SlideShare a Scribd company logo
1 of 3
Scott C. Friedrickson
701 Longwood Dr. scottf1732@sbcglobal.net
Lowell, IN 46356 Cell: 219-765-3342
Home: 219-690-1448
KNOWLEDGE & EXPERIENCE
* Over 25 years experience as an industrial electrician in a variety of manufacturing environments
including – Food processing / packaging, Large tool / precision machining, and office products
* Profficient with A-B PLC5, SLC 504, Logic 5000 controllers RS Logix 5, 500, 5000 software, GE
logic controllers and GE “Logic Master” software
* Vibratory, Radar, Ultrasonic and Capacitive level sensors for dry/ bulk ingredients and liquids –
Endress + Hauser, Vega Puls, A-B
* TB Woods and A-B Power Flex 70, 30, 523, 525 VFD controllers, A-B SMC 150 Soft Start
* Use of Flex IO w/ remote IO, DH+ and Ethernet networks
* A-B (1305, S-class), Indramat and Danfauss servo motor controllers A-B GML and
GML Commander graphic motion control software and Sercos drives operated via Logix 5000
* Experience with A-B Panelviews 900, 1000, 1000e, PV+ HMI’s and Panel Builder software
* Experience working in Class II Div.1&2 hazardous locations, high speed packaging, bulk handling
and distribution equipment with working knowledge of NEC and Chicago electrical codes.
* 7 years of planning and scheduling experience
* SAP 4.7 and ECC 6.0 software, AutoCad 2009 & 2015, DB2 document manager, Excel, Outlook,
Word, Power point. Began using ECC 6.0 in April 2014
ZPI and Minitab software, Autodesk Vault 2015 data management
* Autocad 2009 and DB2 Document Manager to modify and print electrical schematics for drawing
Mark ups used with equipment / process addition and design out projects
* Creating, implementing and maintaining Single Cycle and Strategy based maintenance plans,
maintenance items, counter groups, task lists for Manufacturing equipment and Functional locations
* Create and change Functional Location, Equipment and Material Assembly BOMs for Parts,
documents and technical manuals
* Work directly with vendors / suppliers and parts manufacturers to obtain quotes, lead times,
Set up / installation and maintenance items for new equipment and parts and replacements for
Obsolete parts and equipment.
* Perform criticality studies and determine criticality levels for process equipment and equipment
Sub-assemblies and prioritize planned work based on those established criticalities.
* Track equipment histories including cost analyses to determine continued maintenance levels
Versus cost of equipment replacement and to set maintenance plan frequencies.
* Prioritize work based on downtime data obtained from ZPI software and the use of Maintenance
Best Practices including some predictive maintenance activities.
* Oversee execution of and conduct follow ups on planned work schedules often working within
Narrow work completion time tables
* Set up parts spares with central stores including inventory levels and re-order points
* Determine required parts, materials, estimated costs and man hours for routine and project work
Conferring with electrical and controls engineers to ensure proper layout, design and code compliance
* Drive effective and efficient execution of planned work through best use of electrical personnel
Resources and their individual skill sets / strengths.
* Coordinate maintenance and project work activities with Operations, Trades and Contracted
Personnel to ensure effective execution of work plan
BUSINESS EXPERIENCE
NOV. 97 - PRESENT : Mondelez / Nabisco - Chicago, IL. - ( Electrical Planner / Scheduler)
* First 11 yrs. as a journeyman electrician with the past 7 yrs. as a planner / scheduler. Perform
Planner duties Mon. – Fri. while continuing as an electrician for all daily and weekend overtime.
