Society of Petroleum Engineers
Distinguished Lecturer Program
www.spe.org/dl
1
Professor Ron McLeod
Ron McLeod Ltd.
Human Factors in Barrier Thinking
Objectives
• Explore the role that human performance has in layers-of-
defences strategies
• Consider what Independence and Effectiveness mean for
Human Factors
• Demonstrate how controls reflect an organizations Intentions
and Expectations of human behaviour and performance
• Illustrate how those Intentions and Expectations can be
defeated in the real-world.
2
Content
1. Basic concepts in Barrier Thinking
• Bow-Tie Analysis
• Criteria for robust barriesr
2. Human Factors in control Independence
• Example: Fuel spill during tank filling
3. Human Factors in control Effectiveness
• The importance of understanding Intentions and Expectation
4. Lessons from reality: Buncefield
5. Five challenges in assuring human controls
3
Basic Concepts in Barrier
Thinking
Bow-Tie analysis
Criteria for robust barriers
A Conceptual Model
Losses
EVENT
Human
Organisational
Engineered
Threats
Layers of Protection Analysis
Standards
• IEC 61508, 2003
– Functional safety of electrical. Electronic. Programmable electronic safety-related
systems
• IEC 61511, 2010
– Functional Safety – Safety Instrumented systems for the process industry sector
Good Practices
• Process Safety Leadership Group, 2010
– Safety and environmental standards for fuel storage sites
• Centre for Chemical Process Safety, 2015
– Guidelines for initiating events and independent protection layers in layers of
protection analysis
“Human factors appear to dominate ….in all the LOPA studies assessed in this work”
(Chambers, et al, 2009)
Bowtie Analysis
ConsequenceThreat
Hazard
Top
Event
Degradation
Factor Barrier
• Critical Equipment
– Physical structures or equipment that support a control.
• Critical Activities
– Human tasks necessary to assure the integrity of structural or equipment
controls.
• Critical Positions
– Roles responsible for the performance of Critical Activities.
Barrier Barrier Barrier Barrier
Degradation
Factor Barrier
Current industry initiatives
• Chartered Institute of Ergonomics and Human Factors
(CIEHF)
– White paper: “Human factors in Barrier Thinking”
• Expected early 2017
• Centre for Chemical Process Safety (CCPS)
– Concept Book: “BowTies for Risk Management”
• Energy Institute, EPSC, AICHE, AIDC
• Lyondellbasel, Braskem, Linde, ABS, Eni, Phillips66, Shell,
BP, BHPBilliton
• Expected 2017
Criteria for good barriers
Every barrier should be:
Specific:
Specific actor, specific object, specific goal
Effective:
It – and it alone - must be capable of blocking the threat
Independent:
A single failure should not be able to defeat more than one control
Capable of being Assured:
Be implemented so it is capable of functioning as intended
Be in-place, maintained and supported.
9
• An issued Bowtie Analysis is a very strong statement of
intent.
– It sets out what the organisation intends to do to
protect its workers, the public and the environment.
• The organisation chooses which controls it intends to rely
on.
• If controls are not sufficiently robust, they should not be
relied on.
Note!
10
Human Factors in Control
Independence
Independence: A single failure should not be
able to defeat more than one control
11
A hypothetical Bowtie for tank
filling
Top Event = Spill of flammable fuel during tank filling
Fuel
spill
Tank
overfill
Flammable
Fuel
Transfer
plan
Fuel level
displayed in
control room
High Level
Alarm
High-High
Level Alarm
Independent
Shut-off
Experienced
operator
monitors fill
Are the controls specific?
Fuel
spill
Tank
overfill
Flammable
Fuel
Transfer
plan
Fuel level
displayed in
control room
High Level
Alarm
High-High
Level Alarm
Independent
Shut-off
Experienced
operator
monitors fill
- Specific Actor?
- Specific Object?
- Specific Goal?
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
Are the controls Independent?
Fuel
spill
Tank
overfill
Flammable
Fuel
Transfer
plan
High Level
Alarm
High-High
Level Alarm
Independent
Shut-off
Fuel level
displayed in
control room
Experienced
operator
monitors fill
Human Factors issues in control
Independence
