SlideShare a Scribd company logo
1 of 1
Download to read offline
PROFESSIONAL HIGHLIGHTS
Skilled quantitative analyst with strong record of improving supply-chain performance:
 Demand forecast Performance: Improved forecast accuracy by 37% through development of quantitative forecasting
methods and the establishment of error measures.
 Inventory Control: Reduced the average inventory level by 23%, thus increasing available capital by 14% without reducing
the demand fulfillment rate, by establishing a dynamic replenishment plan reflecting current business circumstances.
 Lead-time reduction: Reduced lead time by 18% without tradeoff by creating an integrated replenishment plan with a key
supplier and sharing information.
 Time saving on operations: Developed a system able to automatically extract needed data from the ERP system and
perform manipulation, saving 34% of the time that had previously been spent generating reports.
PROFESSIONAL EXPERIENCE
GopherScope Mfg. LLC., New Hudson, MI Supply Chain Engineer Sep 2012– Present
Observes operations, collects data, and conducts analysis to provide solutions for maximizing supply-chain surplus under dynamic
business circumstances.
Supply Chain Performance Improvement Projects:
 Identified customer segments for each product and developed quantitative forecast models for each, and established
objective measures of forecast error for continuous analysis and improvement. Improved forecast accuracy by 37%
 Researched product compositions and proposed the use of common parts. Implementation of this idea reduced holding
capital for stocking multiple materials, the cost of shipping from multiple sources, and the expected losses due to shortages.
 Researched product attributes and generated an Excel spreadsheet with product items tagged with their attributes and
embedded with search and filter function, so when shortages are foreseen, the sales team can recommend other products
with the same or similar attributes as wanted by the customer; this reduced losses due to shortages and bought time to
replenish inventory, as well as lowering the total safety inventory due to substitution effects.
 Designed a tracking system for sold, recommended and substituted items along with the original demanded items, so as to
better predict real future demand.
 Shared replenishment plan with a key supplier and helped to integrate their production plan into an aggregate plan in place
of a monthly make-to-order plan; this rendered their production more stable and reduced their overtime labor cost by 16%.
In return, they began holding more inventory for us, thus reducing the average lead time by 28%, which in turn saves on
expensive expedited overseas shipping cost and reduces the holding capital thanks to the lowered safety inventory level.
 Collaborated with a key consignment customer and introduced a de-seasonal forecast method, increased integrated
forecast accuracy by 31%, and changed the replenishment policy for their consignment inventory from monthly review to
weekly review, reducing safety inventory and loss due to shortages by 42%.
Operations Efficiency Improvement Projects:
 Developed a MySQL database and a system able to extract relevant data from our ERP system and manipulate it into the
desired format for further use. This saved 34% of the time previously spent generating reports and performing analysis.
 Renamed products in a comprehensively logical way and transformed the item list shown on ERP into a categorized
hierarchical view, thus improving the ease of product recognition, saving the sales team time in searching for products, and
reducing human error during the sales process.
 Designed and developed a user-friendly CRM system via Excel VBA language that enabled transfer and recording of
customer info, meeting scheduling, automatic postponement of expired schedules, searches for specific meetings using
customer info, sending of interdepartmental task requests, and recording/archiving of the daily work for manager’s review.
 Collaborated with accountant on cost calculations, establishing account classifications, and integrating this information into
the ERP system to ensure each economic activity comprising business operations is automatically and accurately recorded
(e.g., COGS, Expense, Weighted Shipping Cost, etc.).
Other Improvement Projects and Responsibilities:
 Designed a products page for the company’s website embedded with a filter function that introduces and advertises our
200+ products in a detailed and comprehensive yet logical manner.
 Gather and extract essential data and information and generate analytic reports regarding procurement suggestions, cost-
reduction suggestions, inventory objective evaluations and impending business issues alerts.
Education:
University of Florida, Gainesville, USA June 2012
Master of Science in Industrial & System Engineering (Program ranked 13th
in USA)
National Tsing Hua University, Taiwan June 2007
B.S. in Industrial Engineering and Engineering Management
SKILLS
 Programming Languages: Visual Basic, VBA, PHP, Xml
 ERP Systems: Quickbooks, Smart ERP
 Database System: MySQL
 Simulation Software: Arena
 Website Developing Software: Dreamweaver CS5
 Microsoft Office: Word, Excel, PowerPoint
 Languages: English, Chinese, Taiwanese
STEVE K. MU
30768 Jeffrey Ct. Apt. 203,
New Hudson, MI 48165
E-mail: ExcitementKM@gmail.com (352) 870-9218

