OUR CUSTOM PROCESS TO FIT YOUR PROJECT
Why Hire CRG as your
Construction Manager?
There is an emerging trend these days to hire construction managers for rendering certain
services on a contract basis.
Generally these tasks include:
 Project feasibility study, including cost estimates.
 Site survey and soil investigations.
 Estimating the initial budget and plan.
 Scrutiny and coordination of design and drawing work.
 Designing project organization for executing work and developing standard operating
procedures and systems.
 Developing detailed construction plans, project schedules and performance measuring
standards.
 Supervising work, including administration of contract and controlling of project time, cost
and quality objectives.
Advantages of CRG as your CM
 CRG promotes communication and understanding for everyone involved the
project.
 Helps bring projects in on schedule, within budget, environmentally compliant
and at appropriate quality.
 Anticipate, avoid and resolve potential problems.
 Develops and reconciles the scope of work to the budget.
 Manages overall budget and schedule conformance.
 Manages procurement and quality control for multiple projects.
 Manages participation program.
 Coordinates technology program.
Where CRG Adds
Value
Upfront Planning
Financial/Funding Strategies
Community Outreach
Program Controls
Design (Preconstruction)
Procurement and Delivery
Construction
Project Closeout
O&M
Benefits of CRG
as your CM  Scope-to-budget verification and why it is
important?
 Assisting in site selection.
 Developing phasing plans for working in occupied
space.
Upfront
Planning
Benefits of CRG
as your CM  Budget validation – what’s missing?
 Cost modeling of total project hard and
soft costs.
 Financial analysis/scenario development.
 Assistance with State Funding Applications
or Matching Grants.
Financial
And Funding
Strategies
Benefits of CRG
as your CM
 Assistance in consensus building.
 Manage communications plan:
 Project web site
 Town Hall meetings
 Regular updates to principals, staff and
business and community leadership
 Development of local and minority
businesses.
 Good Communication Builds Trust –
Public Trust Helps Win the Next Campaign
Community
Outreach
Benefits of CRG
as your CM
 Using project control systems for more than
cost and document tracking.
 Web-based capabilities for broad-based
progress and status communications.
Program
Controls
Benefits of CRG
as your CM
 Design Reviews/Quality Assurance.
 Constructability/ Phasing.
 Design to Budget.
 Stakeholder Alignment.
 Better design documents = fewer
construction issues = lower project costs
Design
Preconstruction
Benefits of CRG
as your CM  Labor agreements and Labor relations.
 Permitting and Plan check support.
 Bundling and bulk purchasing.
 Outreach to develop market interest.
Procurement
and Delivery
Benefits of CRG
as your CM
 Safety & Risk Management
 Child Safety Programs
 CIP
 Education/Training
 Pro-active Management
 Alternative delivery methods
for specific projects
 Design/Build
 At-Risk or Turnkey Delivery
 Job Order Contracting (JOCs)
 Pro-Active Site Management
 Project “first” with respect to issue resolution
 Maintain clear communications between all
stakeholders
Construction
Benefits of CRG
as your CM
 Enhancing Project Closeout
 Start planning closeout strategy before
design starts
 Requiring a detailed schedule of closeout
tasks
 Breakout detailed schedule for each
closeout activity
 Maintain a dynamic, cost-loaded
Incomplete Work List from start of
construction
Project
Closeout
Benefits of CRG
as your CM
 Assistance with placement of staff
 Providing interim staff
 Training for O&M personnel
 Extended OEM warranties
and service agreements
Commissioning
Project
Hierarchy
Stages of
your Project
5 Stages of
your
projects life
cycle
Project
Conception
and Initiation
1
Project
Definition/Plan
ning
2
Project
Launch/Execu
tion
3
Project
Performance/
Control
4
Project Close
5
When working with CRG we commence your project
management with 5 Key steps.
Project Conception and Initiation
 The first step in a construction project’s life cycle is deciding whether or not a
project is feasible and if it can realistically be completed. This means doing
your meticulous research to determine if a project is worth pursuing.
 Two ways that managers can evaluate and determine this is through a
feasibility study and/or business case document.
 A feasibility study looks at the goals, costs, and timeline of a project to
determine if the project manager thinks they have enough resources to pursue
the project.
 A business case document defines the reasoning for starting a new project
and what the financial benefits will be. If after further research and discussion
a project is found to pass these evaluation tests, the project will move on to
create a project charter or Project Initiation Document (PID).
Project Definition/Planning
 Once a project is approved and given the thumbs-up, a plan or Scope of
work needs to be outlined and put into writing.
 Having a Scope helps ensure that everyone on the team is on the same
page and understands the steps that need to be taken to complete the
project.
 During this step in the construction project’s life cycle, the cost, scope,
