Bertino & Associates
 Corporate Profile




 Construction Management
     Owner/Agent CM
Development Administration
   General Contracting
 Design/Build Contracting

              Bayport One
    8025 Black Horse Pike, Suite 490
       West Atlantic City, NJ 08232
 Phone: 609.383.6700 / Fax: 609.383.6706
Introduction

                 Bertino & Associates, Inc. formation is rooted in the foundation of more than
                 40 years of construction-industry experience. Under the leadership of Michael
INTRODUCTION     S. Bertino, President, the company concentrates on improving its clients’ busi-
                 nesses through the management of construction programs for new facilities,
                 renovations, fit-out programs and expansions. Broad in scope, the company’s
                 services include development, construction management and owner/agent
                 project management.

                 Michael S. Bertino is the guiding force behind Bertino & Associates’ personnel.
                 He is committed to affording clients with personal attention and instills this
                 philosophy in each associate. A Registered Professional Engineer, Mr. Bertino
                 has a strong history of orchestrating and completing the most challenging con-
                 struction programs.

                 For 10 years prior to forming Bertino & Associates, he was Principal in charge
                 of Keating Building Corporation’s construction division where he administered
                 more than $300 million in annual construction. As Senior Vice President of
                 Mellon Stuart Company’s Eastern Region, he also ensured success for up to
                 $350 million in annual construction during his 14 year tenure.

                                                                 Client Focused Services
                 Bertino & Associates is 100% client focused. Our services are flexible in na-
                 ture and respond to specific client and project needs. Our corporate philoso-
                 phy ‘Exceed Expectations’ is the driving force that ensures that we exceed cli-
                 ent goals in each undertaking. Recognizing that every project is unique, we
                 draw upon the technical expertise of our senior associates to formulate an
                 innovative approach that makes projects happen and happen successfully!

                 Perhaps the greatest benefit of Bertino & Associates’ services is the benefit of
                 our early input from an experienced builder’s perspective of approach, plan-
                 ning, concepts, designs, alternatives and proposed solutions, including estab-
                 lishing “realistic” cost based upon our experience with similar projects. Our
                 team is adept at translating architectural and engineering programs into build-
                 ing reality. We instill quality in the total process to ensure completion on-time,
                 and within or under budget.

                 At Bertino & Associates, we know what works well, and we know what has
                 been less than successful. We understand the value that “early teaming”
                 yields to our clients, and the solutions that can be applied to make designs
                 “constructible”. This expertise is brought to the “team planning table” early
  Exceeding      ensuring that clients receive the most value from start to completion without
 Expectations!   sacrificing quality and without entering into costly re-design.
Introduction

                 Outline Scope of Services
INTRODUCTION
                 Bertino & Associates clients include Corporate, Native American, and Private
                 and Public Agencies. Based upon their needs, we tailor our services to in-
                 clude any combination or all the following:


                         PLANNING &                        PROGRAMMING PHASE
                    PREDEVELOPMENT PHASE

                 x Development Pre-Planning
                                                       x Project Program Development
                 x Consultant Request for Proposal
                                                       x Site Utilization/Evaluation
                  Preparation and Issuance
                                                       x Logistics Planning
                 x Consultant Interview & Selection
                                                       x Scheme Estimating
                 x Consultant Contract Negotiations
                                                       x Construction Evaluation
                 x Strategic & Financial Planning
                                                       x Scheduling/Phasing Evaluation
                 x Workload Projections
                                                       x Professional Consultation
                 x Regulatory Planning
                                                       x Cost & Financial Justification



                   PRECONSTRUCTION PHASE                     CONSTRUCTION PHASE

                 x Budget/Estimating Control           x Construction Oversight &
                 x Construction Pre-Planning             Administration
                 x Early-Start Construction            x Early Start Construction
                  Evaluation                           x Cost Control
                 x Constructability Evaluation         x Contraction Coordination
                 x Value Engineering                   x Scheduling/Phasing
                 x Life-Cycle Costing                  x Quality Control
                 x Scheduling, Planning & Phasing      x Coordination/FF&E Installations
                 x Cash Flow Projections               x Systems Start-Up Administration
                 x Competitive Bidding/Evaluation      x Final Close-Out Administration
                 x Equipment Coordination/FF&E/        x Warranty Administration
  Exceeding      x Purchasing & Coordination           x Occupancy Coordination
 Expectations!   x Coordination of FF&E &              x Dispute Resolution
                  Purchasing
                                                       x Post-Construction Follow-Up
Introduction

                 Planning for all things that make projects happen is a critical ingredient in
                 our approach. In evaluating projects, we draw from our staff and associates’
INTRODUCTION     expertise to provide a base of services that is all encompassing for a smooth
                 planning, programming, preconstruction and construction process.

                                                           Leading the Team to Success

                 Bertino & Associates, as Program Manager, puts the entire project team into
                 active roles within a fully integrated planning, design and construction proc-
                 ess. Combining hands-on experience with practical solutions, we achieve
                 success. We understand approvals and compliance concerns, budget restric-
                 tions, schedule parameters, FF&E purchasing, tenant fit-out and occupancy
                 requirements. We also know that the qualifications of the personnel as-
                 signed are critical to the successful execution of the work, and we know With an eye focused
                 how to structure the project team to ensure that resources are maxi- on “most value for
                 mized to potential.                                                       dollars expended” we
                                                                                                 apply a “total team
                 Equally important, we know that a successful project is a project com-          approach” to ensure
                 pleted without claims. Towards that end, we ensure that the early up-           that all components
                 front planning is a total and comprehensive team effort. This approach
                                                                                                  are done right…
                 goes a long way in minimizing change orders in construction, and also
                                                                                                    the first time
                 in ensuring that the documents are as complete and thorough as possi-
                 ble to minimize the potential for conflicts.

                 Aiding our staff in the administration of the work, we apply a variety of
                 computer based applications using Suretrak and Primavera for scheduling;
                 Expedition and Pro Log for documentation, tracking, project controls and
                 communications; estimating software and spreadsheet applications for cost-
                 ing and budgeting; AutoCAD for document review; as well as software for
                 word processing, layout, data management and accounting. All of these
                 components are incorporated into the extensive planning that we apply in our
                 projects.

                 From start through completion, Bertino & Associates’ goal is to achieve suc-
                 cess and exceed expectations in teaming, quality, schedule, budget and total
                 client satisfaction. And in this process, we foster long-term friendships and
                 working relationships with our clients, architects, and the total project team!




  Exceeding
 Expectations!
Bertino & Associates
                Enjoying many successful projects, our associates have been able to develop
                long term relationships throughout the construction industry with owners, de-
 PROJECT        velopers, architects, consultants, subcontractors, vendors and suppliers. Ber-
                tino & Associates’ staff have completed projects of varied sizes, scope and
EXPERIENCE      complexity. We have actively participated in master planning, development
                and design administration, new construction, renovations and expansions,
                interior fit-out, FF&E purchasing and coordination, and in infrastructure to sup-
                port these facilities such as central boiler, chiller plants and parking garages.

                Bertino & Associates’ ongoing and daily activity in the development and con-
                struction marketplace affords our team the advantages of a complete under-
                standing of how to guide projects through the extensive approvals and permit-
                ting process to avoid delays. We know Planning & Zoning Boards’ expecta-
                tions; we understand the local and State approval processes and require-
                ments; and we know how to expedite the Building Permit process. Working
                continuously with these agencies through our daily work, we know what to ex-
                pect and the timing required, and we apply this knowledge to “expedite” the
                process. Similarly, our construction management expertise and working rela-
                tionships with contractors and vendors that serve the construction industry,
                allow us to repeatedly deliver high-quality projects on time and within budget.

                Illustrating the depth of experience of the Bertino & Associates team, the fol-
                lowing projects are high lighted:




 Exceeding
Expectations!
Representative
     CORPORATE                                   OFFICE
            OFFICE                              Projects



The Mid-Town Office Bldg.
Core & Shell Fit-Out / 60,000 s.f.
Tenant Fit-Out / 50,000 s.f.

Centurian Plaza
140,000 s.f. Class “A”Office
Space with 520 car parking

Hewlett Packard Company
360,000 s.f.
Divisional Headquarters with
Research, Development &
Manufacturing Facilities

CONRAIL Headquarters
752,000 s,.f.
28-Story Corporate Fit-Out

IBM Corporation
1,200,000 s.f.
Divisional Headquarters Campus

Chase Manhattan Bank
200,000 s.f.
Corporate Office &
Computer Operations Center

Commerce Square
650,000 s.f., 21-Stories
Multi-Tenant Fit-Out

Independence Blue Cross
800,000 s.f.
27-Story Base Building and
Tenant Fit-Up

Keystone Mercy Health Plan
100,000 s.f. Class “A” Office Fit-
Out

One First Avenue
4 Story Multi-Tenant Fit-Out

100 East Elm Street
4 Story Multi-Tenant Fit-Out
Staff projects while employed by Bertino &
Associates, Keating or Mellon Stuart.




