SlideShare a Scribd company logo
1 of 5
Download to read offline
ASHU BHATT
Mobile: +918814984754 ~ E-Mail: ashu.bhatt89@gmail.com
To achieve a challenging position in a professional organization, where i can enhance my skill and
strength, in conjunction with company goal and achieve excellence in my every deal through team
work.
PROFESSIONAL SYNOPSIS
Worked 1 year and 6 months as a BMS and Control engineer with Daikin Air-conditioning Middle east
& Africa, Dubai, UAE.
Dedicated to provide comprehensive solutions that satisfy organisation’s goal.
Provide product technical support.
JOB RESPONSIBILITIES
Involved in the commissioning of Daikin Air-cooled chillers.
Involved in the execution of projects and their
documentations related to the commissioning of Daikin
Chiller Plant Manager.
1. Review building chilled water drawing schematic, layout
and prepare chilled plant room network structure.
2. Prepare/review specification and compliance statement
as per project guidelines.
3. Prepare/review control and data points schedule list.
4. Prepare/review the functional description and sequence
of operation of the chiller plant manager.
5. Prepare/review BOM sheet.
6. Review material technical data sheet.
Worked on the interfacing works of the Daikin chillers (Air-
cooled & Water cooled) with third part BMS system using
Bacnet IP/MSTP, Modbus protocol.
Carried out the interfacing works of DAIKIN VRV II, VRV III
system with third party BMS system.
Carried out the interfacing works of DAIKIN SPLIT system
with third party BMS system.
Worked on the Daikin D3 Network protocol of Daikin VRV
system.
Worked on the commissioning of Daikin Airnet(Remote
monitoring) system for VRV units offer performance
monitoring and remote services.
1. Monitoring of Indoor and Outdoor units operation such
as:
Project Documentation
Start-up/Commissioning
Supervision/Co-ordination
Product Technical Support
a. Temperature of heat exchangers, outside
conditions, four way valves, solenoid valves,
Inverter parameters, switches status etc.
b. Operation mode of cooling, heating and fans.
c. Status of transmission between indoor and outdoor
units liquid pipe temperature, gas pipe
temperature, thermostat signal etc.
d. Operation history and protection of parts
replacement timing such as total operating hours,
number of on/off cycles, total on time for
thermostat, compressor operation frequency.
Prediction level anticipation notification for
maintenance within 24 hours, several weeks and
months.
Carried out the commissioning of Daikin Airnet system
(Remote monitoring) for Chiller units offer performance
monitoring and remote services.
Worked on the commissioning of Daikin central controller(I-
Touch controller)
Worked on the commissioning of Bacnet and LonWorks using
Daikin controller DMS5022B71 & DMS504C71 to VRV systems,
Indoor units and other local controller with BMS system.
Fire alarm, security, lighting, lift and power supply facility
(elevator, pump lighting) interface on Bacnet and Lonworks
with BMS.
Worked on the commissioning of the Daikin Mini BMS
system(I-Touch manager)
1. Interfacing of fire, security system and power supply
facility with I-TOUCH Manager.
2. Interfacing of lighting, pump, sensor, & AHU using Wago
Node.
3. Web access of I-TOUCH Manager via internet and
LAN(local area connection).
4. Interfacing of VRV and indoor units using ITM plus
adaptor up to 64 unit groups.
5. Interfacing of VRV and indoor units using D-III NET
adaptor up to 1024 units.
6. Web remote management of I-Touch manager using
hub/switch/router up to 4 administrators and 60 users
at the same time.
7. Auto-change over to both VRV and heat recovery
system, weekly schedule with dual setpoint for the
occupied period and setback setpoints for the
unoccupied period round schedule programming upto
100 schedule programs upto 20 events per day.
8. Automatic Alert/Error e-mail enables prompt response
to service person up to 10 email-addresses can be set.