duration, quality, communication, risks and resources are summarized.
 Hitting on each of these areas gives your team a well-rounded idea of
what will go into a project.
 This phase is imperative in preparing and executing a successful project.
Project Launch/Execution
 The next step in a construction project’s life cycle is the actual execution
based on your comprehensive plan developed in the previous step.
 This stage is where deliverables are developed to satisfy the customer.
 An initial meeting is usually held to mark the beginning of a project and to
communicate responsibilities to teams.
 Team members are assigned specific tasks that they are expected to
complete, and resources are allocated accordingly.
 Some of the specific tasks during this phase include: assigning teams,
executing project management plans, conducting status meetings,
updating project schedule, and modifying project plans.
Project Performance/Control
 This stage of the project cycle is all about monitoring.
 Project performance and control goes hand in hand with the previous step because
they occur simultaneously.
 During this phase, project managers track a project’s progress, often having to
adjust to keep a project on track.
 Specific key performance (or project) indicators(KPI’s) for cost, time and quality are
selected and utilized to determine degrees of variation from the original project
goal.
 Some examples of specific KPI’s include project schedule, estimate to project
completion, effort and cost tracking, and project performance.
 Calculating these KPI’s keeps projects on track to prevent any project failures.
Project Close
 After a project is officially completed, we move into the final stage of the
construction project’s life cycle.
 This last step is vitally important because it allows team members to evaluate,
document and learn from the project. Project Close helps members determine
what issues they had so that they can make improvements in the future.
 A final team meeting is usually held and led by a project manager to officially
mark the ending of the project.
 Valuable team members are rewarded and recognized, contractors are
terminated, and project successes and failures are identified.
 Also, project managers must create a final project budget and final budget
report to close out the project.
Project Success
Our Project Managers go through a lot to create and deliver a highly
successful end-product, by understanding the five stages that ensure the
process is easier and more efficient.
Who we are and what we do:
Project Team Roles and Responsibilities
Chris Gorga
COO
Elizabeth Anderson
Assistant Project
Manager
Jaime Murgueytio
Administrative
Assistant
Christian Pussilano
Regulatory
Support
Martin Eller
Controller
John Rizzi
Project Manager
Our Major Accomplishments
 Awarded Owners Representative contract on a $28M privately funded project. Competed project under budget, saving
client $1.5M.
 Captured over 60mw of Construction Management contracts to engineer, procure and construct multiple ground mount
solar projects over 10 locations. All projects have been completed project successfully, saving client millions.
 Delivered critical four month project 30 days faster than expected. A $10M distressed situation utility scale was purchased.
Overcame roadblocks and completed project successfully in record time, saving $1.5M.
 Awarded $3.5M in contracts that had 20% gross profit margins. Nurtured relationship with national developer and was
awarded contracts to build six projects for world’s largest REIT.
 Developed 110 unit multifamily complex. Construction Management contract with complete autonomy on design build
procedures. Completed project on time and 10% below budget.
 Completed Full renovations on over 150 properties ranging from ground up new construction, renovations and fit outs on
Residential Single Family, Multifamily, Commercial and Industrial Properties.
 Completed $4.5M restoration project early and 15% under budget. Renovated historic building back to original oak
beams and natural brickwork. Completed project four months early.
 Selected as Project Oversight for $35M ground up project. With complete facility access, controlled project, union and
trades professionals, completing project as specified in the scope document.
 Member of Construction Management Association of America
Construction Management
Association of America
 Being a member of CMAA comes with BIG responsibility.
 Must demonstrate the mastery of the Construction Management
Association’s (CMAA) Standards of Practice and the Construction Industry
Institute’s (CII) Best Practices Guide.
 Display proven leadership and competency through responsible-in-
charge experience.
 Must keep skills and knowledge fresh through recertification.
 Deliver the benefits of industry-standard services on every job.
 Provide owners with an objective assurance of knowledge skill and
abilities.
Committed to Your Future
 Having a Certified Construction Manager lead your project increases the
chances for:
 Reduced Risk
 Increased Sustainability
 Keep on Schedule
 Stay on Budget
 Additional Resources
For More Information:
Chris Gorga
Founder
Chrisg@crgdevco.com
5 Sicomac Rd
North Haledon, NJ 07508
973-870-0003
www.crgdevco.com
info@crgdevco.com