• Organisational factors can influence all operators
– Chain of Command; Incentives; Contracts
• Cross-checking by another operator is often not
independent
• Often, there is no-one else.
UK Process Safety Leadership Group
“…the intended independence of the checking process may not in fact be
achieved . .”
Swain & Guttman, 1983
“…the behaviour of an operator and a checker are not independent”.
Level Guage
Independent High
Level Switch
Are the controls Independent?
Fuel
spill
Tank
overfill
Flammable
Fuel
Transfer
plan
High Level
Alarm
High-High
Level Alarm
Independent
Shut-off
Fuel level
displayed in
control room
Experienced
operator
monitors fill
Proactive
operator
monitoring
Tank level
alarm and
operator
response
Are the barriers Effective?
What is Intended and what is Expected?
Tank
overfill
Flammable
Fuel
Tank level
alarms
Independent
Shut-Off
Proactive
operator
monitoring
Transfer
Fuel
spill
Intentions and Expectations
• Intentions
– Things the proposers intends to ensure are in place for the Barrier
to function
– Are within the scope of supply of the proposers
– Will often be about the design of the work environment and
equipment interfaces
• Expectations
– Are not within the proposers scope of supply.
– But must be assumed to be true for a control to be considered
effective.
– Will often be about organisational arrangements and operational
and commercial practices
Examples of Intentions
Tank
overfill
Flammable
Fuel
Tank level
alarms
Independent
Shut-Off
Proactive
operator
monitoring
Transfer
• …will be fit for the purpose
• …will be set at appropriate levels
• …will be effective in attracting the operators’ attention
• …will make the operator aware of the problem in good
time…
• …
And that
• …operators will know if the alarm is not working…
• …
“Our intention is that the tank level alarms…
Fuel
spill
Examples of Expectations
Tank
overfill
Flammable
Fuel
Tank level
alarms
Independent
Shut-Off
Proactive
operator
monitoring
Transfer
Fuel
spill
• …the alarms will be installed and maintained correctly
• …operators will be present and in a fit state to respond
• …operators will be trained and competent to know what an alarm means and how
to respond
• …operators will do what is needed in time…
And that
• …operators will report known faults
• …reported faults will be fixed
• ..operators will not initiate a fuel transfer if the alarm system is not working…
“Our expectations are that …
After test of HF Independence
Tank
overfill
Flammable
Fuel
Tank level
alarms
Independent
Shut-Off
Proactive
operator
monitoring
Transfer
Unexpected
change to
plan
Communications
with supplier
Operator
does not
monitor
proactively
Job design and
work
arrangements
allow effective
proactive
monitoring
Operators
understand
safety critical
nature of
operation
Tank level
sensor does
not function
Regular
Routine
Maintenance
and testing
Independent
shut-off does
not function
Regular
Routine
Maintenance
and testing
Fuel
spill
Using independent
data sources
Same operator ?
+ Degradation Factors and their safeguards
Buncefield Fuel Storage
Depot - Dec 11 2005
• Sat 10 Dec, 18:50
– Receipt of parcel of unleaded
fuel initiated into tank 912
• Sunday 11 Dec, 05:37
– Tank capacity exceeded.
Fuel began to spill
• 06:00
– Vapour cloud ignited
– 250,000l fuel
• Fire burned for 5 days
– 0 Fatalities
– 40 injuries
– Major economic and social
disturbance
Why did it happen?
1. Failure of automatic tank gauging system
2. Failure of independent high-level switch
Health and Safety Executive: “Buncefield: Why did it happen? The underlying causes of the
explosion and fire at the Buncefield oil storage depot, Hemel Hempstead, Hertfordshire on 11 December
2005”. http://www.hse.gov.uk/comah/investigation-reports.htm.
22
How did the tank level alarms
perform at Buncefield?
Tank
overfill
Flammable
Fuel
Tank level
alarms
Independent
Shut-Off
Proactive
operator
monitoring
Transfer
Tank level
sensor does
not function
Routine
Maintenance
and testing
Fuel
spill
There were no alarms…
“At 0305 hrs on Sunday 11 December the ATG display
…stopped registering the rising level of fuel in the tank..”