        Exceeding
       Expectations!
Representative
                                                Projects
         HOUSING



Millennium Assisted Living
160 Units of Assisted Living
Elderly Housing

McClay Street Low-Income
Housing
Phases I and II
650 Units Low-Income
Family Housing

Renovo Borough Housing
65 Units Low-Income
Family Housing

Frostburg Heights
Apartments
5-Story, Apartment Complex

Villa Saint Catherine
116-Bed Skilled Nursing
Facility & Secular
Retirement Community

Bahia Vista
146 Unit Hotel & Condominium


University Center at Easton
Avenue—Rutgers
630 Student Apartments
960-Car Parking Garage

Deptford Park II
102 Apartment Units of
Senior Housing with 15,500 sf
Administrative Center


Tre Sorelle
24 Luxury Condominiums


Staff projects while employed by Bertino &
Associates, Keating or Mellon Stuart.




        Exceeding
       Expectations!
Representative
                                                Projects
 INFRASTRUCTURE




Standy Electric Generating
Facility A 16 MW at 4160V de
signed for future expansion.
Unique design for noise, emis-
sions, special structures, & rapid
start.

Bally’s Park Place Overbuild
$22 Million Pop-Lloyd Avenue-
Overbuild joining Claridge &
Bally’s Casinos.

Bally’s Park Place
500-Car Parking Garage
& Transportation Depot

Air Hub Distribution Center
1,000,000 s.f./212 Acre Site
Regional Air Hub, Vehicle Main-
tenance, Pkg. Distribution
Facilities and Roadways

AstraZeneca U.S. Business
Center
2,050 Car Parking Garage

Hahnemann Hospital Park-
ing Garage
13-Story Parking Garage
830 Cars

Central Boiler/Chiller Plant
City of Philadelphia
6,000 Ton Gas-Fired Central
Boiler/Chiller Plant

Steam Generation Plant
Building 7 Powerhouse Expansion
Merck-West Point Campus

Keystone Health Systems
923-Car Parking Garage

Envirotest Systems, Inc.
Multi-State Program for
Construction of 186 Emissions
Testing Centers

Staff projects while employed by Bertino &
Associates, Keating or Mellon Stuart.



        Exceeding
       Expectations!
Representative
                                                Projects
           PUBLIC



Strawberry Square
Harrisburg, PA
1,000,000 s.f. Mixed-Use State
Office, Retail And Parking

City Government Center
New Brunswick, NJ
150,000 s.f. Expansion and
Public Safety Bldg. Renovations

Criminal Justice Center
Philadelphia, PA
582,000 s.f. New Judicial Center
with 64 Courtrooms

Municipal Services Building
Philadelphia, PA
486,000 s.f., 20-Story Base Build-
ing Renovs. w/Interior Fit-Out

State of Ohio VEIP
22 New Emissions Testing Station,
9 Renovations and 2 Technical
Training Centers

Maximum Security Prison
2,000 Bed Maximum Security
Correctional Complex

Lackawanna County Prison
Scranton, PA
596 Beds, 164,000 s.f.
Expansion and Renovations

State of Pennsylvania VEIP
82 New Emission Testing Facilities
throughout the state of PA




Staff projects while employed by Bertino &
Associates, Keating or Mellon Stuart.




        Exceeding
       Expectations!
Representative
                                                Projects
   EDUCATIONAL


University Center at Easton
Rutgers University
630 Student Apartments
960 car parking garage

Sandby Generator Facility
Temple University
16 mega watt/4160 volt facility
Capagle of supplying electric
To total campus

Student Dormitory
Lycoming College
120 student dormitory

Food Service Building
Penn State University
New Creamery, Research and
Classroom

Forest Resources Building
Penn State University
New Research and Classroom
Building

Multipurpose Health Science
Center
Temple University
New Research and Classroom
Building

Fine Auto Center
Rutgers University
Center for Performing Arts,
Audio and Visual

Student Housing
University of Rhode Island
800 Student dormitory complex
Consisting of 4 student suites

Payne Whitney Gymnasium
Renovation
Yale University
Athletic Renovations and install-
ation of squash courts
Staff projects while employed by Bertino &
Associates, Keating or Mellon Stuart.




        Exceeding
       Expectations!
Representative
                                                Projects
   RESTAURANT /
     RETAIL


Allied Domecq
20-Site, Retail Turn-Key Devel-
opment and Build Program

Deptford Crossing Center
200,000 s.f.
Strip Retail Center/4 Anchors

International Retail Center
75,000 s.f. Concourse B/C Airport
Retail Center

Tropicana Hotel & Casino
3 new restaurants
Asian and baccarat gaming
lounges

Isle of Capri Casinos
5 Faradday’s Signature Restaur-
ants

Sun International
Asian Gourmet Restaurant
New Bistro Restaurant
24 hour delicatessen

The Chelsea Hotel
Chelsea Prime Steakhouse
Teplistsky’s Restaurant

Foxwoods Resort & Casino
4 Retail Fit-Out locations
David Burke Steakhouse/Burke
In Box Restaurants
Bar/Lounge Fit-Out

Turning Stone Resort &
Casino
Wild Flowers Restaurant
Radizzio Brazilian Steak House
Festival Harvest Buffet




Staff projects while employed by Bertino &
Associates, Keating or Mellon Stuart.




        Exceeding
       Expectations!
Representative
                                                Projects
    HOSPITALITY



Tropicana Casino & Hotel
21-Story, 600 Rm. Hotel
High-Roller Super Suites
Baccarat Gaming Lounge
Asian Gaming Lounge
Simulcast Gaming
Three New Restaurants

Bally’s Wild Wild West
Casino
210,000 sf Casino w/ 3,600 Gam-
ing Positions


Sun International
600,000 s.f.
Resorts Casino Renovations
500-Rm Hotel Modernization
Asian Gourmet Restaurant
New Bistro Restaurant
24-Hour Delicatessen


The Chelsea Hotel
317 Room Boutique Hotel
And Spa

Caesar’s Transportation
Center
3,500 Car Transportation Center
w/Connection Bridge



Isle of Capri Casinos
Riverboat Casino, Tunica
320 Rm Suites Hotel, Bossier
Inn at the Isle Hotel, Biloxi
100 Rm Suites Hotel, Vicksburg
250 Rm Inn Hotel, Lake Charles
Five Farraddays Signature
Restaurants




Staff projects while employed by Bertino &
Associates, Keating or Mellon Stuart.




        Exceeding
       Expectations!
Representative
                                                Projects
    HOSPITALITY



Turning Stone Resort Casino
287 Room 19 Story Hotel
98 Room Luxury Suite Hotel
5,000 seat Event Center
Winter Garden
Power Plant


Bally’s Park Place Casino &
Hotel
808-Room Guest Hotel
Bus Transportation Ctr.
Bally’s Claridge Connector
500-Car Garage


Foxwoods Resort Casino
818 Room Hotel
4,000 Seat Theater
50,000 s.f. Ballroom
25,000 s.f. Meeting Room
50,000 s.f. Casino
2,900 Parking Garage



Magic City Casino
2,500 Slot & Poker Parlor
Miami, Florida


Monticello Raceway Casino
Renovation of Racetrack and
1,800 Position Slot Machines


The D.C. Capital Hilton
Hotel
1,200 Room Luxury Hotel
Renovation




Staff projects while employed by Bertino &
Associates, Keating or Mellon Stuart.




        Exceeding
       Expectations!
Scope of Services
                                                OVERVIEW
SCOPE OF        Bertino & Associates specializes in providing Program and Development
                Management Services, as well as Construction Management Services and
SERVICES        general construction.

                These services have been formulated to represent and protect the Owner’s
                interests from inception to final completion.

                Our interest lies in providing the highest level of professional services that
                ensure that the project is planned, designed, coordinated and constructed to
                meet the project’s objectives for program, quality, budget and operation.

                Bertino & Associates’ staff of senior professionals is, in fact, an extension of
                an Owner’s project staff. Each member of our staff is highly experienced in
                the development and construction of major sized projects, especially projects
                in the Hospitality and Gaming Industry. We are able to provide the manage-
                ment leadership, technical expertise, and relentless protection of the
                Owner’s interests throughout all phases of the project.

                Bertino & Associates will prepare trade subcontractor bid packages for solici-
                tation of bid proposals. These packages are based on the specific require-
                ments of the project. Upon receipt of responsible proposals, Bertino & Asso-
                ciates will renew the proposals, and as necessary, interview individual trade
                contractor to clarify scope, inclusions and exclusions.