More Related Content

What's hot

Project Management Summary 2012
Project Management Summary 2012Project Management Summary 2012
Project Management Summary 2012CPA Australia
 
Sas Presentation
Sas PresentationSas Presentation
Sas Presentationpats384888
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project ManagementAfolabi Adesola
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management FundamentalsNishant Munjal
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1Ho Yen Liang
 
5 Basic Phases of Project Management
5 Basic Phases of Project Management 5 Basic Phases of Project Management
5 Basic Phases of Project Management Project Insight
 
Project Management Plan
Project Management PlanProject Management Plan
Project Management PlanDaniele Pinto
 
Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12Dreams Design
 
Effective project management skills
Effective project management skillsEffective project management skills
Effective project management skillsCharles Cotter, PhD
 
Infrastructure Project Manager
Infrastructure Project ManagerInfrastructure Project Manager
Infrastructure Project Managergaryclough
 
Project Execution and PM Elements
Project Execution and PM ElementsProject Execution and PM Elements
Project Execution and PM Elementsharoldtaylor1113
 
Project management roles in context - PRINCE2 introduction
Project management roles in context - PRINCE2 introductionProject management roles in context - PRINCE2 introduction
Project management roles in context - PRINCE2 introductionNorthumbria University
 
Multi-Project Management Plan_Alphabet
Multi-Project Management Plan_AlphabetMulti-Project Management Plan_Alphabet
Multi-Project Management Plan_AlphabetHungyu Lai
 
Practical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPractical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPM Solutions
 

What's hot (20)

PM 01 - Introduction to Project Management
PM 01 - Introduction to Project ManagementPM 01 - Introduction to Project Management
PM 01 - Introduction to Project Management
 
Project Management Summary 2012
Project Management Summary 2012Project Management Summary 2012
Project Management Summary 2012
 
Sas Presentation
Sas PresentationSas Presentation
Sas Presentation
 
Project management
Project managementProject management
Project management
 
GAFM Academy Module 1 Project Quality Management
GAFM Academy Module 1  Project Quality ManagementGAFM Academy Module 1  Project Quality Management
GAFM Academy Module 1 Project Quality Management
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
Project management
Project managementProject management
Project management
 
5 Basic Phases of Project Management
5 Basic Phases of Project Management 5 Basic Phases of Project Management
5 Basic Phases of Project Management
 
Project Management Plan
Project Management PlanProject Management Plan
Project Management Plan
 
Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12
 
Effective project management skills
Effective project management skillsEffective project management skills
Effective project management skills
 
Infrastructure Project Manager
Infrastructure Project ManagerInfrastructure Project Manager
Infrastructure Project Manager
 
Overview of project management in engineering environment
Overview of project management in engineering environmentOverview of project management in engineering environment
Overview of project management in engineering environment
 
Project Execution and PM Elements
Project Execution and PM ElementsProject Execution and PM Elements
Project Execution and PM Elements
 
Project management roles in context - PRINCE2 introduction
Project management roles in context - PRINCE2 introductionProject management roles in context - PRINCE2 introduction
Project management roles in context - PRINCE2 introduction
 
Multi-Project Management Plan_Alphabet
Multi-Project Management Plan_AlphabetMulti-Project Management Plan_Alphabet
Multi-Project Management Plan_Alphabet
 