• The control room operators had nothing to draw their attention to the fact
that the alarm had failed
• There was a history of repeated failure and unreliability of these alarms
• The same control room operators who knew the alarms were unreliable
continued to rely on them.
It had stuck 14 times during the three months before the incident
Intention: “…operators will know if the alarm is
not working…”
Expectation: “..operators will not initiate a fuel
transfer if the alarm system is not working…”
What happened at Buncefield?
Tank
overfill
Flammable
Fuel
Tank level
alarms
Independent
Shut-Off
Proactive
operator
monitoring
Transfer
Unexpected
change to
plan
Communications
with supplier
Operator
does not
monitor
proactively
Job design and
work
arrangements
allow effective
proactive
monitoring
Operators
understand
safety critical
nature of
operation
Tank level
sensor does
not function
Regular
Routine
Maintenance
and testing
Independent
shut-off does
not function
Regular
Routine
Maintenance
and testing
Fuel
spill
“..the flow rate.. changed from
550 to 900 m3/h without the
knowledge of the supervisors.”
“The supervisors
relied on the alarms
to control the filling
process.”
“The servo-gauge
had stuck..”
“..was installed
without the
padlock.”
Proactive operator monitoring
Tank
overfill
Flammable
Fuel
Tank level
alarms
Independent
Shut-Off
Proactive
operator
monitoring
Transfer
Operator
does not
monitor
proactively
Job design and
work
arrangements
allow effective
proactive
monitoring
Operators
understand
safety critical
nature of
operation
Fuel
spill
What is Intended and what is Expected?
Pro-active operator monitoring
Examples of intentions
• The design of the control room and instrumentation will provide all of the information
and controls needed.
– Without relying on the tank level sensors.
• Operators will be able to access, understand and use the information and controls.
• Etc…
Examples of expectations
• The operators job will be designed to support proactive monitoring
– Simultaneous tasks will not interfere with the operator’s ability to monitor the
transfer
– The operator will not be incentivised to give pro-active monitoring a low priority
– Etc..
• Operators will check the progress of the transfer frequently enough and while they
have time to intervene, without prompting.
• Etc…
Five Human Factors challenges
1. What exactly is the control?
– What is intended and what is expected of human performance?
2. Who will be involved?
– Who Detects? Who Decides? Who Acts?
3. What information will they need?
– Where will they get it?
4. What judgements or decisions will they need to make?
– Are they reasonable in the conditions?
– Could safety compete with production?
5. What actions will they need to take?
– Will they have the time?
– How and when will they know they were succesful?
In summary
• Considered what Independence and Effectiveness
mean for controls that rely on people
• Demonstrated that controls reflect the organizations
Intentions and Expectations of human performance
• Illustrated how those intentions and expectations can
be defeated in the real-world.
• Suggested 5 challenges to ensure human controls are
as robust as they reasonably can be.
29
Challenges and Take-Aways
• How many of the controls/barriers your business
relies on depend on human performance?
– Operations/ Maintenance/ Inspection / Support
• Would you know exactly what those controls are?
– What is Intended and what is Expected of your people?
• How does your business ensure those human
controls are as robust as they reasonably can be?
– That intentions are actually implemented
– That expectations are managed during planning and operations
30
Look our for….
• CIEHF White paper: “Human factors in Barrier
Thinking”
• Expected early 2017
• CCPS Concept Book: “BowTies for Risk
Management”
• Expected 2017
Thank you for your attention
Any Questions?
ron@ronmcleod.com
www.ronmcleod.com
32
Society of Petroleum Engineers
Distinguished Lecturer Program
www.spe.org/dl 33
Your Feedback is Important
Enter your section in the DL Evaluation Contest by
completing the evaluation form for this presentation
Visit SPE.org/dl