More Related Content

What's hot

jay-mellott-resume
jay-mellott-resumejay-mellott-resume
jay-mellott-resumeJay Mellott
 
Maintenance excellence
Maintenance excellenceMaintenance excellence
Maintenance excellenceosama koddosa
 
Laverdiere,Chris-ResumeOriginal-
Laverdiere,Chris-ResumeOriginal-Laverdiere,Chris-ResumeOriginal-
Laverdiere,Chris-ResumeOriginal-Chris Laverdiere
 
Supply Chain Synchronisation For Effective Operations Planning
Supply Chain Synchronisation For Effective Operations PlanningSupply Chain Synchronisation For Effective Operations Planning
Supply Chain Synchronisation For Effective Operations Planningguestae2434
 
Kenneth Gillig Value Profile
Kenneth Gillig Value ProfileKenneth Gillig Value Profile
Kenneth Gillig Value ProfileKen Gillig
 
Sales and Operations Planning, Supported by Demand Management Capability, Sus...
Sales and Operations Planning, Supported by Demand Management Capability, Sus...Sales and Operations Planning, Supported by Demand Management Capability, Sus...
Sales and Operations Planning, Supported by Demand Management Capability, Sus...Innovation Enterprise
 
SRS - Resume ( Revised )
SRS - Resume ( Revised )SRS - Resume ( Revised )
SRS - Resume ( Revised )S. Ravi Shankar
 
Charles New Resume 4
Charles New Resume 4Charles New Resume 4
Charles New Resume 4Charles Wade
 
Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington
 
Food safety manager kpi
Food safety manager kpiFood safety manager kpi
Food safety manager kpijomxasri
 
Maria Bevan CPIM Resume
Maria Bevan CPIM ResumeMaria Bevan CPIM Resume
Maria Bevan CPIM ResumeMaria Bevan
 
resume - Gary Rice 3
resume - Gary Rice 3resume - Gary Rice 3
resume - Gary Rice 3Gary Rice
 
Sean Costin resume
Sean Costin resumeSean Costin resume
Sean Costin resumeSeanCostin2
 
Alice A Holmes Res O 2015
Alice A Holmes Res O 2015Alice A Holmes Res O 2015
Alice A Holmes Res O 2015Alice Holmes
 

What's hot (19)

jay-mellott-resume
jay-mellott-resumejay-mellott-resume
jay-mellott-resume
 
Palicka steven 4 3
Palicka steven 4 3Palicka steven 4 3
Palicka steven 4 3
 
Maintenance excellence
Maintenance excellenceMaintenance excellence
Maintenance excellence
 
Laverdiere,Chris-ResumeOriginal-
Laverdiere,Chris-ResumeOriginal-Laverdiere,Chris-ResumeOriginal-
Laverdiere,Chris-ResumeOriginal-
 
Supply Chain Synchronisation For Effective Operations Planning
Supply Chain Synchronisation For Effective Operations PlanningSupply Chain Synchronisation For Effective Operations Planning
Supply Chain Synchronisation For Effective Operations Planning
 
Kenneth Gillig Value Profile
Kenneth Gillig Value ProfileKenneth Gillig Value Profile
Kenneth Gillig Value Profile
 
Sales and Operations Planning, Supported by Demand Management Capability, Sus...
Sales and Operations Planning, Supported by Demand Management Capability, Sus...Sales and Operations Planning, Supported by Demand Management Capability, Sus...
Sales and Operations Planning, Supported by Demand Management Capability, Sus...
 