                During the Planning Phase, our experience with similar projects will enhance
                the Design Team and Owner in the establishment of program and budget,
                phase development strategy, timeframe scheduling and operational planning
                and quality assistance in the development of a financing package and strat-
                egy.

                Budget and Schedule Control will continue throughout the Design and Pre-
                construction Phase. During this phase, we will develop and implement a con-
                tracting strategy that utilizes pre-qualified contractors, while taking full ad-
                vantage of the competitive marketplace.

                Through our staff’s 40 plus years experience in the construction industry,
                bidding documents will be prepared with an eye towards minimizing changes
                and potential claims. Prior to bidding, all contract documents and drawings
                will be reviewed for constructability and completeness. Incorporated within
                the documents will be a master schedule for timely start and completion of
                each phase of the project.

                Throughout the Construction Phase, our onsite professional staff will monitor
                and manage the construction contractors and consultants. In this process
 Exceeding      we will review and approve Applications for Payment, Change Orders, Project
                Schedules, and required Submittals. Our staff will conduct weekly
Expectations!   Owner/Contractor/Architect meetings with a focus on coordination and prob-
                lem resolution.
Scope of Services
                During the construction phase, in concert with the Owner’s Facilities Manage-
                ment Group, we will develop and implement a training and operational pro-
                gram to ensure that the facility will be properly operated once placed into ser-
SCOPE OF        vice.
SERVICES         As the project approaches completion, our onsite staff will provide complete
                closeout services including the management of punch list completion, and
                assembly and turnover of all closeout documents.


                    PLANNING PHASE SERVICES

                x     Consultant Selection/Contracting: Assist the Owner and Development
                      Team in identifying the special consultants that may be required. Pre-
                      pare documents for the consultant/contracting solicitation process, as-
                      sist in the evaluation of proposals and negotiations, and assist in the
                      preparation of the contract agreement(s).

                x     Project Budgets/Proforma: Assist the Owner in the formulation of an
                      overall project budget and Proforma. Develop a tracking and reporting
                      system designed to monitor and report on the total project budget
                      throughout the duration of the project. Provide cash flow projections of
                      anticipated expenditures.
                x     Program Development: Provide technical assistance to the Owner and
                      the Design Team in the formulation of the overall Program. Provide com-
                      parisons of the program to comparable facilities. As appropriate, make
                      recommendations for program changes. Coordinate meetings between
                      the Design Team and operations/maintenance staff for the purpose of
                      program review and coordination of team input.

                x     Design Concepts/Site Planning: Provide technical assistance to the
                      Owner and Design Team for the review of design concepts and overall
                      site planning. Compare design concepts to the program requirements.
                      As appropriate, provide recommendations for ensuring the best utiliza-
                      tion of the site for current and future development; development of a
                      cost-effective design; ensuring that quality expectations are met; and that
                      the anticipated construction schedule can be achieved. Prepare cost
                      comparisons of each design concept.

                x     Agency Approvals: Assist the Owner and the Design Team in obtaining all
                      necessary agency approvals. Monitor and report on the progress of each
                      approval process.

                x     Master Project Schedule: Prepare an overall Master Project Schedule
                      that incorporates all major activities required during Planning, Precon-
                      struction and Construction. Update the Master Project Schedule on a
 Exceeding            regular basis.
Expectations!
                x     Job Progress Meetings: On a regular basis, schedule, coordinate and
                      attend Progress Meetings between the Owner, the Development Team
                      and the Design Team.
Scope of Services
                    DESIGN & PRECONSTRUCTION PHASE SERVICES

                x   Financial Assistance: Provide to the Financing Team any required budg-
SCOPE OF            ets, cash flow projections, schedules, and phases that may be necessary
                    for completion of a financial package.
SERVICES
                x   Other Technical Assistance: Provide or secure any other technical assis-
                    tance the Owner may require to ensure the formulation of a Master Pro-
                    ject that will meet the anticipated expectations and provide the required
                    financial return.

                x   Reporting:: Provide the Owner monthly progress reports incorporating all
                    aspects of the Planning Phase.

                •   Design Consultant Selection/Contracting: Assist the Owner and the De-
                    sign Team in the solicitation and selection process, as well as negotiation
                    and contracting of required special consultants. Assist in the preparation
                    of contract agreements for each consultant.

                x   Project Budget:: Continue the tracking and reporting of the overall project
                    budget, and incorporate all contracted costs into the reporting of the Pro-
                    ject Budget. Provide cash flow projections of anticipated expenditures. If
                    any portion of the budget is not met, make recommendations for actions
                    required to be implemented for budget adherence.

                x    Design Review & Coordination Meetings: On a regular basis, schedule,
                    coordinate and attend Design Review and Coordination Meetings. Provide
                    technical assistance to the Design Team and the Owner regarding con-
                    structability, cost-effective design, value engineering, systems selections
                    and phasing/scheduling issues. Conduct a full review at completion of the
                    schematic and design development stages and at issuance of each bid
                    package.

                x   Contractor Selection: In consultation with the Design Team, prepare a
                    solicitation package for construction services with an either stipulated
                    Guaranteed Maximum Price (GMP) or a Lump Sum. The solicitation proc-
                    ess will include the prequalification of invited Contractors and Subcontrac-
                    tors, and issuance of a design package for preparation of bids, which bid
                    packages will include front end documents and scope of work, design
                    documents, outline technical and quality performance specifications, a
                    matrix of Owner/Contractor FF&E responsibilities, necessary allowances,
                    and construction schedule completion requirements. Upon receipt of pro-
                    posals, Bertino & Associates will conduct Contractor interviews for clarifi-
                    cation, evaluation and determination of the completeness of submissions.
                    Following interviews, if necessary, addenda may be issued for re-pricing
                    and submission of revised proposals. Bertino & Associates in consultation
                    with the Owner and Design Team will negotiate the final contract.
 Exceeding
                x   Contractor Coordination: Upon selection, the Contractor and/or Trade
Expectations!       Contractors will join the preconstruction team to provide input into the de-
                    sign for constructability, coordination of bid packages, design adherence
                    to the agreed upon GMP (or Lump Sum) basis of design, and value engi-
                    neering input.
Scope of Services
                x    Subcontractor Bidding: If the Contractor and Subcontractors provides a
                     GMP based upon incomplete design documents (i.e., an early-start ap-
SCOPE OF             proach), Bertino & Associates will oversee the subcontractor bidding
                     phase to ensure that the process is conducted in the best interest of the
SERVICES             Owner and the project. Bertino & Associates will review bidders’ lists,
                     participate in the review of bids received including post-bid interviews,
                     and evaluate the Contractor’s recommendations for subcontractor
                     awards.

                x     Owner Furnished Furniture, Fixtures & Equipment (FF&E): In consulta-
                     tion with the appropriate consultants, including an FF&E Purchasing
                     Agent as may be required, Bertino & Associates will assist in the prepara-
                     tion of bidder solicitation packages and contracting for all Owner-
                     furnished FF&E for the project. The Purchasing Agent’s solicitation proc-
                     ess will include a prequalification of bidders, issuance of bid packages,
                     receipt and evaluation of bids, post-bid interviews and negotiations, and
                     preparation of contracts and purchase orders. Upon award, coordinate
                     deliveries and installations with the work of the Contractor. Bertino &
                     Associates will review and approve all awards and invoices. Bertino &
                     Associates has the in-house capabilities of providing Purchasing Agent
                     Services.

                x     Invoice Review & Approval: Bertino & Associates will review and ap-
                     prove all consultant and contractor invoices for payment that will be sub-
                     mitted to the Owner for payment. During the Preconstruction Phase, Ber-
                     tino & Associates will establish cash flow projections for all work to be
                     performed.

                x    Preconstruction & Construction CPM Schedule: Review and monitor
                     the schedules prepared by the Contractor or individual subcontractors.
                     Whenever activities deviate from the required schedule dates and dura-
                     tions, recommend appropriate action to be taken to get activities back on
                     schedule. Coordinate all Owner action and activities to ensure that the
                     Owner required decisions or actions are made in a timely manner to
                     avoid delaying the project.

                x    Reporting: Provide to the Owner a monthly progress report incorporating
                     all aspects of the Design and Preconstruction Phase.

                    CONSTRUCTION PHASE SERVICES
                x    Construction Oversight: Establish a Field Management Office and pro-
                     vide on-site staff to monitor, report and deliver technical assistance to
                     the Owner on all aspects of the construction process including manage-
                     ment of subcontractors and associated field staff.

