SlideShare a Scribd company logo
Steel Plate
Existing Ground
Vibro Hammer
Chuck
Sheet Pile FSP-III
Lokasi Pancang
Handling SSP
Bore Pile
Existing Ground
 Plat Landasan Baja : untuk menahan
alat berat dalam proses pekerjaan
Stock Yard Pile
Existing Right Side/EB
Project Area
Pagar Proyek
Steel Sheet
Pile
Steel
Sheet Pile
Existing Ground
VERY SOFT CLAY
FAT CLAY
Steel Sheet Pile
Plat
Landasan
Plat
Landasan
SSP
VERY SOFT CLAY
FAT CLAY
Existing Ground
Posisi Sheet Pile
Pagar Proyek
Guide Beam
Guide Beam
Existing Right Side/EB
Project Area
Plat
Landasan
SSP
VERY SOFT CLAY
FAT CLAY
Existing Ground
Pagar Proyek
Setting SSP
Existing Right Side/EB
Project Area
Angkat SSP
Plat
Landasan
SSP
Driving
Steel Plate
Existing Ground
Vibro Hammer
Chuck
Sheet Pile FSP-III
Vibro Hammer
Chuck
VERY SOFT CLAY
FAT CLAY
Steel Sheet Pile
Existing Ground
Project Area
Pagar Proyek
Guide Beam
Pemancangan SSP
Area
Pekerjaan
PILECAP
 Area pemancangan direncanakan
berjarak 1m dari sekeliling
pekerjaan Pilecap. Khusus untuk
proteksi jalan dan Utilitas : berjarak
5cm dari pekerjaan pilecap
 Kedalaman turap yang tertanam
minimal sedalam hasil D. actual dari
perhitungan dan perencanaan Sheet
Pile.
 P adalah Panjang Sheet Pile yang
akan digunakan.
Existing Right Side/EB
D. actual
P
Plat
Landasan
SSP
Vibro
VERY SOFT CLAY
FAT CLAY
Steel Sheet Pile
Existing Ground
Project Area
Pagar Proyek
Guide Beam
Area
Pekerjaan
PILECAP
 Kelurusan pemancangan SSP
dibantu dengan guide frame dan
tim survey sesuai gambar kerja.
 Perhatikan pemasangan
interlock-nya agar SSP saling
berikatan
Existing Right Side/EB
D. actual
P
Pindah
Lokasi
Plat
Landasan
SSP
Interlock
Posisi Interlock SSP Bagian Sudut
Interlock
Sudut
VERY SOFT CLAY
FAT CLAY
Steel Sheet Pile
Existing Ground
Project Area
Pagar Proyek
Area
Pekerjaan
PILECAP
Existing Right Side/EB
D. actual
Steel
Sheet
Pile
 Pemasangan Pengaku Sheet Pile
menggunakan Steel Waller Beam
Type U-250 berjarak 50cm dari atas
Sheet Pile.
Steel Waller
Beam
Plat
Landasan
Steel Waller
Beam Type U-250
VERY SOFT CLAY
FAT CLAY
Steel Sheet Pile
Existing Ground
Project Area
Pagar Proyek
Area
Pekerjaan
PILECAP
Existing Right Side/EB
D. actual
Steel
Sheet
Pile
 Pelepasan guide frame
 Demobilisasi alat berat
Demobilisasi
Plat
Landasan
Hasil Pemancangan
SSP
Posisi SSP Setelah Pancang
Existing Ground
Excavation Phase-1
Excavation Phase-2
Sheet Pile
Existing Ground
Excavation Phase-1
Excavation Phase-2
Sheet Pile
PC Bar Cut-off Elevation
Cut-off Pile Elevation
Bottom Pilecap Elevation
Bottom Lean Concrete Elevation
Bottom Blinding Stone Elevation
0.75
0.10
0.10
0.20
Tegangan Tanah Pasif (sp)
H = 3,00 m
2,58 m
3,00 m
Very soft clay
?1 = 15,5 kN/m3
1 = 0 o
c1 = km2 PILE CAP
GWL
q = 1 t/m3
Perencanaan Awal
Very soft clay
?2 = 15 kN/m3
2 = 0 o
c2 = km2
D
EL. +1.073
Eg. +1.573
TOP OF PILE CAP
MUKA TANAH
0,42 m
D D
Tegangan Tanah Aktif (sa)
Hasil Rencana SSP (P.min = 7 m)
Very soft clay
?1 = 15,5 kN/m3
1 = 0 o
c1 = km2 PILE CAP
GWL
q = 1 t/m3
Very soft clay
?2 = 15 kN/m3
2 = 0 o
c2 = km2
EL. +1.073
Eg. +1.573
TOP OF PILE CAP
MUKA TANAH
H = 3,00 m Galian
D = 4,00 m
P = 7,00 m