Worked on the commissioning of Daikin various controller
such as Liquid crystal wired remote controller, wireless
remote controller.
Worked on Daikin MTII Carel (pico2, pico3) & MTIII Siemens
controller used in Daikin Air-cooled and Water cooled units.
Worked on the Siemens SIMATIC S7-1200 controller and HMI
panels series 270.
Knowledge of PLC & DDC system controller. Type of
programming language used to programme the PLC & DDC
controller.
Knowledge of Chilled water system (Primary only,
Primary/Secondary, & Variable primary flow) and
equipment(DP sensor, 2 way/3 way valve, motorized
butterfly valve on/off & regulated valve, temperature
sensors, flow metering device, Cooling tower operation
control). Overview of Building Management System
Project
Project Name : Dubai Tram (formerly, Al Sufouh Tram Project), Dubai, United Arab Emirates)
The Dubai Tram project, which was formerly known as Al Sufouh Tram Project, is a 14.6km-long route and
the first modern application of trams in the Gulf region.
Duration : 4 months
Scope of Work: Installation and commissioning of I-Touch Manager as BMS system for the entire
project.
1. Interface of the lighting, fire alarm, UPS, sliding door, lift, emergency lighting, and emergency
battery system over bacnet IP gateway with I-TOUCH manager.
2. Monitoring of the lighting, fire alarm, UPS, sliding door, lift, emergency lighting, and emergency
battery system over bacnet IP gateway with I-TOUCH manager.
3. Power monitoring of the complete system and equipment’s used for the entire project.
4. Trending of the power/energy data to diagnose the excess of energy usage in respect to the
target value on an hourly or daily basis.
Worked 10 months as Electrical & Instrumentation Trainee Engineer with Automation Solutions FZC,
SAIF ZONE Sharjah, UAE.
JOB RESPONSIBILITIES
Involved in the installation, pre-commissioning, commissioning of the instrumentation equipment’s as
per Technical specifications/Data Sheets.
Read & review overall project to prepare list of instrumentation, electrical & related material.
To prepare & review data sheets of Electrical & Instrumentation Equipment’s and cable such as:
1. Power cables 2. Instruments cables 3. Control cables 4. Earthing cables.
Gauges, Transmitters (Pressure, Level, Flow etc.), Control valves, On/Off valve, Switches, Push
Button (Start/Stop & ESD), Pump Motors.
To prepare & review Instruments documents i.e. Cable Schedule, Instruments Index etc.
Read and review Instrument drawings & Instrument loop diagrams.
Procurement of material as per specification & data sheets.
Prepare invoices and purchase orders for the procurement of the materials.
Plan & sequence the work by closely co-ordinating with the operation team for any activity that
requires work permit from the plant operation.
Mapping client’s requirements & ensuring rendering of solutions as per project specified guidelines;
minimizing bottlenecks for high quality of service for increasing the Customer Satisfaction Index.
Provide assistance to the Client for commissioning of the facility with specialist crew, labour, tools,
tackles, consumables. Provide commissioning specialist support for the items supplied whenever
necessary & needed.
PROFESSIONAL ENHANCEMENTS
Innovation, & Creativity
Technical Skills
Presentation Skills
SCHOLASTICS
Bachelor of Engineering in Instrumentation passed out in Dec 2012 from the Institute of
Instrumentation Engineering (USIC), Kurukshetra University, India
Computer Proficiency:
Well versed with MS-Word, Excel, Power point presentation and internet application.
College Internship Training
Organization : Hindustan Machine Tool Ltd.
Duration : 6 weeks
Organization : HARTRON PVT LTD. Ambala (Haryana)
Duration : 6 weeks
PERSONAL DOSSIER
Sex : - Male.
Date of Birth : - 13 June, 1989
Languages Known : - English, Hindi.
Having UAE driving license since FEB 2015
Declaration:
I hereby declare that the above mentioned information is correct and true to the best of my knowledge.
Ashu Bhatt