 Exceeding      x    Budget Control: Establish a construction budget reporting system that
                     incorporates a detailed schedule of values of the construction contract,
Expectations!        subcontract awards and invoices, purchase orders by the Contractor,
                     general conditions, consultant costs, soft costs and other related project
                     costs. Report to the Owner on a regular basis regarding the status of the
                     project budget and make recommendations where necessary to ensure
                     that the overall project budget is maintained.
Scope of Services
                x   Quality Control: Establish a project Quality Control Testing and Inspec-
                    tion Program utilizing Independent Testing and Inspection Agencies.
                    Included will be a daily reporting and notification of inspections and
SCOPE OF            tests, a deficiency correction and follow up procedure and preconstruc-
SERVICES            tion conferences and mock-ups.

                x   Change Order Procedures & Control: Bertino & Associates will estab-
                    lish a change order procedure which will be administered on the project
                    for review and processing all change orders. We will make recommen-
                    dations to the Owner for appropriate actions to be taken, and ensure
                    that change orders are in keeping with the terms and conditions of the
                    construction contracts. All change orders will be incorporated into the
                    tracking and project budget reporting systems.

                x   Job Progress Meetings: On a weekly basis, schedule, coordinate and
                    attend Progress Meetings between the Contractor and the Design
                    Team.

                x    Construction Schedule Reporting: Monitor the CPM construction
                    schedule prepared by the Contractor. Conduct regularly scheduled re-
                    views and update sessions. Make recommendations whenever activity
                    schedule dates are not being met and regularly report schedule pro-
                    gress to the Owner. Whenever critical activities fail to meet the re-
                    quired schedule dates, conduct schedule recovery sessions with the
                    Contractor. Document all progress and issue appropriate notices to the
                    Contractor when critical dates are not being met.

                x   Construction Invoice Review: Review and make recommendations for
                    approval and payment of all construction invoices from the Contractors,
                    Vendors and Consultants. Field verifies percentages complete and en-
                    sure all required invoices are substantiated with proper back-up docu-
                    mentation. Provide a cash flow projection for monthly requisitions
                    along with a summary total Project Cost Report.

                x   Owner-Furnished Furniture, Fixtures & Equipment (FF&E): Establish a
                    tracking procedure for the administration of the ordering, delivery, stor-
                    age and installation of all Owner-furnished FF&E. Coordinate receipt of
                    all Owner-furnished/Contractor-installed FF&E with the Contractor to
                    ensure timely delivery, proper receipt, storage and installation. Coordi-
                    nate the Owner’s direct-vendors with the Contractor. Verify receipt of
                    all materials and work completed.

                x   Claims Prevention & Resolution: Establish a claims prevention and
                    resolution procedure for the resolution of disputes on a continuing ba-
                    sis. As part of this process, instill a partnering approach by the project
                    team for the review of bid documents for completeness; prequalifica-
                    tion of bidders; review of required bonds and insurance; and timely is-
 Exceeding          suance, response, discussion and reporting of any unresolved disputes
Expectations!       with recommendations for actions to be taken.
Scope of Services

                    When a claim is submitted, Bertino & Associates will thoroughly investi-
SCOPE OF            gate the merits of the claim, solicit input from the appropriate Consult-
                    ants or other parties, and report to the Owner with appropriate action to
SERVICES            be taken. When authorized by the Owner, conduct settlement negotia-
                    tions and final resolution. If a claim cannot be settled, the Owner will
                    initiate the claims resolution procedures of the contract with Bertino &
                    Associates' full cooperation and support of such claims resolution ac-
                    tions.

                x   Start-Up & Testing: In conjunction with the Contractor and the Owner’s
                    facility operations and maintenance staff, Bertino & Associates will
                    schedule, monitor and report on all start-up and testing of equipment
                    and systems. Where independent testing is required, schedule, monitor
                    and report such testing as performed by testing agencies and consult-
                    ants.

                x   Punch list & Close-Out Documentation: When the project or a portion
                    of the project has been substantially completed, schedule punch list
                    visits by the Design Consultants. Upon receipt of punch list, establish a
                    procedure and schedule for completion by the contractor. Monitor and
                    verify completion of each punch list item.
                    As part of the closeout documentation process, schedule all operation
                    and maintenance training sessions, and coordinate the receipt of all as-
                    built drawings, operations manuals, shop drawing files, warranties and
                    final releases of liens and invoices.
                    Assist the Owner operations/maintenance staff in establishing a library
                    of all maintenance documentation. Where appropriate, assist the Owner
                    in the solicitation and negotiation of outside maintenance contracts.

                • Reporting: Provide the Owner a monthly progress report incorporating
                  all aspects of the Construction Phase. At the completion of the project,
                  Bertino & Associates will turn over all files and construction documents
                  for the Owner’s archives




 Exceeding
Expectations!

More Related Content

What's hot

Catalyze Webcast - Surefire Stakeholder Communication Strategy - Carkenord - ...
Catalyze Webcast - Surefire Stakeholder Communication Strategy - Carkenord - ...Catalyze Webcast - Surefire Stakeholder Communication Strategy - Carkenord - ...
Catalyze Webcast - Surefire Stakeholder Communication Strategy - Carkenord - ...Tom Humbarger
 
Project Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and DifferencesProject Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and DifferencesRicardo Viana Vargas
 
Bennington Green Profile
Bennington Green ProfileBennington Green Profile
Bennington Green ProfileKeith Kirkwood
 
م.58-مبادرة#تواصل_تطوير-د.وليد محفوظ-إدارة مشاركة المعنيين في مشاريع وبرامج ا...
م.58-مبادرة#تواصل_تطوير-د.وليد محفوظ-إدارة مشاركة المعنيين في مشاريع وبرامج ا...م.58-مبادرة#تواصل_تطوير-د.وليد محفوظ-إدارة مشاركة المعنيين في مشاريع وبرامج ا...
م.58-مبادرة#تواصل_تطوير-د.وليد محفوظ-إدارة مشاركة المعنيين في مشاريع وبرامج ا...Egyptian Engineers Association
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefitsPOTIFOB1
 
2018 01-11 raq infra profile v3.0.1
2018 01-11 raq infra profile v3.0.12018 01-11 raq infra profile v3.0.1
2018 01-11 raq infra profile v3.0.1RAQ Infra Pvt. Ltd.
 
Db Right Qualifications
Db Right QualificationsDb Right Qualifications
Db Right Qualificationsjcornwell
 
Ppt Special Effects 2010
Ppt Special Effects 2010Ppt Special Effects 2010
Ppt Special Effects 2010patriatsanjay
 
Ppt Special Effects 2007
Ppt Special Effects 2007Ppt Special Effects 2007
Ppt Special Effects 2007patriatsanjay
 
Program Mgmt Overview
Program Mgmt OverviewProgram Mgmt Overview
Program Mgmt Overviewsmcasas
 
Resume - Sunil M. Birajdar 2
Resume - Sunil M. Birajdar 2Resume - Sunil M. Birajdar 2
Resume - Sunil M. Birajdar 2Sunil Birajdar
 
CJI Marketing Package
CJI Marketing PackageCJI Marketing Package
CJI Marketing Packagecjonesj_48
 
60 minutes to pm
60 minutes to pm60 minutes to pm
60 minutes to pmbhashem007
 
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...Egyptian Engineers Association
 

What's hot (20)

Catalyze Webcast - Surefire Stakeholder Communication Strategy - Carkenord - ...
Catalyze Webcast - Surefire Stakeholder Communication Strategy - Carkenord - ...Catalyze Webcast - Surefire Stakeholder Communication Strategy - Carkenord - ...
Catalyze Webcast - Surefire Stakeholder Communication Strategy - Carkenord - ...
 