More Related Content

What's hot

Slips, Trips Falls
Slips, Trips  FallsSlips, Trips  Falls
Slips, Trips Falls
John Moning
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safety
Prudhvi raj
 
HSE Annual Performance
HSE Annual PerformanceHSE Annual Performance
HSE Annual Performance
Arun Kumar
 
Health & safety training
Health & safety trainingHealth & safety training
Health & safety training
Harvey Allen
 

What's hot (20)

Rig move safety
Rig move safety Rig move safety
Rig move safety
 
Slips, Trips Falls
Slips, Trips  FallsSlips, Trips  Falls
Slips, Trips Falls
 
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYHEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
 
Pause card shell
Pause card shellPause card shell
Pause card shell
 
7 Keys for Creating A Safety Culture
7 Keys for Creating A Safety Culture7 Keys for Creating A Safety Culture
7 Keys for Creating A Safety Culture
 
Behaviour based safety and prevention of accidents in industries
Behaviour based safety and prevention of accidents in industriesBehaviour based safety and prevention of accidents in industries
Behaviour based safety and prevention of accidents in industries
 
Process safety management system
Process safety management systemProcess safety management system
Process safety management system
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Lockout/Tagout
Lockout/TagoutLockout/Tagout
Lockout/Tagout
 
Behaviour based safety
Behaviour based safetyBehaviour based safety
Behaviour based safety
 
Accident Investigation by ESAO
Accident Investigation by ESAOAccident Investigation by ESAO
Accident Investigation by ESAO
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
 
BBS TRAINING.pptx
BBS TRAINING.pptxBBS TRAINING.pptx
BBS TRAINING.pptx
 
HSE Annual Performance
HSE Annual PerformanceHSE Annual Performance
HSE Annual Performance
 
Hazard identification
Hazard identificationHazard identification
Hazard identification
 
LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
 
Safety and the supervisor
Safety and the supervisorSafety and the supervisor
Safety and the supervisor
 
Root Cause Analysis and Accident Investigation
Root Cause Analysis and Accident InvestigationRoot Cause Analysis and Accident Investigation
Root Cause Analysis and Accident Investigation
 
Safety evaluation Best practices-04.11.10
Safety evaluation   Best practices-04.11.10Safety evaluation   Best practices-04.11.10
Safety evaluation Best practices-04.11.10
 
Health & safety training
Health & safety trainingHealth & safety training
Health & safety training
 

Similar to Human Factors in Barrier Thinking

Quality Management System
Quality Management SystemQuality Management System
Quality Management System
Dennis J Morgan
 
PSF_Introduction_202010-2.pptx
PSF_Introduction_202010-2.pptxPSF_Introduction_202010-2.pptx
PSF_Introduction_202010-2.pptx
ssuserbd52c0
 
dokumen.tips_the-blowout-contingency-plan-contingency-and-response-.pdf
dokumen.tips_the-blowout-contingency-plan-contingency-and-response-.pdfdokumen.tips_the-blowout-contingency-plan-contingency-and-response-.pdf
dokumen.tips_the-blowout-contingency-plan-contingency-and-response-.pdf
XolaniRadebeRadebe
 
An Organisation-wide Investigation into the Human Factors-Related Causes of H...
An Organisation-wide Investigation into the Human Factors-Related Causes of H...An Organisation-wide Investigation into the Human Factors-Related Causes of H...
An Organisation-wide Investigation into the Human Factors-Related Causes of H...
Lloyd's Register Energy
 

Similar to Human Factors in Barrier Thinking (20)

Human Factors in Barrier Thinking
Human Factors in Barrier ThinkingHuman Factors in Barrier Thinking
Human Factors in Barrier Thinking
 
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
Hiatt, Jennifer, GHD Services, Spill Plans Made Simple, Avoiding Noncomplianc...
 