KG resume 051915
KG resume 051915KG resume 051915
KG resume 051915
 
SRS - Resume ( Revised )
SRS - Resume ( Revised )SRS - Resume ( Revised )
SRS - Resume ( Revised )
 
Charles New Resume 4
Charles New Resume 4Charles New Resume 4
Charles New Resume 4
 
Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington resume - July 2016
Bruce Billington resume - July 2016
 
Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.
 
Food safety manager kpi
Food safety manager kpiFood safety manager kpi
Food safety manager kpi
 
Maria Bevan CPIM Resume
Maria Bevan CPIM ResumeMaria Bevan CPIM Resume
Maria Bevan CPIM Resume
 
Michaelpritchard
MichaelpritchardMichaelpritchard
Michaelpritchard
 
resume - Gary Rice 3
resume - Gary Rice 3resume - Gary Rice 3
resume - Gary Rice 3
 
Sean Costin resume
Sean Costin resumeSean Costin resume
Sean Costin resume
 
Sourcing kpi
Sourcing kpiSourcing kpi
Sourcing kpi
 
Alice A Holmes Res O 2015
Alice A Holmes Res O 2015Alice A Holmes Res O 2015
Alice A Holmes Res O 2015
 

Viewers also liked

Top 8 supply chain consultant resume samples
Top 8 supply chain consultant resume samplesTop 8 supply chain consultant resume samples
Top 8 supply chain consultant resume samplestonychoper1305
 
Supply Chain Manager
Supply Chain Manager Supply Chain Manager
Supply Chain Manager Gary Rice
 
Sudhakar resume 3 - Technical n Functional Project lead
Sudhakar resume 3 - Technical n Functional Project leadSudhakar resume 3 - Technical n Functional Project lead
Sudhakar resume 3 - Technical n Functional Project leadSudhakar Reddy
 
Lebenslauf Fady IBRAHIM
Lebenslauf Fady IBRAHIMLebenslauf Fady IBRAHIM
Lebenslauf Fady IBRAHIMFady Nabil
 
SWTate resume 2015
SWTate resume 2015SWTate resume 2015
SWTate resume 2015Steve Tate
 
Borang Takmir 2009
Borang Takmir 2009Borang Takmir 2009
Borang Takmir 2009ustazsubhi
 
adk resume 2015
adk resume 2015adk resume 2015
adk resume 2015ajit khire
 
Advertising Design Resume
Advertising Design ResumeAdvertising Design Resume
Advertising Design ResumeKatie Kelly
 
LinkedIn Gina's Profile 1_2016
LinkedIn Gina's Profile 1_2016LinkedIn Gina's Profile 1_2016
LinkedIn Gina's Profile 1_2016Gina Tilton, MBA
 
Oscar Barrera's resume
Oscar Barrera's resumeOscar Barrera's resume
Oscar Barrera's resumeOscar Barrera
 
J keith hubbard vice president of operations and supply chain
J  keith hubbard  vice president of operations and supply chainJ  keith hubbard  vice president of operations and supply chain
J keith hubbard vice president of operations and supply chainJ. Keith Hubbard
 
David sholk cpa resume
David sholk cpa resumeDavid sholk cpa resume
David sholk cpa resumedsholk
 

Viewers also liked (18)

Top 8 supply chain consultant resume samples
Top 8 supply chain consultant resume samplesTop 8 supply chain consultant resume samples
Top 8 supply chain consultant resume samples
 
scott planner resume - Copy
scott planner resume - Copyscott planner resume - Copy
scott planner resume - Copy
 
Supply Chain Manager
Supply Chain Manager Supply Chain Manager
Supply Chain Manager
 
Sudhakar resume 3 - Technical n Functional Project lead
Sudhakar resume 3 - Technical n Functional Project leadSudhakar resume 3 - Technical n Functional Project lead
Sudhakar resume 3 - Technical n Functional Project lead
 