* ZPI real time data software and MiniTab statistical software to develop preventative and
Predictive maintenance plans, reducing downtime and increasing meantime between failures.
* Standardized electrical parts spares, reducing overall inventory and parts in central stores for an
average annual savings in excess of $100K.
* Created strategy maintenance plans to reduce meantime between failures using Thermal Imaging,
Vibration analysis, 4-20 milliamp generating and high voltage testing Instrumentation.
* Planned, scheduled and oversaw execution of all issued electrical work for 37 electricians spanning
over 2300 pieces of production equipment and a 2.5 million sq. ft. facilities including 2 conjoined
bakeries and a Distribution Center with 9 automated H&K cranes.
* Have lead several money saving projects including lighting upgrade from HID to fluorescent T8
fixtures for entire 2.5 million sq.ft. facility, resulting an electrical power usage savings of several
hundred thousand dollars per year. Planned, laid out, scheduled, ordered all materials for project and
calculated cost vs. savings to secure capital and approval for the project.
MAR. 94 - NOV. 97 : American Lock co. - Crete, IL. - (electrician)
* Electrical controls and basic plc programming of all production equipment, electrical control and
distribution systems and all electrical construction projects including new equipment installs and
existing equipment upgrades
* Automated precision machining equipment - Mikron, Hydromat and Giuliani multifactor machines,
Giuliani shackle broaches, Fimat broaches, Brown & Sharp screw machines, Giuliani key warders,
Maromatic pin loaders, Bodine and ALC combination lock assemblers and Morisiki and Modern CNC
machines
* Replaced relay logic with plc controls on 4 auto-broaches and 6 auto pin loaders
* Designed, programmed and built electrical controls and panels for 5 custom machines
JAN. 92 - MAR. 94 : American Trade and Production co. - Chicago, IL. - (electrician)
* Troubleshoot / repair vinyl office product assembly and welding equipment
* Automated high RF welders, Superweb print presses, Chicago riveters, Scott index tab machines,
Bourg collators and Nema stretch wrappers
AUG. 90 - JAN. 92 : Continental Mach. & Eng. - E. Chicago, IN. - (apprentice)
* Troubleshoot / repair large tool machining equipment, “Lincoln” welders, Detroit & DeMag bridge
cranes, hydraulic presses, 7” and 6” horizontal boring mills, 72” lathes, 600 ton presses, 60 ton AC
overhead cranes and large metal planers
OCT. 87 - JUL. 90 : U.S. ARMY 82nd
ABN. DIV.
JAN. 91 - APR. 91 : U.S. ARMY 82nd
ABN. DIV. (recalled for “Desert Storm”)
EDUCATION
Purdue University
A.A.S. - Manufacturing Engineering Technology w/ 42 credits toward B.S.
DeVry Institute of Technology
Certificate - Electronic Repair Technology (transferred to Purdue)
Ivy Tech.
1 ½ years Industrial Electricity (apprenticeship w/ Cont. Mach. & Eng.)
GE Fanuc
GE 90-30, Series One intermediate and advanced programming
Rockwell automation / Allen-Bradley
plc 5 troubleshooting
RS Logix 5 & 500 programming
RS Logix 5000 (ProLogix) programming
Panelbuilder 5200 & 550 for A-B panelviews
GML and GML Commander programming and troubleshooting
Smart motor controls / Softstart and 1305 / 1336 AFD controllers
Technical Training Services
TTS Refrigeration
Micromotion mass flow metering sytem
Fisher-Rosemount specific gravity level control system
Danfauss servo controllers
Vibration analysis
Snell Infrared
Thermographic applications
IUOE Local 399
* HVACR I
* HVACR II
* CFC certification
SAP maintenance scheduling software - 120 hrs. of training
Lean Six Sigma - 120 hrs. of training (Green Belt Level)
Best Maintenance Practices - 40 hrs. of training