Area Pilecap
Tegangan Tanah Pasif (sp)
Tegangan Tanah Aktif (sa)
Very soft clay
?1 = 15,5 kN/m3
1 = 0 o
c1 = km2 PILE CAP
GWL
q = 1 t/m3
Very soft clay
?2 = 15 kN/m3
2 = 0 o
c2 = km2
EL. +1.073
Eg. +1.573
TOP OF PILE CAP
MUKA TANAH
H = 3,00 m
D = 4,00 m
Pt = 5,00 m
12,00 m
Galian
Area Pilecap
Ea1
Ep2
Ep1
2,86 m + D
1
2D
1
3D
Distribusi Tegangan Tanah
Aktif (sa)
Distribusi Tegangan Tanah
Pasif (sp)
0,86 m + D
1
2D
1
3D
Ea2
Ea3
Ea4
SOFT CLAY
STIFF CLAY
A
N
E
K
A
SOIL AUGER
Existing Right Side/EB
Project Area Sheet Pile
Stock Pile
Pile Driving Rig
Pile Driving Direction
Excavation Phase-1
Excavation Phase-2
Excavation Phase-1
Excavation Phase-2
Existing Ground
Excavation Phase-1
Excavation Phase-2
Existing Ground
Excavation Phase-1
Excavation Phase-2
Sheet Pile
Existing Ground
Excavation Phase-1
Excavation Phase-2
Sheet Pile
PC Bar Cut-off Elevation
Cut-off Pile Elevation
Bottom Pilecap Elevation
Bottom Lean Concrete Elevation
Bottom Blinding Stone Elevation
0.75
0.10
0.10
0.20
Existing Right Side/EB
Project Area Sheet Pile
Project Fence
START
FINISH
Existing Traffic (RS/EB)
Sheet Pile Driving Direction
Existing Traffic (RS/EB)
Stair for Climbing Up/Down
Up/Down Stair
n Stair
Sheet Pile Driving Direction
Existing Traffic (RS/EB)
Sheet Pile Driving Direction
Existing Traffic (RS/EB)
Sheet
Pile
Driving
Direction
START
FINISH
PROJECT FENCE
Existing Ground
Excavation Phase-1
Excavation Phase-2
Existing Ground
Excavation Phase-1
Excavation Phase-2
Sheet Pile
Existing Ground
Excavation Phase-1
Excavation Phase-2
Sheet Pile
PC Bar Cut-off Elevation
Cut-off Pile Elevation
Bottom Pilecap Elevation
Bottom Lean Concrete Elevation
Bottom Blinding Stone Elevation
0.75
0.10
0.10
0.20
Existing Right Side/EB
Project Area Sheet Pile
Project Fence
START
FINISH
Sheet Pile Driving Direction
Existing Traffic (RS/EB)
Existing Traffic (RS/EB)
Stair for Climbing Up/Down
Up/Down Stair
n Stair
Sheet Pile Driving Direction
Existing Traffic (RS/EB)
Sheet Pile Driving Direction
Existing Traffic (RS/EB)
Sheet
Pile
Driving
Direction
START
FINISH
PROJECT FENCE
Existing Right Side/EB
Project Area Sheet Pile
Stock Pile
Pile Driving Rig
Pile Driving Direction
14500
500 13500 500
200 14500
500
13500
500
G1 G2 G3 G4
C
L PIER (N) C
L PIER (S)
1900 3 @3566.7 = 10700 1900 1900
3 @3566.7 = 10700
1900
+2%
G1
G2
G3
G4
+2%
FG. +10.050
FG. +10.320
FG. +10.050
FG. +10.320
El. +2.187
Excavation Phase-1
Excavation Phase-2
Excavation Phase-3
Excavation Phase-1
Excavation Phase-2
Excavation Phase-3
SHEET PIL
SHEET PIL
DOLKEN
Start
(RS)
Finish
(RS)
Start
(RS)
Finish
(LS)
Existing Arterial Road
RS (EB)
Existing Arterial Road
LS (WB)
SHEET PILE
SHEET PILE
DOLKEN
SHEET PILE
SHEET PILE
DOLKEN
SHEET PILE
SHEET PILE
DOLKEN
Existing Ground
Vibro Hammer
Chuck
Lifting
Steel Plate
Sheet Pile FSP-III
Existing Ground
Vibro Hammer
Chuck
Driving
Steel Plate
Sheet Pile FSP-III
Using suitable existing soil
material (below -3m don’t have to
be compacted
Using suitable existing soil
material, above -3m (must be
compact layer by layer @ 20cm
thick)
Or
PC Spun Pile
5 m 5 m
Vibro Roller
3cm
3cm
L = 4 m
15 ~ 20 cm