Lebenslauf Fady IBRAHIM
Lebenslauf Fady IBRAHIMLebenslauf Fady IBRAHIM
Lebenslauf Fady IBRAHIM
 
SWTate resume 2015
SWTate resume 2015SWTate resume 2015
SWTate resume 2015
 
Borang Takmir 2009
Borang Takmir 2009Borang Takmir 2009
Borang Takmir 2009
 
Suchismita saha
Suchismita sahaSuchismita saha
Suchismita saha
 
adk resume 2015
adk resume 2015adk resume 2015
adk resume 2015
 
Advertising Design Resume
Advertising Design ResumeAdvertising Design Resume
Advertising Design Resume
 
LinkedIn Gina's Profile 1_2016
LinkedIn Gina's Profile 1_2016LinkedIn Gina's Profile 1_2016
LinkedIn Gina's Profile 1_2016
 
Alathea Douglas Resume
Alathea Douglas Resume Alathea Douglas Resume
Alathea Douglas Resume
 
Alexwileyresume1
Alexwileyresume1Alexwileyresume1
Alexwileyresume1
 
Oscar Barrera's resume
Oscar Barrera's resumeOscar Barrera's resume
Oscar Barrera's resume
 
J keith hubbard vice president of operations and supply chain
J  keith hubbard  vice president of operations and supply chainJ  keith hubbard  vice president of operations and supply chain
J keith hubbard vice president of operations and supply chain
 
David sholk cpa resume
David sholk cpa resumeDavid sholk cpa resume
David sholk cpa resume
 
Robs CV Menu
Robs CV MenuRobs CV Menu
Robs CV Menu
 
ABSasis_CV
ABSasis_CVABSasis_CV
ABSasis_CV
 

Similar to Resume - Steve K. Mu - Supply Chain Engineer 0611

Production Planning and Control How to Optimise Your Manufacturing Process.pdf
Production Planning and Control How to Optimise Your Manufacturing Process.pdfProduction Planning and Control How to Optimise Your Manufacturing Process.pdf
Production Planning and Control How to Optimise Your Manufacturing Process.pdfDataNote
 
Towards connected planning for Supply Chain
Towards connected planning for Supply Chain Towards connected planning for Supply Chain
Towards connected planning for Supply Chain Bluecrux
 
Why the Manufacturing Sector of Today Needs a Redesigned ERP System.pdf
Why the Manufacturing Sector of Today Needs a Redesigned ERP System.pdfWhy the Manufacturing Sector of Today Needs a Redesigned ERP System.pdf
Why the Manufacturing Sector of Today Needs a Redesigned ERP System.pdfJose thomas
 
CHRIS_SMITH_CV_2015
CHRIS_SMITH_CV_2015CHRIS_SMITH_CV_2015
CHRIS_SMITH_CV_2015Chris Smith
 
CV_MCU_2016_OPSACC
CV_MCU_2016_OPSACCCV_MCU_2016_OPSACC
CV_MCU_2016_OPSACCMario Umali
 
Representative Case Studies
Representative Case StudiesRepresentative Case Studies
Representative Case Studiescliff27
 
Dynamics 365 for Project Service Automation - Profit from Your Projects
Dynamics 365 for Project Service Automation - Profit from Your ProjectsDynamics 365 for Project Service Automation - Profit from Your Projects
Dynamics 365 for Project Service Automation - Profit from Your ProjectsDavid J Rosenthal
 
Group 4 Supply Chain Synchronisation For Effective Operations Planning (Rev)
Group 4   Supply Chain Synchronisation For Effective Operations Planning (Rev)Group 4   Supply Chain Synchronisation For Effective Operations Planning (Rev)
Group 4 Supply Chain Synchronisation For Effective Operations Planning (Rev)guestba021a
 
