a better product. ● Everyone on the team has a backup person to check his work. ● Sharing the task makes the job easier and more fun. ● Teaming allows each member to use his or her talents in a more focused way. Aero474 Aircraft Design
  • 12.
    Team-working ● Teaming also has disadvantages: ● The success of the team may be limited by its weakest members. ● Some members may tend to procrastinate, delaying the work of the entire team. ● Teaming makes it easier to blame problems on the least liked or least productive member of the team. ● Personalities can get in the way of progress. ● The most energetic team members usually do more than their fair share of the work. Aero474 Aircraft Design
  • 13.
    Homework #2 ● Read Chapter 11 of the textbook! ● Prepare a summary of the chapter in the form of a report and a presentation on it and the following ● Prepare a task breakdown and Gantt chart for the project work ● Prepare a document presenting how your meeting will be managed (a template for agenda and minutes should be developed) ● Assign Roles including titles and responsibilities of each team member Aero474 Aircraft Design