Practical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPractical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar Slides
 

Similar to CRG DevCo's Construction Management Benefits

CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementChris Gorga
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?maria_singh
 
ASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICEASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICEMichele Thomas
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdfJamieDornan2
 
Project Management
Project ManagementProject Management
Project ManagementPrarthan P
 
Understand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases IntroductionUnderstand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases IntroductionDivya Malik
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overviewcford1973
 
Presentation of project management (907, scm. mir mohammed shorab hossein)
Presentation of project management (907, scm. mir mohammed shorab hossein)Presentation of project management (907, scm. mir mohammed shorab hossein)
Presentation of project management (907, scm. mir mohammed shorab hossein)ferozpatowary
 
Project Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lkProject Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lkUdara Sandaruwan
 
Presentation of project management (905, scm. rajib ahashan rashel)
Presentation of project management (905, scm. rajib ahashan rashel)Presentation of project management (905, scm. rajib ahashan rashel)
Presentation of project management (905, scm. rajib ahashan rashel)ferozpatowary
 
Project Planning & Management
Project Planning & Management Project Planning & Management
Project Planning & Management Kashif-khan
 
CPMGT_300 Week_5__Project Life Cycle Paper.docx
CPMGT_300 Week_5__Project Life Cycle Paper.docxCPMGT_300 Week_5__Project Life Cycle Paper.docx
CPMGT_300 Week_5__Project Life Cycle Paper.docxRebeccaEdwards88
 
140704 project planning presentation
140704 project planning presentation140704 project planning presentation
140704 project planning presentationMadhusudan Kashyap
 
Project management
Project managementProject management
Project managementPooja Rani
 
components of project.pdf
components of project.pdfcomponents of project.pdf
components of project.pdfSanjeepKhadka1
 

Similar to CRG DevCo's Construction Management Benefits (20)

CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project Management
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
 
ASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICEASSIGNMENT-1 PROFESSIONAL PRACTICE
ASSIGNMENT-1 PROFESSIONAL PRACTICE
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdf
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
Understand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases IntroductionUnderstand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases Introduction
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
Presentation of project management (907, scm. mir mohammed shorab hossein)
Presentation of project management (907, scm. mir mohammed shorab hossein)Presentation of project management (907, scm. mir mohammed shorab hossein)
Presentation of project management (907, scm. mir mohammed shorab hossein)
 
Project Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lkProject Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lk
 
Presentation of project management (905, scm. rajib ahashan rashel)
Presentation of project management (905, scm. rajib ahashan rashel)Presentation of project management (905, scm. rajib ahashan rashel)
Presentation of project management (905, scm. rajib ahashan rashel)
 
Project Planning & Management
Project Planning & Management Project Planning & Management
Project Planning & Management
 
Project Mangement
Project MangementProject Mangement
Project Mangement
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
CPMGT_300 Week_5__Project Life Cycle Paper.docx
CPMGT_300 Week_5__Project Life Cycle Paper.docxCPMGT_300 Week_5__Project Life Cycle Paper.docx
CPMGT_300 Week_5__Project Life Cycle Paper.docx
 
140704 project planning presentation
140704 project planning presentation140704 project planning presentation
140704 project planning presentation
 
Project management
Project managementProject management
Project management
 
components of project.pdf
components of project.pdfcomponents of project.pdf
components of project.pdf
 

Recently uploaded

VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girladitipandeya
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...First NO1 World Amil baba in Faisalabad
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...aditipandeya
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 

Recently uploaded (20)

VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls ServicesPreet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
 