Manage Supply Chain Complexity With Predictive Commerce
Manage Supply Chain Complexity With Predictive CommerceManage Supply Chain Complexity With Predictive Commerce
Manage Supply Chain Complexity With Predictive CommerceORTEC US
 
ERP implementation at steel mill
ERP implementation at steel millERP implementation at steel mill
ERP implementation at steel millAsher Jawad
 

Similar to Resume - Steve K. Mu - Supply Chain Engineer 0611 (20)

ERP Assignment
ERP AssignmentERP Assignment
ERP Assignment
 
LSCM.pptx
LSCM.pptxLSCM.pptx
LSCM.pptx
 
Production Planning and Control How to Optimise Your Manufacturing Process.pdf
Production Planning and Control How to Optimise Your Manufacturing Process.pdfProduction Planning and Control How to Optimise Your Manufacturing Process.pdf
Production Planning and Control How to Optimise Your Manufacturing Process.pdf
 
Flyer ProTrack
Flyer ProTrackFlyer ProTrack
Flyer ProTrack
 
Towards connected planning for Supply Chain
Towards connected planning for Supply Chain Towards connected planning for Supply Chain
Towards connected planning for Supply Chain
 
Why the Manufacturing Sector of Today Needs a Redesigned ERP System.pdf
Why the Manufacturing Sector of Today Needs a Redesigned ERP System.pdfWhy the Manufacturing Sector of Today Needs a Redesigned ERP System.pdf
Why the Manufacturing Sector of Today Needs a Redesigned ERP System.pdf
 
Mis unit iv PIMR
Mis unit iv PIMRMis unit iv PIMR
Mis unit iv PIMR
 
JGreisiger Resume
JGreisiger ResumeJGreisiger Resume
JGreisiger Resume
 
J Greisiger
J Greisiger  J Greisiger
J Greisiger
 
CHRIS_SMITH_CV_2015
CHRIS_SMITH_CV_2015CHRIS_SMITH_CV_2015
CHRIS_SMITH_CV_2015
 
9. erp pgp1
9. erp pgp19. erp pgp1
9. erp pgp1
 
Michaelpritchard
MichaelpritchardMichaelpritchard
Michaelpritchard
 
CV_MCU_2016_OPSACC
CV_MCU_2016_OPSACCCV_MCU_2016_OPSACC
CV_MCU_2016_OPSACC
 
Representative Case Studies
Representative Case StudiesRepresentative Case Studies
Representative Case Studies
 
Materials management
Materials managementMaterials management
Materials management
 
Dynamics 365 for Project Service Automation - Profit from Your Projects
Dynamics 365 for Project Service Automation - Profit from Your ProjectsDynamics 365 for Project Service Automation - Profit from Your Projects
Dynamics 365 for Project Service Automation - Profit from Your Projects
 
Group 4 Supply Chain Synchronisation For Effective Operations Planning (Rev)
Group 4   Supply Chain Synchronisation For Effective Operations Planning (Rev)Group 4   Supply Chain Synchronisation For Effective Operations Planning (Rev)
Group 4 Supply Chain Synchronisation For Effective Operations Planning (Rev)
 
CV WH2016 Latest
CV WH2016 LatestCV WH2016 Latest
CV WH2016 Latest
 
Manage Supply Chain Complexity With Predictive Commerce
Manage Supply Chain Complexity With Predictive CommerceManage Supply Chain Complexity With Predictive Commerce
Manage Supply Chain Complexity With Predictive Commerce
 
ERP implementation at steel mill
ERP implementation at steel millERP implementation at steel mill
ERP implementation at steel mill
 