More Related Content

Similar to 0.0 Gambar Metoda Kerja_Sheet Pile.pptx

PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptxPPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
AGNIVORAY1
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)
Chong jiayi
 
Lecture three.pptx
Lecture three.pptxLecture three.pptx
Lecture three.pptx
Osman Abdi Kulane
 
s-Presentation-1ST 4 KM
s-Presentation-1ST 4 KMs-Presentation-1ST 4 KM
s-Presentation-1ST 4 KM
Svet Dotchev
 
Audiotorium Calcs.pdf
Audiotorium Calcs.pdfAudiotorium Calcs.pdf
Audiotorium Calcs.pdf
mjnasarkhanjamal
 
Ns eco pile
Ns eco pileNs eco pile
Marks Sess13 102309
Marks Sess13 102309Marks Sess13 102309
Tsps
TspsTsps
Computer aided analysis and design of multi story building
Computer aided analysis and design of multi story buildingComputer aided analysis and design of multi story building
Computer aided analysis and design of multi story building
paras6904
 
06 bridge
06 bridge06 bridge
06 bridge
Cida Feitosa
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slab
Deepak Patil
 
Underground expansion of Drents Museum-005
Underground expansion of Drents Museum-005Underground expansion of Drents Museum-005
Underground expansion of Drents Museum-005
Marco Peters
 
WEEKLY ACTIVITY REPORT 22.pptx
WEEKLY ACTIVITY REPORT 22.pptxWEEKLY ACTIVITY REPORT 22.pptx
WEEKLY ACTIVITY REPORT 22.pptx
jongLac
 
ICDE2008, Singapore
ICDE2008, SingaporeICDE2008, Singapore
ICDE2008, Singapore
Tong Seng Chua
 
SW Presentation-SC (05.09.2021).pptx
SW Presentation-SC (05.09.2021).pptxSW Presentation-SC (05.09.2021).pptx
SW Presentation-SC (05.09.2021).pptx
LeDuc49898
 
Design Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost AnalysisDesign Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost Analysis
Michael Masi, Jr. Eng.
 
B structure final final
B structure final finalB structure final final
B structure final final
杉 江紫
 
B structure final_c
B structure final_cB structure final_c
B structure final_c
leejanett3
 
site monitoring project
site monitoring projectsite monitoring project
site monitoring project
Antonella Gennusa
 
6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjs6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjs
BrajeshRanjanAcharya
 

Similar to 0.0 Gambar Metoda Kerja_Sheet Pile.pptx (20)

PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptxPPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)
 
Lecture three.pptx
Lecture three.pptxLecture three.pptx
Lecture three.pptx
 
s-Presentation-1ST 4 KM
s-Presentation-1ST 4 KMs-Presentation-1ST 4 KM
s-Presentation-1ST 4 KM
 
Audiotorium Calcs.pdf
Audiotorium Calcs.pdfAudiotorium Calcs.pdf
Audiotorium Calcs.pdf
 
Ns eco pile
Ns eco pileNs eco pile
Ns eco pile
 
Marks Sess13 102309
Marks Sess13 102309Marks Sess13 102309
Marks Sess13 102309
 
Tsps
TspsTsps
Tsps
 
Computer aided analysis and design of multi story building
Computer aided analysis and design of multi story buildingComputer aided analysis and design of multi story building
Computer aided analysis and design of multi story building
 
06 bridge
06 bridge06 bridge
06 bridge
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slab
 
Underground expansion of Drents Museum-005
Underground expansion of Drents Museum-005Underground expansion of Drents Museum-005
Underground expansion of Drents Museum-005
 
WEEKLY ACTIVITY REPORT 22.pptx
WEEKLY ACTIVITY REPORT 22.pptxWEEKLY ACTIVITY REPORT 22.pptx
WEEKLY ACTIVITY REPORT 22.pptx
 
ICDE2008, Singapore
ICDE2008, SingaporeICDE2008, Singapore
ICDE2008, Singapore
 
SW Presentation-SC (05.09.2021).pptx
SW Presentation-SC (05.09.2021).pptxSW Presentation-SC (05.09.2021).pptx
SW Presentation-SC (05.09.2021).pptx
 
Design Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost AnalysisDesign Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost Analysis
 
B structure final final
B structure final finalB structure final final
B structure final final
 
B structure final_c
B structure final_cB structure final_c
B structure final_c
 
site monitoring project
site monitoring projectsite monitoring project
site monitoring project
 
6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjs6-Eccecntric Footing.pdf shajasjakssjssjwjs
6-Eccecntric Footing.pdf shajasjakssjssjwjs
 

Recently uploaded

美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
balliuvilla512
 
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
evnum
 
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
uhynup
 
按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
evnum
 
LinkedIn Strategic Guidelines for June 2024
LinkedIn Strategic Guidelines  for June 2024LinkedIn Strategic Guidelines  for June 2024
LinkedIn Strategic Guidelines for June 2024
Bruce Bennett
 