More Related Content

What's hot

Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016paul joshua
 
resume_GAUTAM_03112016
resume_GAUTAM_03112016resume_GAUTAM_03112016
resume_GAUTAM_03112016GAUTAM DEKA
 
Eric Bledsoe IT Resume
Eric Bledsoe IT ResumeEric Bledsoe IT Resume
Eric Bledsoe IT ResumeEric Bledsoe
 
Lawrence Bjornsson resume
Lawrence Bjornsson resumeLawrence Bjornsson resume
Lawrence Bjornsson resumeLarry Bjornsson
 
RESUME _2016 Rev (A1)
RESUME  _2016 Rev (A1)RESUME  _2016 Rev (A1)
RESUME _2016 Rev (A1)Ken Gates
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMohammed Akbar
 
Pankaj Sharma 2015 Resume
Pankaj Sharma 2015 ResumePankaj Sharma 2015 Resume
Pankaj Sharma 2015 Resumesharmapower
 
Steve Vest Resume 2015
Steve Vest Resume 2015Steve Vest Resume 2015
Steve Vest Resume 2015Steve Vest
 
MEP Draftsman/ Junior Design Engineer
MEP Draftsman/ Junior Design EngineerMEP Draftsman/ Junior Design Engineer
MEP Draftsman/ Junior Design Engineerprecious001
 

What's hot (20)

Sam mep
Sam mepSam mep
Sam mep
 
resume 04092015
resume 04092015resume 04092015
resume 04092015
 
Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016Paul_joshua_resume_JAN2016
Paul_joshua_resume_JAN2016
 
resume_GAUTAM_03112016
resume_GAUTAM_03112016resume_GAUTAM_03112016
resume_GAUTAM_03112016
 
Eric Bledsoe IT Resume
Eric Bledsoe IT ResumeEric Bledsoe IT Resume
Eric Bledsoe IT Resume
 
Lawrence Bjornsson resume
Lawrence Bjornsson resumeLawrence Bjornsson resume
Lawrence Bjornsson resume
 
RESUME _2016 Rev (A1)
RESUME  _2016 Rev (A1)RESUME  _2016 Rev (A1)
RESUME _2016 Rev (A1)
 
AK+CV
AK+CVAK+CV
AK+CV
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15
 
LGC PP-ABC Int
LGC PP-ABC IntLGC PP-ABC Int
LGC PP-ABC Int
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
Pankaj Sharma 2015 Resume
Pankaj Sharma 2015 ResumePankaj Sharma 2015 Resume
Pankaj Sharma 2015 Resume
 
Mohamed mahfouaz 20 v5
Mohamed mahfouaz 20 v5Mohamed mahfouaz 20 v5
Mohamed mahfouaz 20 v5
 
Sourav chakraborty
Sourav chakrabortySourav chakraborty
Sourav chakraborty
 
Steve Vest Resume 2015
Steve Vest Resume 2015Steve Vest Resume 2015
Steve Vest Resume 2015
 
Jd deisgn electrcial
Jd deisgn electrcialJd deisgn electrcial
Jd deisgn electrcial
 
Roberto-CV-F
Roberto-CV-FRoberto-CV-F
Roberto-CV-F
 
CV SAdikh 2 (1)
CV SAdikh 2 (1)CV SAdikh 2 (1)
CV SAdikh 2 (1)
 
MEP Draftsman/ Junior Design Engineer
MEP Draftsman/ Junior Design EngineerMEP Draftsman/ Junior Design Engineer
MEP Draftsman/ Junior Design Engineer
 

Viewers also liked

William Menke Sr Operations Manager Resume
William Menke Sr Operations Manager ResumeWilliam Menke Sr Operations Manager Resume
William Menke Sr Operations Manager ResumeBill Menke
 
Resume - Steve K. Mu - Supply Chain Engineer 0611
Resume - Steve K. Mu - Supply Chain Engineer 0611Resume - Steve K. Mu - Supply Chain Engineer 0611
Resume - Steve K. Mu - Supply Chain Engineer 0611Ko-Ping Mu
 
Analyst - Supply Chain Management
Analyst - Supply Chain ManagementAnalyst - Supply Chain Management
Analyst - Supply Chain ManagementChirag Dabhee
 
Jerry James Supply Chain Manager Resume
Jerry James Supply Chain Manager ResumeJerry James Supply Chain Manager Resume
Jerry James Supply Chain Manager Resumejamescpim
 
Supply Chain Manager
Supply Chain Manager Supply Chain Manager
Supply Chain Manager Gary Rice
 
Lebenslauf Fady IBRAHIM
Lebenslauf Fady IBRAHIMLebenslauf Fady IBRAHIM
Lebenslauf Fady IBRAHIMFady Nabil
 
Top 8 supply chain consultant resume samples
Top 8 supply chain consultant resume samplesTop 8 supply chain consultant resume samples
Top 8 supply chain consultant resume samplestonychoper1305
 
adk resume 2015
adk resume 2015adk resume 2015
adk resume 2015ajit khire
 
Advertising Design Resume
Advertising Design ResumeAdvertising Design Resume
Advertising Design ResumeKatie Kelly
 
Borang Takmir 2009
Borang Takmir 2009Borang Takmir 2009
Borang Takmir 2009ustazsubhi
 