chapter 2 Maintenance.pptx
chapter 2 Maintenance.pptxchapter 2 Maintenance.pptx
chapter 2 Maintenance.pptx
 
Audit Efficiency and Effectiveness
Audit Efficiency and EffectivenessAudit Efficiency and Effectiveness
Audit Efficiency and Effectiveness
 
Critical hazard management system hasm presentation
Critical hazard management system  hasm presentationCritical hazard management system  hasm presentation
Critical hazard management system hasm presentation
 
management of change
management of changemanagement of change
management of change
 
Critical Hazard in Management system
Critical Hazard in Management systemCritical Hazard in Management system
Critical Hazard in Management system
 
Cswip 11-01 - plant inspection- Week 1 cours
Cswip 11-01 - plant inspection- Week 1 coursCswip 11-01 - plant inspection- Week 1 cours
Cswip 11-01 - plant inspection- Week 1 cours
 
SiteFM Interim Life Safety Measures Webinar
SiteFM Interim Life Safety Measures WebinarSiteFM Interim Life Safety Measures Webinar
SiteFM Interim Life Safety Measures Webinar
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
 
Effective Storage Tank Risk Management
Effective Storage Tank Risk ManagementEffective Storage Tank Risk Management
Effective Storage Tank Risk Management
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
Improving reliability thru automation projects r4
Improving reliability thru automation projects r4Improving reliability thru automation projects r4
Improving reliability thru automation projects r4
 
PSF_Introduction_202010-2.pptx
PSF_Introduction_202010-2.pptxPSF_Introduction_202010-2.pptx
PSF_Introduction_202010-2.pptx
 
dokumen.tips_the-blowout-contingency-plan-contingency-and-response-.pdf
dokumen.tips_the-blowout-contingency-plan-contingency-and-response-.pdfdokumen.tips_the-blowout-contingency-plan-contingency-and-response-.pdf
dokumen.tips_the-blowout-contingency-plan-contingency-and-response-.pdf
 
Bow tie.pdf
Bow tie.pdfBow tie.pdf
Bow tie.pdf
 
Hemp final
Hemp finalHemp final
Hemp final
 
IG1 Element 4.pptx
IG1 Element 4.pptxIG1 Element 4.pptx
IG1 Element 4.pptx
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
An Organisation-wide Investigation into the Human Factors-Related Causes of H...
An Organisation-wide Investigation into the Human Factors-Related Causes of H...An Organisation-wide Investigation into the Human Factors-Related Causes of H...
An Organisation-wide Investigation into the Human Factors-Related Causes of H...
 

More from Society of Petroleum Engineers

More from Society of Petroleum Engineers (20)

Who Owns the Oil? The How and Why of Unitization
Who Owns the Oil? The How and Why of UnitizationWho Owns the Oil? The How and Why of Unitization
Who Owns the Oil? The How and Why of Unitization
 
Compositional Simulations that is Truly Compositional - Russell Johns
Compositional Simulations that is Truly Compositional - Russell JohnsCompositional Simulations that is Truly Compositional - Russell Johns
Compositional Simulations that is Truly Compositional - Russell Johns
 
A performance-based approach for developing upstream professionals - Salam Sa...
A performance-based approach for developing upstream professionals - Salam Sa...A performance-based approach for developing upstream professionals - Salam Sa...
A performance-based approach for developing upstream professionals - Salam Sa...
 
Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...
Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...
Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...
 
Thriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van DomelenThriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van Domelen
 
The Fracts of Life - Martin Rylance
The Fracts of Life - Martin RylanceThe Fracts of Life - Martin Rylance
The Fracts of Life - Martin Rylance
 
Vulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem LawalVulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem Lawal
 
CO2 in the Subsurface - From EOR to Storage
CO2 in the Subsurface - From EOR to StorageCO2 in the Subsurface - From EOR to Storage
CO2 in the Subsurface - From EOR to Storage
 