CRG DevCo's Construction Management Benefits

  • 2. Why Hire CRG as your Construction Manager? There is an emerging trend these days to hire construction managers for rendering certain services on a contract basis. Generally these tasks include:  Project feasibility study, including cost estimates.  Site survey and soil investigations.  Estimating the initial budget and plan.  Scrutiny and coordination of design and drawing work.  Designing project organization for executing work and developing standard operating procedures and systems.  Developing detailed construction plans, project schedules and performance measuring standards.  Supervising work, including administration of contract and controlling of project time, cost and quality objectives.
  • 3. Advantages of CRG as your CM  CRG promotes communication and understanding for everyone involved the project.  Helps bring projects in on schedule, within budget, environmentally compliant and at appropriate quality.  Anticipate, avoid and resolve potential problems.  Develops and reconciles the scope of work to the budget.  Manages overall budget and schedule conformance.  Manages procurement and quality control for multiple projects.  Manages participation program.  Coordinates technology program.
  • 4. Where CRG Adds Value Upfront Planning Financial/Funding Strategies Community Outreach Program Controls Design (Preconstruction) Procurement and Delivery Construction Project Closeout O&M
  • 5. Benefits of CRG as your CM  Scope-to-budget verification and why it is important?  Assisting in site selection.  Developing phasing plans for working in occupied space. Upfront Planning
  • 6. Benefits of CRG as your CM  Budget validation – what’s missing?  Cost modeling of total project hard and soft costs.  Financial analysis/scenario development.  Assistance with State Funding Applications or Matching Grants. Financial And Funding Strategies
  • 7. Benefits of CRG as your CM  Assistance in consensus building.  Manage communications plan:  Project web site  Town Hall meetings  Regular updates to principals, staff and business and community leadership  Development of local and minority businesses.  Good Communication Builds Trust – Public Trust Helps Win the Next Campaign Community Outreach
  • 8. Benefits of CRG as your CM  Using project control systems for more than cost and document tracking.  Web-based capabilities for broad-based progress and status communications. Program Controls
  • 9. Benefits of CRG as your CM  Design Reviews/Quality Assurance.  Constructability/ Phasing.  Design to Budget.  Stakeholder Alignment.  Better design documents = fewer construction issues = lower project costs Design Preconstruction
  • 10. Benefits of CRG as your CM  Labor agreements and Labor relations.  Permitting and Plan check support.  Bundling and bulk purchasing.  Outreach to develop market interest. Procurement and Delivery
  • 11. Benefits of CRG as your CM  Safety & Risk Management  Child Safety Programs  CIP  Education/Training  Pro-active Management  Alternative delivery methods for specific projects  Design/Build  At-Risk or Turnkey Delivery  Job Order Contracting (JOCs)  Pro-Active Site Management  Project “first” with respect to issue resolution  Maintain clear communications between all stakeholders Construction
  • 12. Benefits of CRG as your CM  Enhancing Project Closeout  Start planning closeout strategy before design starts  Requiring a detailed schedule of closeout tasks  Breakout detailed schedule for each closeout activity  Maintain a dynamic, cost-loaded Incomplete Work List from start of construction Project Closeout
  • 13. Benefits of CRG as your CM  Assistance with placement of staff  Providing interim staff  Training for O&M personnel  Extended OEM warranties and service agreements Commissioning
  • 15. Stages of your Project 5 Stages of your projects life cycle Project Conception and Initiation 1 Project Definition/Plan ning 2 Project Launch/Execu tion 3 Project Performance/ Control 4 Project Close 5 When working with CRG we commence your project management with 5 Key steps.
  • 16. Project Conception and Initiation  The first step in a construction project’s life cycle is deciding whether or not a project is feasible and if it can realistically be completed. This means doing your meticulous research to determine if a project is worth pursuing.  Two ways that managers can evaluate and determine this is through a feasibility study and/or business case document.  A feasibility study looks at the goals, costs, and timeline of a project to determine if the project manager thinks they have enough resources to pursue the project.  A business case document defines the reasoning for starting a new project and what the financial benefits will be. If after further research and discussion a project is found to pass these evaluation tests, the project will move on to create a project charter or Project Initiation Document (PID).
  • 17. Project Definition/Planning  Once a project is approved and given the thumbs-up, a plan or Scope of work needs to be outlined and put into writing.  Having a Scope helps ensure that everyone on the team is on the same page and understands the steps that need to be taken to complete the project.  During this step in the construction project’s life cycle, the cost, scope, duration, quality, communication, risks and resources are summarized.  Hitting on each of these areas gives your team a well-rounded idea of what will go into a project.  This phase is imperative in preparing and executing a successful project.