Resume - Steve K. Mu - Supply Chain Engineer 0611

  • 1. PROFESSIONAL HIGHLIGHTS Skilled quantitative analyst with strong record of improving supply-chain performance:  Demand forecast Performance: Improved forecast accuracy by 37% through development of quantitative forecasting methods and the establishment of error measures.  Inventory Control: Reduced the average inventory level by 23%, thus increasing available capital by 14% without reducing the demand fulfillment rate, by establishing a dynamic replenishment plan reflecting current business circumstances.  Lead-time reduction: Reduced lead time by 18% without tradeoff by creating an integrated replenishment plan with a key supplier and sharing information.  Time saving on operations: Developed a system able to automatically extract needed data from the ERP system and perform manipulation, saving 34% of the time that had previously been spent generating reports. PROFESSIONAL EXPERIENCE GopherScope Mfg. LLC., New Hudson, MI Supply Chain Engineer Sep 2012– Present Observes operations, collects data, and conducts analysis to provide solutions for maximizing supply-chain surplus under dynamic business circumstances. Supply Chain Performance Improvement Projects:  Identified customer segments for each product and developed quantitative forecast models for each, and established objective measures of forecast error for continuous analysis and improvement. Improved forecast accuracy by 37%  Researched product compositions and proposed the use of common parts. Implementation of this idea reduced holding capital for stocking multiple materials, the cost of shipping from multiple sources, and the expected losses due to shortages.  Researched product attributes and generated an Excel spreadsheet with product items tagged with their attributes and embedded with search and filter function, so when shortages are foreseen, the sales team can recommend other products with the same or similar attributes as wanted by the customer; this reduced losses due to shortages and bought time to replenish inventory, as well as lowering the total safety inventory due to substitution effects.  Designed a tracking system for sold, recommended and substituted items along with the original demanded items, so as to better predict real future demand.  Shared replenishment plan with a key supplier and helped to integrate their production plan into an aggregate plan in place of a monthly make-to-order plan; this rendered their production more stable and reduced their overtime labor cost by 16%. In return, they began holding more inventory for us, thus reducing the average lead time by 28%, which in turn saves on expensive expedited overseas shipping cost and reduces the holding capital thanks to the lowered safety inventory level.  Collaborated with a key consignment customer and introduced a de-seasonal forecast method, increased integrated forecast accuracy by 31%, and changed the replenishment policy for their consignment inventory from monthly review to weekly review, reducing safety inventory and loss due to shortages by 42%. Operations Efficiency Improvement Projects:  Developed a MySQL database and a system able to extract relevant data from our ERP system and manipulate it into the desired format for further use. This saved 34% of the time previously spent generating reports and performing analysis.  Renamed products in a comprehensively logical way and transformed the item list shown on ERP into a categorized hierarchical view, thus improving the ease of product recognition, saving the sales team time in searching for products, and reducing human error during the sales process.  Designed and developed a user-friendly CRM system via Excel VBA language that enabled transfer and recording of customer info, meeting scheduling, automatic postponement of expired schedules, searches for specific meetings using customer info, sending of interdepartmental task requests, and recording/archiving of the daily work for manager’s review.  Collaborated with accountant on cost calculations, establishing account classifications, and integrating this information into the ERP system to ensure each economic activity comprising business operations is automatically and accurately recorded (e.g., COGS, Expense, Weighted Shipping Cost, etc.). Other Improvement Projects and Responsibilities:  Designed a products page for the company’s website embedded with a filter function that introduces and advertises our 200+ products in a detailed and comprehensive yet logical manner.  Gather and extract essential data and information and generate analytic reports regarding procurement suggestions, cost- reduction suggestions, inventory objective evaluations and impending business issues alerts. Education: University of Florida, Gainesville, USA June 2012 Master of Science in Industrial & System Engineering (Program ranked 13th in USA) National Tsing Hua University, Taiwan June 2007 B.S. in Industrial Engineering and Engineering Management SKILLS  Programming Languages: Visual Basic, VBA, PHP, Xml  ERP Systems: Quickbooks, Smart ERP  Database System: MySQL  Simulation Software: Arena  Website Developing Software: Dreamweaver CS5  Microsoft Office: Word, Excel, PowerPoint  Languages: English, Chinese, Taiwanese STEVE K. MU 30768 Jeffrey Ct. Apt. 203, New Hudson, MI 48165 E-mail: ExcitementKM@gmail.com (352) 870-9218