More Related Content

What's hot (20)

RAbella CV
RAbella CVRAbella CV
RAbella CV
 
Balaram_Panda_Resume
Balaram_Panda_ResumeBalaram_Panda_Resume
Balaram_Panda_Resume
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
 
MilenaSaenz
MilenaSaenzMilenaSaenz
MilenaSaenz
 
Episode 31 : Project Execution Part (2)
Episode 31 :  Project Execution Part (2)Episode 31 :  Project Execution Part (2)
Episode 31 : Project Execution Part (2)
 
updated_ashishmalhotra
updated_ashishmalhotraupdated_ashishmalhotra
updated_ashishmalhotra
 
CV-ATO-3 (1)
CV-ATO-3 (1)CV-ATO-3 (1)
CV-ATO-3 (1)
 
Sunderland Resume
Sunderland ResumeSunderland Resume
Sunderland Resume
 
Venkat_Resume
Venkat_ResumeVenkat_Resume
Venkat_Resume
 
Pramod Chand Chaturvedi
Pramod Chand ChaturvediPramod Chand Chaturvedi
Pramod Chand Chaturvedi
 
York National Accounts
York National AccountsYork National Accounts
York National Accounts
 
Raghunath Patil
Raghunath Patil Raghunath Patil
Raghunath Patil
 
Saquib Resume
Saquib ResumeSaquib Resume
Saquib Resume
 
CV Nagashiva
CV Nagashiva CV Nagashiva
CV Nagashiva
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 
Episode 32 : Project Execution Part (3)
Episode 32 :  Project Execution Part (3)Episode 32 :  Project Execution Part (3)
Episode 32 : Project Execution Part (3)
 
Jai kishore Tiwari resume
Jai kishore Tiwari resume Jai kishore Tiwari resume
Jai kishore Tiwari resume
 
Jayasinghe Abrode PDF
Jayasinghe Abrode   PDFJayasinghe Abrode   PDF
Jayasinghe Abrode PDF
 
Episode 33 : Project Execution Part (4)
Episode 33 :  Project Execution Part (4)Episode 33 :  Project Execution Part (4)
Episode 33 : Project Execution Part (4)
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 

Viewers also liked

Theodora datsika 1049296_konstantina_grimani_1049265
Theodora datsika 1049296_konstantina_grimani_1049265Theodora datsika 1049296_konstantina_grimani_1049265
Theodora datsika 1049296_konstantina_grimani_1049265nadiagrimani
 
Background of Sustainable Agriculture project_ Exploratory Research in Beijing
Background of  Sustainable Agriculture project_ Exploratory Research in BeijingBackground of  Sustainable Agriculture project_ Exploratory Research in Beijing
Background of Sustainable Agriculture project_ Exploratory Research in BeijingMiaoling Gonzalez
 
Company pagesplaybook6 11-13
Company pagesplaybook6 11-13Company pagesplaybook6 11-13
Company pagesplaybook6 11-13Christof Maass
 
Minfin Press-conference_15.12.2015
Minfin Press-conference_15.12.2015Minfin Press-conference_15.12.2015
Minfin Press-conference_15.12.2015Ministry_Finance
 
RISE SUSTAINABLE AGRICULTURE WORKSHOPS PROPOSAL 2016
RISE SUSTAINABLE AGRICULTURE WORKSHOPS PROPOSAL 2016RISE SUSTAINABLE AGRICULTURE WORKSHOPS PROPOSAL 2016
RISE SUSTAINABLE AGRICULTURE WORKSHOPS PROPOSAL 2016Miaoling Gonzalez
 
Nonlinearities in Circuits
Nonlinearities in CircuitsNonlinearities in Circuits
Nonlinearities in Circuitskailash karki
 
Mimo in Wireless Communication
Mimo in Wireless CommunicationMimo in Wireless Communication
Mimo in Wireless Communicationkailash karki
 
How to swim with a whale
How to swim with a whaleHow to swim with a whale
How to swim with a whaleŁukasz Siudut
 

Viewers also liked (11)

Theodora datsika 1049296_konstantina_grimani_1049265
Theodora datsika 1049296_konstantina_grimani_1049265Theodora datsika 1049296_konstantina_grimani_1049265
Theodora datsika 1049296_konstantina_grimani_1049265
 
Westchester airport limo
Westchester airport limoWestchester airport limo
Westchester airport limo
 
Background of Sustainable Agriculture project_ Exploratory Research in Beijing
Background of  Sustainable Agriculture project_ Exploratory Research in BeijingBackground of  Sustainable Agriculture project_ Exploratory Research in Beijing
Background of Sustainable Agriculture project_ Exploratory Research in Beijing
 
Company pagesplaybook6 11-13
Company pagesplaybook6 11-13Company pagesplaybook6 11-13
Company pagesplaybook6 11-13
 
5 steg til flere leads
5 steg til flere leads5 steg til flere leads
5 steg til flere leads
 
Minfin Press-conference_15.12.2015
Minfin Press-conference_15.12.2015Minfin Press-conference_15.12.2015
Minfin Press-conference_15.12.2015
 
RISE_Proposal_rooftop
RISE_Proposal_rooftopRISE_Proposal_rooftop
RISE_Proposal_rooftop
 
RISE SUSTAINABLE AGRICULTURE WORKSHOPS PROPOSAL 2016
RISE SUSTAINABLE AGRICULTURE WORKSHOPS PROPOSAL 2016RISE SUSTAINABLE AGRICULTURE WORKSHOPS PROPOSAL 2016
RISE SUSTAINABLE AGRICULTURE WORKSHOPS PROPOSAL 2016
 
Nonlinearities in Circuits
Nonlinearities in CircuitsNonlinearities in Circuits
Nonlinearities in Circuits
 