Learnings from Successful Jobs Searchers
Learnings from Successful Jobs SearchersLearnings from Successful Jobs Searchers
Learnings from Successful Jobs Searchers
Bruce Bennett
 
美洲杯体育投注-美洲杯体育投注推荐-美洲杯体育投注|【​网址​🎉ac10.net🎉​】
美洲杯体育投注-美洲杯体育投注推荐-美洲杯体育投注|【​网址​🎉ac10.net🎉​】美洲杯体育投注-美洲杯体育投注推荐-美洲杯体育投注|【​网址​🎉ac10.net🎉​】
美洲杯体育投注-美洲杯体育投注推荐-美洲杯体育投注|【​网址​🎉ac10.net🎉​】
hanniaarias53
 
0624.CV_studentscholarandacademic-02.pdf
0624.CV_studentscholarandacademic-02.pdf0624.CV_studentscholarandacademic-02.pdf
0624.CV_studentscholarandacademic-02.pdf
Thomas GIRARD BDes
 
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
lemike859
 
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
waldorfnorma258
 
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
nguqayx
 
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
kkkkr4pg
 
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
gnokue
 
LinkedIn for Your Job Search June 17, 2024
LinkedIn for Your Job Search June  17, 2024LinkedIn for Your Job Search June  17, 2024
LinkedIn for Your Job Search June 17, 2024
Bruce Bennett
 
0624.CV_studentscholarandacademic-01.pdf
0624.CV_studentscholarandacademic-01.pdf0624.CV_studentscholarandacademic-01.pdf
0624.CV_studentscholarandacademic-01.pdf
Thomas GIRARD BDes
 
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
1wful2fm
 
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
zukou
 
世预赛买球-世预赛买球下注平台-世预赛买球投注平台|【​网址​🎉ac10.net🎉​】
世预赛买球-世预赛买球下注平台-世预赛买球投注平台|【​网址​🎉ac10.net🎉​】世预赛买球-世预赛买球下注平台-世预赛买球投注平台|【​网址​🎉ac10.net🎉​】
世预赛买球-世预赛买球下注平台-世预赛买球投注平台|【​网址​🎉ac10.net🎉​】
terkesimamishy540
 
Parabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position FeedbackParabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position Feedback
StevenPatrick17
 
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
yhkox
 

Recently uploaded (20)

美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
 
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
 
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
 
按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
 
LinkedIn Strategic Guidelines for June 2024
LinkedIn Strategic Guidelines  for June 2024LinkedIn Strategic Guidelines  for June 2024
LinkedIn Strategic Guidelines for June 2024
 
Learnings from Successful Jobs Searchers
Learnings from Successful Jobs SearchersLearnings from Successful Jobs Searchers
Learnings from Successful Jobs Searchers
 
美洲杯体育投注-美洲杯体育投注推荐-美洲杯体育投注|【​网址​🎉ac10.net🎉​】
美洲杯体育投注-美洲杯体育投注推荐-美洲杯体育投注|【​网址​🎉ac10.net🎉​】美洲杯体育投注-美洲杯体育投注推荐-美洲杯体育投注|【​网址​🎉ac10.net🎉​】
美洲杯体育投注-美洲杯体育投注推荐-美洲杯体育投注|【​网址​🎉ac10.net🎉​】
 
0624.CV_studentscholarandacademic-02.pdf
0624.CV_studentscholarandacademic-02.pdf0624.CV_studentscholarandacademic-02.pdf
0624.CV_studentscholarandacademic-02.pdf
 
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
 
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
 
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
 
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
 
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
 
LinkedIn for Your Job Search June 17, 2024
LinkedIn for Your Job Search June  17, 2024LinkedIn for Your Job Search June  17, 2024
LinkedIn for Your Job Search June 17, 2024
 
0624.CV_studentscholarandacademic-01.pdf
0624.CV_studentscholarandacademic-01.pdf0624.CV_studentscholarandacademic-01.pdf
0624.CV_studentscholarandacademic-01.pdf
 
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
 
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
 
世预赛买球-世预赛买球下注平台-世预赛买球投注平台|【​网址​🎉ac10.net🎉​】
世预赛买球-世预赛买球下注平台-世预赛买球投注平台|【​网址​🎉ac10.net🎉​】世预赛买球-世预赛买球下注平台-世预赛买球投注平台|【​网址​🎉ac10.net🎉​】
世预赛买球-世预赛买球下注平台-世预赛买球投注平台|【​网址​🎉ac10.net🎉​】
 
Parabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position FeedbackParabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position Feedback
 
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
 

0.0 Gambar Metoda Kerja_Sheet Pile.pptx