LinkedIn Gina's Profile 1_2016
LinkedIn Gina's Profile 1_2016LinkedIn Gina's Profile 1_2016
LinkedIn Gina's Profile 1_2016Gina Tilton, MBA
 
Oscar Barrera's resume
Oscar Barrera's resumeOscar Barrera's resume
Oscar Barrera's resumeOscar Barrera
 
J keith hubbard vice president of operations and supply chain
J  keith hubbard  vice president of operations and supply chainJ  keith hubbard  vice president of operations and supply chain
J keith hubbard vice president of operations and supply chainJ. Keith Hubbard
 
David sholk cpa resume
David sholk cpa resumeDavid sholk cpa resume
David sholk cpa resumedsholk
 
J. Keith Hubbard Resume - Manufacturing and Supply Chain Leadership
J. Keith Hubbard Resume -  Manufacturing and Supply Chain LeadershipJ. Keith Hubbard Resume -  Manufacturing and Supply Chain Leadership
J. Keith Hubbard Resume - Manufacturing and Supply Chain LeadershipJ. Keith Hubbard
 

Viewers also liked (20)

Executive Profile
Executive ProfileExecutive Profile
Executive Profile
 
William Menke Sr Operations Manager Resume
William Menke Sr Operations Manager ResumeWilliam Menke Sr Operations Manager Resume
William Menke Sr Operations Manager Resume
 
Resume - Steve K. Mu - Supply Chain Engineer 0611
Resume - Steve K. Mu - Supply Chain Engineer 0611Resume - Steve K. Mu - Supply Chain Engineer 0611
Resume - Steve K. Mu - Supply Chain Engineer 0611
 
Analyst - Supply Chain Management
Analyst - Supply Chain ManagementAnalyst - Supply Chain Management
Analyst - Supply Chain Management
 
Jerry James Supply Chain Manager Resume
Jerry James Supply Chain Manager ResumeJerry James Supply Chain Manager Resume
Jerry James Supply Chain Manager Resume
 
Supply Chain Manager
Supply Chain Manager Supply Chain Manager
Supply Chain Manager
 
Lebenslauf Fady IBRAHIM
Lebenslauf Fady IBRAHIMLebenslauf Fady IBRAHIM
Lebenslauf Fady IBRAHIM
 
Top 8 supply chain consultant resume samples
Top 8 supply chain consultant resume samplesTop 8 supply chain consultant resume samples
Top 8 supply chain consultant resume samples
 
Alexwileyresume1
Alexwileyresume1Alexwileyresume1
Alexwileyresume1
 
adk resume 2015
adk resume 2015adk resume 2015
adk resume 2015
 
Advertising Design Resume
Advertising Design ResumeAdvertising Design Resume
Advertising Design Resume
 
Borang Takmir 2009
Borang Takmir 2009Borang Takmir 2009
Borang Takmir 2009
 
Suchismita saha
Suchismita sahaSuchismita saha
Suchismita saha
 
LinkedIn Gina's Profile 1_2016
LinkedIn Gina's Profile 1_2016LinkedIn Gina's Profile 1_2016
LinkedIn Gina's Profile 1_2016
 
Alathea Douglas Resume
Alathea Douglas Resume Alathea Douglas Resume
Alathea Douglas Resume
 
Oscar Barrera's resume
Oscar Barrera's resumeOscar Barrera's resume
Oscar Barrera's resume
 
J keith hubbard vice president of operations and supply chain
J  keith hubbard  vice president of operations and supply chainJ  keith hubbard  vice president of operations and supply chain
J keith hubbard vice president of operations and supply chain
 
David sholk cpa resume
David sholk cpa resumeDavid sholk cpa resume
David sholk cpa resume
 
J. Keith Hubbard Resume - Manufacturing and Supply Chain Leadership
J. Keith Hubbard Resume -  Manufacturing and Supply Chain LeadershipJ. Keith Hubbard Resume -  Manufacturing and Supply Chain Leadership
J. Keith Hubbard Resume - Manufacturing and Supply Chain Leadership
 
CV Petar Luketic
CV Petar LuketicCV Petar Luketic
CV Petar Luketic
 

Similar to scott planner resume - Copy

Similar to scott planner resume - Copy (20)

Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 
Mike Leeper Resume
Mike Leeper ResumeMike Leeper Resume
Mike Leeper Resume
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
Randy Hogue resume 092316
Randy Hogue resume 092316Randy Hogue resume 092316
Randy Hogue resume 092316
 
Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis CV(2016)
Ariel Pacis CV(2016)
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
 
CV_Ashu Bhatt
CV_Ashu BhattCV_Ashu Bhatt
CV_Ashu Bhatt
 
Raju Thamke_CV
Raju Thamke_CVRaju Thamke_CV
Raju Thamke_CV
 
MCV
MCVMCV
MCV
 
James Sander Resume
James Sander ResumeJames Sander Resume
James Sander Resume
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15
 
RESUME AS MODIFIED 21 Apr 2014
RESUME AS MODIFIED 21 Apr 2014RESUME AS MODIFIED 21 Apr 2014
RESUME AS MODIFIED 21 Apr 2014
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Matt Watters Resume 2017
Matt Watters Resume 2017Matt Watters Resume 2017
Matt Watters Resume 2017
 
Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & control
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
Electromechanical engineer (2)
Electromechanical engineer (2)Electromechanical engineer (2)
Electromechanical engineer (2)
 

scott planner resume - Copy

  • 1. Scott C. Friedrickson 701 Longwood Dr. scottf1732@sbcglobal.net Lowell, IN 46356 Cell: 219-765-3342 Home: 219-690-1448 KNOWLEDGE & EXPERIENCE * Over 25 years experience as an industrial electrician in a variety of manufacturing environments including – Food processing / packaging, Large tool / precision machining, and office products * Profficient with A-B PLC5, SLC 504, Logic 5000 controllers RS Logix 5, 500, 5000 software, GE logic controllers and GE “Logic Master” software * Vibratory, Radar, Ultrasonic and Capacitive level sensors for dry/ bulk ingredients and liquids – Endress + Hauser, Vega Puls, A-B * TB Woods and A-B Power Flex 70, 30, 523, 525 VFD controllers, A-B SMC 150 Soft Start * Use of Flex IO w/ remote IO, DH+ and Ethernet networks * A-B (1305, S-class), Indramat and Danfauss servo motor controllers A-B GML and GML Commander graphic motion control software and Sercos drives operated via Logix 5000 * Experience with A-B Panelviews 900, 1000, 1000e, PV+ HMI’s and Panel Builder software * Experience working in Class II Div.1&2 hazardous locations, high speed packaging, bulk handling and distribution equipment with working knowledge of NEC and Chicago electrical codes. * 7 years of planning and scheduling experience * SAP 4.7 and ECC 6.0 software, AutoCad 2009 & 2015, DB2 document manager, Excel, Outlook, Word, Power point. Began using ECC 6.0 in April 2014 ZPI and Minitab software, Autodesk Vault 2015 data management * Autocad 2009 and DB2 Document Manager to modify and print electrical schematics for drawing Mark ups used with equipment / process addition and design out projects * Creating, implementing and maintaining Single Cycle and Strategy based maintenance plans, maintenance items, counter groups, task lists for Manufacturing equipment and Functional locations * Create and change Functional Location, Equipment and Material Assembly BOMs for Parts, documents and technical manuals * Work directly with vendors / suppliers and parts manufacturers to obtain quotes, lead times, Set up / installation and maintenance items for new equipment and parts and replacements for Obsolete parts and equipment. * Perform criticality studies and determine criticality levels for process equipment and equipment Sub-assemblies and prioritize planned work based on those established criticalities. * Track equipment histories including cost analyses to determine continued maintenance levels Versus cost of equipment replacement and to set maintenance plan frequencies. * Prioritize work based on downtime data obtained from ZPI software and the use of Maintenance Best Practices including some predictive maintenance activities. * Oversee execution of and conduct follow ups on planned work schedules often working within Narrow work completion time tables * Set up parts spares with central stores including inventory levels and re-order points * Determine required parts, materials, estimated costs and man hours for routine and project work Conferring with electrical and controls engineers to ensure proper layout, design and code compliance * Drive effective and efficient execution of planned work through best use of electrical personnel Resources and their individual skill sets / strengths. * Coordinate maintenance and project work activities with Operations, Trades and Contracted Personnel to ensure effective execution of work plan