Project Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and DifferencesProject Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and Differences
 
Bennington Green Profile
Bennington Green ProfileBennington Green Profile
Bennington Green Profile
 
07-12-2014m
07-12-2014m07-12-2014m
07-12-2014m
 
م.58-مبادرة#تواصل_تطوير-د.وليد محفوظ-إدارة مشاركة المعنيين في مشاريع وبرامج ا...
م.58-مبادرة#تواصل_تطوير-د.وليد محفوظ-إدارة مشاركة المعنيين في مشاريع وبرامج ا...م.58-مبادرة#تواصل_تطوير-د.وليد محفوظ-إدارة مشاركة المعنيين في مشاريع وبرامج ا...
م.58-مبادرة#تواصل_تطوير-د.وليد محفوظ-إدارة مشاركة المعنيين في مشاريع وبرامج ا...
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefits
 
2018 01-11 raq infra profile v3.0.1
2018 01-11 raq infra profile v3.0.12018 01-11 raq infra profile v3.0.1
2018 01-11 raq infra profile v3.0.1
 
0130219142
01302191420130219142
0130219142
 
Db Right Qualifications
Db Right QualificationsDb Right Qualifications
Db Right Qualifications
 
T355
T355T355
T355
 
Ppt Special Effects 2010
Ppt Special Effects 2010Ppt Special Effects 2010
Ppt Special Effects 2010
 
Ppt Special Effects 2007
Ppt Special Effects 2007Ppt Special Effects 2007
Ppt Special Effects 2007
 
Construction Supervising Site Engineer - Duties & Responsibilities
Construction Supervising Site Engineer - Duties & ResponsibilitiesConstruction Supervising Site Engineer - Duties & Responsibilities
Construction Supervising Site Engineer - Duties & Responsibilities
 
M.Kamran Bashir- PMP, LEED AP BD+C, M.E. Structures
M.Kamran Bashir- PMP, LEED AP BD+C, M.E. StructuresM.Kamran Bashir- PMP, LEED AP BD+C, M.E. Structures
M.Kamran Bashir- PMP, LEED AP BD+C, M.E. Structures
 
Methodology
MethodologyMethodology
Methodology
 
Program Mgmt Overview
Program Mgmt OverviewProgram Mgmt Overview
Program Mgmt Overview
 
Resume - Sunil M. Birajdar 2
Resume - Sunil M. Birajdar 2Resume - Sunil M. Birajdar 2
Resume - Sunil M. Birajdar 2
 
CJI Marketing Package
CJI Marketing PackageCJI Marketing Package
CJI Marketing Package
 
60 minutes to pm
60 minutes to pm60 minutes to pm
60 minutes to pm
 
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
139 مبادرة #تواصل_تطوير المحاضرة ال 139 من المبادرة مهندس / محمد ماجد استشاري...
 

Similar to Corp. Profile Pdf 6 23 09

Owners Representation On Capital Projects
Owners Representation On Capital ProjectsOwners Representation On Capital Projects
Owners Representation On Capital ProjectsPMSIinc
 
Real Estate Solutions Brochure
Real Estate Solutions BrochureReal Estate Solutions Brochure
Real Estate Solutions BrochureManeer
 
Kaymonto and Partners_Profile 8 Apr 2016 (1)
Kaymonto and Partners_Profile 8 Apr 2016 (1)Kaymonto and Partners_Profile 8 Apr 2016 (1)
Kaymonto and Partners_Profile 8 Apr 2016 (1)Islam Shafiqul
 
OSI / Infinity LLC ,Power point
OSI / Infinity LLC ,Power pointOSI / Infinity LLC ,Power point
OSI / Infinity LLC ,Power pointRoakleyosi
 
Synefra e-pm brochure for mail
Synefra e-pm brochure for mailSynefra e-pm brochure for mail
Synefra e-pm brochure for mailManjit Dey
 
Synefra e-PM Update with ISO 2015
Synefra e-PM Update with ISO 2015Synefra e-PM Update with ISO 2015
Synefra e-PM Update with ISO 2015Sagar Raiyarela
 
Maconomy Management It Consulting Brochure
Maconomy Management It Consulting BrochureMaconomy Management It Consulting Brochure
Maconomy Management It Consulting Brochurejanbultinck
 
DELTEK Maconomy IT Consulting Brochure
DELTEK Maconomy IT Consulting BrochureDELTEK Maconomy IT Consulting Brochure
DELTEK Maconomy IT Consulting BrochureJan Bultinck
 
Lee Margolis Resume
Lee Margolis ResumeLee Margolis Resume
Lee Margolis ResumeLee Margolis
 
Strivent Service Offerings Differentiators Web 2 9
Strivent Service Offerings  Differentiators Web 2 9Strivent Service Offerings  Differentiators Web 2 9
Strivent Service Offerings Differentiators Web 2 9John Streit
 
The emphasis of Construction Management and Preconstruction Services in the A...
The emphasis of Construction Management and Preconstruction Services in the A...The emphasis of Construction Management and Preconstruction Services in the A...
The emphasis of Construction Management and Preconstruction Services in the A...BIM Engineering LLC U.S.
 
Construction Management | Preconstruction Services
Construction Management | Preconstruction ServicesConstruction Management | Preconstruction Services
Construction Management | Preconstruction ServicesBIM Engineering LLC U.S.
 
VTS MANAGEMENT SERVICES LTD Profile
VTS MANAGEMENT SERVICES LTD ProfileVTS MANAGEMENT SERVICES LTD Profile
VTS MANAGEMENT SERVICES LTD ProfileVTS Management
 
CRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management BenefitsCRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management BenefitsChris Gorga
 
RockPoint Services Presentation
RockPoint Services PresentationRockPoint Services Presentation
RockPoint Services Presentationbavila12
 

Similar to Corp. Profile Pdf 6 23 09 (20)

Owners Representation On Capital Projects
Owners Representation On Capital ProjectsOwners Representation On Capital Projects
Owners Representation On Capital Projects
 
Lighthouse Advisors Brochure
Lighthouse Advisors BrochureLighthouse Advisors Brochure
Lighthouse Advisors Brochure
 
Real Estate Solutions Brochure
Real Estate Solutions BrochureReal Estate Solutions Brochure
Real Estate Solutions Brochure
 
Kaymonto and Partners_Profile 8 Apr 2016 (1)
Kaymonto and Partners_Profile 8 Apr 2016 (1)Kaymonto and Partners_Profile 8 Apr 2016 (1)
Kaymonto and Partners_Profile 8 Apr 2016 (1)
 
OSI / Infinity LLC ,Power point
OSI / Infinity LLC ,Power pointOSI / Infinity LLC ,Power point
OSI / Infinity LLC ,Power point
 
Synefra e-pm brochure for mail
Synefra e-pm brochure for mailSynefra e-pm brochure for mail
Synefra e-pm brochure for mail
 
BC&M LLC 2013
BC&M LLC 2013BC&M LLC 2013
BC&M LLC 2013
 
136 work planning and programming
136 work planning and programming136 work planning and programming
136 work planning and programming
 
Synefra e-PM Update with ISO 2015
Synefra e-PM Update with ISO 2015Synefra e-PM Update with ISO 2015
Synefra e-PM Update with ISO 2015
 
Maconomy Management It Consulting Brochure
Maconomy Management It Consulting BrochureMaconomy Management It Consulting Brochure
Maconomy Management It Consulting Brochure
 
DELTEK Maconomy IT Consulting Brochure
DELTEK Maconomy IT Consulting BrochureDELTEK Maconomy IT Consulting Brochure
DELTEK Maconomy IT Consulting Brochure
 
Lee Margolis Resume
Lee Margolis ResumeLee Margolis Resume
Lee Margolis Resume
 
Strivent Service Offerings Differentiators Web 2 9
Strivent Service Offerings  Differentiators Web 2 9Strivent Service Offerings  Differentiators Web 2 9
Strivent Service Offerings Differentiators Web 2 9
 
The emphasis of Construction Management and Preconstruction Services in the A...
The emphasis of Construction Management and Preconstruction Services in the A...The emphasis of Construction Management and Preconstruction Services in the A...
The emphasis of Construction Management and Preconstruction Services in the A...
 
Construction Management | Preconstruction Services
Construction Management | Preconstruction ServicesConstruction Management | Preconstruction Services
Construction Management | Preconstruction Services
 
VTS MANAGEMENT SERVICES LTD Profile
VTS MANAGEMENT SERVICES LTD ProfileVTS MANAGEMENT SERVICES LTD Profile
VTS MANAGEMENT SERVICES LTD Profile
 
CRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management BenefitsCRG DevCo's Construction Management Benefits
CRG DevCo's Construction Management Benefits
 
RockPoint Services Presentation
RockPoint Services PresentationRockPoint Services Presentation
RockPoint Services Presentation
 
PriyankaTelang_resume
PriyankaTelang_resumePriyankaTelang_resume
PriyankaTelang_resume
 
Pmc profile 22032016
Pmc profile 22032016Pmc profile 22032016
Pmc profile 22032016
 