Mimo in Wireless Communication
Mimo in Wireless CommunicationMimo in Wireless Communication
Mimo in Wireless Communication
 
How to swim with a whale
How to swim with a whaleHow to swim with a whale
How to swim with a whale
 

Similar to CV_Ashu Bhatt

Similar to CV_Ashu Bhatt (20)

dinesh techom - with outpic revised
dinesh techom - with outpic reviseddinesh techom - with outpic revised
dinesh techom - with outpic revised
 
Electrical Engineer cv.PDF
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDF
 
prakash_final
prakash_finalprakash_final
prakash_final
 
[Resume prasanth]
[Resume prasanth][Resume prasanth]
[Resume prasanth]
 
[Resume Prasanth]
[Resume Prasanth][Resume Prasanth]
[Resume Prasanth]
 
Cv
CvCv
Cv
 
Lingeswaran CVe
Lingeswaran CVeLingeswaran CVe
Lingeswaran CVe
 
scott planner resume - Copy
scott planner resume - Copyscott planner resume - Copy
scott planner resume - Copy
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning Engineer
 
Balu Resume
Balu ResumeBalu Resume
Balu Resume
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice Cv
 
ahmed saad cv
ahmed saad cvahmed saad cv
ahmed saad cv
 
Krishna prasad fm engineer
Krishna prasad fm engineerKrishna prasad fm engineer
Krishna prasad fm engineer
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
Delta Telecom O&m presentation
Delta Telecom O&m presentationDelta Telecom O&m presentation
Delta Telecom O&m presentation
 
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 
CV
CVCV
CV
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 