Paul Mitchell
Paul MitchellPaul Mitchell
Paul Mitchell
 
Mark Van Domelen
Mark Van DomelenMark Van Domelen
Mark Van Domelen
 
Srikanta Mishra
Srikanta MishraSrikanta Mishra
Srikanta Mishra
 
Silviu Livescu
Silviu LivescuSilviu Livescu
Silviu Livescu
 
Roberto Aguilera
Roberto AguileraRoberto Aguilera
Roberto Aguilera
 
Robert Hawkes
Robert HawkesRobert Hawkes
Robert Hawkes
 
Leroy Ledgerwood
Leroy LedgerwoodLeroy Ledgerwood
Leroy Ledgerwood
 
John Hedengren
John HedengrenJohn Hedengren
John Hedengren
 
Jim Galford
Jim GalfordJim Galford
Jim Galford
 
Hank Rawlins
Hank RawlinsHank Rawlins
Hank Rawlins
 
George Stosur
George StosurGeorge Stosur
George Stosur
 
Cosan Ayan
Cosan AyanCosan Ayan
Cosan Ayan
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 

Human Factors in Barrier Thinking

  • 1. Society of Petroleum Engineers Distinguished Lecturer Program www.spe.org/dl 1 Professor Ron McLeod Ron McLeod Ltd. Human Factors in Barrier Thinking
  • 2. Objectives • Explore the role that human performance has in layers-of- defences strategies • Consider what Independence and Effectiveness mean for Human Factors • Demonstrate how controls reflect an organizations Intentions and Expectations of human behaviour and performance • Illustrate how those Intentions and Expectations can be defeated in the real-world. 2
  • 3. Content 1. Basic concepts in Barrier Thinking • Bow-Tie Analysis • Criteria for robust barriesr 2. Human Factors in control Independence • Example: Fuel spill during tank filling 3. Human Factors in control Effectiveness • The importance of understanding Intentions and Expectation 4. Lessons from reality: Buncefield 5. Five challenges in assuring human controls 3
  • 4. Basic Concepts in Barrier Thinking Bow-Tie analysis Criteria for robust barriers
  • 6. Layers of Protection Analysis Standards • IEC 61508, 2003 – Functional safety of electrical. Electronic. Programmable electronic safety-related systems • IEC 61511, 2010 – Functional Safety – Safety Instrumented systems for the process industry sector Good Practices • Process Safety Leadership Group, 2010 – Safety and environmental standards for fuel storage sites • Centre for Chemical Process Safety, 2015 – Guidelines for initiating events and independent protection layers in layers of protection analysis “Human factors appear to dominate ….in all the LOPA studies assessed in this work” (Chambers, et al, 2009)
  • 7. Bowtie Analysis ConsequenceThreat Hazard Top Event Degradation Factor Barrier • Critical Equipment – Physical structures or equipment that support a control. • Critical Activities – Human tasks necessary to assure the integrity of structural or equipment controls. • Critical Positions – Roles responsible for the performance of Critical Activities. Barrier Barrier Barrier Barrier Degradation Factor Barrier
  • 8. Current industry initiatives • Chartered Institute of Ergonomics and Human Factors (CIEHF) – White paper: “Human factors in Barrier Thinking” • Expected early 2017 • Centre for Chemical Process Safety (CCPS) – Concept Book: “BowTies for Risk Management” • Energy Institute, EPSC, AICHE, AIDC • Lyondellbasel, Braskem, Linde, ABS, Eni, Phillips66, Shell, BP, BHPBilliton • Expected 2017
  • 9. Criteria for good barriers Every barrier should be: Specific: Specific actor, specific object, specific goal Effective: It – and it alone - must be capable of blocking the threat Independent: A single failure should not be able to defeat more than one control Capable of being Assured: Be implemented so it is capable of functioning as intended Be in-place, maintained and supported. 9
  • 10. • An issued Bowtie Analysis is a very strong statement of intent. – It sets out what the organisation intends to do to protect its workers, the public and the environment. • The organisation chooses which controls it intends to rely on. • If controls are not sufficiently robust, they should not be relied on. Note! 10
  • 11. Human Factors in Control Independence Independence: A single failure should not be able to defeat more than one control 11
  • 12. A hypothetical Bowtie for tank filling Top Event = Spill of flammable fuel during tank filling Fuel spill Tank overfill Flammable Fuel Transfer plan Fuel level displayed in control room High Level Alarm High-High Level Alarm Independent Shut-off Experienced operator monitors fill