Corp. Profile Pdf 6 23 09

  • 1. Bertino & Associates Corporate Profile Construction Management Owner/Agent CM Development Administration General Contracting Design/Build Contracting Bayport One 8025 Black Horse Pike, Suite 490 West Atlantic City, NJ 08232 Phone: 609.383.6700 / Fax: 609.383.6706
  • 2. Introduction Bertino & Associates, Inc. formation is rooted in the foundation of more than 40 years of construction-industry experience. Under the leadership of Michael INTRODUCTION S. Bertino, President, the company concentrates on improving its clients’ busi- nesses through the management of construction programs for new facilities, renovations, fit-out programs and expansions. Broad in scope, the company’s services include development, construction management and owner/agent project management. Michael S. Bertino is the guiding force behind Bertino & Associates’ personnel. He is committed to affording clients with personal attention and instills this philosophy in each associate. A Registered Professional Engineer, Mr. Bertino has a strong history of orchestrating and completing the most challenging con- struction programs. For 10 years prior to forming Bertino & Associates, he was Principal in charge of Keating Building Corporation’s construction division where he administered more than $300 million in annual construction. As Senior Vice President of Mellon Stuart Company’s Eastern Region, he also ensured success for up to $350 million in annual construction during his 14 year tenure. Client Focused Services Bertino & Associates is 100% client focused. Our services are flexible in na- ture and respond to specific client and project needs. Our corporate philoso- phy ‘Exceed Expectations’ is the driving force that ensures that we exceed cli- ent goals in each undertaking. Recognizing that every project is unique, we draw upon the technical expertise of our senior associates to formulate an innovative approach that makes projects happen and happen successfully! Perhaps the greatest benefit of Bertino & Associates’ services is the benefit of our early input from an experienced builder’s perspective of approach, plan- ning, concepts, designs, alternatives and proposed solutions, including estab- lishing “realistic” cost based upon our experience with similar projects. Our team is adept at translating architectural and engineering programs into build- ing reality. We instill quality in the total process to ensure completion on-time, and within or under budget. At Bertino & Associates, we know what works well, and we know what has been less than successful. We understand the value that “early teaming” yields to our clients, and the solutions that can be applied to make designs “constructible”. This expertise is brought to the “team planning table” early Exceeding ensuring that clients receive the most value from start to completion without Expectations! sacrificing quality and without entering into costly re-design.
  • 3. Introduction Outline Scope of Services INTRODUCTION Bertino & Associates clients include Corporate, Native American, and Private and Public Agencies. Based upon their needs, we tailor our services to in- clude any combination or all the following: PLANNING & PROGRAMMING PHASE PREDEVELOPMENT PHASE x Development Pre-Planning x Project Program Development x Consultant Request for Proposal x Site Utilization/Evaluation Preparation and Issuance x Logistics Planning x Consultant Interview & Selection x Scheme Estimating x Consultant Contract Negotiations x Construction Evaluation x Strategic & Financial Planning x Scheduling/Phasing Evaluation x Workload Projections x Professional Consultation x Regulatory Planning x Cost & Financial Justification PRECONSTRUCTION PHASE CONSTRUCTION PHASE x Budget/Estimating Control x Construction Oversight & x Construction Pre-Planning Administration x Early-Start Construction x Early Start Construction Evaluation x Cost Control x Constructability Evaluation x Contraction Coordination x Value Engineering x Scheduling/Phasing x Life-Cycle Costing x Quality Control x Scheduling, Planning & Phasing x Coordination/FF&E Installations x Cash Flow Projections x Systems Start-Up Administration x Competitive Bidding/Evaluation x Final Close-Out Administration x Equipment Coordination/FF&E/ x Warranty Administration Exceeding x Purchasing & Coordination x Occupancy Coordination Expectations! x Coordination of FF&E & x Dispute Resolution Purchasing x Post-Construction Follow-Up
  • 4. Introduction Planning for all things that make projects happen is a critical ingredient in our approach. In evaluating projects, we draw from our staff and associates’ INTRODUCTION expertise to provide a base of services that is all encompassing for a smooth planning, programming, preconstruction and construction process. Leading the Team to Success Bertino & Associates, as Program Manager, puts the entire project team into active roles within a fully integrated planning, design and construction proc- ess. Combining hands-on experience with practical solutions, we achieve success. We understand approvals and compliance concerns, budget restric- tions, schedule parameters, FF&E purchasing, tenant fit-out and occupancy requirements. We also know that the qualifications of the personnel as- signed are critical to the successful execution of the work, and we know With an eye focused how to structure the project team to ensure that resources are maxi- on “most value for mized to potential. dollars expended” we apply a “total team Equally important, we know that a successful project is a project com- approach” to ensure pleted without claims. Towards that end, we ensure that the early up- that all components front planning is a total and comprehensive team effort. This approach are done right… goes a long way in minimizing change orders in construction, and also the first time in ensuring that the documents are as complete and thorough as possi- ble to minimize the potential for conflicts. Aiding our staff in the administration of the work, we apply a variety of computer based applications using Suretrak and Primavera for scheduling; Expedition and Pro Log for documentation, tracking, project controls and communications; estimating software and spreadsheet applications for cost- ing and budgeting; AutoCAD for document review; as well as software for word processing, layout, data management and accounting. All of these components are incorporated into the extensive planning that we apply in our projects. From start through completion, Bertino & Associates’ goal is to achieve suc- cess and exceed expectations in teaming, quality, schedule, budget and total client satisfaction. And in this process, we foster long-term friendships and working relationships with our clients, architects, and the total project team! Exceeding Expectations!
  • 5. Bertino & Associates Enjoying many successful projects, our associates have been able to develop long term relationships throughout the construction industry with owners, de- PROJECT velopers, architects, consultants, subcontractors, vendors and suppliers. Ber- tino & Associates’ staff have completed projects of varied sizes, scope and EXPERIENCE complexity. We have actively participated in master planning, development and design administration, new construction, renovations and expansions, interior fit-out, FF&E purchasing and coordination, and in infrastructure to sup- port these facilities such as central boiler, chiller plants and parking garages. Bertino & Associates’ ongoing and daily activity in the development and con- struction marketplace affords our team the advantages of a complete under- standing of how to guide projects through the extensive approvals and permit- ting process to avoid delays. We know Planning & Zoning Boards’ expecta- tions; we understand the local and State approval processes and require- ments; and we know how to expedite the Building Permit process. Working continuously with these agencies through our daily work, we know what to ex- pect and the timing required, and we apply this knowledge to “expedite” the process. Similarly, our construction management expertise and working rela- tionships with contractors and vendors that serve the construction industry, allow us to repeatedly deliver high-quality projects on time and within budget. Illustrating the depth of experience of the Bertino & Associates team, the fol- lowing projects are high lighted: Exceeding Expectations!
  • 6. Representative CORPORATE OFFICE OFFICE Projects The Mid-Town Office Bldg. Core & Shell Fit-Out / 60,000 s.f. Tenant Fit-Out / 50,000 s.f. Centurian Plaza 140,000 s.f. Class “A”Office Space with 520 car parking Hewlett Packard Company 360,000 s.f. Divisional Headquarters with Research, Development & Manufacturing Facilities CONRAIL Headquarters 752,000 s,.f. 28-Story Corporate Fit-Out IBM Corporation 1,200,000 s.f. Divisional Headquarters Campus Chase Manhattan Bank 200,000 s.f. Corporate Office & Computer Operations Center Commerce Square 650,000 s.f., 21-Stories Multi-Tenant Fit-Out Independence Blue Cross 800,000 s.f. 27-Story Base Building and Tenant Fit-Up Keystone Mercy Health Plan 100,000 s.f. Class “A” Office Fit- Out One First Avenue 4 Story Multi-Tenant Fit-Out 100 East Elm Street 4 Story Multi-Tenant Fit-Out Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart. Exceeding Expectations!
  • 7. Representative Projects HOUSING Millennium Assisted Living 160 Units of Assisted Living Elderly Housing McClay Street Low-Income Housing Phases I and II 650 Units Low-Income Family Housing Renovo Borough Housing 65 Units Low-Income Family Housing Frostburg Heights Apartments 5-Story, Apartment Complex Villa Saint Catherine 116-Bed Skilled Nursing Facility & Secular Retirement Community Bahia Vista 146 Unit Hotel & Condominium University Center at Easton Avenue—Rutgers 630 Student Apartments 960-Car Parking Garage Deptford Park II 102 Apartment Units of Senior Housing with 15,500 sf Administrative Center Tre Sorelle 24 Luxury Condominiums Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart. Exceeding Expectations!