  • 18. Project Launch/Execution  The next step in a construction project’s life cycle is the actual execution based on your comprehensive plan developed in the previous step.  This stage is where deliverables are developed to satisfy the customer.  An initial meeting is usually held to mark the beginning of a project and to communicate responsibilities to teams.  Team members are assigned specific tasks that they are expected to complete, and resources are allocated accordingly.  Some of the specific tasks during this phase include: assigning teams, executing project management plans, conducting status meetings, updating project schedule, and modifying project plans.
  • 19. Project Performance/Control  This stage of the project cycle is all about monitoring.  Project performance and control goes hand in hand with the previous step because they occur simultaneously.  During this phase, project managers track a project’s progress, often having to adjust to keep a project on track.  Specific key performance (or project) indicators(KPI’s) for cost, time and quality are selected and utilized to determine degrees of variation from the original project goal.  Some examples of specific KPI’s include project schedule, estimate to project completion, effort and cost tracking, and project performance.  Calculating these KPI’s keeps projects on track to prevent any project failures.
  • 20. Project Close  After a project is officially completed, we move into the final stage of the construction project’s life cycle.  This last step is vitally important because it allows team members to evaluate, document and learn from the project. Project Close helps members determine what issues they had so that they can make improvements in the future.  A final team meeting is usually held and led by a project manager to officially mark the ending of the project.  Valuable team members are rewarded and recognized, contractors are terminated, and project successes and failures are identified.  Also, project managers must create a final project budget and final budget report to close out the project.
  • 21. Project Success Our Project Managers go through a lot to create and deliver a highly successful end-product, by understanding the five stages that ensure the process is easier and more efficient.
  • 22. Who we are and what we do: Project Team Roles and Responsibilities Chris Gorga COO Elizabeth Anderson Assistant Project Manager Jaime Murgueytio Administrative Assistant Christian Pussilano Regulatory Support Martin Eller Controller John Rizzi Project Manager
  • 23. Our Major Accomplishments  Awarded Owners Representative contract on a $28M privately funded project. Competed project under budget, saving client $1.5M.  Captured over 60mw of Construction Management contracts to engineer, procure and construct multiple ground mount solar projects over 10 locations. All projects have been completed project successfully, saving client millions.  Delivered critical four month project 30 days faster than expected. A $10M distressed situation utility scale was purchased. Overcame roadblocks and completed project successfully in record time, saving $1.5M.  Awarded $3.5M in contracts that had 20% gross profit margins. Nurtured relationship with national developer and was awarded contracts to build six projects for world’s largest REIT.  Developed 110 unit multifamily complex. Construction Management contract with complete autonomy on design build procedures. Completed project on time and 10% below budget.  Completed Full renovations on over 150 properties ranging from ground up new construction, renovations and fit outs on Residential Single Family, Multifamily, Commercial and Industrial Properties.  Completed $4.5M restoration project early and 15% under budget. Renovated historic building back to original oak beams and natural brickwork. Completed project four months early.  Selected as Project Oversight for $35M ground up project. With complete facility access, controlled project, union and trades professionals, completing project as specified in the scope document.  Member of Construction Management Association of America
  • 24. Construction Management Association of America  Being a member of CMAA comes with BIG responsibility.  Must demonstrate the mastery of the Construction Management Association’s (CMAA) Standards of Practice and the Construction Industry Institute’s (CII) Best Practices Guide.  Display proven leadership and competency through responsible-in- charge experience.  Must keep skills and knowledge fresh through recertification.  Deliver the benefits of industry-standard services on every job.  Provide owners with an objective assurance of knowledge skill and abilities.
  • 25. Committed to Your Future  Having a Certified Construction Manager lead your project increases the chances for:  Reduced Risk  Increased Sustainability  Keep on Schedule  Stay on Budget  Additional Resources
  • 26. For More Information: Chris Gorga Founder Chrisg@crgdevco.com 5 Sicomac Rd North Haledon, NJ 07508 973-870-0003 www.crgdevco.com info@crgdevco.com