  • 13. Are the controls specific? Fuel spill Tank overfill Flammable Fuel Transfer plan Fuel level displayed in control room High Level Alarm High-High Level Alarm Independent Shut-off Experienced operator monitors fill - Specific Actor? - Specific Object? - Specific Goal? ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔
  • 14. Are the controls Independent? Fuel spill Tank overfill Flammable Fuel Transfer plan High Level Alarm High-High Level Alarm Independent Shut-off Fuel level displayed in control room Experienced operator monitors fill
  • 15. Human Factors issues in control Independence • Organisational factors can influence all operators – Chain of Command; Incentives; Contracts • Cross-checking by another operator is often not independent • Often, there is no-one else. UK Process Safety Leadership Group “…the intended independence of the checking process may not in fact be achieved . .” Swain & Guttman, 1983 “…the behaviour of an operator and a checker are not independent”.
  • 16. Level Guage Independent High Level Switch Are the controls Independent? Fuel spill Tank overfill Flammable Fuel Transfer plan High Level Alarm High-High Level Alarm Independent Shut-off Fuel level displayed in control room Experienced operator monitors fill Proactive operator monitoring Tank level alarm and operator response
  • 17. Are the barriers Effective? What is Intended and what is Expected? Tank overfill Flammable Fuel Tank level alarms Independent Shut-Off Proactive operator monitoring Transfer Fuel spill
  • 18. Intentions and Expectations • Intentions – Things the proposers intends to ensure are in place for the Barrier to function – Are within the scope of supply of the proposers – Will often be about the design of the work environment and equipment interfaces • Expectations – Are not within the proposers scope of supply. – But must be assumed to be true for a control to be considered effective. – Will often be about organisational arrangements and operational and commercial practices
  • 19. Examples of Intentions Tank overfill Flammable Fuel Tank level alarms Independent Shut-Off Proactive operator monitoring Transfer • …will be fit for the purpose • …will be set at appropriate levels • …will be effective in attracting the operators’ attention • …will make the operator aware of the problem in good time… • … And that • …operators will know if the alarm is not working… • … “Our intention is that the tank level alarms… Fuel spill
  • 20. Examples of Expectations Tank overfill Flammable Fuel Tank level alarms Independent Shut-Off Proactive operator monitoring Transfer Fuel spill • …the alarms will be installed and maintained correctly • …operators will be present and in a fit state to respond • …operators will be trained and competent to know what an alarm means and how to respond • …operators will do what is needed in time… And that • …operators will report known faults • …reported faults will be fixed • ..operators will not initiate a fuel transfer if the alarm system is not working… “Our expectations are that …
  • 21. After test of HF Independence Tank overfill Flammable Fuel Tank level alarms Independent Shut-Off Proactive operator monitoring Transfer Unexpected change to plan Communications with supplier Operator does not monitor proactively Job design and work arrangements allow effective proactive monitoring Operators understand safety critical nature of operation Tank level sensor does not function Regular Routine Maintenance and testing Independent shut-off does not function Regular Routine Maintenance and testing Fuel spill Using independent data sources Same operator ? + Degradation Factors and their safeguards
  • 22. Buncefield Fuel Storage Depot - Dec 11 2005 • Sat 10 Dec, 18:50 – Receipt of parcel of unleaded fuel initiated into tank 912 • Sunday 11 Dec, 05:37 – Tank capacity exceeded. Fuel began to spill • 06:00 – Vapour cloud ignited – 250,000l fuel • Fire burned for 5 days – 0 Fatalities – 40 injuries – Major economic and social disturbance Why did it happen? 1. Failure of automatic tank gauging system 2. Failure of independent high-level switch Health and Safety Executive: “Buncefield: Why did it happen? The underlying causes of the explosion and fire at the Buncefield oil storage depot, Hemel Hempstead, Hertfordshire on 11 December 2005”. http://www.hse.gov.uk/comah/investigation-reports.htm. 22