  • 8. Representative Projects INFRASTRUCTURE Standy Electric Generating Facility A 16 MW at 4160V de signed for future expansion. Unique design for noise, emis- sions, special structures, & rapid start. Bally’s Park Place Overbuild $22 Million Pop-Lloyd Avenue- Overbuild joining Claridge & Bally’s Casinos. Bally’s Park Place 500-Car Parking Garage & Transportation Depot Air Hub Distribution Center 1,000,000 s.f./212 Acre Site Regional Air Hub, Vehicle Main- tenance, Pkg. Distribution Facilities and Roadways AstraZeneca U.S. Business Center 2,050 Car Parking Garage Hahnemann Hospital Park- ing Garage 13-Story Parking Garage 830 Cars Central Boiler/Chiller Plant City of Philadelphia 6,000 Ton Gas-Fired Central Boiler/Chiller Plant Steam Generation Plant Building 7 Powerhouse Expansion Merck-West Point Campus Keystone Health Systems 923-Car Parking Garage Envirotest Systems, Inc. Multi-State Program for Construction of 186 Emissions Testing Centers Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart. Exceeding Expectations!
  • 9. Representative Projects PUBLIC Strawberry Square Harrisburg, PA 1,000,000 s.f. Mixed-Use State Office, Retail And Parking City Government Center New Brunswick, NJ 150,000 s.f. Expansion and Public Safety Bldg. Renovations Criminal Justice Center Philadelphia, PA 582,000 s.f. New Judicial Center with 64 Courtrooms Municipal Services Building Philadelphia, PA 486,000 s.f., 20-Story Base Build- ing Renovs. w/Interior Fit-Out State of Ohio VEIP 22 New Emissions Testing Station, 9 Renovations and 2 Technical Training Centers Maximum Security Prison 2,000 Bed Maximum Security Correctional Complex Lackawanna County Prison Scranton, PA 596 Beds, 164,000 s.f. Expansion and Renovations State of Pennsylvania VEIP 82 New Emission Testing Facilities throughout the state of PA Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart. Exceeding Expectations!
  • 10. Representative Projects EDUCATIONAL University Center at Easton Rutgers University 630 Student Apartments 960 car parking garage Sandby Generator Facility Temple University 16 mega watt/4160 volt facility Capagle of supplying electric To total campus Student Dormitory Lycoming College 120 student dormitory Food Service Building Penn State University New Creamery, Research and Classroom Forest Resources Building Penn State University New Research and Classroom Building Multipurpose Health Science Center Temple University New Research and Classroom Building Fine Auto Center Rutgers University Center for Performing Arts, Audio and Visual Student Housing University of Rhode Island 800 Student dormitory complex Consisting of 4 student suites Payne Whitney Gymnasium Renovation Yale University Athletic Renovations and install- ation of squash courts Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart. Exceeding Expectations!
  • 11. Representative Projects RESTAURANT / RETAIL Allied Domecq 20-Site, Retail Turn-Key Devel- opment and Build Program Deptford Crossing Center 200,000 s.f. Strip Retail Center/4 Anchors International Retail Center 75,000 s.f. Concourse B/C Airport Retail Center Tropicana Hotel & Casino 3 new restaurants Asian and baccarat gaming lounges Isle of Capri Casinos 5 Faradday’s Signature Restaur- ants Sun International Asian Gourmet Restaurant New Bistro Restaurant 24 hour delicatessen The Chelsea Hotel Chelsea Prime Steakhouse Teplistsky’s Restaurant Foxwoods Resort & Casino 4 Retail Fit-Out locations David Burke Steakhouse/Burke In Box Restaurants Bar/Lounge Fit-Out Turning Stone Resort & Casino Wild Flowers Restaurant Radizzio Brazilian Steak House Festival Harvest Buffet Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart. Exceeding Expectations!
  • 12. Representative Projects HOSPITALITY Tropicana Casino & Hotel 21-Story, 600 Rm. Hotel High-Roller Super Suites Baccarat Gaming Lounge Asian Gaming Lounge Simulcast Gaming Three New Restaurants Bally’s Wild Wild West Casino 210,000 sf Casino w/ 3,600 Gam- ing Positions Sun International 600,000 s.f. Resorts Casino Renovations 500-Rm Hotel Modernization Asian Gourmet Restaurant New Bistro Restaurant 24-Hour Delicatessen The Chelsea Hotel 317 Room Boutique Hotel And Spa Caesar’s Transportation Center 3,500 Car Transportation Center w/Connection Bridge Isle of Capri Casinos Riverboat Casino, Tunica 320 Rm Suites Hotel, Bossier Inn at the Isle Hotel, Biloxi 100 Rm Suites Hotel, Vicksburg 250 Rm Inn Hotel, Lake Charles Five Farraddays Signature Restaurants Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart. Exceeding Expectations!
  • 13. Representative Projects HOSPITALITY Turning Stone Resort Casino 287 Room 19 Story Hotel 98 Room Luxury Suite Hotel 5,000 seat Event Center Winter Garden Power Plant Bally’s Park Place Casino & Hotel 808-Room Guest Hotel Bus Transportation Ctr. Bally’s Claridge Connector 500-Car Garage Foxwoods Resort Casino 818 Room Hotel 4,000 Seat Theater 50,000 s.f. Ballroom 25,000 s.f. Meeting Room 50,000 s.f. Casino 2,900 Parking Garage Magic City Casino 2,500 Slot & Poker Parlor Miami, Florida Monticello Raceway Casino Renovation of Racetrack and 1,800 Position Slot Machines The D.C. Capital Hilton Hotel 1,200 Room Luxury Hotel Renovation Staff projects while employed by Bertino & Associates, Keating or Mellon Stuart. Exceeding Expectations!
  • 14. Scope of Services OVERVIEW SCOPE OF Bertino & Associates specializes in providing Program and Development Management Services, as well as Construction Management Services and SERVICES general construction. These services have been formulated to represent and protect the Owner’s interests from inception to final completion. Our interest lies in providing the highest level of professional services that ensure that the project is planned, designed, coordinated and constructed to meet the project’s objectives for program, quality, budget and operation. Bertino & Associates’ staff of senior professionals is, in fact, an extension of an Owner’s project staff. Each member of our staff is highly experienced in the development and construction of major sized projects, especially projects in the Hospitality and Gaming Industry. We are able to provide the manage- ment leadership, technical expertise, and relentless protection of the Owner’s interests throughout all phases of the project. Bertino & Associates will prepare trade subcontractor bid packages for solici- tation of bid proposals. These packages are based on the specific require- ments of the project. Upon receipt of responsible proposals, Bertino & Asso- ciates will renew the proposals, and as necessary, interview individual trade contractor to clarify scope, inclusions and exclusions. During the Planning Phase, our experience with similar projects will enhance the Design Team and Owner in the establishment of program and budget, phase development strategy, timeframe scheduling and operational planning and quality assistance in the development of a financing package and strat- egy. Budget and Schedule Control will continue throughout the Design and Pre- construction Phase. During this phase, we will develop and implement a con- tracting strategy that utilizes pre-qualified contractors, while taking full ad- vantage of the competitive marketplace. Through our staff’s 40 plus years experience in the construction industry, bidding documents will be prepared with an eye towards minimizing changes and potential claims. Prior to bidding, all contract documents and drawings will be reviewed for constructability and completeness. Incorporated within the documents will be a master schedule for timely start and completion of each phase of the project. Throughout the Construction Phase, our onsite professional staff will monitor and manage the construction contractors and consultants. In this process Exceeding we will review and approve Applications for Payment, Change Orders, Project Schedules, and required Submittals. Our staff will conduct weekly Expectations! Owner/Contractor/Architect meetings with a focus on coordination and prob- lem resolution.
  • 15. Scope of Services During the construction phase, in concert with the Owner’s Facilities Manage- ment Group, we will develop and implement a training and operational pro- gram to ensure that the facility will be properly operated once placed into ser- SCOPE OF vice. SERVICES As the project approaches completion, our onsite staff will provide complete closeout services including the management of punch list completion, and assembly and turnover of all closeout documents. PLANNING PHASE SERVICES x Consultant Selection/Contracting: Assist the Owner and Development Team in identifying the special consultants that may be required. Pre- pare documents for the consultant/contracting solicitation process, as- sist in the evaluation of proposals and negotiations, and assist in the preparation of the contract agreement(s). x Project Budgets/Proforma: Assist the Owner in the formulation of an overall project budget and Proforma. Develop a tracking and reporting system designed to monitor and report on the total project budget throughout the duration of the project. Provide cash flow projections of anticipated expenditures. x Program Development: Provide technical assistance to the Owner and the Design Team in the formulation of the overall Program. Provide com- parisons of the program to comparable facilities. As appropriate, make recommendations for program changes. Coordinate meetings between the Design Team and operations/maintenance staff for the purpose of program review and coordination of team input. x Design Concepts/Site Planning: Provide technical assistance to the Owner and Design Team for the review of design concepts and overall site planning. Compare design concepts to the program requirements. As appropriate, provide recommendations for ensuring the best utiliza- tion of the site for current and future development; development of a cost-effective design; ensuring that quality expectations are met; and that the anticipated construction schedule can be achieved. Prepare cost comparisons of each design concept. x Agency Approvals: Assist the Owner and the Design Team in obtaining all necessary agency approvals. Monitor and report on the progress of each approval process. x Master Project Schedule: Prepare an overall Master Project Schedule that incorporates all major activities required during Planning, Precon- struction and Construction. Update the Master Project Schedule on a Exceeding regular basis. Expectations! x Job Progress Meetings: On a regular basis, schedule, coordinate and attend Progress Meetings between the Owner, the Development Team and the Design Team.