CV_Ashu Bhatt

  • 1. ASHU BHATT Mobile: +918814984754 ~ E-Mail: ashu.bhatt89@gmail.com To achieve a challenging position in a professional organization, where i can enhance my skill and strength, in conjunction with company goal and achieve excellence in my every deal through team work. PROFESSIONAL SYNOPSIS Worked 1 year and 6 months as a BMS and Control engineer with Daikin Air-conditioning Middle east & Africa, Dubai, UAE. Dedicated to provide comprehensive solutions that satisfy organisation’s goal. Provide product technical support. JOB RESPONSIBILITIES Involved in the commissioning of Daikin Air-cooled chillers. Involved in the execution of projects and their documentations related to the commissioning of Daikin Chiller Plant Manager. 1. Review building chilled water drawing schematic, layout and prepare chilled plant room network structure. 2. Prepare/review specification and compliance statement as per project guidelines. 3. Prepare/review control and data points schedule list. 4. Prepare/review the functional description and sequence of operation of the chiller plant manager. 5. Prepare/review BOM sheet. 6. Review material technical data sheet. Worked on the interfacing works of the Daikin chillers (Air- cooled & Water cooled) with third part BMS system using Bacnet IP/MSTP, Modbus protocol. Carried out the interfacing works of DAIKIN VRV II, VRV III system with third party BMS system. Carried out the interfacing works of DAIKIN SPLIT system with third party BMS system. Worked on the Daikin D3 Network protocol of Daikin VRV system. Worked on the commissioning of Daikin Airnet(Remote monitoring) system for VRV units offer performance monitoring and remote services. 1. Monitoring of Indoor and Outdoor units operation such as: Project Documentation Start-up/Commissioning Supervision/Co-ordination Product Technical Support
  • 2. a. Temperature of heat exchangers, outside conditions, four way valves, solenoid valves, Inverter parameters, switches status etc. b. Operation mode of cooling, heating and fans. c. Status of transmission between indoor and outdoor units liquid pipe temperature, gas pipe temperature, thermostat signal etc. d. Operation history and protection of parts replacement timing such as total operating hours, number of on/off cycles, total on time for thermostat, compressor operation frequency. Prediction level anticipation notification for maintenance within 24 hours, several weeks and months. Carried out the commissioning of Daikin Airnet system (Remote monitoring) for Chiller units offer performance monitoring and remote services. Worked on the commissioning of Daikin central controller(I- Touch controller) Worked on the commissioning of Bacnet and LonWorks using Daikin controller DMS5022B71 & DMS504C71 to VRV systems, Indoor units and other local controller with BMS system. Fire alarm, security, lighting, lift and power supply facility (elevator, pump lighting) interface on Bacnet and Lonworks with BMS. Worked on the commissioning of the Daikin Mini BMS system(I-Touch manager) 1. Interfacing of fire, security system and power supply facility with I-TOUCH Manager. 2. Interfacing of lighting, pump, sensor, & AHU using Wago Node. 3. Web access of I-TOUCH Manager via internet and LAN(local area connection). 4. Interfacing of VRV and indoor units using ITM plus adaptor up to 64 unit groups. 5. Interfacing of VRV and indoor units using D-III NET adaptor up to 1024 units. 6. Web remote management of I-Touch manager using hub/switch/router up to 4 administrators and 60 users at the same time.
  • 3. 7. Auto-change over to both VRV and heat recovery system, weekly schedule with dual setpoint for the occupied period and setback setpoints for the unoccupied period round schedule programming upto 100 schedule programs upto 20 events per day. 8. Automatic Alert/Error e-mail enables prompt response to service person up to 10 email-addresses can be set. Worked on the commissioning of Daikin various controller such as Liquid crystal wired remote controller, wireless remote controller. Worked on Daikin MTII Carel (pico2, pico3) & MTIII Siemens controller used in Daikin Air-cooled and Water cooled units. Worked on the Siemens SIMATIC S7-1200 controller and HMI panels series 270. Knowledge of PLC & DDC system controller. Type of programming language used to programme the PLC & DDC controller. Knowledge of Chilled water system (Primary only, Primary/Secondary, & Variable primary flow) and equipment(DP sensor, 2 way/3 way valve, motorized butterfly valve on/off & regulated valve, temperature sensors, flow metering device, Cooling tower operation control). Overview of Building Management System Project Project Name : Dubai Tram (formerly, Al Sufouh Tram Project), Dubai, United Arab Emirates) The Dubai Tram project, which was formerly known as Al Sufouh Tram Project, is a 14.6km-long route and the first modern application of trams in the Gulf region. Duration : 4 months Scope of Work: Installation and commissioning of I-Touch Manager as BMS system for the entire project. 1. Interface of the lighting, fire alarm, UPS, sliding door, lift, emergency lighting, and emergency battery system over bacnet IP gateway with I-TOUCH manager. 2. Monitoring of the lighting, fire alarm, UPS, sliding door, lift, emergency lighting, and emergency battery system over bacnet IP gateway with I-TOUCH manager. 3. Power monitoring of the complete system and equipment’s used for the entire project. 4. Trending of the power/energy data to diagnose the excess of energy usage in respect to the target value on an hourly or daily basis.
  • 4. Worked 10 months as Electrical & Instrumentation Trainee Engineer with Automation Solutions FZC, SAIF ZONE Sharjah, UAE. JOB RESPONSIBILITIES Involved in the installation, pre-commissioning, commissioning of the instrumentation equipment’s as per Technical specifications/Data Sheets. Read & review overall project to prepare list of instrumentation, electrical & related material. To prepare & review data sheets of Electrical & Instrumentation Equipment’s and cable such as: 1. Power cables 2. Instruments cables 3. Control cables 4. Earthing cables. Gauges, Transmitters (Pressure, Level, Flow etc.), Control valves, On/Off valve, Switches, Push Button (Start/Stop & ESD), Pump Motors. To prepare & review Instruments documents i.e. Cable Schedule, Instruments Index etc. Read and review Instrument drawings & Instrument loop diagrams. Procurement of material as per specification & data sheets. Prepare invoices and purchase orders for the procurement of the materials. Plan & sequence the work by closely co-ordinating with the operation team for any activity that requires work permit from the plant operation. Mapping client’s requirements & ensuring rendering of solutions as per project specified guidelines; minimizing bottlenecks for high quality of service for increasing the Customer Satisfaction Index. Provide assistance to the Client for commissioning of the facility with specialist crew, labour, tools, tackles, consumables. Provide commissioning specialist support for the items supplied whenever necessary & needed. PROFESSIONAL ENHANCEMENTS Innovation, & Creativity Technical Skills Presentation Skills SCHOLASTICS Bachelor of Engineering in Instrumentation passed out in Dec 2012 from the Institute of Instrumentation Engineering (USIC), Kurukshetra University, India Computer Proficiency: Well versed with MS-Word, Excel, Power point presentation and internet application.
  • 5. College Internship Training Organization : Hindustan Machine Tool Ltd. Duration : 6 weeks Organization : HARTRON PVT LTD. Ambala (Haryana) Duration : 6 weeks PERSONAL DOSSIER Sex : - Male. Date of Birth : - 13 June, 1989 Languages Known : - English, Hindi. Having UAE driving license since FEB 2015 Declaration: I hereby declare that the above mentioned information is correct and true to the best of my knowledge. Ashu Bhatt