  • 23. How did the tank level alarms perform at Buncefield? Tank overfill Flammable Fuel Tank level alarms Independent Shut-Off Proactive operator monitoring Transfer Tank level sensor does not function Routine Maintenance and testing Fuel spill
  • 24. There were no alarms… “At 0305 hrs on Sunday 11 December the ATG display …stopped registering the rising level of fuel in the tank..” • The control room operators had nothing to draw their attention to the fact that the alarm had failed • There was a history of repeated failure and unreliability of these alarms • The same control room operators who knew the alarms were unreliable continued to rely on them. It had stuck 14 times during the three months before the incident Intention: “…operators will know if the alarm is not working…” Expectation: “..operators will not initiate a fuel transfer if the alarm system is not working…”
  • 25. What happened at Buncefield? Tank overfill Flammable Fuel Tank level alarms Independent Shut-Off Proactive operator monitoring Transfer Unexpected change to plan Communications with supplier Operator does not monitor proactively Job design and work arrangements allow effective proactive monitoring Operators understand safety critical nature of operation Tank level sensor does not function Regular Routine Maintenance and testing Independent shut-off does not function Regular Routine Maintenance and testing Fuel spill “..the flow rate.. changed from 550 to 900 m3/h without the knowledge of the supervisors.” “The supervisors relied on the alarms to control the filling process.” “The servo-gauge had stuck..” “..was installed without the padlock.”
  • 26. Proactive operator monitoring Tank overfill Flammable Fuel Tank level alarms Independent Shut-Off Proactive operator monitoring Transfer Operator does not monitor proactively Job design and work arrangements allow effective proactive monitoring Operators understand safety critical nature of operation Fuel spill What is Intended and what is Expected?
  • 27. Pro-active operator monitoring Examples of intentions • The design of the control room and instrumentation will provide all of the information and controls needed. – Without relying on the tank level sensors. • Operators will be able to access, understand and use the information and controls. • Etc… Examples of expectations • The operators job will be designed to support proactive monitoring – Simultaneous tasks will not interfere with the operator’s ability to monitor the transfer – The operator will not be incentivised to give pro-active monitoring a low priority – Etc.. • Operators will check the progress of the transfer frequently enough and while they have time to intervene, without prompting. • Etc…
  • 28. Five Human Factors challenges 1. What exactly is the control? – What is intended and what is expected of human performance? 2. Who will be involved? – Who Detects? Who Decides? Who Acts? 3. What information will they need? – Where will they get it? 4. What judgements or decisions will they need to make? – Are they reasonable in the conditions? – Could safety compete with production? 5. What actions will they need to take? – Will they have the time? – How and when will they know they were succesful?
  • 29. In summary • Considered what Independence and Effectiveness mean for controls that rely on people • Demonstrated that controls reflect the organizations Intentions and Expectations of human performance • Illustrated how those intentions and expectations can be defeated in the real-world. • Suggested 5 challenges to ensure human controls are as robust as they reasonably can be. 29
  • 30. Challenges and Take-Aways • How many of the controls/barriers your business relies on depend on human performance? – Operations/ Maintenance/ Inspection / Support • Would you know exactly what those controls are? – What is Intended and what is Expected of your people? • How does your business ensure those human controls are as robust as they reasonably can be? – That intentions are actually implemented – That expectations are managed during planning and operations 30
  • 31. Look our for…. • CIEHF White paper: “Human factors in Barrier Thinking” • Expected early 2017 • CCPS Concept Book: “BowTies for Risk Management” • Expected 2017
  • 32. Thank you for your attention Any Questions? ron@ronmcleod.com www.ronmcleod.com 32