  • 16. Scope of Services DESIGN & PRECONSTRUCTION PHASE SERVICES x Financial Assistance: Provide to the Financing Team any required budg- SCOPE OF ets, cash flow projections, schedules, and phases that may be necessary for completion of a financial package. SERVICES x Other Technical Assistance: Provide or secure any other technical assis- tance the Owner may require to ensure the formulation of a Master Pro- ject that will meet the anticipated expectations and provide the required financial return. x Reporting:: Provide the Owner monthly progress reports incorporating all aspects of the Planning Phase. • Design Consultant Selection/Contracting: Assist the Owner and the De- sign Team in the solicitation and selection process, as well as negotiation and contracting of required special consultants. Assist in the preparation of contract agreements for each consultant. x Project Budget:: Continue the tracking and reporting of the overall project budget, and incorporate all contracted costs into the reporting of the Pro- ject Budget. Provide cash flow projections of anticipated expenditures. If any portion of the budget is not met, make recommendations for actions required to be implemented for budget adherence. x Design Review & Coordination Meetings: On a regular basis, schedule, coordinate and attend Design Review and Coordination Meetings. Provide technical assistance to the Design Team and the Owner regarding con- structability, cost-effective design, value engineering, systems selections and phasing/scheduling issues. Conduct a full review at completion of the schematic and design development stages and at issuance of each bid package. x Contractor Selection: In consultation with the Design Team, prepare a solicitation package for construction services with an either stipulated Guaranteed Maximum Price (GMP) or a Lump Sum. The solicitation proc- ess will include the prequalification of invited Contractors and Subcontrac- tors, and issuance of a design package for preparation of bids, which bid packages will include front end documents and scope of work, design documents, outline technical and quality performance specifications, a matrix of Owner/Contractor FF&E responsibilities, necessary allowances, and construction schedule completion requirements. Upon receipt of pro- posals, Bertino & Associates will conduct Contractor interviews for clarifi- cation, evaluation and determination of the completeness of submissions. Following interviews, if necessary, addenda may be issued for re-pricing and submission of revised proposals. Bertino & Associates in consultation with the Owner and Design Team will negotiate the final contract. Exceeding x Contractor Coordination: Upon selection, the Contractor and/or Trade Expectations! Contractors will join the preconstruction team to provide input into the de- sign for constructability, coordination of bid packages, design adherence to the agreed upon GMP (or Lump Sum) basis of design, and value engi- neering input.
  • 17. Scope of Services x Subcontractor Bidding: If the Contractor and Subcontractors provides a GMP based upon incomplete design documents (i.e., an early-start ap- SCOPE OF proach), Bertino & Associates will oversee the subcontractor bidding phase to ensure that the process is conducted in the best interest of the SERVICES Owner and the project. Bertino & Associates will review bidders’ lists, participate in the review of bids received including post-bid interviews, and evaluate the Contractor’s recommendations for subcontractor awards. x Owner Furnished Furniture, Fixtures & Equipment (FF&E): In consulta- tion with the appropriate consultants, including an FF&E Purchasing Agent as may be required, Bertino & Associates will assist in the prepara- tion of bidder solicitation packages and contracting for all Owner- furnished FF&E for the project. The Purchasing Agent’s solicitation proc- ess will include a prequalification of bidders, issuance of bid packages, receipt and evaluation of bids, post-bid interviews and negotiations, and preparation of contracts and purchase orders. Upon award, coordinate deliveries and installations with the work of the Contractor. Bertino & Associates will review and approve all awards and invoices. Bertino & Associates has the in-house capabilities of providing Purchasing Agent Services. x Invoice Review & Approval: Bertino & Associates will review and ap- prove all consultant and contractor invoices for payment that will be sub- mitted to the Owner for payment. During the Preconstruction Phase, Ber- tino & Associates will establish cash flow projections for all work to be performed. x Preconstruction & Construction CPM Schedule: Review and monitor the schedules prepared by the Contractor or individual subcontractors. Whenever activities deviate from the required schedule dates and dura- tions, recommend appropriate action to be taken to get activities back on schedule. Coordinate all Owner action and activities to ensure that the Owner required decisions or actions are made in a timely manner to avoid delaying the project. x Reporting: Provide to the Owner a monthly progress report incorporating all aspects of the Design and Preconstruction Phase. CONSTRUCTION PHASE SERVICES x Construction Oversight: Establish a Field Management Office and pro- vide on-site staff to monitor, report and deliver technical assistance to the Owner on all aspects of the construction process including manage- ment of subcontractors and associated field staff. Exceeding x Budget Control: Establish a construction budget reporting system that incorporates a detailed schedule of values of the construction contract, Expectations! subcontract awards and invoices, purchase orders by the Contractor, general conditions, consultant costs, soft costs and other related project costs. Report to the Owner on a regular basis regarding the status of the project budget and make recommendations where necessary to ensure that the overall project budget is maintained.
  • 18. Scope of Services x Quality Control: Establish a project Quality Control Testing and Inspec- tion Program utilizing Independent Testing and Inspection Agencies. Included will be a daily reporting and notification of inspections and SCOPE OF tests, a deficiency correction and follow up procedure and preconstruc- SERVICES tion conferences and mock-ups. x Change Order Procedures & Control: Bertino & Associates will estab- lish a change order procedure which will be administered on the project for review and processing all change orders. We will make recommen- dations to the Owner for appropriate actions to be taken, and ensure that change orders are in keeping with the terms and conditions of the construction contracts. All change orders will be incorporated into the tracking and project budget reporting systems. x Job Progress Meetings: On a weekly basis, schedule, coordinate and attend Progress Meetings between the Contractor and the Design Team. x Construction Schedule Reporting: Monitor the CPM construction schedule prepared by the Contractor. Conduct regularly scheduled re- views and update sessions. Make recommendations whenever activity schedule dates are not being met and regularly report schedule pro- gress to the Owner. Whenever critical activities fail to meet the re- quired schedule dates, conduct schedule recovery sessions with the Contractor. Document all progress and issue appropriate notices to the Contractor when critical dates are not being met. x Construction Invoice Review: Review and make recommendations for approval and payment of all construction invoices from the Contractors, Vendors and Consultants. Field verifies percentages complete and en- sure all required invoices are substantiated with proper back-up docu- mentation. Provide a cash flow projection for monthly requisitions along with a summary total Project Cost Report. x Owner-Furnished Furniture, Fixtures & Equipment (FF&E): Establish a tracking procedure for the administration of the ordering, delivery, stor- age and installation of all Owner-furnished FF&E. Coordinate receipt of all Owner-furnished/Contractor-installed FF&E with the Contractor to ensure timely delivery, proper receipt, storage and installation. Coordi- nate the Owner’s direct-vendors with the Contractor. Verify receipt of all materials and work completed. x Claims Prevention & Resolution: Establish a claims prevention and resolution procedure for the resolution of disputes on a continuing ba- sis. As part of this process, instill a partnering approach by the project team for the review of bid documents for completeness; prequalifica- tion of bidders; review of required bonds and insurance; and timely is- Exceeding suance, response, discussion and reporting of any unresolved disputes Expectations! with recommendations for actions to be taken.
  • 19. Scope of Services When a claim is submitted, Bertino & Associates will thoroughly investi- SCOPE OF gate the merits of the claim, solicit input from the appropriate Consult- ants or other parties, and report to the Owner with appropriate action to SERVICES be taken. When authorized by the Owner, conduct settlement negotia- tions and final resolution. If a claim cannot be settled, the Owner will initiate the claims resolution procedures of the contract with Bertino & Associates' full cooperation and support of such claims resolution ac- tions. x Start-Up & Testing: In conjunction with the Contractor and the Owner’s facility operations and maintenance staff, Bertino & Associates will schedule, monitor and report on all start-up and testing of equipment and systems. Where independent testing is required, schedule, monitor and report such testing as performed by testing agencies and consult- ants. x Punch list & Close-Out Documentation: When the project or a portion of the project has been substantially completed, schedule punch list visits by the Design Consultants. Upon receipt of punch list, establish a procedure and schedule for completion by the contractor. Monitor and verify completion of each punch list item. As part of the closeout documentation process, schedule all operation and maintenance training sessions, and coordinate the receipt of all as- built drawings, operations manuals, shop drawing files, warranties and final releases of liens and invoices. Assist the Owner operations/maintenance staff in establishing a library of all maintenance documentation. Where appropriate, assist the Owner in the solicitation and negotiation of outside maintenance contracts. • Reporting: Provide the Owner a monthly progress report incorporating all aspects of the Construction Phase. At the completion of the project, Bertino & Associates will turn over all files and construction documents for the Owner’s archives Exceeding Expectations!