  • 2. BUSINESS EXPERIENCE NOV. 97 - PRESENT : Mondelez / Nabisco - Chicago, IL. - ( Electrical Planner / Scheduler) * First 11 yrs. as a journeyman electrician with the past 7 yrs. as a planner / scheduler. Perform Planner duties Mon. – Fri. while continuing as an electrician for all daily and weekend overtime. * ZPI real time data software and MiniTab statistical software to develop preventative and Predictive maintenance plans, reducing downtime and increasing meantime between failures. * Standardized electrical parts spares, reducing overall inventory and parts in central stores for an average annual savings in excess of $100K. * Created strategy maintenance plans to reduce meantime between failures using Thermal Imaging, Vibration analysis, 4-20 milliamp generating and high voltage testing Instrumentation. * Planned, scheduled and oversaw execution of all issued electrical work for 37 electricians spanning over 2300 pieces of production equipment and a 2.5 million sq. ft. facilities including 2 conjoined bakeries and a Distribution Center with 9 automated H&K cranes. * Have lead several money saving projects including lighting upgrade from HID to fluorescent T8 fixtures for entire 2.5 million sq.ft. facility, resulting an electrical power usage savings of several hundred thousand dollars per year. Planned, laid out, scheduled, ordered all materials for project and calculated cost vs. savings to secure capital and approval for the project. MAR. 94 - NOV. 97 : American Lock co. - Crete, IL. - (electrician) * Electrical controls and basic plc programming of all production equipment, electrical control and distribution systems and all electrical construction projects including new equipment installs and existing equipment upgrades * Automated precision machining equipment - Mikron, Hydromat and Giuliani multifactor machines, Giuliani shackle broaches, Fimat broaches, Brown & Sharp screw machines, Giuliani key warders, Maromatic pin loaders, Bodine and ALC combination lock assemblers and Morisiki and Modern CNC machines * Replaced relay logic with plc controls on 4 auto-broaches and 6 auto pin loaders * Designed, programmed and built electrical controls and panels for 5 custom machines JAN. 92 - MAR. 94 : American Trade and Production co. - Chicago, IL. - (electrician) * Troubleshoot / repair vinyl office product assembly and welding equipment * Automated high RF welders, Superweb print presses, Chicago riveters, Scott index tab machines, Bourg collators and Nema stretch wrappers AUG. 90 - JAN. 92 : Continental Mach. & Eng. - E. Chicago, IN. - (apprentice) * Troubleshoot / repair large tool machining equipment, “Lincoln” welders, Detroit & DeMag bridge cranes, hydraulic presses, 7” and 6” horizontal boring mills, 72” lathes, 600 ton presses, 60 ton AC overhead cranes and large metal planers OCT. 87 - JUL. 90 : U.S. ARMY 82nd ABN. DIV. JAN. 91 - APR. 91 : U.S. ARMY 82nd ABN. DIV. (recalled for “Desert Storm”)
  • 3. EDUCATION Purdue University A.A.S. - Manufacturing Engineering Technology w/ 42 credits toward B.S. DeVry Institute of Technology Certificate - Electronic Repair Technology (transferred to Purdue) Ivy Tech. 1 ½ years Industrial Electricity (apprenticeship w/ Cont. Mach. & Eng.) GE Fanuc GE 90-30, Series One intermediate and advanced programming Rockwell automation / Allen-Bradley plc 5 troubleshooting RS Logix 5 & 500 programming RS Logix 5000 (ProLogix) programming Panelbuilder 5200 & 550 for A-B panelviews GML and GML Commander programming and troubleshooting Smart motor controls / Softstart and 1305 / 1336 AFD controllers Technical Training Services TTS Refrigeration Micromotion mass flow metering sytem Fisher-Rosemount specific gravity level control system Danfauss servo controllers Vibration analysis Snell Infrared Thermographic applications IUOE Local 399 * HVACR I * HVACR II * CFC certification SAP maintenance scheduling software - 120 hrs. of training Lean Six Sigma - 120 hrs. of training (Green Belt Level) Best Maintenance Practices - 40 hrs. of training